




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)
文檔簡介
1、.6Flow of Turrnovver ProoceddureeProject Execution Plan rev.2 PAGE 156Vopak Caojing Terminal Project ATTACCHMEENT 16.1Sheett 1 of 6DIVISSIONN OFF REESPOONSIIBILLITIIES FORR TUURNOOVERR.Mechaaniccal CommpleetioonPre-ccommmisssionninggItemContrracttorOwnerr/SCCContrracttorOwnerr/ SSC1.Vesseels DDrumms
2、a.Instaall alll drrum intternnalss annd pperfformm leevellingg addjusstmeentss ass reequiiredd.Xb.Cleann ouut aall vesssells aand opeen mmanhholees aand othher opeeninngs forr innspeectiion.Xc.Inspeect forr meechaaniccal commpleetennesss annd ccleaanliinesss.Xd.Open, clleann annd cclosse vvessselss
3、duurinng aand aftter fluushiing, iff reequiiredd.XX(Witnnesss)2.Furnaacessa.Perfoorm colld hhydrrosttatiic ttestt onn coomplleteed ffurnnacee cooilss.Xb.Witneess hyddrosstattic tesst.Xc.Emptyy waaterr frrom coiil aand airr bllow if neccesssaryy.Xd.Proviide furrnacce ddry outt prroceedurre bbaseed oo
4、n mmanuufaccturrers rrecoommeendaatioons. Xe.Checkk fuurnaace dryy ouut pprocceduure. Xf.Checkk ouut iinsttrummentts oon ffurnnacee foor ddry outt.Xg.Prepaare furrnacce aand fueel ssysttemss foor ddry outt opperaatioon.Xh.Dry oout thee fuurnaace folllowwingg thhe pprocceduure.XATTACCHMEENT 16.1Sheet
5、t 2 of 6DIVISSIONN OFF REESPOONSIIBILLITIIES FORR TUURNOOVERR.Mechaaniccal CommpleetioonPre-ccommmisssionninggItemContrracttorOwnerr/ SSCContrracttorOwnerr/ SSC3.Pumpssa.Inspeect pummps intternnalss cllearrancce, seaals beaarinngs aftter recceippt aat ssitee.Xb.Witneess pummps intternnal insspecctio
6、on.Xc.Set aand colld aaliggn aall pummps andd drriveers, fuurniish reccordd off allignnmennt aat OOwneer. Chheckk paaralllell fllangge aaliggnmeent.Xd.Couplle ppumpps tto ddrivverss affterr thhe mmotoor hhas beeen cchecckedd foor rrotaatioon, runn-inn foor hhourrs uuncoouplled, annd hhavee beeariing
7、ss chheckked.Xe.Removve aall russt pprevventtatiivess, ooil greeasee, eetc., uusedd too prrepaare thee eqquippmennt dduriing connstrructtionn.Xf.Proviide andd innstaall prooperr luubriicannts immmediiateely priior to staart-up.Xg.Instaall temmporraryy paackiing if perrmannentt paackiing is nott suui
8、taablee foor fflusshinng. Innstaall temmporraryy suuctiion strrainnerss beeforre fflusshinng.Xh.Mechaaniccal seaals andd peermaanennt ppackkingg too bee innstaalleed pprioor tto sstarrt-uup.Xi.Make finnal cheeck of colld aaliggnmeent aftter fluushiing.XATTACCHMEENT 16.1Sheett 3 of 6DIVISSIONN OFF RE
9、ESPOONSIIBILLITIIES FORR TUURNOOVERR.Mechaaniccal CommpleetioonPre-ccommmisssionninggItemContrracttorOwnerr/ SSCContrracttorOwnerr/ SSC4.Misceellaaneoous Mecchannicaal EEquiipmeenta.Instaall alll miisceellaaneoous mecchannicaal eequiipmeent succh aas lloaddingg arrms, looadiing raccks, miixerrs, fil
10、lterrs, agiitattorss, sscalles craaness, ffanss, eetc.Xb.Mainttainn thhe eequiipmeent up to thee tiime of colld rrun-in.Xc.Lubriicatte, andd addjusst aall equuipmmentt immmeddiattelyy prriorr too ruun-iin.Xd.Perfoorm alll teestss; rrun-in equuipmmentt.Xe.Assisst OOwneer tto ccaliibraate alll soolidd
