版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
SteelStructureConstructionSchemeⅠ.AbriefaccountofsteelstructureworkTherewillbe68tbridgetravelingcranesinproductionhall,weldingH-sectionsteelcolumnandbeam,structuralmainmaterialisQ345B,coldbendingsheetsteelZ-purlin,wallandroofcladdingaredouble-skinpressedsteelsheetandthermalinsulationwool.Ⅱ.CharacteristicofsteelstructureworkThesinglespanoftheworkis18m,theheightofsteelcolumnislarge,singleframeplaneexternalrigidityisverysmall,sothekeypointofsafetytechnicalcontrolistoguaranteethestabilityoutsidethestructuralplane.Takeout6steelcolumnsfromgridline9~14intheproductionbuilding,insteadof52.5mⅢ.FabricationofsteelstructuralmembersTechnicalpreparationspriorfabrication1.Studyandcheckthedesignworkingdrawingbeforefabrication,makeshopdrawingandgetapprovalfromdesignerthenpreparematerialforfabrication.2.Makeaplanandprogramforfabricationasperthetype,quantityandmaterialofthestructuralmembers.3.Writeconstructiontechniquesandtechnicalmeasures,andtheequipmentregularexamineandmaintainplan,keepthemachineryingoodcondition.Materialrequirements:1.Selectandconfirmthematerialfortheproject.2.Allkindsofmaterialshouldbewithqualityguaranteeandex-factorycertificate.Ifthereisanydoubt,samplingexaminationshouldbetakenaccordingtorelevantnationalstandard,onlywhenpassedtheexaminationmaterialinbatchescanbeused.3.Rustdegreeofsteelsurfaceshouldconformtothepresentnationalstandard<rustandrustremovaldegreebeforepainting>.4.Jointingmaterial(weldingrod,solder,flux),highstrengthbolt,andcoating(undercoatandtopcoating)shouldbewithex-factoryqualitycertificateandconformtothedesignandnationalstandard.5.Iftheskinofweldingrodispeeledofforthecoreisrust,weldingfluxiswettingandagglomeratingormelting,thehighstrengthboltisrust/damagedortakenfromdifferentbatches,thesematerialsarestrictlyprohibited.6.Anti-corrosionpaintshouldconformtothedesignandrelevantstandard,andwithqualitycertificateandoperationinstruction.Equipmentandtoolpreparation1.Checkandmaintainthefabricatingequipmentinadvance.2.Thefabricatingtoolsandmeasuringinstrumentshouldbewithcertainaccuracy,andbeexaminedandmarkedbythemeasurementtestingdepartmentregularly.3.Weldershouldbearingthequalificationcertificate,anddotheworkwithinthescopestipulatedincertificate.Iftheweldingworkstoppedmorethan6months,theweldershouldbere-examinedandpassedtheexamination.KeypointsofsteelstructuralmemberfabricationweldingweldingadjustmentpartassemblyIntegralassemblyEndmillingweldingadjustmentEndmillingPuchingRust-removalAnnealingtrPainting&packingSemi-readyproductstoragebendingEdgemachiningPunchingandboringSecondmaterialutting割Ex-factoryloftingRawmaterialcalibrationCutting,punching,sawingsawingGascuttingSparepartsstraighteningassemblyweldingadjustmentⅣ.SteelstructureinstallationmethodPreparationspriortoinstallationAspertherequirementofsteelstructureinstallation,beforeinstallationworkstarted,itisneedtocheckandclearthesite,insuretheaccessforhoistingissmoothandfirm,andconstructionpowerisready,thefollowingworksarealsoneedtodosimultaneously:1.Surveythehorizontallevelandaxialdeviationoftheallgroupsofembeddedbolts,makerecordsforthehandingoverwiththecivilworkteaminwriting.2.Thesincethequantityofstructuralmembersislargeandhasagreatvariety,itmustbenumberedandconfirmedtoavoidmis-placed.3.Makenecessaryinspectionandacceptancejointlywiththeemployerandsupervisorbeforeinstallation.Transportationandstorageofstructuralmembers1.Transportstructuralmembersbyappropriatevehicleasperthegeometricdimensionandunitweight,makenecessarysoftmatandbindingduringtransportation.2.Whileloading/unloadingandmovingthestructuralmembers,itmustbehandledgently.Insertspacerwhilenecessarytoavoiddamagethepainting.3.Someonemustbeputinchargeoftransportationandstorage.Structurehostingandinstallationmethod1.ConsiderationaboutinstallationofsteelstructureThetypethestructureinthisprojectisastandardportal-framedstructurewithmovingcranebeam,externalrigidityofasingleframeissmall,thesequenceofmobilizationofstructureisstartfromgridline1,firstinstallsteelframeatgridline1~2,bracingtocolumnandroofinstalledandadjustedsimultaneouslytoformastablespacesystem,thenmovedtogridline29.SteelcolumntobehoistedandinstalledthroughSinge-Crane-Rotating-method,thesteelbeamtobehoistedthroughTwo-Crane-Lifting-methodafterassembledontheground.TrusstrimmertobeassembledwithboltsonthegroundandhoistedthroughTwo-Crane-Lifting-method.Spacebetweencranebeamandroofpurlinis3.5m,itisenoughforminimumhostingspace,andcanbedoneafterthestructureinstalledoralternatedin.2.HoistingandinstallationandadjustmentofsteelcolumnSteelcolumntobehoistedthroughRotatingMethod.Someonemustbeinchargeofhoistingandinstallation,safety,qualityandtechnologytobetalkedoverindetailsbeforehoisting.Fortheefficienthosting,whilepilingthecolumns,putthebindingpoint/columnfootingcenter/basecenteratasamearc.Whilethecolumnisbeinghoistedslowly20cmabovethefloor,stophoistingforawhiletochecktheslingandcrane,opentheswingbrake,thenputthecolumndownat40~100mmtotheinstallationplane,aligntothedatumline,directthecranedescend,insertthecolumntotheanchorboltandfixedtemporarily,tiethecolumnattwodirectiontostablethecolumnstructure.Afterinitialadjustmentofthecolumn,onlywhentheverticaldeviationcontrolledwithin20mmthencanremovethehookofcrane,checktheverticalitywiththeodlite,anydeviationtobeadjustedimmediately,whileadjustmentisbeingdone,observethebottomandlevelcontrolblocktoavoidhorizontalleveldeviation.Verticaladjustmentofthecolumn,fixtwotheodlitestothelongitudinalandtransverseaxis,firstaimatthecolumnbottomwingorcenterlinethenmoveupwardtothecolumntop,ifthecenterlinedriftedoffthelineofsight,toadjustthetieropeorsupport,makethecolumntobeverticalthroughprying.Usuallytoerectarowofcolumnsfirstthentodoadjustment.Atthattime,twotheodlitescanbeplacedatonesideoflongitudinalandtransverseaxis,deviationtothecenterlinenotmorethan3m.whilehoistingrooftrussorinstallingverticalmembers,thesteelcolumnmustbere-checkandadjusted.2.Hoistingandinstallationofsteelbeam3.Afterthesteelbeamturnedoverandpositioned,trialhoistmustbedonerepeatedlyandbondagain,whiletrialhoistisbeingcarriedoutitmustbeliftedslowly,thebeststateisthatuniformforceateachpointandthebeamwillnotdeformed,thentohoistandrotatetothedesignedposition,pullthecontrollingropebuckledonthebeaminadvancebyhandontheground,rotatingtotheposition,fixthecolumnandbeamconnectingholewithhighstrengthbolt.Sincethefirsthoistedbeamlengthis46m,5guyropesshouldbetied,whilefixingit,checktheverticalitywithpendant.Thesecondandtheafterbeamstobefixedtemporarilybytheroofpurlinandtiebeam..4.Re-checkthecolumnwhilehoistingthebeam,normallyusethechainblockandsteelwirerope,theropetoberemovedtillthebeaminstalled.Thesteelbeamridgelinemustbecontrolled.Makethedeviationbetweenthetrussandthecolumnendscenterlinebeequal,sothatalltherooftrusstobeatasamecenterline.TheconnectionofthehighdensityboltMaterial1.Thebolt,nutandwasherswillbeaccompaniedwiththequalitypasscertificateofwhichiscompliedwiththenationalstandardandthespecification.2.Thebolt,nutandwashersshouldbeinuniform.Thethreadshouldnotbeworn-out.Itshouldbeincleananddrystateandbekeptinthestorageaccordingtothespecification.Preparationtotheboltbeforeinstallation1.Checkeachpartoftheinstallationisinrightpositionandmakesurethattheinstallationiscomplywiththe“Regulationforcheckandacceptancetothequalityofsteelstructurework”codeno.GB50205-20012.Checkthemainmaterialwiththeholeiscorrectindiameterandthesize.Makesurethatthesmoothismetthespecifiedrequirement.Ifthereisthreadonthemainmaterial,weimmediatelyremoveit.3.Weshallfamiliarwiththeinstallationconstructiondrawingandprogramscheduleandmakefullpreparationtotheworkspannerandtheotherrelatedequipment.4.PreparationtothemeasuringtoolsTheworkmanship1.Theconnectiontothesteelplatemustbestraight,thesideandholeshouldcontainnothorntomakesurethesurfaceiscloselyattached.Ifthereisthebending,weshallmakenecessaryadjustmentandavoidthedamagetothefractionsurface.2.Beforefixing,weshallcleandirtyoilandpaintontheholeside.3.Beforeinstallation,weshallusetemporarybolttofixinposition,thenumberwillbemorethanonethirdofthetotalnumberfortheconnectedbolt.Themethodispreadjustthesteelholeandputthetemporaryboltinsideandthenusethenuttoscrewit.Therewillbetwotemporaryboltsineachpoint.Notallowedtousethehighdensitybolttobeservedasthetemporarybolt.Afteronesectioniscompleted,thentocheckitandconfirmedthentocarryouttheworkwiththehighdensitybolt.4.Whileinstallthehighdensitybolt,weshallmakesurethatthecentralpositionischeckandnomistakeandthenproceduretheworkofthehighdensitybolt(Thisprojectadoptthedoublenutscrewtight).Thewasherwillbeputononesideofthenutandbesurenotinoppositedirection.Iftheboltcannotbethroughtheholefreely,weshallusetheknifetoadjusttheholeandthenprocedurethework.Itshouldnotusetheforcetogothroughtheholesoastoavoidthedamagetothethread.Cleanthethornafteradjustingthehole.5.Thetightforhighdensitybolt:Thisworkwillbeintwostage,thefirststageiscalledpreliminarytight,thetightforceisabout50%-60%ofthedesignedpre-pullforce.Thesecondstageiscalledthefinaltight.Thetightforcewillreachthedesignedpullforce.Thedeviationwillbelessthan±10%.Thepre-pullforcewillbedeterminedaccordingtothedesignedspecification.Duringthework,thespannerforceformulawillbeTc=k*Pc*dk=0.11~0.15Pc(designedpre-pullforce)d=thediameterofthebolt.6.Checktheturnspacespannermarkrecordandtheboltconstructionrecord.Ifthereisanyquestioning,weshallcheckthepreliminarytightrecord.Qualitystandard1.Thehighdensitybolt’stype,specificationandthetechnicalconditionshouldbecomplywiththedesignedspecificationandtherelatedstandard.Wemustcarryoutthetesttodeterminetheturnspacecoefficientandrecheckboltpre-pullforceandcheckthequalitypasscertificateandthetestreport.2.Theconnectionsurfacefortheboltinfrictioncoefficientwillbecompliedwiththedesignedrequirementandtherelatedspecification.Onitssurface,thereshouldbenorust,thorn,weldingremaining,dirtyoilandpaint,etc.3.Thehighdensityboltmustbetightintwostage,thequalityofthepreliminaryandfinaltightshouldbecompliedwiththeconstructionregulationandtherelatedspecification.4.Thehighdensityboltwillbeputthroughinthesamedirectionandthethreadringsshouldlessthan2rings.5.Thefrictionsurfacebetweenshallcompliedwiththedesignerandtheregulationforsteelstructurecheckandacceptancerequirement.