/Construction
of
the
Project
Management
of
the
importance
of
organization
design
Abstract:
The
construction
organization
is
a
construction
project
and
guide
the
importanttechnical
and
economic
documents.
Can
regulate
the
construction
workers,
machinery,
raw
materials,
environment,
technology,
equipment,
construction,
installation,
management,
production
and
other
conflicts,
to
supervise
the
construction
and
control
of
organizational
design
in
order
to
ensure
scientific
and
rational
project
high-quality,
low
cost,
less
the
completion
of
energy.
Keywords:
project
management;
construction
organization;
design;
importance
Construction
design
and
project
construction
is
an
important
document
guiding
construction,
construction
enterprises
are
able
to
high-quality,
high
speed,
low
cost,
low
consumption
of
completed
building
projects
to
ensure
effective
measures,
but
also
strengthen
the
management,
the
importance
of
improving
economic
efficiency
means,
is
also
properly
handle
the
construction
workers,
machinery,
raw
materials,
methods,
environment
and
technology
and
equipment,
civil
works
and
installation
of
collaboration,
consumption
and
supply,
management
and
production
and
other
kinds
of
contradictions,
scientific
and
rational,
planned
and
orderly
,
the
equilibrium
organization
of
production
and
an
important
guarantee
for
project
construction.
With
the
establishment
of
socialist
market
economy,
an
increasingly
competitive
construction
market,
the
objective
situation
of
construction
enterprises
have
become
increasingly
demanding,
not
only
in
technology
and
equipment,
personnel
quality,
the
construction
put
forward
higher
requirements
of
the
organizers,
and
engineering
economic
management
Pre-settlement
work
in
the
project
is
also
facing
new
challenges.
Strict
construction
market
situation,
some
construction
companies
are
not
actively
taken
measures,
professional
and
technical
staff
is
not
updated,
training,
science
and
technology
management
level
is
very
backward,
with
the
preparation
of
construction
design
review
did
not
attract
enough
attention,
so
there
will
be
the
following
common
situations:
(1)
audit
is
not
compiled
before
the
start
of
construction
organization
design:
not
to
pursue
the
construction
of
floor
plans,
materials,
cluttered,
moving
out
of
import
of
machinery
and
equipment,
unplanned
demand
for
labor,
quality,
security,
construction
without
assurance
measures,
resulting
in
nest
Workers
serious
waste
management
lower.
(2)
whether
it
is
the
preparation
of
construction
design
professionals:
In
order
to
cope
with
the
higher
authorities
and
supervisory
agencies,
Party
member
or
check
the
information
to
the
construction
workers
on
behalf
of
the
Code
construction
design,
because
the
data
simply
do
not
know
right
now
who
is
a
leading
construction
management
recent
arrangements,
had
casually
made
up,
just
go.
(3)
the
preparation
of
the
low
level
of
construction
organization
design:
Some
construction
units,
construction
organizations
do
not
understand
the
importance
of
the
construction
process,
to
write
about
the
sub-construction
process,
draw
a
floor
plan,
schedule
progress,
it
regarded
construction
organization
design.
(4)
to
abandon
technology
economy:
a
considerable
number
of
construction
enterprises
in
the
preparation
of
construction
organization
design,
construction
organization
which
only
concerned
the
various
sub-project
of
the
technical
measures,
without
considering
the
sub-project
aspects
of
economic
indicators,
leading
to
the
completion
of
settlement
disputes
about
economic
loss.
[Example
1]
in
a
district
of
Nanning
City,
the
life
of
a
dormitory
building
to
be
a
form
of
water
renovation
project,
but
because
the
dormitory
was
built
in
the
eighties,
has
been
twenty
years,
the
owners
between
buildings
without
authorization
of
their
own
debris
occupied
the
public
space
of
normal
channels,
resulting
in
too
narrow
passage
between
two
buildings,
traffic
problems,
so
the
resulting
need
for
manual
handling
of
construction
materials
to
construction
sites,
construction
materials
are
stated
not
to
enter
the
venue
and
request
for
additional
materials
secondary
transportation
fee,
Party
A
will
not
sign
recognition,
resulting
in
economic
losses.