11、s wweigghinng aand meaasurringg deevicces in theeir fieeld-insstallledd opperaatinng pposiitioons. FFurnnishh reecorrd oof aall callibrratiion datte. Shhow thaat eequiipmeent meeets thee sppeciifieed ttoleerannce forr acccurracyy ovver fulll rrangge oof ooperratiing conndittionns.X5.Pipinnga.Hydroos
12、taaticcallly ttestt alll ppipiing as reqquirred by draawinngs andd sppeciificcatiionss.Xb.Instaall alll teempoorarry sstraaineers, annd ttempporaary blaankss, ccallled forr onn drrawiingss annd sspeccifiicattionn.Xc.Witneess andd appproove alll fiiledd prresssuree teestss.Xd.Scheddulee annd ccarrry
13、oout watter fluushiing opeerattionns.XX(Witnnesss)e.Cleann teempoorarry sstraaineers durringg XATTACCHMEENT 16.1Sheett 4 of 6DIVISSIONN OFF REESPOONSIIBILLITIIES FORR TUURNOOVERR.Mechaaniccal CommpleetioonPre-ccommmisssionninggItemContrracttorOwnerr/ SSCContrracttorOwnerr/ SSCand aafteer tthe fluush
14、iing opeerattionn. Remmovee coontrrol vallvess beeforre fflusshinng.6.Electtriccala.Removve aall russt pprevventtatiivess, ooilss, ggreaase, ettc., ussed to preeserrve equuipmmentt duurinng cconsstruuctiion.Xb.Instaall neccesssaryy luubriicannts.Xc.Perfoorm alll neecesssarry nnon-opeerattingg teests
15、s annd ccheccks on genneraatorrs ffolllowiing mannufaactuurerrs insstruuctiion.Xd.Perfoorm apppliccablle iinsttalllatiion, chheckks, adjjusttmennts, annd ffielld ttestts pprioor eenerrgizzingg.Xe.Energgizee alll ssubsstattionns.Xf.Calibbratte aand sett reelayys oon aall cirrcuiit bbreaakerrs. Seet t
16、timee deelayys.Xg.Checkk opperaabillityy off emmerggenccy aand insstruumennt ppoweer ssysttemss.Xh.Assumme rrespponssibiilitty ffor maiinteenannce andd opperaatioon oof aall eleectrricaal ffaciilittiess whhichh arre eenerrgizzed.X11.Instrrumeentaatioona.Perfoorm reqquirred preessuure tessts on insst
17、ruumennt ttakee-offf ppipiing andd aiir ppipiing andd tuubinng.Xb.Checkk coontiinuiity andd iddenttifiicattionn off trranssmisssioon aand conntrool ssysttemss foor eeachh innstrrumeent to inssuree prropeer XATTACCHMEENT 16.1Sheett 5 of 6DIVISSIONN OFF REESPOONSIIBILLITIIES FORR TUURNOOVERR.Mechaanic
18、cal CommpleetioonPre-ccommmisssionninggItemContrracttorOwnerr/ SSCContrracttorOwnerr/ SSChook-up. TThiss apppliies to botth ppneuumattic andd ellecttriccal sysstemms.c.Witneess alll reequiiredd teestss.Xd.Removve cconttroll vaalvees, rottameeterrs, oriificce pplattes, fllow nozzzlees, vennturri aand
19、 othher inllinee prrimaary floow eelemmentts, strrainnerss, aand othher equuipmmentt ass neecesssarry bbefoore hyddrosstattic tesstinng. Reeinsstalll aand cheeck forr diirecctioon oof ffloww annd ppropper opeerattionn, ii.e., ttravvel, acctioon wwithh aiir ffailluree, eetc.Xe.Instaall airr prresssur
20、ee annd ttempperaaturre ggaugges.Xf.Calibbratte aall insstruumennts.Xg.Instaall alll orrifiice plaatess affterr waaterr fllushhingg annd / orr bllowiing.Xh.Instaall seaalinng ffluiids wheere reqquirred.X12.Safetty EEquiipmeenta.Instaall saffetyy vaalvees oor ddummmy sspoools durringg coonsttrucctioo
21、n.Xb.Scheddulee saafetty vvalvve ttesttingg wiith Ownners aagreeemeent, suuffiicieentlly iin aadvaancee off sttartt-upp too peermiit oordeerlyy innstaallaatioon.Xc.Removve aas nneceessaary andd trranssporrt aall saffetyy vaalvees tto aand froo teest facciliitiees.Xd.Proviide tesst ffaciilittiess foo
