![PTR-1205D-生產(chǎn)試運(yùn)行流程_第1頁(yè)](http://file4.renrendoc.com/view/79fd0a5c75dc5facb18c098935095ee8/79fd0a5c75dc5facb18c098935095ee81.gif)
![PTR-1205D-生產(chǎn)試運(yùn)行流程_第2頁(yè)](http://file4.renrendoc.com/view/79fd0a5c75dc5facb18c098935095ee8/79fd0a5c75dc5facb18c098935095ee82.gif)
![PTR-1205D-生產(chǎn)試運(yùn)行流程_第3頁(yè)](http://file4.renrendoc.com/view/79fd0a5c75dc5facb18c098935095ee8/79fd0a5c75dc5facb18c098935095ee83.gif)
![PTR-1205D-生產(chǎn)試運(yùn)行流程_第4頁(yè)](http://file4.renrendoc.com/view/79fd0a5c75dc5facb18c098935095ee8/79fd0a5c75dc5facb18c098935095ee84.gif)
下載本文檔
版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、零部件生產(chǎn)試運(yùn)行程序Procedure of Part/Component PTRQS/Y-140-0011.0016/12/2002.一!a -=,- 一“y 工一 一,請(qǐng)?jiān)谑褂们昂藢?duì)網(wǎng)上此文件的最新有效版本Please check the latest version of the document on the server before you use it公司機(jī)密(密級(jí) C2)CONFIDENTIAL (LEVEL C2)4.4-3Page /51.驗(yàn)證生產(chǎn)制造工藝可行性. PurposeQualifying the possibility of manufacturing proc
2、ess.編制和適用范圍本文件由生產(chǎn)控制組負(fù)責(zé)編制,適用于進(jìn) 口件,國(guó)產(chǎn)件,自制件,零星國(guó)產(chǎn)化以及過(guò)時(shí)零件回用的生產(chǎn)試運(yùn)行。.術(shù)語(yǔ)生產(chǎn)試運(yùn)行(PTR)新零件或更改過(guò) 的零件投入到制造系 統(tǒng)前的受控的先期試生產(chǎn)。PTR小組和小組長(zhǎng)PTR小組為實(shí)施某一特定PTR而設(shè)立 的非常設(shè)機(jī)構(gòu)。成員由車(chē)間,質(zhì)量,產(chǎn)品工 程,供應(yīng)商質(zhì)量和生產(chǎn)控制組等部門(mén)的人員組 成。是否需要小組會(huì)由 PTR小組成員負(fù)責(zé)向組長(zhǎng) 申請(qǐng)。PTR組長(zhǎng)由生產(chǎn)控制組 規(guī)格控制工程師 擔(dān)任。.責(zé)任組長(zhǎng)根據(jù)申請(qǐng)召集PTR小組會(huì);與生產(chǎn) 車(chē)間商定PTR時(shí)間;簽發(fā)PTR通知單;采 購(gòu)PTR零件;對(duì)PTR有關(guān)文件進(jìn)行編號(hào)管 理和分發(fā);pc&l向loc
3、發(fā)放CKD件和自制件 PTR標(biāo)簽;將PTR物料及時(shí)送到線旁,除非另作 安排。生產(chǎn)車(chē)間負(fù)責(zé)在現(xiàn)場(chǎng)為PTR做準(zhǔn)備工 作;為ptr提供設(shè)備和工藝的 決策依據(jù); 配 合生產(chǎn)控制組 協(xié)調(diào)ptr時(shí)間與零部件數(shù)量; 配合質(zhì)量工程師跟蹤ptr在現(xiàn)場(chǎng)的實(shí)施, 參與評(píng)估ptr結(jié)果,簽署意見(jiàn)。質(zhì)量控制組負(fù)責(zé)跟蹤PTR在相關(guān)區(qū)域 的Preparation and applicabilityThe procedure is initiated by Production Control and Logistics. It is applicable to the trial run of imported part,
4、local part, in-house part, misc. localization part, and re-used obsolete part.TermsProduction Trial Run (PTR)A Production Trial Run is a controlled, advanced production tryout of any new or revised part/component into the manufacturing systemPTR team and team leaderPTR team is a non-permanent organi
5、zation which is set up to implement a certain PTR. Whether to establish the team or not should be initiated to team leader by PTR team members.The Specs control engineer of PC&L takes the responsibility of PTR team leader.ResponsibilitiesThe team leaderis responsible for: calling a PTR team meeting;
6、 coordinating PTR timing with manufacturing; Issuing PTR notification; scheduling PTR material; numbering and distributing PTR documentation; distributing PTR tag of CKD part and in-house part to RDC; delivering the PTR material to line side at right time unless alternative arrangement are made.Manu
