邱志武,外文翻譯Word 文檔.doc_第1頁
邱志武,外文翻譯Word 文檔.doc_第2頁
邱志武,外文翻譯Word 文檔.doc_第3頁
邱志武,外文翻譯Word 文檔.doc_第4頁
邱志武,外文翻譯Word 文檔.doc_第5頁
已閱讀5頁,還剩4頁未讀 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

科學(xué)技術(shù)學(xué)院專業(yè)外文資料翻譯題 目:Steel structure design of high-rise building has become the main selection 鋼結(jié)構(gòu)成為高層建筑的主要選擇學(xué) 科 部: 理工學(xué)科部專 業(yè): 土木工程班 級(jí): 土木081學(xué) 號(hào): 7011508018學(xué)生姓名: 邱志武指導(dǎo)教師: 李建海Steel structure design of high-rise building has become the main selection Steel structure used in high-rise building dozens of years of history. First the steel structures build high-rise building is the United States, after post-war economic recovery, high-rise steel structure engineering construction rise again, along with the steelmaking technology and molding manufacture process of development, the application of the steel structure project to bring new energy, engineering construction increasingly, the corresponding and promoted the steel structure design and construction technology advances product perfect, especially since 1960, high-rise steel structure engineering rapid development, the steel structure has become a high building design selection of the main object. With Chinas national economic development and population urbanization housing construction in our country for unprecedented development, peoples living conditions gradually improved and the requirements of the quality of the live more and more is also high. China has become the first country produces steel structure housing suitable for mass production factory, industrialization and commercialization degree is high, can design, production, construction, installation integration, improve the level of housing industrialization. Due to these advantages, steel structures in the housing market will have good development prospect. Through the flowers district 1 # floor high-rise residential steel structure system and application of the better improve steel structure housing industry system in the application of technology, promote domestic steel structures in the real estate industry, the steel structure for the development of the system to make the contribution 2, engineering survey Flowers of # 1 in jinan area located high and new technology industrial development construction corporation in the district of the construction of the flowers, building area of 33000 square meters, underground, the ground and layer (including underground garage, for every 1 to 3 layer for public, 4 layer above for residential building). Bearing framework for box section column and H beam and column of the production workshop Q345B masteel steel processing production. Inside, outside wall using in nanjing ALC lightweight autoclaved aerated concrete board), exterior wall directly in the BanShua ALC coatings. Part of the building outside the window frameless window; Housing outside the window the 60 PVC window of model steel window, hollow glass. Floor for cast-in-situ concrete construction site, roof use PVC felt waterproofing fat foam insulation roofing gather b. Residence in water and electricity are walk wiring, and beam crossing walk beam webs pre-setting hole. Water, electric household metering, broadband door. In heating the import of American original JinMaKe electric heaters. Indoor fine decoration, the space is big, the effect is good, fully embodies the advantages of the steel structure of the structure. 3, main construction method 3.1 steel structure processing production box column USES the steel plate, in steel components processing workshops processing, steel structure component the removal of rust, welding completed. 3.1.1 box production technology column 1) steel plate joining together Since each DuanZhu in 12 meters high, in order to ensure the material plate after the straightness, the first of two steel plate joining together. Steel mouth open slope at both ends. 2) crossed the material Press the row materials figure crossed, crossed a 3 mm width allowance, 50 mm length direction leave allowance. No middle clapboard crossed headroom. Along the length direction crossed every 5 m drilling 8 mm holes. With two sets of semi-automatic cutting machine (or double) along the center and cutting crossed, every 5 meters leave 100 mm not cutting, wait for after cooling cut again. 3) assembly welding Use h-beam as temporary assembly platform, before the assembly with level will platform make level and will H mat real fixed. In the two webs struck the assembly line, assembly welding liner. Positioning welding. In the liner inside every 300 mm weld 10-20 mm weld. Will a webs and partition of group, positioning welding. Two group to cover. Positioning welding. Assembly webs, positioning welding. With three pillars of the size of the box with side by side, and two spot welding. With both sides for the automatic welding machine in orbit. Welding: with two sets of submerged arc welding the direction welding two welds. Weld ends and 100 mm arc starting board and extinguish arc welding. After welding layer will case after emancipation, welding the other side two welds. Welding methods are the same as above. After the completion of the rolling again for welding welding process the other side two welds. The welding, will lead out the arc from mother material 5 board in mm is cut off, and the maintenance of the grinding wheel grinding smooth, must not use hammer shot down; And after the grinding of the cut surface for inspection. Weld nondestructive testing, the use of ultrasonic flaw detection. Testing for each welding line length of 20%, according to the provisions of the JB11345 not less than level. 