ItemstobetakeninconsiderationduringtheinstallationforhighdensityboltQualitycontrol1.Thesurfacewithrust,dirtyoil,thornandweldingremainingshouldbecleaned.2.Aftertreatingthefrictionsurfaceshouldbereachedtheantislidecoefficientrequirement.Theuseofthehighdensityboltandthenut,washersshouldbeuniformandbeusedatthesametimenotallowedtoexchange.3.Treatthepart’sfrictionsurface.Whileinstallation,therewillbenodirtyoilandsoil,etc4.Whileinstallationthepart,thefrictionsurfaceshouldkeepdryandavoidtoworkinrain.5.Beforeinstallation,weshallcheckandrechecktheconnectedsteelplateandmakenecessaryadjustmenttothebending.6.Whileinstallation,weshallnotusethehammertohitthebolttoavoidthethornoftheboltbedamaged.7.Weshallcheckandmeasurethespannertimelytothepreliminaryandthefinaltightofthehighdensitybolt.Weshallmakesurethepreciseanddothenecessaryrecord.Thetightworkwillbecarriedoninrightprocedure.Majorsafetytechnicalmeasures1.Tousetheflexiblespannerthesizewillfitthenut.Whileworkhighabovetheground,weshallusethefixedspanner.Ifweareusingtheflexiblespanner,weshallbetiedwithsafetybelt.2.Whileassemblethesteelparttoconnectthebolt,weshallavoidtousethehandintestingthescrewhole.Thehandwillbeonthesideofthesteelplate.Ⅴ.TheroofpanelinstallationmethodTheinstallationofthecolorsteelsheetcomposedofthedetailedpartdesign,productionsequence,transportandinstallation,etc.Everypartoftheworkandthemethodisthekeylinktotheproject’scompletion,safety,andquality.Theinstallationworkwillbecarriedoutafterthesteelstructureworkhasbeencompletedwiththeformalityofthecheckandacceptcertificate.DetailedpartdesignworkThispartofthedetaileddesignplaysakeyroletotheinstallation.Weshallmagnifyeveryconnectionpointontheoriginaldrawingsoastoinstructtheworkandworkmanshipprocedure.Thefollowingsarethemaincontentforthedetaileddesign:1.Theroofcoveragearrangement2.Theconnectpointenlargedrawing(includethetreatmenttogutter,thejoint,facialandflush)3.DetailedpartdesignflowProject→constructionjointdesign→editdrawing→check→audit→sent→issuePreparationforthecolorsteelsheetinstallation1.Beforetheinstallationofthecolorsteelsheet,weshallcheckthesizebetweenthestructureparts,thelevelandthequality.Ifthereisanybendingonsteelstructureparts,weshallcarryouttheadjustmentworkimmediately.2.Beforetheinstallationofthecolorsteelsheet,weshallcheckthosealreadyinstalledcoolbendthinplatepartofwhichshouldnotbeheavyloadedorwelded.3.Beforetheinstallationofthecolorsteelsheet,weshallmakesurethatthepullpoleorthepresspolearetightandthepurlinareinrightposition.Thetwistedangleforprulinshouldlessthan3°.4.Beforetheinstallationofcolorsteelsheet,weshallcheckallthecoolbendedstructurewhetherthepartsaretreatedwiththerustprotected,fireprotected,convenientforinspection,brush,paint,avoidwatercollectedandsealedtheendofthesteelstructurepart.5.Thetemporarystackforcolorsteelsheetshouldbearrangedaccordingtothegeneralconstructionlayouttoputinposition.Weshallprepareasolidcompacted,flatareawithgooddrainagesystemandconvenienttransportationforcolorsteelsheetandtemperaturereservecotton.Weshallalsomakesurethattheareawillhavethemeasurestobecoveredwithplasticclothetoprotecttherainwater.6.Weshallmakesurethattheinstallationtools,equipment,protectitems,connectparts,propandtheaccessoriestothecolorsteelsheetarefullyprepared.Allthesewillbetestedandqualified.Theseitemswillbeinstoragewithafulltimepersontolookafter.7.Weshallmakesurethatthestaffwillbefullyunderstandthetechnical,quality