7、facturing shop is responsible for doing readiness on floor; providing decision criteria on equipment and process; assisting PP&C to determine PTR timing and part / component quantity; assisting QE to oversee the implementation on floor,participating inQS/Y-140-0011.0016/12/2002請(qǐng)?jiān)谑褂们昂藢?duì)網(wǎng)上此文件的最新有效版本Ple
8、ase check the latest version of the document on the server before you use it公司機(jī)密(密級(jí) C2)CONFIDENTIAL (LEVEL C2)4.4-3Page /5零部件生產(chǎn)試運(yùn)行程序Procedure of Part/Component PTR實(shí)施評(píng)估PIR結(jié)果并出具報(bào)告evaluating the PTR result and signing off.工程組技術(shù)支持負(fù) 責(zé)向PTR小組回答更改 的詳細(xì)情況,PTR3天前提供臨時(shí)技術(shù)文件, 并 在實(shí)施期間向小組提供技術(shù)支持。供應(yīng)商質(zhì)量負(fù)責(zé)提供國(guó)產(chǎn)外購(gòu)件PPAP 批準(zhǔn)
9、通知書(shū);發(fā)放國(guó)產(chǎn)外購(gòu)件PTR標(biāo)簽; 及時(shí)向PTR小組提供PPAP進(jìn)度;向供應(yīng)商 反饋PTR結(jié)果。采購(gòu)應(yīng)全程跟蹤國(guó)產(chǎn)件PTR過(guò)程。規(guī)定以下三種情況的零部件被投入制造系 統(tǒng)時(shí)須實(shí)施PTR新零件:因工程更改而引入生產(chǎn)的 零件(帶新零件號(hào))。修正過(guò)的零件:因新供應(yīng)商或供應(yīng)商 工藝更改等而須進(jìn)行PPAP的零件過(guò)時(shí)零件:經(jīng)授權(quán)回用于正常生產(chǎn)的過(guò)時(shí)零 件原則上,PTR零件應(yīng)已通過(guò)PPAP.未通過(guò) PPAP的零件申請(qǐng)PTR需PAA授權(quán)。PTR程序的啟動(dòng)申請(qǐng)所有 進(jìn)口零 件和自制件 的PTR由工程組 提 出。所有國(guó)產(chǎn)外購(gòu) 零件的PTR由供應(yīng)商質(zhì) 量提出。所有過(guò)時(shí)零件的PTR由生產(chǎn)控制組提 出。在PTR成功結(jié)束前
10、,不能啟動(dòng)物料斷點(diǎn) 流程以避免在PTR失敗后無(wú)法采購(gòu)到舊零 件。年度國(guó)產(chǎn)化零件的試生產(chǎn)走年度國(guó)產(chǎn)化生產(chǎn)Quality Engineering are responsible for overseeing the implementation on floor relevant area; assessing PTR result and providing relevant report.Product engineering is responsible foreplying the details of change to PTR team, providing temporary tec
11、hnical documents 3 days before PTR and providing technical support to the team during PTR implementation period.Supplier Quality is responsible for providing production part approval status notice of local out sourcing part; distributing PTR tag of local out sourcing part to supplier; monitoring the
12、 PPAP schedule and informing PTR team; feeding back the PTR result to supplierProduction purchasing participates in the whole PTR process of local parts.5. ProvisionA PTR should be performed when one of the following parts are introduced:New part/component: the part/component (with new part number)
13、which is released by engineering change.Revised part/component: include new supplier, or process change etc. within supplier requiring PPAP submission.Obsolete part:the obsolete part which is reused to normal production with authorization .In principles, all PTR parts should be qualified by PPAP. No
14、n PPAP parts need PAA as the authorization,f i i=r i l r-,QS/Y-140-0011.0016/12/2002.一!a -=,- 一“y 工一 一,請(qǐng)?jiān)谑褂们昂藢?duì)網(wǎng)上此文件的最新有效版本Please check the latest version of the document on the server before you use it公司機(jī)密(密級(jí) C2)CONFIDENTIAL (LEVEL C2)4.4-3Page /5啟動(dòng)流程。零部件生產(chǎn)試運(yùn)行程序 Procedure of Part/Component PTR of pt
