




版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、(文檔含英文原文和中文翻譯)interpretation, introduction and analysis, study the preparation of district level (2-3 squareunit) of the control regulation in response to the traditional regulatory control problemoften encountered when has the advantage and flexibility, in particular, to highlight it forthe plannin
2、g and management department can provide a new tool for management andcoordination and more flexible to deal with complex changes in the market diversity, theprotection of the Government of the characteristics of public service functions. Finally, thefuture also need to block-level control regulation
3、 of the legal status of the application of11.1 Traditional regulatory control can not fully reflect the transformation ofgovernment functionsWith the deepening of reform, the government functions under the planned economicsystem by the all-around type to a service-oriented transformation of the func
4、tions of theGovernment focuses on government control and the provision of public services twoaspects: First, we must deal with social activities in the various questions, function ofmaintaining social stability and order; two social development is to provide the necessarypublic goods, in particular,
5、 the market can not afford or are unwilling to provide publicgoods. At city-building, more and more real estate enterprises and industrial enterpriseshave become the mainstay of city development and construction, more and more with theright to speak, when the government must release the necessary pe
6、rmissions in order toplay the role of market mechanisms, while at the same time be able to achieve maintainingthe social function of stability, and ensure the supply of public goods, needed to reflect theGovernment represented by the maximization of public interest, this is not the original2space-ba
7、sed content-control regulations can be reflected.1.2 Traditional regulatory control results to the transformation of public policyhave a considerable gapCity planning as a public policy, determined at the overall planning of urban and ruralspatial distribution, the citys public resources to conduct
8、an effective configuration of theliving environment to make the corresponding request, the need for further construction ofthe city to conduct a comprehensive coordination, guidance and restraint, and madeavailable to the management of the Town Planning Department of a management tool.Traditional co
9、ntrol regulations although the preparation of a comprehensive set of controlindicators and measures, but because of its factual findings to the block-type control chartis provided in the form of a lack of overall balance is always the aspect as well as theflexibility to respond to changes in the mar
10、ket.Changing market demand in the face of too rigid3is the nature of the industry, and what mode of transportation and living elements and soon. Often wait until the need to implement when the city-building mechanisms have takenplace in very many changes in the main body of investment, development p
11、atterns,construction and operation of regional mechanisms and so on with the original planningassumptions are inconsistent, industry, transport, mode of living have been Ultra-out theoriginal, this time charged with the regulation already completed will become very out ofdate.1.4Prior to this, as ar
12、e Beijings Daxing county, to carry out the construction of satellitetowns, the status quo conditions and Metro Planning has a larger gap between theobjectives, the lack of sufficiently attractive to the urban areas can not effectively alleviatethe stress. For instance: the lack of public facilities,
13、 facilities standards have been too low,with the center city poor transport links and so on. How to achieve the status quo to theMetro from the blueprint for change? At Daxing Metro Planning (2005 -2020 years)from the Metros construction to start the implementation process, identified through thecon
14、struction of rail transit, urban road construction, public service facilities, the transfer ofadministrative functions, cultural and educational function of the introduction of theintroduction of leading industries six elements of the main construction of the Metro guide:the role of these elements t
15、ogether, and based on their spatial characteristics influence the4scope and timing on reasonable arrangements to promote the development of Metrosconstruction, so that Metro be able to at the planning blueprint for the status quo graduallyon the foundation can be achieved.Epistasis plans face simila
16、r macro-planning requirements, is clearly not a specific plotplan can be fully reflected in, let alone to cope with up to 15 years in the planning of theimplementation process of various elements of the Change.2.5(18 m), Medium (18-45 meter), high (45-60 m) and 60 meters above 4, the implementationo
17、f each blocks range of benchmarks; to improve the living environment in accordance withthe overall goals and other conditions, strength of construction will be divided into blocksof low-density, medium density, high-density third gear.facilitateTo block as a unit, decomposition and quantify the epis
18、tatic planning functions andDominant in determining the neighborhood function, construction and classificationof the total construction scale, construction baseline height, strength of construction scopeof the facilities after the configuration of such factors, whether developers are still at alllev
19、els of government to entrust the preparation of land-control regulations, planning andmanagement departments have a strong public policy based on quantifiable and can beused to guide and monitor the preparation of regulatory control block content, can ensurethe configuration of the various facilitie
20、s such as the contents of rigidity to theimplementation, but also be able to through the overall control and strength to the blockclassification must control regulations left behind the flexibility of space.63.3Highlight the protection of the Governments public service functionsBlock-level control r
21、egulations, all land classified as Class A land (for the city toprovide basic support and services) and Class B land (Government under the guidance ofthe market development of land), as well as X-type sites (sites to be studied) threecategories. One of, A-type sites are the main green space, infrast
22、ructure, public servicefacilities, etc. must have a public property, mainly by the Government as an investmentand management entities of the public space, its emphasis on the priority theimplementation of space, thereby protecting the public interest priority . Comparatively7speaking, the original c
23、oncern of the traditional regulatory control elements at street levelspace of the controlled regulation of take a back seat, the.In general, block-level regulatory control to add a meso-level studies, preparation ofregulatory control block provides a fresh discussion of the work platform, as well as
24、planning and management provided some actionable public policy basis for improvedtraditional regulatory control of some problems. However, block-level control regulation asa new thing also have a number of issues need to be further explored and research:First of all, the necessary clarity of its leg
25、al status and recognition. Because ofSecondly, the required supporting management measures on the corresponding.Block-level control regulation is not only a many-level planning so easy that it giveplanning and management in the overall planning and control regulation of traditional landbetween the d
26、evelopment of a new management platform, therefore, should give full playto its role, from the can not be supporting the planning and management measures oninnovation. Such as in the control plots on the regulation of convergence can be theimplementation process for some of the demand, derived from
27、transfer of developmentrights and other related management measures and control means.87,Guohui Cheng,Li Shi, HUANG Jie. Rigid-flexible and relief: for controlling theoperation of the detailed planning. Town Planning .2007 (7) :77-808, Lin audience. Public Management from the Perspective of the adaptive control considerthe detailed planning. Planners .2007 (4) :71-7412, city planning approach to make Peoples Republic of China Ministry o
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 聚焦海上成品油運輸合同新篇章
- 瑜伽課程預約合同
- 酒店經營轉讓合同范本
- 草莓購銷合同范本
- 工程項目合同廉政承諾書范文
- 誠信標志合作合同范本
- 人工智能在醫(yī)療保健中的創(chuàng)新考核試卷
- 木材切削刀具的選用與磨損分析考核試卷
- 云母制品在太陽能熱水器中的應用考核試卷
- 安全網絡數據安全應急響應考核試卷
- 2025年上半年潛江市城市建設發(fā)展集團招聘工作人員【52人】易考易錯模擬試題(共500題)試卷后附參考答案
- 旋轉類機電設備故障預測、診斷研究
- 新媒體營銷(第三版) 課件全套 林海 項目1-6 新媒體營銷認知-新媒體營銷數據分析
- 愚公移山英文 -中國故事英文版課件
- DB52∕T 1413-2019 黎平牛-行業(yè)標準
- 公園綠化養(yǎng)護景觀綠化維護項目迎接重大節(jié)會活動的保障措施
- 國內外旅游公共服務研究的文獻綜述
- 集團公司各職能部管控分權手冊
- 機車電測儀表使用及檢修
- PMS顏色對照表
- 2012年北京大學醫(yī)學部外國留學生本科入學考試
評論
0/150
提交評論