If
the
construction
units
in
the
field
before
the
start
of
the
investigation,
carefully
review
the
preparation
of
construction
design
and
engineering
contract
be
described
in
the
notes,
you
can
reduce
unnecessary
trouble.
[Example
2]
of
a
residential
building
project
excavation,
construction
site
is
not
large,
the
construction
unit
construction
with
construction
design,
but
no
earth
survey
program,
no
excavation
of
the
slope
coefficient
of
discharge,
nor
the
accumulation
of
pre-construction
earthwork
calculation,
the
original
machine
in
the
pit
excavation
uppercut
on
it,
because
there
is
no
construction
design
survey
on
the
ground,
resulting
in
ruptured
a
nearby
residential
building
to
the
water,
resulting
in
increased
costs
of
grading
required
to
show
there
is
no
clear
,
resulting
in
a
Jixietaiban
increase
moving
away
more,
but
also
back
when
the
backfill
backfill,
resulting
in
construction
enterprises
in
the
economy
by
the
economic
loss
in
vain.
[Example
3]
Construction
of
a
residential
building
products
business
in
the
construction
process,
when
preparing
to
start
construction
organization
is
very
simple,
even
the
template
sub-project
calculations
are
not,
in
the
basement
of
the
construction
of
the
installation
template
template
installation
height
of
5
m,
maximum
beam
for
the
600
×
1200,
thickness
250,
in
the
erection
of
experience
by
the
workers
under
their
erection,
supervision
and
acceptance
can
not
be
acceptance
of
the
results,
but
also
re-checking,
the
results
support
the
strength
of
pole
did
not
meet
the
template
requirements
of
a
full
return
to
work.
Rework
the
economic
losses
can
be
imagined.
Such
as
steel
is
now
more
fitting
to
discuss
the
situation,
the
tender
list
or
did
not
say
by
welding
sleeve,
you
said
in
the
welding
construction
organization,
it
can
talk
with
the
sleeve
construction
of
a
visa;
Earthwork
and
temporary
facilities
in
the
Shih
group
calculated
as
long
as
the
excess
of
the
quota
rules
set
paved
the
way
is
part
of
the
claim.
The
problem
is
now
that
this
file
is
isolated,
not
construction,
not
cost,
because
it
is
not
targeted.
The
above
three
examples
fully
show
that
the
construction
design
in
the
construction
process
as
well
as
pre-settlement
project
plays
an
important
role,
not
only
organized
the
construction
of
organizational
design,
guiding
production
role
in
the
objective
economic
management
has
become
a
very
important
can
not
be
ignored
component.
Construction
design
is
the
arrangement
of
a
construction
company
building
a
comprehensive
technical
and
economic
documentation
of
construction
products.
The
depth
of
the
content
of
their
preparation,
can
be
divided
into
construction
design,
construction
organization
design,
construction
design
outline
and
so
on.
Meaning:
in
order
to
process
the
entire
project
implementation
macro-control.
Complete
the
construction
of
a
sub-organization
design
should
include:
project
overview,
construction
methods,
quality
assurance
measures,
manpower
and
machinery
plan
and
guarantee
measures,
construction
of
network
diagrams,
and
bar
charts,
safety
measures,
details
of
resources,
energy
conservation
measures,
construction
period
to
ensure
measures.
Implementation
of
the
project
in
the
construction
of
the
session,
the
price
of
construction
projects
through
the
construction
drawings
to
determine
the
general
preparation
of
the
budget,
the
determination
of
the
construction
contract
price,
engineering
and
project
final
settlement
price
to
determine
price
and
other
processes.
