




版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
恒逸文萊PMB石油化工項(xiàng)目碼頭工程及配套工程施工水上沉樁首件樣板工程實(shí)施方案恒逸文萊PMB石油化工項(xiàng)目碼頭工程及配套工程施工PMBIslandPetrochemicalProjectofHengyiIndustriesSdnBhdJettyWorksandAuxiliaryProjectsConstruction水上沉樁樣板工程施工方案ImplementationMethodologyforSampleProjectofPilingWorks編制人Preparedby:審核人Reviewedby:批準(zhǔn)人Approvedby:Pahaytc&BentengJ.V.SdnBhdApr.2016
目錄Contents工程概況ProjectOverview1編制依據(jù)BasisofPreparation3實(shí)施目的ImplementationObjectives4實(shí)施準(zhǔn)備PreparatoryWorks..5施工工藝ConstructionProcess8驗(yàn)收程序AcceptanceProcedures10質(zhì)量控制QualityControl...10HSE保證措施HSESafeguardingMeasures.12水上沉樁樣板工程施工主要工序:Themainproceduresoftheinitialsampleprojectofpilingworksareasfollows:(1)、施工準(zhǔn)備:對(duì)現(xiàn)場(chǎng)施工人員做好技術(shù)安全交底工作;做好機(jī)械設(shè)備報(bào)審工作,打樁船進(jìn)場(chǎng)后做好錨纜布置工作;對(duì)進(jìn)場(chǎng)鋼管樁做好檢驗(yàn)工作,包括鋼管樁的原材料檢驗(yàn)報(bào)告、出廠檢驗(yàn)報(bào)告以及鋼管樁的外觀質(zhì)量。Constructionpreparations:performingtechnicalsafetybriefingsontheconstructors;submittingdocumentsoftheconstructionmachineriesandequipmentforapproval;arranginganchorcablesforthepilingbargeafteritsentrance;inspectingthesteelpipepilesdelivered,whichshouldincludetestreportsoftherawmaterials,deliveryinspectionreportsandappearancequalityofthesteelpipepile.(2)、測(cè)量定位:沉樁平面定位采用船載GPS定位系統(tǒng)控制為主,全站儀復(fù)核,樁頂標(biāo)高及貫入度采用兩臺(tái)水準(zhǔn)儀控制,通過(guò)在樁身、樁錘上用油漆標(biāo)出控制線,架設(shè)在大堤上的水準(zhǔn)儀進(jìn)行觀測(cè),以此確保沉樁過(guò)程處于受控狀態(tài)。具體樁位資料見下表:Surveyandpositioning:thepilingpositioningwillbemainlycontrolledbyship-borneGPSpositioningsystemandverifiedbytotalstation.Thepiletopelevationandpenetrationwillbecontrolledbytwolevelgauges.Markcontrollinesonthepileshaftandthehammerwithpaint,andobservewiththelevelgaugeplacedonshore,soastoensurethatthepilepositioniscontrolled.Dataofthespecificpilepositionsisasshowninthefollowedsheet:(3)、沉樁:測(cè)量定位后可進(jìn)行沉樁施工,首先進(jìn)行壓錘穩(wěn)樁,穩(wěn)樁停止后開始錘擊沉樁,為防止溜樁,開始沉樁時(shí)應(yīng)采用重錘壓樁,待樁基穩(wěn)定后開始錘擊,直至設(shè)計(jì)樁頂標(biāo)高CD+1.35m。1#引橋Y9-A采用重錘輕擊,Y9-B采用正常錘擊,Y9-C視前兩根樁的沉樁貫入度情況決定正常錘擊還是重錘高檔。沉樁過(guò)程中須及時(shí)做好沉樁記錄,真實(shí)反映沉樁實(shí)際情況。沉樁結(jié)束后,及時(shí)對(duì)樁位進(jìn)行復(fù)測(cè),及時(shí)反饋樁的偏位情況。Piling:pilingoperationcanbeimplementedafterthesurveyandpositioning.Stabilizethepilefirstwithhammerpressure.Hammeringcanbecommencedafterthestabilizingoperation.Inordertopreventpiledisplacement,heavyhammershouldbeusedtopressdownthepileattheverybeginning.ThenstarthammeringthepiletodesignedelevationofCD+1.35mafterthepilefoundationisstabilized.UsesmallimpactenergybyheavyhammertodrivepileY9-Aof1#approachbridgeandnormalimpactenergyforpileY9-B.ThendecidewhethertousenormalimpactenergyorhighimpactenergywithheavyhammerforthedrivingofpileY9-C,whiletakingthepenetrationconditionsoftheabovetwopilesintoconsideration.Keeppilinglogstimelysoastofaithfullyrecordtheactualpilingcondition.Conductresurveyonthepositionofthepiledrivenandreportthepositiondeviationtimely.