22、r ssafeety vallvess annd ccarrry oout. XATTACCHMEENT 16.1Sheett 6 of 6DIVISSIONN OFF REESPOONSIIBILLITIIES FORR TUURNOOVERR.Mechaaniccal CommpleetioonPre-ccommmisssionninggItemContrracttorOwnerr/ SSCContrracttorOwnerr/ SSCe.Witneess tessts andd doo taaggiing.Xf.Instaall alll saafetty vvalvves aftter
23、 tesst.Xg.Paintt annd / orr taag aall saffetyy vaalvees, carr seealeed vvalvves andd saafetty eequiipmeent.Xh.Instaall carr seealss onn bllockk vaalvees wwherre rrequuireed.XProject Execution Plan rev.2 PAGE 159Vopak Caojing Terminal Project ATTACCHMEENT 16.3Sheett 1 of 2Date:Letteer NNo.:File No.:M
24、r xxxxxxxxxxxxxxxxxxxxxProjeect MannageerxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxDear Mr xxxxxxxxxxxxxxxxxNOTICCE OOF MMECHHANIICALL COOMPLLETIIONThis is to nottifyy yoou tthatt thhe uunitt sttatee heereiin wwilll bee tuurneed ooverr too yoou iin aaccoordaancee wiith Artticl
25、le xxxxxxx oof tthe Conntraact andd thhe TTurnn Ovver Proocedduree, aand undder thee coondiitioons desscriibedd beeloww :(1)Unit to be Turrnedd Ovver:(2)Date to be Turrnovver:2.1Date of firrst Punnch Lisst ssubmmittted:2.2Date of Commmennts givven by Ownner:2.3Complletiion Datte oof aall worrk rrema
26、ainiing on Punnch Lisst aas mmarkked by Ownner:(3)Turnooverr Coondiitioons:3.1Remaiininng wworkk too bee peerfoormeed aafteer tturnningg ovver uniit iis aas sshowwn oon AAttaacheed PPuncch LListt.3.2Remaiininng wworkk wiill be commpleetedd byy:(4)Attacchmeentss:Punchh Liist, daatedd:ATTACCHMEENT 16.
27、3Sheett 2 of 2It iss reequeesteed tthatt thhe CCerttifiicatte oof MMechhaniicall Coomplletiion be isssuedd inn acccorrdannce witth tthe Turrnovver Proocedduree.Yourss faaithhfulllyRCC CCONSSORTTIUMM _XXXXXXXXXXXXXXXXXXXPROJEECT MANNAGEERProject Execution Plan rev.2 PAGE 162Vopak Caojing Terminal Pro
28、ject ATTACCHMEENT 16.4Sheett 1 of 2Date:Letteer NNo.:File No.:Mr xxxxxxxxxxxxxxxxxxxxxProjeect MannageerxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxDear Mr xxxxxxxxxxxxxxxxxNOTICCE OOF CCOMPPLETTIONN OFF REEPAIIR WWORKKThis lettterr iss too nootiffy yyou thaat aall thee woork it
29、eems menntioonedd inn thhe ffolllowiing notticees hhavee beeen perrforrmedd byy Coontrracttor :(1)Unit(2)Noticce oof MMechhaniicall CoomplletiionNo.Datedd(3)Ownerrs Notticee off Reepaiir WWorkkNo.DateddIn thhis reggardd, iit iis rrequuestted thaat tthe Cerrtifficaate of Mecchannicaal CCompplettionn bee isssueed iin aaccoordaancee wiith thee Tuurnooverr Prroceedurre aas mmutuuallly aagreeed.ATTACCHMEENT 16.4Sheett 2 of 2Yourss faaithhfulllyRCC CCONSSORTTIUMM_XXXXXXXXXXXX
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 駕校場地租賃合同
- 悅海一品國慶活動方案
- 情人節(jié)商城活動方案
- 情侶婚禮體驗活動方案
- 驚蟄線上活動方案
- 惠州小公司團建活動方案
- 意甲賽場活動方案
- 感動師恩活動方案
- 感恩喚醒活動方案
- 感恩插花活動方案
- 2024年江西省公安廳招聘警務輔助人員考試真題
- 2025年湖北省中考英語真題含答案
- 砂石銷售提成管理制度
- 2025年湖南省中考生物試卷及答案
- 2025至2030中國地效飛行器行業(yè)產(chǎn)業(yè)運行態(tài)勢及投資規(guī)劃深度研究報告
- 2025年四川省眉山市中考化學試卷及答案
- 2025年重慶市中考語文試卷(含解析)
- 2025年湖北省普通高中學業(yè)水平合格性考試模擬(三)歷史試題(含答案)
- 廣東省中山市2023-2024學年八年級下學期語文期末試卷(含答案)
- 2025至2030中國處方呼吸藥物行業(yè)發(fā)展趨勢分析與未來投資戰(zhàn)略咨詢研究報告
- 2025年河南高考真題化學試題含答案
評論
0/150
提交評論