1、項(xiàng)目治理考前模擬試題二Disclaimer: These questions are intended for study purposes only. Success on these questions is not indicative of success on the Project Management Professional Certification Examination. This download of the Sample Exam Questions is for your personal use and NOT FOR commercial use. Any u
2、nauthorized use or duplication of this document is prohibited!1. Activity duration estimate inputs include all of the following except:A. Resource requirements.B. Basis of estimates.C. Activity lists.D. Constraints. 2. All of the following are contract types except:A. Unit-price.B. Make-or-buy.C. Co
3、st reimbursable.D. Lump sum.3. Initiation inputs for a project include all of the following except:A. Product description.B. Strategic plan.C. Project charter.D. Selection criteria.4. Responses to risk threats include all of the following except:A. Avoidance.B. Acceptance.C. Mitigation.D. Rejection.
4、5. The process of performance reporting includes all of the following except _.A. Status reporting.B. Progress reporting.C. Forecasting.D. Product analysis6. Constrained optimization methods of project selection include:A. Scoring models. B. Benefit-cost ratios. C. Multi-objective programming algori
5、thms.D. Subjective analyses.7. Which of the following statements concerning contract type is correct?A. A fixed price contract contains the most risk for the buyer.B. Cost reimbursable contracts offer sellers the highest profit potential.C. Lump sum contracts offer sellers the greatest profit potent
6、ial.D. Unit price contracts are illegal in many jurisdictions.8. A Work Breakdown Structure (WBS) numbering system should allow project staff to:A. Identify the level at which individual WBS elements are found.B. Identify configuration management milestones.C. Estimate the costs of WBS elements.D. P
7、rovide project justification.9. All of the following are true quality statements except:A. Quality improvement depends upon better definition and increased awareness of the requirements/specifications.B. Project quality management must address both management of the project and the product of the pr
8、oject.C. Recognition of key actions required of each team member is necessary to meet quality objectives.D. Computer-aided design systems can improve quality, but only at the expense of an increase in the cost of design.10. All of the following are examples of tools often used in cost estimating exc
9、ept:A. Parametric modeling.B. Analogous estimating.C. Bottom-up estimating.D. Activity duration estimates.11. At XYZ Inc., the hourly wage for semi-skilled workers is $14.00. The annual audit shows that fringe benefits cost 30% of basic wages, and that overhead costs are 60% of wages plus fringe ben
10、efits. What is the loaded” hourly wage for a semi-skilled worker at XYZ Inc.?A. $27.14.B. $28.96. C. $30.03.D. $29.12.12. Of the following estimates, which most accurately reflect the actual cost of the project?A. Conceptual estimates.B. Order of magnitude estimates.C. Preliminary estimates.D. Botto
11、m-up estimates.13. The most crucial time for project risk assessment is:A. When a problem surfaces.B. During the planning phase.C. During the close-out phase.D. After the project schedule has been published.14. When there is uncertainty associated with one or more aspects of the project, one of the
12、first steps to take is to:A. Revise project plan.B. Conduct a risk-benefit analysis.C. Conduct a needs analysis. D. Increase the estimated cost of the project.15. Including a contingency reserve in the project budget is intended to:A. Reduce the probability of scope changes.B. Increase the probabili
13、ty of scope changes.C. Reduce the probability of a cost overrun.D. Increase the probability of a cost overrun.16. Given the information in the following table, what is the expected value from this risk event?Probability Result A. -10,000.B. - 7,500.C. + 2,500.D. -7,000.17. A contractor is working on
14、 a fixed price contract that calls for a single, lump sum payment upon satisfactory completion of the contract. About halfway through the contract, the contractor project manager informs their contract administrator that financial problems are making it difficult for them to pay their employees and
15、subcontractors. The contractor asks for a partial payment for work accomplished. Which of the following actions by the buyer is most likely to cause problems for the project?A. Starting partial payments for work accomplished.B. Making no payments because it would violate the conditions of the contra
16、ct.C. Paying for work accomplished to date.D. Negotiating a change to the payment conditions in the contract.18. A precise description of a physical item, procedure, or service for implementation of an item or service is called :A. Work package.B. Baseline.C. Product description.D. Work breakdown st
17、ructure (WBS) element.19. A project should be terminated for all of the following reasons except:A. Lack of team synergy.B. The project no longer meets the companys objectives.C. The resources are not available to complete project activities.D. Project funding has been significantly reduced.20. One common way to compute estimated at completion (EAC) is to take the project budgeted-at-completion and:A
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 項(xiàng)目實(shí)施過程中的信息分享與反饋機(jī)制試題及答案
- 微生物防治措施與技巧試題及答案
- 2024年項(xiàng)目管理全面復(fù)習(xí)指南試題及答案
- 注冊(cè)會(huì)計(jì)師考試成功故事的啟示試題及答案
- 高校輔導(dǎo)員在促進(jìn)學(xué)生成功中的作用試題及答案
- 項(xiàng)目管理認(rèn)證考試挑戰(zhàn)與應(yīng)對(duì)試題及答案
- 2024年項(xiàng)目管理考試中的高效學(xué)習(xí)模式試題及答案
- 2024年項(xiàng)目管理變化趨勢(shì)題目及答案
- 證券從業(yè)資格證考試的全局理解試題及答案
- 2024年行政管理師考試內(nèi)容解析的試題及答案
- 第7課《珍視親情+學(xué)會(huì)感恩》第2框《理解父母+學(xué)會(huì)感恩》【中職專用】《心理健康與職業(yè)生涯》(高教版2023基礎(chǔ)模塊)
- 無人機(jī)駕駛員培訓(xùn)計(jì)劃及大綱
- 自費(fèi)藥品知情同意書
- 江蘇省書法水平等級(jí)證書考試-硬筆書法考試專用紙-(123級(jí))
- 山東省各地市地圖課件
- 全套IATF16949內(nèi)審核檢查表(含審核記錄)
- 基礎(chǔ)工程量計(jì)算表
- 設(shè)備報(bào)修單表
- 心肺復(fù)蘇急救步驟圖例
- 《春夜喜雨》公開課一等獎(jiǎng)?wù)n件
- 簡(jiǎn)易呼吸球囊
評(píng)論
0/150
提交評(píng)論