版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)
文檔簡介
Ref.
編號
Item
項目
Quantity
數(shù)量
Unit
單位
Rate
單價
Total
總額
BILLNO.7
C.W.CULVERTSYSTEM
Notes:
1)Thestructureofconcreteinlet/outletboxaremeasured
)
inBillNo.2-MainStationBuildingUnitL11.
)
)
2)Takingupexistingpaving,removalofexistingroadbase
)
andgranularsub-baseandreinstatementworksaremeasured
)
inBillNo.12-Road,Drainage,UtilitiesandExternalWorks.
)
)
3)TheContractorshallpayparticularattentionthatheis
)
requiredtotakeupfulldesignresponsibilityforexcavation
)
includingopencutslopes,lateralsupportworks,ground
)
watercontrolworks,etc.,allasdescribedinthedrawings.
)
Alltherates/costspricedhereunderbytheContractorshall
)
bedeemedtoincludethesaidworks.
)
GENERAL
1
AllowforpreparingBuildingInformation
1
Item
Modelling(BIM)forallundergroundutilities
worksincludingallnecessarysubmissions,all
asdescribedinSpecificationsandasdirected
byandtothesatisfactionoftheEngineer.
SETTLEMENTMONITORINGWORKS
LongtermsettlementmarkersasDrawingsNo.
552/03/025/2001and552/03/025/2015
2
Establishandlabellongtermsettlement
1
No.
markersonmanholesurfacesincludingall
necessaryfixingaccessories,allasdescribed.
CarriedtoCollection
$
-
Ref.
Item
Quantity
Unit
Rate
Total
3
Establishandlabellongtermsettlement
6
No.
markersonexistinggroundlevelstotopof
ductileironinletpipeincludingconstruction
ofgrade20D/20PFAconcreteboxwithcast-
inPVCweeppipe,greasedgalvanisedsteel
pipes,externallypaintedprotectivesteelpipes,
galvanisedstiffeners,castironlockablecovers
withassociatedframeworkandhardwares,
welding,allnecessaryfixingaccessories,
formworkandearthworks,allasdescribed.
4
Ditto,buttotopofductileironoutletpipe.
2
No.
5
Ditto,buttotopofreinforcedconcretethrust
2
No.
blockforinletpipe.
6
Ditto,buttotopofreinforcedconcretethrust
1
No.
blockforoutletpipe.
7
Allowformaintainingandcarryingoutdaily
12
No.
monitoringofthelongtermsettlement
monitoringmarkersincludingsubmitting
initialreadingsandtakingregular
measurementsandreadings,preparingand
submittingperiodicalrecords,graphicalplotof
readingsandreportstotheEngineerand
BuildingAuthority,allasdescribed(No.of
monitoringmarkerinregardlessofitslocation
aremeasured).
8
Takeupexistinglongtermsettlementmarkers
8
No.
andcarryoutdailymonitoringincluding
submittinginitialandtakingregularreadings
measurements,preparingandsubmitting
periodicalrecords,graphicalplotofreadings
andreportstotheEngineerandBuilding
Authority,allasdescribedonSpecifications
andDrawings.
CarriedtoCollection
$
-
Ref.
Item
Quantity
Unit
Rate
Total
9
ALTERATIONANDADDITIONWORKSTOEXISTINGNO.4C.W.INTAKECHAMBERASDRAWING550/03/025/1096,550/03/025/1098and
550/03/025/1099
AllowforIC-L11C.W.PumpSlabOpeningEnlargementincludingremoveexistingconcretecover,chipoffexistingconcretebymanualbreakingmethod,concrete,formwork,reinforcement,hot-dipgalvanizdmildsteeljoist,cementgrout,drilling,retaining,rebentingandrefixingtheexistingreinforcement,surfacetreatment,coring,boltsandnuts,allasDrawingNo.
550/03/025/1098.
(TheTenderershallsubmitmethodstatementanddetailcostbreakdownforthisitembutnotbelimitedtothefollowingworks:
Qty+ Unit Rate+ Total+
removingexisting
concretecover Item
enlargingexisting
concreteslab Item
chippingoffexistingconcretebymanual
breakingmethod Item
(handheldtoolonly)
hot-dipgalvanized
mildsteeljoists Kg
non-shrinkcement
grout Sup
reinforcedGrade45D/20PFA
concrete Cube
surfacetreatment Sup
formwork Sup
hot-dipgalvanized
steelbars Kg
coring No
boltsandnuts No
Allotherworksrequired Itemforcompletionofthe
constructionofCWIutletpipeandallotherContractWorks(Pleasespecify)
ItemTotal========)
+TobefilledbytheTenderer
1
item
CarriedtoCollection$
-
Ref.
