版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、大學(xué)英語四級(jí)考試流程:8:509:00 試音時(shí)間9:009:10 播放考場(chǎng)指令,發(fā)放作文考卷9:10 取下耳機(jī),開始作文考試9:35 發(fā)放含有快速閱讀的試題冊(cè)(但9:40才允許開始做)9:409:55 做快速閱讀 (15分鐘)9:5510:00 收答題卡一(即作文和快速閱讀)9:5510:00 重新戴上耳機(jī),試音尋臺(tái),準(zhǔn)備聽力考試10:00 開始聽力考試,電臺(tái)開始放音聽力結(jié)束后完成剩余考項(xiàng)。11:20全部考試結(jié)束。新題型英語四級(jí)各題詳細(xì)分值1.作文:15,,合106.5分;2.快速閱讀:10,合71分,每個(gè)7.1分; 10個(gè)3.聽力客觀題(單選):25,合177.5分每個(gè)7.1分; 4.聽力主
2、觀題(復(fù)合式聽寫):10,合71分,前八個(gè)每個(gè)3.55分共28.4分,后三個(gè)每個(gè)14.2分,共42.6分; (共11個(gè)) 5.閱讀短句問答:10%合71分,每個(gè)14.2分; 5個(gè)6.仔細(xì)閱讀理解:15,合106.5分,共10個(gè)每個(gè)10.65分。 7.完形填空:10,合71分,共20個(gè)每個(gè)3.55分。 8.句子翻譯:5,合35.5分,共5個(gè),每個(gè)7.1分。 the oil level to the normal oil level. (2)for the secondary prevention of the leakage of cooling water pipefittings, valv
3、e parts before installation to check . 4.2 measures toeliminate quality defects of cables cable laying in front of the cableconstruction, design, supervision and construction units to deliver thedesign, and drawing the third. Combined the engineering field to findfault, adding omitted items. Because
4、 the unit used computer DCS controland adds a great deal of control and signal cables. So you shouldcarefully review, checks for missing physical cable, ready forconstruction and to verify cable length, specifications, familiar withthe cable channel and the device location and bracket cable bracket
5、onthe section number. At the time of preparation of the inventory of cable,first of all, the professional carefully study electrical schematics, inaccordance with the principle of accounting the cable path cable volume,the number of cores used, total volume and design inventory check cableto cable w
6、ith and without omission, laying of the cable in order toensure the process does not put a cable one cable. Finally, at the timeof inventory, prepared to take the same path the cables together.Inventory preparation is completed, later in each enclosure affixed onboth sides of each side of the cable
7、you want to lay accurately verifycable lengths and set aside. Bridge should be combined, correctingerrors, avoid straight, no cable bridge scaffolding used in theconstruction, not allowed to use electricity (fire) cutting, fix cabletray, cable tray is not allowed as a welding ground connection or ca
8、bletray cannot be used for other processes9.加起來總計(jì):100,合710分。1.作文分?jǐn)?shù)占總分的15%,也就是106.5分,在這部分你要達(dá)到63.9分為及格。答題時(shí)間為30分鐘。2.快速閱讀占總分的10%,即71分,在這部分你要達(dá)到42.6分為及格分。題號(hào)為1-10題,答題時(shí)間為15分鐘。3.聽力部分占總分的35%,即248.5分,在這部分的及格分為149.1分。題號(hào)為11-35題,答題時(shí)間為35分鐘。4.是一篇篇章詞匯理解和兩篇傳統(tǒng)的閱讀理解,總分?jǐn)?shù)為177.5分。在這部分你要達(dá)到106.5分為及格分。題好為36-66。答題時(shí)間為25分鐘。5.是完
9、形填空(或改錯(cuò)),占總分的10%,即71分,在這部分你要達(dá)到42.6分及格。題號(hào)67-86,答題時(shí)間為15分鐘。 6.翻譯,漢譯英并且需譯部分只是一般的短句翻譯。占總分的5%,即35.5分,在這部分你要達(dá)到21.3分為及格,題號(hào)為87-91,答題時(shí)間是15分鐘四級(jí)聽力題目構(gòu)成與比例小對(duì)話: 8% 選擇題 共8段小對(duì)話,8道題 ,放音一遍長(zhǎng)對(duì)話: 7% 選擇題 共2段長(zhǎng)對(duì)話,7道題,放音一遍(短文聽力: 10% 選擇題 共3篇文章,10道題,放音一遍)復(fù)合式聽寫:10% 聽寫填空 填8個(gè)單詞和3句話,放音三遍聽力位于考試的卷二部分,共占全卷35%the oil level to the norm