15、r.PTR標(biāo)簽國(guó)產(chǎn)外購(gòu)PTR零件的標(biāo)簽由供應(yīng)商質(zhì) 量在PTR物料發(fā)運(yùn)前,發(fā)放給供應(yīng)商。交貨時(shí)還需攜帶PPAP文件。進(jìn)口和自制件PTR零件的標(biāo)簽由生產(chǎn)控 制組物流管理 于PTR兩天前 發(fā)放給LOC或車(chē) 間。自制件的PTR標(biāo)簽由車(chē)間在零件上懸掛。PTR實(shí)施時(shí)間及數(shù)量原則上,每天每個(gè)區(qū)域最多1個(gè)PTR。原則上PTR必需進(jìn)行三輪,具體輪數(shù)和數(shù)量 由生產(chǎn)車(chē)間決定PTR只能開(kāi)始于日班,允許在夜班結(jié)束。在實(shí)施PTR前,PE必須根據(jù)EWO要求進(jìn)行 ETR。首輪PTR開(kāi)始時(shí),SQE、QE和PE必須到生產(chǎn) 現(xiàn)場(chǎng)。PTR文件申請(qǐng)人負(fù)責(zé)填寫(xiě)PTR通知單”,并負(fù)責(zé)獲得“同意執(zhí)行/不執(zhí)行PTR”的所有簽名。同意不執(zhí)行的P
16、TR也需編號(hào)存檔。PTR通知單”上須申請(qǐng)部門(mén)區(qū)域經(jīng)理或其授 權(quán)人簽名確認(rèn)。Initiator of PTR process launchAll the PTR of CKD part and in house part should be initiated by PEAll the PTR of local outsourcing part should be initiated by Supplier QualityAll the PTR of obsolete parts should be initiated by PC<he material breakpoint process
17、 should not be launched before PTR successfully completed. This prevent will shortage of the old material if a PTR fails. The trial run of annual localization parts shall follow annual localization launch process.PTR tagThe PTR tag of local out sourcing part should be distributed to supplier by Supp
18、lier Quality before PTR material delivering. PPAP document should also be with PTR parts.The PTR tag of import part and in-house part should be distributed to LOC or workshop by PC&L material management Two days prior to PTR implementation.Manufacturing shop is responsible for hanging PTR tag on in
19、house part.PTR timing and quantityIn principles, Only one PTR for one area per dat is allowed.5.8.3PTR報(bào)告需在PTR車(chē)下線后一周內(nèi)完成,如 果PTR失敗,必須在兩天內(nèi)完成報(bào)告。5.9 PTR協(xié)調(diào)員所有部門(mén)需確定一名 PTR協(xié)調(diào)員,協(xié)調(diào)本部門(mén)PTR事宜。5.5.2 The first, second and third round of GA PTR limited to 10, 50, 300. Body shop can have more.5.5.3 PTR only start at d
20、ay shift, night shift can close it.零部件生產(chǎn)試運(yùn)行程序Procedure of Part/Component PTRQS/Y-140-0011.0016/12/2002.一!a -=,- 一“y 工一 一,請(qǐng)?jiān)谑褂们昂藢?duì)網(wǎng)上此文件的最新有效版本Please check the latest version of the document on the server before you use it公司機(jī)密(密級(jí) C2)CONFIDENTIAL (LEVEL C2)4.4-3Page /55.6 PE shall conduct ETR before PTR per EWOV instruction.其他適用資料無(wú)5.7 SQE, QE and PE shall be on site for PTR firstround.存檔文件PTR通知單、決策依據(jù)和報(bào)告由生產(chǎn)控制組歸檔保存,保存期5年。.附件? 附件一:生產(chǎn)試運(yùn)行流程? 附件二:PTR通知單及附件A? 附件三:PTR決策依據(jù)? 附件四:PTR報(bào)告.最新更改匯總無(wú)8 PTR documentsIvbnitiator is responsible for filling out PTR notification and get all the signature of approval (no
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2024-2025學(xué)年河北省唐山市高一上學(xué)期期中考試歷史試卷
- 2025年債務(wù)糾紛導(dǎo)致離婚協(xié)議書(shū)策劃模板
- 2025年企業(yè)暫時(shí)性停止勞動(dòng)合同樣本
- 2025年策劃復(fù)婚關(guān)系解除協(xié)議書(shū)樣本
- 2025年滌綸短纖項(xiàng)目申請(qǐng)報(bào)告模稿
- 2025年農(nóng)產(chǎn)品加工與合作協(xié)議書(shū)
- 2025年水蘇糖項(xiàng)目立項(xiàng)申請(qǐng)報(bào)告模板
- 建筑工地外部協(xié)作單位安全合作協(xié)議書(shū)
- 2025年信息技術(shù)服務(wù)合同續(xù)簽
- 2025年住宅區(qū)物品存放室租賃合同范文
- 睡眠障礙護(hù)理查房課件
- 應(yīng)急物資的采購(gòu)、存儲(chǔ)與調(diào)配
- 超融合架構(gòu)與傳統(tǒng)架構(gòu)對(duì)比解析方案
- 少兒美術(shù)課件- 9-12歲 素描班《場(chǎng)景素描》
- 剪映:手機(jī)短視頻制作-配套課件
- 金融工程.鄭振龍(全套課件560P)
- 血液透析的醫(yī)療質(zhì)量管理與持續(xù)改進(jìn)
- 橋式起重機(jī)日常檢查保養(yǎng)記錄表
- 五年級(jí)小數(shù)乘法豎式計(jì)算300道(可直接打印)
- 英語(yǔ)演講技巧和欣賞課件
- 物流托運(yùn)單模板
評(píng)論
0/150
提交評(píng)論