(4)、停錘:本工程沉樁以標(biāo)高控制為主(CD高程+1.35m),貫入度校核。沉樁控制貫入度為最后10擊平均貫入度小于5mm/擊。當(dāng)沉樁貫入度已達(dá)到控制貫入度,而樁端未達(dá)到設(shè)計(jì)標(biāo)高時(shí),應(yīng)繼續(xù)錘擊貫入100mm或錘擊30~50擊,此時(shí)貫入度不應(yīng)大于控制貫入度,且樁端距設(shè)計(jì)標(biāo)高不宜超過(guò)2m。超過(guò)2m時(shí),應(yīng)會(huì)同設(shè)計(jì)單位研究解決。當(dāng)樁端已達(dá)到設(shè)計(jì)標(biāo)高而貫入度仍較大時(shí),應(yīng)繼續(xù)錘擊使其貫入度達(dá)到控制貫入度,具體接樁方案應(yīng)會(huì)同設(shè)計(jì)單位研究解決。沉樁偏位超出允許偏差時(shí)(直樁:100mm),應(yīng)及時(shí)與設(shè)計(jì)單位聯(lián)系,研究解決方案。Hammerstopping:thepilingworksofthisprojectshallbemainlycontrolledbyelevation(CDelevation+1.35m)andverifiedbypenetration.Thecontrolledpenetrationforpilingoperationisthattheaveragepenetrationofthelast10strikesshouldbelessthan5mm/strike.Whenthepenetrationhasreachedthecontrolledpenetration,butthepiletipstillhasnotreachedthedesignelevation,thepileshouldbecontinuouslyhammeredtopenetrate100mmdeeperorcontinuouslyhammeredfor30~50strikeswhiletheadditionalpilepenetrationshouldnotbegreaterthanthecontrolledpenetrationandtheactualpiletiptothedesignedpiletipelevationshouldnotexceed2m(whenitismorethan2m,shallconsultwiththedesigninstitutetostudyandsolvethesituation).Whenthepiletiphasreachedthedesignelevationandthepenetrationisstilllargerthanthecontrolledvalue,thepileshouldbecontinuouslyhammereduntilthepilepenetrationreachesthecontrolledpenetration,specifiedpilesplicingmethodologyshallbesolvedwiththedesigninstitute.Ifthepilepositiondeviationisbeyondtheallowablevalue(100mmforverticalpile),thecontractorshallcontactwiththedesigninstituteintimeforsolvingtheproblem.驗(yàn)收程序AcceptanceProcedures首件工程完成后,由港區(qū)項(xiàng)目組工程師組織對(duì)鋼管樁的貫入度、樁頂標(biāo)高、設(shè)計(jì)標(biāo)高處樁頂?shù)钠矫嫖恢靡约皹渡泶怪倍冗M(jìn)行檢測(cè)、驗(yàn)收和評(píng)定。施工單位應(yīng)對(duì)已完成的首件工程的施工工藝和質(zhì)量進(jìn)行評(píng)價(jià),提交總結(jié)報(bào)告。由港區(qū)項(xiàng)目組工程師組織有關(guān)人員對(duì)其進(jìn)行分析、研究,驗(yàn)證施工工藝的可靠性、合理性,提出改進(jìn)意見,確定最佳施工方法,并形成評(píng)審會(huì)議紀(jì)要。Aftercompletionoftheinitialsampleproject,inspection,acceptanceandevaluationonthepilepenetration,piletopelevation,planepositionofpiletopatdesignelevationandtheperpendicularityofpileshaftshallbeorganizedbyengineersofRegionalConstructionTeam.TheContractorshallconductevaluationontheconstructionprocessandqualityoftheinitialsampleprojectcompleted,andsubmitrelevantsummaryreport.TheRegionalConstructionTeamshallorganizerelevantpersonneltoanalyzeandstudythereport,verifythereliabilityandfeasibilityoftheconstructionprocess,putforwardimprovementsuggestions,determinetheoptimumconstructionmethodandmakeMinutesofMeetingforit.