3.1.1&3.1.2, beam and connection board processing and compound 1) the material The steel material cutting steel, steel plate with semi-automatic cutting machine of material, after the material should be clear slag the grinding, Numbers classification is placed; 2) drilling In the first component with needle and a ruler delimit the center of hole diameter, in around the hole (90 position) play four punching, bored after check; 3) high strength bolt the friction surface treatment Sandblasting processing high strength bolts of friction surface roughness: gush arenaceous pressure about 6 Kg/c , quartz sand particle size 1.5 4 mm, the processed surface display steel gray; With an electric grinder grinding plate surface, grinding wheel grinding direction and the vertical stress direction, burnish range should be not less than 4 times bolt diameter, grinding should not be in the steel surface grinding out the obvious pits; 3.2 steel structure installation 3.2.1 box column installation: box column in the real construction process according to the material purchasing, processing, transportation, lifting, connection (reinforcement) process completed. All steel structure products, in the brush paint rust before, must will component surface of burr, rust, oil and clean attachments. To St2 manual derusting, mechanical derusting to Sa2. This project four layers below the skirt building pillar for 48 root, the main building pillar for 37 root. Single pillar shortest 4.5 meters, the longest 12.5 meters. Section shape for the box. The biggest single pillar design weight of 3.5 tons, minimum design weight 1.88 tons. Shear wall frame column for 150 * 150 H section. Lifting the order by the center around to expand the principle, to ensure the installation process of framework symmetry and stability. The hoisting installation pillar QTZ-80 cranes, use the tops of the ear plate as temporary design connection lifting lifting point for lifting. Pillar is used to connect the temporary connection plate and temporary bolt connection, to form stable unit after welding and adjustment framework UT detection. Installation of steel girder 3.2.2 installation points girders, and second beam and outside carry beam installation; Main material for Q345B H steel rolling. In pillar form girder by unit of construction crane bound, according to the engineering design characteristics of the hoisting number 2 4 root; Second beam and shear wall frame beams because of the space and the actual situation of the contacts, generally USES single lifting. The high strength bolts of the high strength bolts 3.2.3 installation is the building 1, introduction Steel structure used in high-rise building dozens of years of history. First the steel structures build high-rise building is the United States, after post-war economic recovery, high-rise steel structure engineering construction rise again, along with the steelmaking technology and molding manufacture process of development, the application of the steel structure project to bring new energy, engineering construction increasingly, the corresponding and promoted the steel structure design and construction technology advances product perfect, especially since 1960, high-rise steel structure engineering rapid development, the steel structure has become a high building design selection of the main object. With Chinas national economic development and population urbanization housing construction in our country for unprecedented development, peoples living conditions gradually improved and the requirements of the quality of the live more and more is also high. China has become the first country produces steel structure housing suitable for mass production factory, industrialization and commercialization degree is high, can design, production, construction, installation integration, improve the level of housing industrialization. Due to these advantages, steel structures in the housing market will have good development prospect. Through the flowers district 1 # floor high-rise residential steel structure system and application of the better improve steel structure housing industry system in the application of technology, promote domestic steel structures in the real estate industry, the steel structure for the development of the system to make the contribution. ; 3.3 the concrete construction The project is part of the concrete in the main core tube funnel wall and cast-in-situ concrete floor two parts. The transportation of concrete. Concrete vertical transportation mainly through concrete pump pumping. Floor formwork-supports schemes, according to the structure characteristics of the project, using the H beams flange support under small size h-beam, H steel in the laying of bamboo veneer, steel. Box column site concrete roof up by law, the use of the concrete pump pressure will be pressed into the next up by concrete box column. In the concrete roof up before, in conjunction with the designer roof up the entrance to the wall, the strength of the strict detailed analysis, ensure roof up pressure on the strength of the requirements, within the scope of the lower lateral wall installation at the same time in the column special pressure gauge, at any time observation of the concrete column pressure change. In addition, with concrete roof up gradation to strict requirement, ensure the concrete slump not less than 200 MM. 3.4 outside wall installation Outside the building in nanjing xu panels 175 MM thickness ALC board. The plank all adopt the factory, transportation to the scene the hoisting, lifting equipment for crane. Exterior wall panels including approximately 9780 pieces, including TU flat of more than 4600, TU art board is 5180 pieces. According to manufacturer provides atlas construction, expansion bolt from the inside wall of the floor in long angles and ALC plate on the special link rod connections, crack embedded with sewing mortar and sealed plastic seal. In bed in connection with Angle steel around another window. 3.5 installation inside wallboard All use in nanjing in wallboard C 125 thickness ALC board. Factory production, site installation. Construction process simple, from the weather and constraints. The installation of the wall inside the basic and external wall is similar. Toilet, kitchen and other parts of the special PVC sealed plastic panels. 