10、al oil level. (2) for the secondaryprevention of the leakage of cooling water pipe fittings, valve partsbefore installation to check . 4.2 measures to eliminate qualitydefects of cables cable laying in front of the cable construction,design, supervision and construction units to deliver the design,
11、anddrawing the third. Combined the engineering field to find fault, addingomitted items. Because the unit used computer DCS control and adds agreat deal of control and signal cables. So you should carefully review,checks for missing physical cable, ready for construction and to verifycable length, s
12、pecifications, familiar with the cable channel and thedevice location and bracket cable bracket on the section number. At thetime of preparation of the inventory of cable, first of all, theprofessional carefully study electrical schematics, in accordance withthe principle of accounting the cable pat
13、h cable volume, the number ofcores used, total volume and design inventory check cable to cable withand without omission, laying of the cable in order to ensure the processdoes not put a cable one cable. Finally, at the time of inventory,prepared to take the same path the cables together. Inventoryp
14、reparation is completed, later in each enclosure affixed on both sidesof each side of the cable you want to lay accurately verify cablelengths and set aside. Bridge should be combined, correcting errors,avoid straight, no cable bridge scaffolding used in the construction,not allowed to use electrici
15、ty (fire) cutting, fix cable tray, cabletray is not allowed as a welding ground connection or cable tray cannotbe used for other processesCET4考試流程時(shí)間 項(xiàng)目 說明開始入憑準(zhǔn)考證、身份證,檢查準(zhǔn)考證上的考場(chǎng)號(hào)8:45 場(chǎng) 是否與本考場(chǎng)相符,不攜帶違規(guī)物品入場(chǎng)。遲到考生禁止入場(chǎng)。發(fā)答題卡1和答題卡2。只能用黑色字跡簽入場(chǎng)結(jié)9:00 字筆在答題卡上填寫姓名、準(zhǔn)考證號(hào),用束 2B鉛筆涂黑相應(yīng)的信息點(diǎn)。暫不填寫答題卡2上試卷代號(hào)一欄。不能提前答題??荚囌介_始
16、??忌鲈囶}的第一部分,即考試開9:10 寫作部分(用黑色字跡簽字筆答題)??荚囀?全程,考生不得提前退場(chǎng)。監(jiān)考員發(fā)試題冊(cè)。將試題冊(cè)背面向上放到考發(fā)試題生桌子左上角,并要求考生不得提前翻閱或9:35 冊(cè) 改變?cè)嚲砦恢?,否則按違規(guī)違紀(jì)處理??忌荒芴崆胺喸囶}冊(cè)。寫作部分考試結(jié)束。考生打開試題冊(cè),開始寫作結(jié)做試題的第二部分,即快速閱讀理解部分, 9:40 束 15分鐘后(即9:55)結(jié)束快速閱讀理解部分的答題。收答題收答題卡1。收卷期間考生不得答題,否則9:55 卡1作違規(guī)違紀(jì)處理。聽力考試正式開始。監(jiān)考員播放聽力磁帶。注:考試聽力磁帶AB雙面都有內(nèi)容。A面內(nèi)容播放完后將有提示語,提示監(jiān)考教師將
17、磁帶手動(dòng)轉(zhuǎn)換到B面,請(qǐng)不要使用錄音機(jī)的聽力考10:00 自動(dòng)翻面功能。提示語為:“A面內(nèi)容已結(jié)試開始 束,請(qǐng)監(jiān)考教師聽到嘀的一聲后,手動(dòng)將磁帶轉(zhuǎn)換到B面繼續(xù)播放”。聽力考試結(jié)束后,考生開始做試題的第四部分。離考試結(jié)束還有十分鐘,將試題冊(cè)封面上的填寫試11:10 試卷代號(hào)填涂在答題卡2上試卷代號(hào)一卷代號(hào) 欄??荚嚱Y(jié)束,立即停止答題。監(jiān)考員驗(yàn)收各考生試題冊(cè)和答題卡2,清點(diǎn)考試結(jié)11:20 無誤后,組織考生退場(chǎng)(嚴(yán)禁考生帶走試題束 冊(cè)和答題卡)。違規(guī)違紀(jì)考生在登記表上簽字確認(rèn)。the oil level to the normal oil level. (2) for the secondarypr
18、evention of the leakage of cooling water pipe fittings, valve partsbefore installation to check . 4.2 measures to eliminate qualitydefects of cables cable laying in front of the cable construction,design, supervision and construction units to deliver the design, anddrawing the third. Combined the en
19、gineering field to find fault, addingomitted items. Because the unit used computer DCS control and adds agreat deal of control and signal cables. So you should carefully review,checks for missing physical cable, ready for construction and to verifycable length, specifications, familiar with the cabl