首件工程經(jīng)評(píng)審?fù)ㄟ^(guò)后,施工單位進(jìn)一步完善后形成最終施工方案,在此基礎(chǔ)上進(jìn)行水上沉樁工程的施工。Aftertheinitialsampleprojectpassestheevaluation,theContractorshalldevelopthefinalconstructionmethodologyafterfurtherimprovementstoguidethefollowingoverwaterpilingworks.質(zhì)量控制QualityControl7.1、樁的質(zhì)量控制PileQualityControl(1)、本工程的鋼管樁已經(jīng)委托上海三航--亞新太鋼管有限公司制作,為更好的控制樁的質(zhì)量,從制樁開始,我公司和港區(qū)項(xiàng)目組已經(jīng)派出駐廠人員對(duì)樁的質(zhì)量進(jìn)行監(jiān)控,確保鋼管樁質(zhì)量。WehavecommissionedShanghaiThirdNavigationASPSteelPipeCo.,Ltdfortheprefabricationofsteelpipepiles.Inordertoeffectivelycontrolthepilequality,attheverybeginningoftheprefabrication,theRegionalConstructionTeamandourcompanyhadalreadyassignedresidentrepresentativetothefactorytomonitorthefabricationsoastoguaranteethequalityofsteelpipepiles.(2)、樁在沉樁前必須會(huì)同港區(qū)項(xiàng)目組對(duì)樁的規(guī)格、樁身質(zhì)量進(jìn)一步作全面的檢查,對(duì)不合格樁不得用于沉樁。Beforepilingoperation,theContractortogetherwiththeRegionalConstructionTeamshallmakefurthercomprehensiveinspectionsonthespecificationsandqualityofthepiles.Thoseunqualifiedonescannotbedriven.7.2、沉樁時(shí)質(zhì)量控制要點(diǎn)FocalPointsforQualityControlduringPiling(1)、根據(jù)地質(zhì)資料加強(qiáng)觀測(cè)和指揮,做好對(duì)“溜樁”的準(zhǔn)備措施,采用重錘輕擊,避免樁頂受損。Strengthenobservationandcommandingonthebasisofthegeologicaldata;takepreparatorymeasuresagainstpiledisplacement;Useheavyhammertostrikethepilegentlyinordertopreventdamagingthepiletop.(2)、樁駁出廠前隨船攜帶一桶防腐漆,用于管樁吊裝過(guò)程中可能受纜繩纏裹而導(dǎo)致表面防腐層局部受損的修補(bǔ)。Beforedepartureofthepiletransportationbarge,abarrelofanticorrosionpaintshallbealsodeliveredsoastorepairthecoatingwhichmaybepartiallydamagedduringhoistingandtransportationoperation.(3)、禁止在錘擊過(guò)程中用移船的方法糾正樁位。Itisstrictlyprohibitedtocorrectthepilepositionbymovingthevesselduringhammering.(4)、錘擊過(guò)程中,如出現(xiàn)貫入度反常,樁身突然下降時(shí)應(yīng)立即停錘,會(huì)同港區(qū)項(xiàng)目組、設(shè)計(jì)等單位查明原因,采取有效措施后,方可繼續(xù)沉樁。Duringhammering,intheeventofabnormalpenetrationandthepileshaftpenetratestoomuchabruptly,theoperationshouldbesuspendedimmediately.TheContractortogetherwiththeRegionalConstructionTeam,designinstituteandetc.shallcarryoutstudiestoidentifythecause.Pilingworkscanberesumedaftertakingeffectivemeasures.(5)、移船過(guò)程中,打樁船上派專人看纜,防止纜繩蹩樁。Whenmovingthevessels,dedicatedpersonshouldbeassignedtowatchovertheanchorcablestopreventthemfromcollidingwithpilesdriven.(6)、本次沉樁時(shí)以標(biāo)高控制為主,貫入度校核。Thepilingworkswillbemainlycontrolledbyelevationandverifiedbypenetration.(7)、做好打樁記錄,為首件沉樁后質(zhì)量驗(yàn)收提供原始記錄。Makepilinglogsfaithfully,soastoprovideoriginalrecordsforthequalityacceptanceoftheinitialsampleproject.