Item
Quantity
Unit
Rate
Total
10
11
Allowforconstructing1No.ofreinforcedconcretebeamin8100x675x1800mmdeepundertheexistingreinforcedconcretebeamincludingchipoffexistingconcretesurface,concretereinforcement,formwork,2nos.457x191x89kg/muniversalsteelbeam,anchorbolt,baseplate,grouting,allnecessarytemporaryworks,makinggoodallworksdisturbed,etc.,allasDrawingNo.
550/03/025/1098.
AllowforIC-L11ACWPumpSlabOpeningEnlargementincludingremoveexistingconcreteplinth,removeexistingprecastconcretecover,concrete,formwork,reinforcement,hot-dipgalvanizedmildsteeljoist,cementgrout,surfacetreatment,jointsealant,boltsandnutsallasDrawingNo.
550/03/025/1099.
(TheTenderershallsubmitmethodstatementanddetailcostbreakdownforthisitembutnotbelimitedtothefollowingworks:
Qty+ Unit Rate+ Total+
removingexisting
concreteplinth Item
enlargingexisting
concreteslabopening Item
removeexistingremovable
precastconcretecover Item
hot-dipgalvanized
mildsteeljoists Kg
non-shrinkcementgrout Sup
reinforcedGrade45D/
20PFAconcrete Cube
surfacetreatment Sup
formwork Sup
hot-dipgalvanized
steelbars Kg
jointsealant No
boltsandnuts No
Allotherworksrequired Itemforcompletionofthe
constructionofCWIutletpipeandallotherContractWorks(Pleasespecify)
ItemTotal========)
+TobefilledbytheTenderer
1
1
item
item
CarriedtoCollection$
-
Ref.
Item
Quantity
Unit
Rate
Total
12
13
MiscellaneousWorks
AllowfortheinstallationofexistingL10penstocktoL11penstockchambertofacilitatethemodificationworkduringthedeliveryfortakingfromdesignatedstorageareawithinLammaPowerStationincludingallnecessarycleaningofexistingstainlesssteelguidechannelbeforeinstallationandsubsequentlyremoveandreturntodesignatedstorageareawithinLammaPowerStationasdirectedbytheEngineer.
AllowforpumpingouttheseawaterinsideL11intakechamberandmaintainingdryconditionuponcompletionofinstallationofnewL11outletpipeworks,allasdescribedanddirectedbytheEngineer.
C.W.INLET/OUTLETPIPE
Note:
1
1
Item
Item
)
)
)
)
)
TheContractorshallpayparticularattentiontotherequirementsasstatedinthe"NotesforExcavation,LateralSupportandTemporaryWork"ofDrawingNo.552/03/025/2016.Alltheratespricedunder
thissectionshallbedeemedtoincludeallnecessarycostsandtime
forcomplyingsuchrequirements.
CarriedtoCollection$
-
Ref.
Item
Quantity
Unit
Rate
Total
14
AllowfordesigningandcarryingoutearthworksforC.W.Outletpipeconstruction(TypeC)asshowninDrawingno.
552/03/025/2016includingexcavation,allearthworksupports,temporaryshoringsystemandsubsequentremoval,weldingtoexistingsteelsheetpiles,backfillingwithselectedexcavatedmaterialsandimportedfillingifrequireduptospecifiedlevels,removingsurplusexcavatedmaterialfromSite,reinstatementofalldisturbedareatomatchwithexisting,dewateringandgroundwatercontrol,protectiontoexistingstructuresandutilitiesandallnecessarytemporaryworksfortheconstructionofC.W.OutletpipeifsorequiredbytheContractor.
(TheTenderershallsubmitmethodstatementanddetailcostbreakdownforthisitembutnotbelimitedtothefollowingworks:
Qty+ Unit Rate+ Total+
Excavation Cube
Backfilling/imported Cubefilling
Disposal Cube
Temporaryshoringsystem kgandsubsequentremoval
Weldingtoexistingsteel Runsheetpiles
Dewateringandground Itemwatercontrol
Protectiontoexisting Itemstructuresandutilities
Allotherworksrequired Itemforcompletionofthe
constructionofCWIutletpipeandallotherContractWorks(Pleasespecify)
ItemTotal========)
+TobefilledbytheTenderer
1
Item
CarriedtoCollection$
-
Ref.
Item
Quantity
Unit
Rate
Total
15
AllowfordesigningandcarryingoutearthworksforC.W.Inletpipeconstruction(TypeD)asshowninDrawingno.
552/03/025/2016includingexcavation,allearthworksupports,temporaryshoringsystemandsubsequentremoval,weldingtoexistingsteelsheetpiles,backfillingwithselectedexcavatedmaterialsandimportedfillingifrequireduptospecifiedlevels,removingsurplusexcavatedmaterialfromSite,reinstatementofalldisturbedareatomatchwithexisting,dewateringandgroundwatercontrol,protectiontoexistingstructuresandutilitiesandallnecessarytemporaryworksfortheconstructionofC.W.InletpipeifsorequiredbytheContractor.
(TheTenderershallsubmitmethodstatementanddetailcostbreakdownforthisitembutnotbelimitedtothefollowingworks:
Qty+ Unit Rate+ Total+
Excavation Cube
Backfilling/imported Cubefilling
Disposal Cube
Temporaryshoringsystem kgandsubsequentremoval
Weldingtoexistingsteel Runsheetpiles
Dewateringandground Itemwatercontrol
Protectiontoexisting Itemstructuresandutilities
Allotherworksrequired Itemforcompletionofthe
constructionofCWInletpipeandallotherContractWorks(Pleasespecify)
ItemTotal========)
+TobefilledbytheTenderer
1
Item
CarriedtoCollection$
-
Ref.
Item
Quantity
Unit
Rate
Total
16
17
18
19
20
21
22
23
Cutandremoveexistingsteelsheetpiledowntotherequiredlevelincludingallnecessarytemporarysupportstoearthwork,excavation,backfilling,reinstateexternalpavementtomatchwithexistingandreomvedebrisfromsite.
Concrete
Grade20D/20PFAconcreteinallelements.
ReinforcedGrade45D/20waterproofPFAconcreteinallelements.
ClassU2finishasdescribedtoconcretesurfaces.
FormworkClassF2toverticalsidesofallelementsincludingvoidformers.
Deformedhighyieldsteelbars10mmandoveringeneralreinforcementincludingbarsbenttocurveandover12.00minlength.
Ditto,butinlinks,stirrups,bindersandhelicalreinforcement.
2500mmWidex800mmhighoverallprecastGrade45D/20waterproofPFAconcretepipesupports3.00-5.00mlongeachforsupportingonepipesectionincludingallmoulds,reinforcement,finishing,hoistingandsettinginpositionandcompletewithtwosetsof12mmdiametergalvanisedirontiedownwireropefixedaroundductileironpipe(pipefixingmeasuredseparately)withriggingscrewspersupport,allinaccordancewithDrawingNo.552/03/025/2001.
570
10
410
400
280
62000
16000
265
Run
CubeCube
Sup.
Sup.
kg
kg
Run
CarriedtoCollection$
-
Ref.
Item
Quantity
Unit
Rate
Total
24
25
Miscellaneous
ManholeasDrawingNo.552/03/022/2013includingexcavation,disposal,concrete,reinforcement,formwork,blankflange,sumppit,inspectionhole,hook,blindinglayer,stepirons,rendering,coversasBS497havingclearopeningsizesstated,beddingandhaunchingframesincementmortarandsealinginthickgrease
Manhole1800x1800x1000-2000mmdeepcompletewithapproximate1800x1800mmwidedoublesealheavydutycoatedcastironcoverandframe.
ManholeasDrawingNo.552/03/025/2012includingexcavation,disposal,concrete,reinforcement,formwork,blankflange,sumppit,inspectionhole,hook,blindinglayer,stepirons,rendering,coversasBS497havingclearopeningsizesstated,beddingandhaunchingframesincementmortarandsealinginthickgrease
Manhole3200x3300x8000-9000mmdeepcompletewithapproximate1800x1800mmwidedoublesealheavydutycoatedcastironcoverandframe.
