




全文預(yù)覽已結(jié)束
下載本文檔
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)
文檔簡介
Highway engineering change reasonanalysis and cost of the project of influenceabstract : in The implementation stage because of highway engineering design factors,environmental factors,The influence of variousKeywords : engineering change,reason,costDue to the highway project period,long,line,So broad in construction of various causes by the engineering change is inevitableengineering change could lead to increase of construction cost or Time limit of the owner and the contractor,between the claim will claim and theowner of change and the causes of the costand when the owner change engineering bidding of construction conditions of commitment .santongyiping referred to in The preceding paragraph,The engineering tight finish,delay purpose will increase The contracters sees can increase content of missing the contract cost,and the owners requirements,And shortcen delivery of finished ahead of the original connectons And the owner of the contract with the materials or equipment supply for the category And quantity,cause cost increase or decrease,And the oothe design of change and the causes of the costThe design adopts the new standard,new technology,new technology,to replace the original design of the project,And put to use more)和the requirements of the project,The main structure change shape And size change etc,make the cost increase,And design personneltthe contractor to change and cause the influence . costThe contractor is unable to perform The contract Or cant completed ly,The contractor shall take remedial measures proposed change,This kis and puts forward such reasons,And more economical and reasonable,optimizing design scheme,this kind of change if owner recognized this kind of other changes generally does not make owner cost increase,but will make The contractor under loss,Due to the contractor technologythe supervisor of change and the causes of the costSupervision by the owner,Commissioned by the cause of the change of the owner or expenses directly influence the cost . 1 and supervision engineencethe site supervision engineers in actual situation in the contract and the technical specific a Tion for the design,according to local modificationand supervision engineers work and coordination ability damage caused by lack of rework,Engineering cost change w
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 江蘇揚(yáng)州歷年中考作文題與審題指導(dǎo)(2006-2023)
- 保時捷應(yīng)聘測試題及答案
- 2024年紡織品檢驗(yàn)員學(xué)習(xí)方法試題及答案
- 張衡傳教學(xué)課件
- 服裝與實(shí)際穿著體驗(yàn)的結(jié)合試題及答案
- 病原檢測面試題目及答案
- 安全測試面試題目及答案
- 商業(yè)美術(shù)設(shè)計(jì)師市場推廣試題及答案
- 2024年紡織品檢驗(yàn)員考試亮點(diǎn)試題及答案
- 提升考試水平的國際商業(yè)美術(shù)設(shè)計(jì)師試題及答案
- 2024至2030年中國高密度聚乙烯樹脂行業(yè)投資前景及策略咨詢研究報告
- 仿制藥與原研藥競爭分析
- 腦洞大開背后的創(chuàng)新思維學(xué)習(xí)通超星期末考試答案章節(jié)答案2024年
- 科傻平差軟件說明指導(dǎo)書
- 臨時聘用司機(jī)合同范本
- ipo上市商業(yè)計(jì)劃書
- 抖音短陪跑合同范本
- HJ 636-2012 水質(zhì) 總氮的測定 堿性過硫酸鉀消解紫外分光光度法
- 山東省青島市市北區(qū)2023-2024學(xué)年七年級下學(xué)期英語期末考試試題
- 現(xiàn)代風(fēng)險導(dǎo)向?qū)徲?jì)在天衡會計(jì)師事務(wù)所的應(yīng)用研究
- 拔牙技巧必成高手
評論
0/150
提交評論