(8)、樁基檢測(cè)過(guò)程中,配合檢測(cè)人員,提供地質(zhì)、樁基、樁位、沉樁記錄等資料,并就樁基檢測(cè)結(jié)果及時(shí)與設(shè)計(jì)人員聯(lián)系,確保工程沉樁質(zhì)量符合要求。Duringpilefoundationtesting,theContractorshallcooperatewiththetesterstoprovidedatarelatingtogeology,pilefoundation,pileposition,pilinglogsandsoon.Timelycommunicatewiththedesigneronthepilefoundationtestingresults,soastoensurethatthepilingqualitycanmeettherequirements.8、HSE保證措施HSESafeguardingMeasures8.1、安全保證措施HSESafeguardingMeasures(1)、嚴(yán)格建立安全生產(chǎn)責(zé)任制,職責(zé)明確,落實(shí)到人。Establisharigidsystemofresponsibilitiesinsafetyconstructionandmaketheresponsibilitiesofspecificpersonclear.(2)、所有施工管理及作業(yè)人員必須持證上崗,特殊工種人員必須持有相應(yīng)的安全操作證及技術(shù)操作證。Allconstructionmanagementandoperationpersonnelmusthaverelevantcertificates;personneltakingspecializedpostsmustholdcorrespondingsafetyoperationcertificatesandtechnicaloperationcertificates.(3)、建立安全檢查制度,檢查記錄齊全,隱患整改做到定人、定時(shí)、定措施。Establishsafetyinspectionsystemandkeepcompleteinspectionrecords.Therectificationsofhiddendangersmustbeimplementedbythespecificpersonwiththestipulatedmeasureswithintheregulatedtimeline.(4)、首件沉樁施工前對(duì)工人進(jìn)行全面的針對(duì)性安全技術(shù)交底,受交者履行簽名手續(xù)。Priortotheinitialsampleproject,conductcomprehensivesafetytechnologybriefingsontheconstructors,andthosewhoareinstructedshouldperformthesignatureformality.(5)、打樁移船時(shí),錨纜布置時(shí)要做好相應(yīng)安排。首件沉樁完成后,應(yīng)在樁頂上設(shè)置警示燈,提醒過(guò)往或周邊船舶注意避讓,嚴(yán)禁各型船只靠停、帶纜繩等。Whenmovingthevesselsduringpiling,thelayoutofanchorcablesmustbeproperlyarranged.Setupwarninglightsforthepilesdriventokeepthepassingorsurroundingvesselsaway.Approachingofanyirrelevantvesselsisprohibited.(6)、布置沉樁任務(wù)時(shí)述安全生產(chǎn)要點(diǎn),落實(shí)安全生產(chǎn)措施。召開生產(chǎn)會(huì)議要評(píng)述安全生產(chǎn)狀況,進(jìn)行有針對(duì)性、有目的、有內(nèi)容的安全生產(chǎn)教育,增強(qiáng)職工的安全生產(chǎn)意識(shí)。Whenassigningpilingtasks,statethekeyitemsforsafetyinproductionandenforcethesafetymeasures.Reviewthesafetyproductionconditionsandconducttargeted,aimedandsubstantialsafetytrainingsatproductionmeetings,soastostrengthentheemployees’awarenessofsafetyinproduction.(7)、所有施工人員進(jìn)入施工現(xiàn)場(chǎng)必須戴好安全帽,穿好救生衣。工作前嚴(yán)禁飲酒。Allconstructorsenteringintotheconstructionsitemustwearsafetyhelmetsandlifejacketsproperly.Consumingalcoholbeforeworkingisstrictlyprohibited.(8)、沉樁必須由專人指揮,分工明確,統(tǒng)一信號(hào)。Thepilingworksmustbeconductedbydedicatedpersonwithresponsibilitiesclearlydividedanduniformsignals.(9)、注意用電安全,電箱和配電板及用電方式均符合安全要求。氧氣、乙炔等危險(xiǎn)物品專門另行儲(chǔ)放,并由專人保管。Payspecialattentiontothesafetyutilizationofelectricity;theelectricityboxes,switchpanelsandthemodeofelectricityutilizationshouldallconformtothesafetyrequirements.Dangerousmaterialslikeoxygen,acetyleneandetc.,shouldbestoredexclusivelyandmanagedbydedicatedperson.