20、e channel and thedevice location and bracket cable bracket on the section number. At thetime of preparation of the inventory of cable, first of all, theprofessional carefully study electrical schematics, in accordance withthe principle of accounting the cable path cable volume, the number ofcores us
21、ed, total volume and design inventory check cable to cable withand without omission, laying of the cable in order to ensure the processdoes not put a cable one cable. Finally, at the time of inventory,prepared to take the same path the cables together. Inventorypreparation is completed, later in eac
22、h enclosure affixed on both sidesof each side of the cable you want to lay accurately verify cablelengths and set aside. Bridge should be combined, correcting errors,avoid straight, no cable bridge scaffolding used in the construction,not allowed to use electricity (fire) cutting, fix cable tray, ca
23、bletray is not allowed as a welding ground connection or cable tray cannotbe used for other processes題型 分值 所占比例 題數(shù)每小題分?jǐn)?shù)寫作 106.5分 15% 1題106.5分/題快速閱讀 71分10% 10題7.1分/題 聽 客觀題 177.5分 25% 25題(單選) 7.1分/題 力 主觀題 前8題28.4分 8題(復(fù)合10% 3.55分式聽寫) /題后3題42.6分 3題14.2/題選詞填空 71分10% 10題7.1分/題閱讀理解 106.5分 15% 10題the oil le
24、vel to the normal oil level. (2) for the secondaryprevention of the leakage of cooling water pipe fittings, valve partsbefore installation to check . 4.2 measures to eliminate qualitydefects of cables cable laying in front of the cable construction,design, supervision and construction units to deliv
25、er the design, anddrawing the third. Combined the engineering field to find fault, addingomitted items. Because the unit used computer DCS control and adds agreat deal of control and signal cables. So you should carefully review,checks for missing physical cable, ready for construction and to verify
26、cable length, specifications, familiar with the cable channel and thedevice location and bracket cable bracket on the section number. At thetime of preparation of the inventory of cable, first of all, theprofessional carefully study electrical schematics, in accordance withthe principle of accountin
27、g the cable path cable volume, the number ofcores used, total volume and design inventory check cable to cable withand without omission, laying of the cable in order to ensure the processdoes not put a cable one cable. Finally, at the time of inventory,prepared to take the same path the cables toget
28、her. Inventorypreparation is completed, later in each enclosure affixed on both sidesof each side of the cable you want to lay accurately verify cablelengths and set aside. Bridge should be combined, correcting errors,avoid straight, no cable bridge scaffolding used in the construction,not allowed t
29、o use electricity (fire) cutting, fix cable tray, cabletray is not allowed as a welding ground connection or cable tray cannotbe used for other processes10.65分/題完形填空 71分10% 20題3.55分/題句子翻譯 35.5分 5% 5題7.1分/題總計(jì) 710分 100% 共92題樣卷答題試題內(nèi)容 答題卡 結(jié)構(gòu) 時(shí)間Part 30WritingI minutes AnswerSheet 1 Part Reading Comprehen