2
1
No.
No.
CarriedtoCollection$
-
Ref.
Item
Quantity
Unit
Rate
Total
26
27
28
29
30
AllowfordeliveringEmployer'sductileironpipingmaterialsandflexiblejointswithfittingsandfixingaccessories,fromLammaPowerStationExtensionHeavyLoading/UnloadingAreatotheContractor'sownstorageareaincludingco-ordinationwithEmployer'ssupplierformaterialdelivery,provisionoflabourandplantfortransportation,jointinspectionwiththeEmployer'ssupplierforhandovermaterials,unpackingthematerials,etc.allasdescribed.
Allowfortakingdown1No.existingsteelendplates/blankflangeatexistingoutletpipeincludingpreparingexistingpipesurfacesforconnectionofnewworksandremovingfromSiteortolocationswithinLammaPowerStationasdirectedbytheEngineer.
Ditto,butatexistinginletpipe.
TakedeliveryfromContractor'sownstorageareaandFIXONLY2000mmnominaldiameterflexiblejointinapproximate2mlongandassociatedfittingsandfixingaccessoriescapabletoaccommodatemax.200mmdifferentialmovementwithflangedjointincludingisolationgasketatbothends,adjustmentofflexiblecouplingjointtosuitactualpipelayinglevelandconnectedtopuddlepipesatnewlyconstructedconcreteinlet/outletboxes.
DittotoFIXONLY2000mmnominaldiameterpuddleflangepipeandassociatefittingsandfixingaccessoriescastintoconcretewithflangejointatnewlyconstructedconcreteinlet/outletboxes.
1
1
1
2
2
Item
Item
ItemNo.
No.
CarriedtoCollection$
-
Ref.
Item
Quantity
Unit
Rate
Total
31
32
33
34
35
36
37
38
39
TakedeliveryfromContractor'sownstorageareaandFIXONLY2200mmnominaldiameterproprietaryductileironpipeincludingsupplyandwrapwithminimum0.2mmthickpolyethylenesleeve,allwithK-typemechanicaljoints/flangedjointslaidandjointedintrench.
Extraforfixing2200mmnominaldiametercollarwithK-typemechanicaljoint/flangedjoint.
Extraforfixing2000mm/2200mmnominaldiametertaperpipewithflangejoint.
Extraforfixing45°bendwithK-typemechanicaljoin
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2024高考地理一輪復(fù)習(xí)第七單元自然環(huán)境對人類活動的影響考法精練含解析
- DB42-T 2358-2024 智慧界樁系統(tǒng)技術(shù)與工程建設(shè)規(guī)范
- (3篇)2024-2025年少先隊工作總結(jié)
- 安全監(jiān)理工作方法
- 二零二五年度品牌VI形象重塑與傳播合同
- 2024年全國交通安全日活動總結(jié)例文(四篇)
- 乒乓球正手攻球技術(shù)教學(xué)設(shè)計
- 二零二五年度飛機(jī)租賃及航空器改裝合同3篇
- 二零二五版?zhèn)€人水利工程運(yùn)行維護(hù)施工合同2篇
- 2021-2021學(xué)年高中化學(xué)212脂肪烴第2課時炔烴脂肪烴的來源及應(yīng)用課件新人教版選修5
- 2025年中國南水北調(diào)集團(tuán)限公司總部招聘工作人員(27人)高頻重點(diǎn)提升(共500題)附帶答案詳解
- 縫紉技能培訓(xùn)課件
- 《翻板式隔爆閥性能試驗方法》
- 2024年銷售崗位工作總結(jié)
- 數(shù)字化解決方案設(shè)計師職業(yè)技能競賽參考試題庫(含答案)
- 采購管理實務(wù)案例庫
- JGJT46-2024《施工現(xiàn)場臨時用電安全技術(shù)標(biāo)準(zhǔn)》條文解讀
- 2024-2030年中國鋼結(jié)構(gòu)行業(yè)發(fā)展需求及投資規(guī)劃分析報告版
- 2022年河南省公務(wù)員錄用考試《行測》真題及答案解析
- 2024ESC心房顫動管理指南解讀
- 專項11-三角形中角度計算-經(jīng)典小題(30道)
評論
0/150
提交評論