(10)、檢測(cè)人員施工過(guò)程中,由打樁船配合其檢測(cè)工作,提供人員上下及樁上檢測(cè)等。Whenthetestersareimplementingthetests,thepilingbargeshouldprovidepossibleassistancestocooperatewiththetestingworks.(11)、密切注意天氣變化情況。隨時(shí)與當(dāng)?shù)睾J隆⒕葥萍胺琅_(tái)部門保持密切聯(lián)系,處理緊急事件。Paycloseattentiontoweatherchanges,keeptimelyandclosecontactwithlocalmarinedepartment,searchandrescuedepartmentandtyphoonpreventiondepartmenttohandlewithemergencies.8.2、環(huán)境保護(hù)措施EnvironmentalProtectionMeasures(1)、施工機(jī)械產(chǎn)生的廢油料及潤(rùn)滑油等,必須集中收集交由當(dāng)?shù)鼐哂匈Y質(zhì)的廢棄物處理公司統(tǒng)一處理。Wasteoil/ducedbyconstructionmachineriesmustbecollectedandhandedovertoqualifiedlocalwastedisposalcompanyforcollectivedisposal.(2)、生產(chǎn)用油料必須嚴(yán)格保管,防止泄漏,污染水質(zhì),加油區(qū)設(shè)置滴油托盤。Oilforproductionmustbestrictlystoredinordertopreventleakageandpollutingwater.Provideoildriptraysinrefuelingarea.(3)、船舶施工時(shí)期生活用水禁止隨意排放,必須集中收集,使用船舶自帶的污水處理裝置進(jìn)行處理,經(jīng)有資質(zhì)的檢測(cè)公司檢測(cè)合格后排放。如污水處理裝置損壞無(wú)法處理的通知岸上準(zhǔn)備容器接受污水。Domesticsewageproducedbyconstructionvesselscannotbedischargedfreely;instead,itmustbecollectedandtreatedbythesewagetreatmentequipmentonboard.Itcanbedischargedafterpassingthetestscarriedoutbyqualifiedtestingcompany.Incasethesewagetreatmentequipmentonvesselsisdamagedandthesewagecannotbeproperlytreated,thevesselsshouldinformdepartmentsonshoretopreparecontainersforacceptanceofthesewage.(4)、船舶作業(yè)前要檢查輸油軟管和有關(guān)設(shè)備,軟管損壞是造成溢油的主要原因。使用期間要定期檢查,已保證盡早發(fā)現(xiàn)溢漏和損壞。Inspectoilhosesandrelevantequipmentbeforevesseloperation,becausehosedamageisthemaincauseofoilleakage.Conductregularpressuretestsduringoperationinor
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 提高語(yǔ)文試題通過(guò)率試題及答案
- 食品安全風(fēng)險(xiǎn)防控策略考查試題及答案
- 江西省余干縣七年級(jí)地理上冊(cè) 3.3降水的變化與分布教學(xué)設(shè)計(jì) (新版)新人教版
- 一年級(jí)道德與法治下冊(cè) 第一單元 我愛我家 第2課《在家人關(guān)愛下成長(zhǎng)》教學(xué)設(shè)計(jì) 冀教版
- Module 10 Unit 1 Don't talk in the library (教學(xué)設(shè)計(jì))-2024-2025學(xué)年外研版(三起)英語(yǔ)六年級(jí)上冊(cè)
- 古代文學(xué)史相關(guān)試題及答案分享
- 江蘇省江陰市高中生物 第二章 組成細(xì)胞的分子 2.2.2 生命活動(dòng)的主要承擔(dān)者-蛋白質(zhì)教學(xué)設(shè)計(jì) 新人教版必修1
- 會(huì)務(wù)接待考試題及答案
- 三年級(jí)英語(yǔ)上冊(cè) Unit 1 School and Numbers Lesson 3 How Are You教學(xué)設(shè)計(jì) 冀教版(三起)
- 重慶市巴南區(qū)石龍初級(jí)中學(xué)初中體育與健康教育《談“艾”不必色變》教學(xué)設(shè)計(jì) 新人教版
- 常見惡性心律失常的護(hù)理
- 2025年1月浙江省高考物理試卷(含答案)
- 天然氣站租賃合同
- 2024年貴州貴州烏江煤層氣勘探開發(fā)有限公司招聘筆試真題
- 【公開課】同一直線上二力的合成+課件+2024-2025學(xué)年+人教版(2024)初中物理八年級(jí)下冊(cè)+
- (正式版)HGT 22820-2024 化工安全儀表系統(tǒng)工程設(shè)計(jì)規(guī)范
- (2024年)橋梁施工質(zhì)量控制要點(diǎn)
- NB-T 47013.15-2021 承壓設(shè)備無(wú)損檢測(cè) 第15部分:相控陣超聲檢測(cè)
- 空調(diào)清洗施工方案
- 《錢的旅行》課堂 課件
- 《數(shù)據(jù)庫(kù)驗(yàn)收規(guī)定》word版
評(píng)論
0/150
提交評(píng)論