Construction
design
of
which
is
the
main
factor
of
the
project
cost,
therefore,
project
cost
management,
construction
design
must
pay
close
attention
as
an
important
link
in
this
regard
should
address
the
following
two
aspects
of
the
relations.
Fixed
construction
budget
to
reflect
the
actual
construction
of
each
sub-part
of
the
construction
process
of
each
project
component
of
labor,
materials,
Jixietaiban
consumption
standards.
It
is
to
identify
and
control
the
construction
and
installation
cost
base;
is
to
design
technical
and
economic
comparison,
based
on
technical
and
economic
analysis;
is
the
construction
unit
based
on
the
analysis
of
economic
activities;
the
preparation
of
bidding
price,
bidding
price
of
the
base;
is
the
preparation
of
the
fixed
budget
and
estimates
based
on
indicators;
is
construction
drawing
budget,
project
contracts,
project
budget
and
project
an
important
basis
for
final
prices,
but
the
budget
is
fixed
under
normal
construction
conditions,
the
majority
of
the
construction
unit
to
the
current
level
of
machinery
and
equipment,
the
reasonable
construction
period
,
construction
technology,
labor
organizations
based
on
each
sub-part
of
the
preparation
of
the
consumption
of
the
project.
However,
construction
of
the
project
there
are
many
special
cases
in
which
sub-part
of
the
project
construction
method
is
not
necessarily
the
same
under
a
fixed
budget,
as
currently
stipulated
in
the
budget
scale,
"based
on
construction
design
OK"
and
so
on.
Such
as
"consumption
of
fixed
construction
Guangxi
Zhuang
Autonomous
Region",
the
earth
and
stone
work
on
the
manual
calculation
rules.
Trench
digging,
earthwork
grading
time
required
to
"construction
design"
shall
be
calculated,
"construction
design"
no
clearly
defined,
put
the
slope
coefficient
by
a
fixed
proportion
of
the
implementation
of
the
provisions.
Construction
projects
with
construction
design
is
closely
related
to
project
cost.
The
basic
construction
design
includes:
project
overview
and
analysis
of
construction
conditions,
construction
programs,
construction
technology,
construction
schedule,
construction
general
layout.
There
are
economic
analysis
and
construction
preparation
work
plan.
Among
them,
the
construction
program
and
construction
process
is
more
important
to
determine,
for
example:
the
choice
of
construction
machinery,
horizontal
transport
method
of
choice,
moving
the
main
structure
of
the
construction
methods
and
construction
methods
and
construction
technology
of
choice,
etc.,
are
a
direct
impact
on
project
budget
price
changes.
In
ensuring
the
quality
and
meet
the
owners
requirements
and
schedule
requirements
of
the
premise,
optimize
the
construction
program
and
construction
process
is
to
control
the
cost
of
investment
projects
and
reduce
the
importance
of
measures
and
means.
Construction
design
is
not
only
an
important
guiding
document
production
and
management
activities,
preparation
of
construction
plans
is
an
important
basis
for
the
budget.
Therefore,
the
construction
unit
leaders
before
the
start
of
the
unit
project
to
tissue
engineering,
materials
and
equipment,
industrial
scale,
economic
planning,
project
cost
and
other
personnel
to
seriously
familiar
with
the
drawings,
in-depth
on-site
field
survey
of
the
technical
and
economic
organizational
measures.
Project
cost
in
the
preparation
of
construction
design
is
directly
related
to
the
economic
interests
of
enterprises,
because,
in
the
project
cost
management
and
implementation
of
the
provisions
of
the
budget
scale,
the
cost
of
personnel
staff
plays
the
role
of
business
manager
in
charge;
in
the
bidding
and
construction
contract,
the
cost
commissioned
by
the
enterprise
legal
person
can
be
used
as
the
legal
representative
of
the
agent,
the
exercise
of
powers
conferred
by
enterprise
legal
person;
in
the
construction
and
budget
work,
supervision
plays
a
role
in
the
economy.