,safetyoftheworkbeforeundertakingtheroofinstallationwork.Weshallmakethemfullyunderstandtheconstructiondrawings,workmethod,safetyoperation,qualityrequirement.Weshallrechecktheaxisfortheinstallationparts,thelevel,etc.TheinstallationmethodofColorplate1.Theinstallationofroofpanelstartedfromthegable.Surveyandsetadatumpositioninglineatthelowerendofroofinadvancetoguaranteetheaccuracyofinstallation,theninstallinorder.2.Checktheroofpanelinlengths(normallytenpanels)duringinstallation,tocheckthestraightnessofthetwoendofthepanelandtheparallelismtoavoidthatitwillbeinclinedorfan-shaped.Necessaryadjustmenttobedoneduringinstallation,micro-adjustmenttobedoneonebyonetomeettherequirementofquality.3.Jointofroofpanelinlengthdirectionwillbeover-lappedonthebracingmembers,lappinglengthis250mm.4.Reliablesealanttobedonetolapatthelengthdirectionoftheroofpanel,siliconeorweatherstriptobefilledattwoends,15mmapartfromthepanelend.Bottompanelover-lappinglengthis80~100mm,sealantmightnotbedoneatover-lap.5.Leave50mmgapbetweentwopanelsatridge,itispreferabletobentthepanelupwardat80”toformaflashing.Thepressedsteelpaneltobeprojected120mmatgutter,bentdownwardat10”toformadrip.6.Over-lapofflashingboardnotlessthan100mm,withenoughwidthandrollededge,spacingofjointsnotmorethan50mm.Sealanttobedonetoover-lapforwater-tightness.7.Atroofridgeandinterfacebetweenupperandlowerspan,flashingandroofpaneltobejointedbyover-lap,lapnotless200mm,insertwaterproofclosureinlap.Ⅵ.Wallpanelinstallation1.Wallpaneltobeinstalledpriortoroofeavesgutterwithspecialpurposehoistingandclampingapparatus.2.Thefirstwallpaneltobeinstalledasperthegableoutsidecornerline,usetheodliteandorpendanttofixthedatumline.3.Screwtobefixedtothetopandbottomendofthewallpanelfortemporarypositioning,whenagroup(about10)ofpanelslaidandadjusted,fastenthescrewtothewallpurlin.4.Markthepositionofscrewbetweenwallpanelandpurlin,itshouldbeeventothepurlinandbeuniformlyarranged.5.Installthepaneltobeover-lappedinlengthdirectfrombottomtotop,theover-laptobearrangedatthepositionwallpurlin,interpanelover-lappinglengthis80-100mm,outerpanelover-lappinglengthis120mm,sealantmightnotbeneededatover-lap.6.Inspectiontobedonebyroomsforwallpanel,usetheodliteorhangthependantatcolumncenterlinetosurveytheverticality.7.Gablepanelstobecutatdifferentlengthaspertheroofpitch,thentoinstallit.Addendclosuretogableeaveflashingifnecessary.8.Gableflashingtobedonestartedfromeaveuptotheridgeaftertheroofandwallpanelinstalled.Outsidecornerpaneltobedownfrombottomtotop,rivettobeusedforthejointstowallpanel,spacingasperthetechnicalrequirement.9.Doorandwindowflashingstartedfromtoptothetwosides,usewallpurlinordoor/windowframeforfixing.Ifitistobeconnectedtothepressedplate,userivetforjoint.Flashingatopeningonwall,it’stoptobeinstalledinsidethewallpanel,bottomoutsidethewallpanel.Tofixthewallpanelandflashingtothewallpurlinwithself-tappingscrew.10.Jointsbetweenflashingstobesealedwithsilicone,andifwrongscrewholeopenedonthewall,itmustbefilled.