30、sion(Skimming 15II and Scanning) minutes the oil level to the normal oil level. (2)for the secondary prevention of the leakage of cooling water pipefittings, valve parts before installation to check . 4.2 measures toeliminate quality defects of cables cable laying in front of the cableconstruction,
31、design, supervision and construction units to deliver thedesign, and drawing the third. Combined the engineering field to findfault, adding omitted items. Because the unit used computer DCS controland adds a great deal of control and signal cables. So you shouldcarefully review, checks for missing p
32、hysical cable, ready forconstruction and to verify cable length, specifications, familiar withthe cable channel and the device location and bracket cable bracket onthe section number. At the time of preparation of the inventory of cable,first of all, the professional carefully study electrical schem
33、atics, inaccordance with the principle of accounting the cable path cable volume,the number of cores used, total volume and design inventory check cableto cable with and without omission, laying of the cable in order toensure the process does not put a cable one cable. Finally, at the timeof invento
34、ry, prepared to take the same path the cables together.Inventory preparation is completed, later in each enclosure affixed onboth sides of each side of the cable you want to lay accurately verifycable lengths and set aside. Bridge should be combined, correctingerrors, avoid straight, no cable bridge
35、 scaffolding used in theconstruction, not allowed to use electricity (fire) cutting, fix cabletray, cable tray is not allowed as a welding ground connection or cabletray cannot be used for other processesPart 35Listening ComprehensionIII minutes Part Reading Comprehension(Reading 25 IV in Depth)minu
36、tes AnswerSheet 2 Part 15ClozeV minutes Part 5TranslationVI minutesthe oil level to the normal oil level. (2) for the secondaryprevention of the leakage of cooling water pipe fittings, valve partsbefore installation to check . 4.2 measures to eliminate qualitydefects of cables cable laying in front of the cable construction,design, supervision and construction units to deliver the design, anddrawing the third. Combined the engineering field to find fault, addingomitted items. Because the unit used comp
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2024年新型能源發(fā)電項(xiàng)目投資合作協(xié)議
- DB4116T 040-2023 黃花菜采收保鮮技術(shù)規(guī)程
- DB4114T 218-2023 規(guī)模肉牛場(chǎng)生物安全防控技術(shù)規(guī)范
- 2024年新農(nóng)村土地租賃協(xié)議
- 2024年房屋租賃協(xié)議:讓租住更簡(jiǎn)單
- 2024年批發(fā)市場(chǎng)西瓜采購協(xié)議
- 2024年度餐飲公司與食材供應(yīng)商采購合同
- 2024年收購雙方保密合同
- 2024年房產(chǎn)買賣合同公證
- 2024互聯(lián)網(wǎng)企業(yè)廣告投放與媒體采購合同
- 廣東省廣州市四校2024-2025學(xué)年九年級(jí)上學(xué)期11月期中化學(xué)試題(含答案)
- 浙江省杭州市2023-2024學(xué)年高二上學(xué)期期末學(xué)業(yè)水平測(cè)試政治試題 含解析
- 科技公司研發(fā)項(xiàng)目風(fēng)險(xiǎn)防控制度
- 2024年全國企業(yè)員工全面質(zhì)量管理知識(shí)競(jìng)賽活動(dòng)題庫(完整)
- 【課件】Unit+4+Section+B+1a-1d+課件人教版英語七年級(jí)上冊(cè)
- 海南省申論真題2022年(C類行政執(zhí)法)
- 大數(shù)據(jù)行業(yè)分析報(bào)告
- (5篇)國開2024年秋形策大作業(yè):中華民族現(xiàn)代文明有哪些鮮明特質(zhì)?建設(shè)中華民族現(xiàn)代文明的路徑是什么
- 錯(cuò)牙合畸形的早期矯治(口腔正畸學(xué)課件)
- 江蘇省徐州市沛縣第五中學(xué)2024-2025學(xué)年九年級(jí)上學(xué)期11月期中考試數(shù)學(xué)試題
- 2024年中國酶免試劑市場(chǎng)調(diào)查研究報(bào)告
評(píng)論
0/150
提交評(píng)論