Therefore,
the
full
cost
of
in-house
staff
not
only
understands
technology,
understand
the
policy,
but
also
understands
the
role
of
legal
expertise
and
is
prepared
well
construction
design
and
improve
an
important
aspect
of
economic
efficiency
of
enterprises,
but
also
works
to
overcome
and
avoid
an
economic
dispute
settlement
reasonable
and
effective
way.
Finally,
the
construction
organization
of
this
document
is
very
important,
it
is
the
technical
and
economic
documents.
Construction
of
the
project,
be
sure
to
supervise
the
construction
and
control
of
organizational
design
to
ensure
the
project's
construction
order,
to
prevent
the
construction
design
a
mere
formality.
Engineering
construction
design
is
the
quality,
safety,
effective
measures
to
guarantee
progress.淺談項(xiàng)目管理中施工組織設(shè)計(jì)重要性
摘要:施工組織是項(xiàng)目建設(shè)和指導(dǎo)工程施工的重要技術(shù)經(jīng)濟(jì)文件。能調(diào)整施工中人員、機(jī)器、原料、環(huán)境、工藝、設(shè)備、土建、安裝、管理、生產(chǎn)等沖突,要對施工組織設(shè)計(jì)進(jìn)行監(jiān)督和限制,才能科學(xué)合理的保證工程項(xiàng)目高質(zhì)量、低成本、少耗能的完成。
關(guān)鍵字:項(xiàng)目管理;施工組織;設(shè)計(jì);重要性
施工組織設(shè)計(jì)是項(xiàng)目建設(shè)和指導(dǎo)工程施工的重要文件,是建筑施工企業(yè)單位能以高質(zhì)量、高速度、低成本、少消耗完成工程項(xiàng)目建筑的有力保證措施,也是加強(qiáng)管理、提高經(jīng)濟(jì)效益的重要手段,也是很正確處理施工中人員、機(jī)器、原料、方法、環(huán)境及工藝和設(shè)備,土建和安裝協(xié)作,消耗和供應(yīng),管理和生產(chǎn)等各種各樣的沖突,科學(xué)合理地、支配而有序地、均衡地組織項(xiàng)目施工生產(chǎn)的重要保障。
隨著社會(huì)主義市場經(jīng)濟(jì)的建立,建筑市場的競爭日趨激烈,客觀形勢對施工企業(yè)的要求越來越高,不僅在技術(shù)裝備、人員素養(yǎng)、施工組織者方面提出較高的要求,而且工程經(jīng)濟(jì)管理工作中有關(guān)工程預(yù)結(jié)算也面臨新的挑戰(zhàn)。嚴(yán)謹(jǐn)建筑市場形勢下,有些施工企業(yè)沒有主動(dòng)實(shí)行應(yīng)對措施,對員工的專業(yè)技術(shù)沒有更新、培訓(xùn),科學(xué)技術(shù)管理水平相當(dāng)落后,加上對編制審核施工組織設(shè)計(jì)沒有引起足夠的重視,因此就會(huì)出現(xiàn)以下幾種常見的狀況:
(1)開工前沒有編制審核施工組織設(shè)計(jì):不搞施工平面布置圖,材料亂堆亂放,土方運(yùn)出運(yùn)進(jìn),機(jī)械設(shè)備、勞動(dòng)力需求無支配,工程質(zhì)量、平安施工無保證措施,造成窩工奢侈現(xiàn)象嚴(yán)峻,管理水平較低。