Ⅶ.FireproofingcoatingPreparations1.Tofulfillthehighrequirementofappearance,andthecoatingmustbefireproofingasperthedesign,sothetopcoatingtobedonewithnon-airspray-onmethod.2.Thefireproofcoatingshouldbewithex-factoryqualitycertificateandex-factorycertificate.3.Beforefireproofingcoatingdone,thesurfaceofstructuralmembersshouldbefreefromrustanddust.Applycomplementaryanti-rustundercoattotheexposedareaontheinstalledstructuralmembersandjoints.4.Checkthereceivingsurfacebeforecoating,toseewhetheritisfreefromrust,oil,anddustetc.Makesurethematerial,machineryandscaffoldingareready.WorkingprocesschatReceivingsurfaceclearing→applyundercoat→drying→repeatasperproductrequirement→filler→grinding→sprayfireproofcoating4layers(metalgloss)Technologicaloperationmainpoints1.Togetgoodadhesion,thicknessofdryfilmofthefirstlayerofcoatingshouldbenotmorethan200μm,after24hoursapplynextlayer,theafterlayersthicknessnotmorethan300μmtofulfilltherequirementoffireproofinglimit.2.Sprayingdistancetobecontrolledwithin300~380mm,sprayingrange30~50cmforlargeobject,10~30cmforsmallobject,normallyitis30cm.3.Anglebetweenspraynozzleandtheobjectsurfaceis30°~80°,spraygunrunningspeedis0.1~1.0m/minPointsforattention1.Onpresentmarket,therearevariedkindsoffireproofcoating,applyingmethodisbasicallythesame,butthethicknessshouldrefertotheproductdirectionandtestingreportissuedbygovenmentfirefightingdepartment.2.Environmentrequirementforcoating:theairtemperatureshouldbeabove3℃,coatingshouldnotbedoneoutdoorifitrains,condensationofsurfaceorairhumidityexceed85%.3.Afterlastlayerofundercoatfinished,scrapingthesurface,andthenfollowedby4layersofsprayingcoating.4.Whilecoatingbedoneontheground,leavethemarkofnumberofthestructuralmembers.Consideringspoilanddamagemayoccur,leavecertainthicknessfortouch-upcoatinghighabovethegroundtomatchthecolor.Acceptancestandardofquality1.Thereshouldbenomistake,misses,peelingandrusting.Thecoatingshouldbeuniformnoobviousriveling,runs,airbubblesetc.2.Thesecondlayeroffireproofcoatingmustbeappliedonlywhenthefirstlayergetdriedcompletely,otherwiseitwillberiveling,peeling.It’sthicknesstobetestedandacceptedaspertheproductdirectionandtestingresultissuedbyqualifiedfirefightingdepartment.3.Coverthecoatingwhichisnotfilmedwhenitrain,coverthepaintedstructuralmembersoranyotherpartwhichmightbespoiledwithPVCmembrane.Ⅷ.SafetyguaranteemeasuresSafetyworkingmeasures1.Allconstructermustbeabidestrictlybynationalsafetyrulesandregulations,makeself-protectionconscientiously.2.Allconstructermustbetrainedandeducatedwithprofessionalsafetyknowledge,andgotoworkingbearingthecertificate.3.Appointfulltimesafetysupervisortothesite.Appointfulltimesafetyadministratortoeachworkingteamtoformaeffectivesafetynetwork..4.Arrangedifferentsafetymeasurestodifferentworks,makerecords,organizeinspections.Safetypointsforattentionatconstructionsite1.Firmlycarryoutnationalstipulationof<Safetytechniqueoperationrulesofbuildingandinstallation>2.Strengtheningsiteconstructionmanagement,constructingroadtobelevel,smooth,andhardened,materialandstructuralmemberstobepiledandstoredstablyandinorder.3.Nosmokingonsite,inworkshopandtemporarywarehouse,equipwithfirefightingdevice.4.Providesafetyprotectioncoverandgroundprotectiontoelectricalequipment,someonemustbeputinchargeofmachineoperation,eachmachinetobeinstalledwithaelectricshockprotector.5.Providesufficientprotectiveglasses,maskandsafetyshoestostaffonsite.6.Allmaterialandstructuralpiledandstoredstablyandinorderinproperplace.Structuralmembersmustbefixedwhilepilingandassembling,nowalkingaheadtothemovingmembers.7.Pryupobjectwithhands,itisprohibitedtorideonthecrowerandcarrythecrowerunderarms.Donotoverexertoneselfwhileusingcrowerworkhighabovetheground.8.Checkthespringboard,scaffolding,swingingscaffold,scalingladder,ropeandsafetynettingetcpriortoworkhighabovetheground.9.Nooneallowedtogointothehoistingsite,donotstandunderthecranecantilever.Thehoistingdirectorcannotstandaheadtotheheavyobjecttobehoisted.Runningstablywhilehoisting,thehookcanberemovedonlywhenthehoistedmembersinpositionandfixedtemporarilyorconnectedreliably.10.Whenthewindspeedreaches10m/s,partofhoistingworkshouldbestopped,whenitreaches15m/s,alltheworkmustbestopped.Noweldingoutdoorinrain.Checkthestructuralmembersafterrainandwindmakesuretheblindingandsupportbefirm,slip-resistanceworkneedtobedone.11.Clearthesiteaftereachshift,keeptheroadsmooth,cutoffthepowerafterwork,checktheworkingsiteafterworkmakesurenofiredangerous.Safetyofconstructionelectricity1.Maketemporaryconstructionelectricityorganizationdesignorelectricitysafetytechnicalmeasuresandfireproofmeasures.2.Establishsafetyelectricitysystem.Selectexperiencedprofessionalelectriciantothesite.3.Constructionelectricityistobearrangedaspertheconstructionelectricityscheme.Oneequipmentprovidedwithonegear,andconnectedwithreliablegroundprotection.4.Iftheconstructionsiteandoutsidelinesharewithonepowersupplysystem,theelectricalequipmentmustbeprotectedwithgroundconnectionorzerocircuit,butshouldbeallthesame,partgroundprotectionpartzerocircuitisprohibited.5.Groundconnectercannotusealuminiumconductor,verticalgroundconnecterprefersteelangle,steeltubeorroundsteelbutnotscrew-threadedsteel.6.Distributionboxandswitchboxpreferablytobemadeofsteelplateorgoodqualityinsulatedmaterial,thicknessofsteelplatenotlessthan1.5mm.Spacingbetweenthefixeddistributionandswitchboxbottomshouldwithin1.3mto1.5m;Spacingforportableboxeswithin0.6mto1.5m7.Oneequipmentuseoneswitchbox,aswitchboxcannotbesharedbytwoormoreequipment(includingsocket),maindistributionboxandswitchboxmustbeequippedwithelectricleakageprotectivedevice,ratedleakageactiontimeshouldbereasonablydisposed.8.Allthedistributionandswitchboxshouldbemarkedwithnameandusage,signofbranch.,someonemusttobeputinchargeofthework,providelocktoit,inspectandmaintainonceamonth.Usequalifiedfuse.9.Alltheelectricalequipmentanditsdevice,safety,protection,useandmaintainmustbeaccordwiththerequirementofJGJ46—88<Constructionsitetemporaryelectricitysafetytechnicalrules>.Boldsafetysignandoperationrulesboardtobeprovided.10.Dailysafetyinspectionistobetakenonsiteforelectriclineandequipment.Anyproblemistobesettleddownbycertainpersonwithinthefixedtime.ⅨQualityguaranteemeasuresFabricationqualityguaranteemeasures1.Organizeainternalfulltimeinspectionteamtocarryoutregularandirregularinspectionorspotchecks.
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- GB/T 44887.10-2024IPv6演進(jìn)技術(shù)要求 第10部分:支持IP網(wǎng)絡(luò)切片的增強(qiáng)型虛擬專用網(wǎng)(VPN+)
- 2025年教學(xué)檢查通報(bào) 教學(xué)計(jì)劃檢查通報(bào)
- 開咖啡屋的創(chuàng)業(yè)計(jì)劃書
- 基層派出所宣傳工作計(jì)劃行政工作計(jì)劃
- 2025年急診護(hù)理工作計(jì)劃024年門急診工作計(jì)劃
- 初二數(shù)學(xué)教學(xué)計(jì)劃
- 醫(yī)院業(yè)務(wù)宣傳年度工作計(jì)劃范文
- 2025年中小學(xué)課件中心組活動(dòng)計(jì)劃
- 企業(yè)經(jīng)理工作計(jì)劃報(bào)告大全
- 《歐美簡(jiǎn)約美模板》課件
- 2024年云南中考?xì)v史試卷試題答案解析及備考指導(dǎo)課件(深度解讀)
- 工程電磁場(chǎng)(山東聯(lián)盟)智慧樹知到期末考試答案章節(jié)答案2024年山東航空學(xué)院
- 提高護(hù)理文書書寫規(guī)范率PDCA
- 汽車電器DFMEA-空調(diào)冷暖裝置
- 國開可編程控制器應(yīng)用形考實(shí)訓(xùn)任務(wù)二
- 生命健康教育智慧樹知到期末考試答案章節(jié)答案2024年溫州醫(yī)科大學(xué)
- 全國養(yǎng)老護(hù)理職業(yè)技能大賽養(yǎng)老護(hù)理員賽項(xiàng)考試題庫-下(判斷題)
- 胸痛中心關(guān)鍵質(zhì)控指標(biāo)及質(zhì)量改進(jìn)計(jì)劃
- 2024年中考作文十二大高頻熱點(diǎn)主題4-青春夢(mèng)想(素材)
- 2024年四川省網(wǎng)格員招聘理論考試復(fù)習(xí)題庫(含答案)
- 中建測(cè)評(píng)2024二測(cè)題庫及答案
評(píng)論
0/150
提交評(píng)論