4, the main technical achievements 1) box type concrete column A box of concrete column column is in the box with the column of high strength concrete (C50) level, in a box with internal pillars support partition, form two materials supplement each other work together, the mechanism of the solution under load strength have not yet reached the limit to take the lead in the distortion of the problem too. It has high bearing capacity, the seismic performance is good, the characteristics of the construction is simple, general every four layers (each section 12 meters long) for a production installation unit, the whole root steel tube column a hoisting in place, as the main body structure installation created flow operation conditions. Box column-concrete outsourcing fire prevention board, concrete-filled steel tube column refractory limit more than 3 hours, meet the high building fire prevention requirements. H beams of the processing, the stud welding, the use of reasonable process, decrease as far as possible from the residual stress due to welding, and the use of reasonable means error correction. High strength bolt, the make and model of the interface requirements of high strength bolts with grinding wheel to grinding, polishing direction and the component stress direction perpendicular installation in the steel wire brush to clean rust, and according to the rules of the sliding resistance coefficient of friction do test, the requirement of sliding coefficient is not less than 0.35. 2) H beams H steel beam all use rolling h-beam, its deformation ability, the seismic performance is good, high bearing capacity. H steel beam anti-corrosive paint is brushed outside, outsourcing fire prevention board, solve the steel structure of the anticorrosion, fire prevention problems. When construction steel beam have larger capacity, can greatly reduce the template workload. The beams are in the factory processing, transportation to the county hoisting, greatly reducing the workload, shorten the construction period. 3) resist lateral force support concrete tube structure The elevator, stair position forming reinforced concrete core tube, as shear wall resist lateral force support, improve the structure stability, optimized for resistance to the lateral stiffness, improve the aseismic performance which has played a positive role. 4) cast-in-place reinforced concrete floor By steel frame beams as a template next flange material supports, bamboo veneer spread, then press design laid reinforced, casting C30 concrete. Save template materials, shorten the construction period. 5) energy-saving composite wall outside Wallboard especially outside wall in a certain sense, it is even more important than structure system. Because the main functions of the residential buildings by the realization of the wall. The project by the composite panels is classed as a national housing construction recommend products, the nanjing xu built autoclaved aerated concrete light (ALC) board, this wallboard aerated concrete and reinforced by a combination of the keel. Wallboard workshop prefabrication production, installation, basic cancelled wet homework. Processing size is exact, construction rapid, simple, greatly shorten the construction period; Due to the light and have relatively intensity, it can be simplified engineering foundation; Excellent insulating performance can reduce thickness of the wall body, increase the use of building area. At the same time in the earthquake damaged greatly reduce the building, reduce the loss caused by disasters. Wallboard board seam anti-permeability, wallboard also meet the national fire protection of the requirements of the relevant standards. ALC board of the main properties: 1, light: weight for 0.5, for 1/5 of the concrete, one-third of the hollow bricks, reduce weight of building, reducing the economic investment, improve the construction quality. 2, stays: coefficient of thermal conductivity for: 0.11 W/m k. 3, bear the watery: refractory limit for up to four hours. 4, sound insulation sex: a sound insulation and sound absorption performance of double. 5, carrying capacity and seismic performance is superior. 6 and green environmental protection, no radioactive. ALC board construction convenient installation, plate material completely mechanization production, high precision, and can be according to the scene to cut it into any shape, construction technology is simple, low labor strength, solve the traditional block in the construction of a series of construction quality problem, construction period cocoa shorten a third, greatly improving the construction efficiency. 6) high-rise residential steel structure system energy-saving heating means; Energy saving residence in the big field can save energy and protect the environment; In the small way to save the cost of the life. According to the survey show that, with the people to the understanding of the energy saving residence, with more than seventy percent of the people are willing to buy energy-saving residential. So in this project, also the full consideration of the energy saving technology application: First of all, in the design well reduce the building wall, roof, form and other parts of the thermal conductivity. Low energy consumption by building palisade structure design, use new low energy consumption and shielding material. One to three layers of the skirt building exterior wall USES 200 thick aerated concrete block, four layers and above the 175 MM thick wall residential energy-saving wallboard. New roof waterproofing materials in the laying of expansion perlite, increase the roofing heat preservation effect. Outside the window except the skirt building office without installation the be born glass outside, other all use PVC series of window of model steel window, its physical properties to the type A, hollow glass lumen gas layer thickness not less than 12 MM. Hot

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論