(2)是否是專業(yè)人員編制施工組織設(shè)計(jì):為應(yīng)付上級部門及監(jiān)理單位、甲方檢查而給施工員或資料員代編施工組織設(shè)計(jì),因?yàn)橘Y料根本對現(xiàn)在的施工管理不了解而又是領(lǐng)導(dǎo)最近支配的,不得不胡亂編造,應(yīng)付了事。
(3)施工組織設(shè)計(jì)編制水平低:有的施工單位,不明白施工組織在施工過程中的重要性,寫一寫各分項(xiàng)施工工藝、畫張平面布置圖、工程進(jìn)度支配表,便認(rèn)為是施工組織設(shè)計(jì)了。
(4)要技術(shù)棄經(jīng)濟(jì):相當(dāng)多的施工企業(yè)單位在編制施工組織設(shè)計(jì)時(shí),只重視施工組織當(dāng)中的各分項(xiàng)工程的技術(shù)措施,沒有考慮分項(xiàng)工程經(jīng)濟(jì)指標(biāo)方面內(nèi)容,導(dǎo)致工程竣工結(jié)算時(shí)糾紛不斷,蒙受經(jīng)濟(jì)損失。
[例1]南寧市某小區(qū)某宿舍樓要對生活用水進(jìn)行一戶一表改造工程,但由于宿舍樓是八十年頭建成的,已經(jīng)有二十幾年了,業(yè)主擅自由樓和樓之間的自家雜物用房擠占了公用正常的通道,導(dǎo)致兩樓之間通道過于狹窄,通車?yán)щy,所以造成了施工材料須要人力搬運(yùn)到施工地點(diǎn),施工單位則以材料未進(jìn)入場地而要求增加材料的二次搬運(yùn)費(fèi),甲方不予簽認(rèn),造成了經(jīng)濟(jì)損失。假如施工單位在開工前進(jìn)行現(xiàn)場勘測,細(xì)致編制審核施工組織設(shè)計(jì)并在工程承包合同中附注加以說明,則可削減不必要的麻煩。
[例2]某住宅樓工程的基坑開挖,施工現(xiàn)場并不寬敞,施工單位施工時(shí)有施工組織設(shè)計(jì),但是無土方調(diào)查方案,沒有開挖的放坡系數(shù),也未進(jìn)行施工前土方積累計(jì)算,原本上勾機(jī)在坑上開挖就可以了,就因?yàn)槭┕そM織設(shè)計(jì)中沒有對地下調(diào)查,導(dǎo)致挖破了旁邊居民樓的給水管,致使成本增加,對放坡要示也沒有明確
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年度存量房買賣雙方權(quán)利義務(wù)合同范本4篇
- 大件運(yùn)輸車輛技術(shù)管理
- 二零二五年度內(nèi)外墻粉刷與室內(nèi)外安防系統(tǒng)集成合同
- 二零二五年度金融數(shù)據(jù)安全保密協(xié)議范本4篇
- 安全投入與經(jīng)費(fèi)保障
- 2025版高端住宅美縫施工質(zhì)量保證合同4篇
- 《大學(xué)物理下教學(xué)課件》電磁感應(yīng)習(xí)題
- 《漢英科技翻譯》課件
- 2025版苗圃場租賃與綠色認(rèn)證服務(wù)合同4篇
- 2025年度二手車交易車輛質(zhì)押擔(dān)保與售后服務(wù)協(xié)議4篇
- 山東省技能大賽青島選拔賽-世賽選拔項(xiàng)目52樣題(平面設(shè)計(jì)技術(shù))
- 幼兒園工作總結(jié)匯報(bào)課件
- 2024汽車租賃合同起訴狀范本模板
- 《民用爆炸物品安全管理?xiàng)l例》課件
- 2025屆南師附中集團(tuán)物理九年級第一學(xué)期期末經(jīng)典試題含解析
- 移動(dòng)通信室內(nèi)覆蓋工程施工技術(shù)
- 數(shù)獨(dú)比賽“六宮”練習(xí)題(96道)
- 人教版小學(xué)英語單詞表(完整版)
- 2024年4月自考02202傳感器與檢測技術(shù)試題
- 生產(chǎn)組織供應(yīng)能力說明
- 新入職員工培訓(xùn)考試附有答案
評論
0/150
提交評論