版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、Doc. Title: CommisFor Helicopter Deck Safety Net直升機(jī)甲板安全網(wǎng)調(diào)試程序Doc. No. :-M043- Helicopter Deck Safety Net Project No.: H6001Unit:R-550D Jack-up Drilling UnitREVI0SIGNDATEPREPAREDREVIEWEDAPPROVED中 船 黃 埔 文 沖 船 舶CSSC HUANGPU WENCHONG SHIPBUILDING COMPANY LIMITEDTHIS DATA (OR) PARTS THEREOF, ARE HPWS PROP
2、ERTY AND THUS SHALL NOT BE USED IN ANY FORM WITHOUT PERMISTABLE OF CONTENTS1GENERAL31.1Pure31.2Responsibility31.3References and Drawings3Engineering Drawings3Mechanical and Electrical Completion Inspection Test Record3機(jī)械和電氣完工測(cè)試. 32345SYSTEM DESCRIPTION4SCOPE4PRE-REQUISITES4EXECUTION45.1System Checkl
3、ist45.2Safety Precautions45.3Fieldnel Deployment55.4Inspection by Vendors Service Represenive56COMMISING PROCEDURES56.1Safety Net Test57TEST ACCEPTANCE61GENERAL1.1PureThe pure of this procedure is to give clear instructions for the activities to be carried out tocomplete the commising of the describ
4、ed system.To ensure proper installation of safety net.To demonstrate the operational capabilities of the safety net.1.2ResponsibilityAny updates/revis of thiswill be the responsibility of the Commising Team. Anydeviations from this procedure will have to beed. In case of major changeshe workdescribe
5、dhis procedure (e.g. reduced scope of operating tests to be performed), a reviof theprocedure is required.任何更新/文件的修改都是調(diào)試團(tuán)隊(duì)的義務(wù)程序任何的偏差都需將化,這個(gè)程序的工作必須修改程序版本(例如:減少操作測(cè)試)下來(lái)假如發(fā)生變1.3References and Drawings1.3.1Engineering Drawings1.3.2 Mechanical and Electrical Completion Inspection Test Record機(jī)械和電氣完工測(cè)試Item項(xiàng)
6、目Description描述Initial初始NameDate日期MCReview Mechanical Inspection Test Reports for:機(jī)械檢查Safety netNoDrawing No.DescriptionRemark1HP6001-H100-12General Arrangement Plan-Quarters Roof & Helicopter deck總布置圖-生活區(qū)頂層及直升機(jī)甲板2SYSTEM DESCRIPTIONHelicopter deck safety net is used to protect people from falling dow
7、n accidently.3SCOPEThis procedure covers safety net test.4PRE-REQUISITESAll the equipment shall be properly installed.All the electrical control panel and cables shall be properly installed and connected.The following is required for sucCrane with slingsful commising of the system:Sand bag of 100kg
8、test weightNote: All test instruments shall bear evidence of calibration within 12 months of test.5EXECUTION5.1System Checklist5.2Safety PrecautionsItemDescriptionInitialNameDateaAll commising activities must be in accordance with the HPWS permit-to-work system.bThe permit-to-work system shall speci
9、fy the conditions of work and precautions to be taken during the execution of the commising work to protectnel, plant and theItemDescriptionInitialNameDateaThe helicopter safety nes been installed as per Northsea drawing Helideck layout and Helideck safety net layout .Ensuret mounting and connection
10、 by ABS and ed by HPWS QC.5.3Fieldnel Deployment5.4Inspection by Vendors Service Represenive6COMMISING PROCEDURES6.1Safety Net TestNo.DescriptionHPWSAODABS6.1.1Drop the test load of 125Kg form 1.0 meter above the safety net.Check the safety net is strong enough to withstand, without damage, does not
11、 aa troline giving a “bounce” effect.6.1.2Repeat item (1) as many times as determined by the framing support configuration(s). For every differentItemDescriptionInitialNameDateaAll the mechanical components of the system are installed to vendors specificationbAll the electrical components of the sys
12、tem are installed to vendors specificationcVendors service engineer to verify t the system is ready and safe to be start up and commisedItemDescriptionInitialNameDateaEnsure requirednel are sioned properlybEnsure requirednel are sioned at helicopter deckcEnsure safetynel are sioned at the right plac
13、eenvironment.cAll commisingnel shall receive training to the level of their individual responsibilities on thepermit-to-work system prior to its commencement.dAll activities shall be carried out in accordance with the HPWS Safety Procedures, Project Standards and Sutory Regulations.eHPWS commising e
14、ngineers and supervisors will ensuret allnel involvedhe activity / work scope assisthe completion of hazard identification as per HPWS procedure.7TEST ACCEPTANCEThe units and system covered under this test meve been tested accordingly and found tobe satisfactory in accordance with test procedures.REPRESENIVENAMESIGNATUREDATEHPWSAODAB
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 二零二五版法律服務(wù)企業(yè)法務(wù)專員職位勞動(dòng)合同3篇
- 二零二五版房屋買賣合同范本下載涉及裝修及家具家電條款3篇
- 二零二五年時(shí)尚服飾品牌區(qū)域獨(dú)家代理銷售合同2篇
- 二零二五年度航空貨運(yùn)大客戶承運(yùn)合同范本3篇
- 二零二五年建筑材料出口銷售與綠色認(rèn)證合同3篇
- 二零二五版grc構(gòu)件生產(chǎn)、安裝與裝配式建筑推廣實(shí)施合同3篇
- 二零二五版技術(shù)開(kāi)發(fā)與成果轉(zhuǎn)化合同3篇
- 二零二五年建筑材料運(yùn)輸及安裝服務(wù)合同6篇
- 二零二五年度家具安裝與室內(nèi)空氣凈化合同2篇
- 二零二五版展覽館場(chǎng)地租賃合同范本(含展覽策劃服務(wù))3篇
- 公路工程施工現(xiàn)場(chǎng)安全檢查手冊(cè)
- 公司組織架構(gòu)圖(可編輯模版)
- 1汽輪機(jī)跳閘事故演練
- 陜西省銅川市各縣區(qū)鄉(xiāng)鎮(zhèn)行政村村莊村名居民村民委員會(huì)明細(xì)
- 禮品(禮金)上交登記臺(tái)賬
- 北師大版七年級(jí)數(shù)學(xué)上冊(cè)教案(全冊(cè)完整版)教學(xué)設(shè)計(jì)含教學(xué)反思
- 2023高中物理步步高大一輪 第五章 第1講 萬(wàn)有引力定律及應(yīng)用
- 青少年軟件編程(Scratch)練習(xí)題及答案
- 浙江省公務(wù)員考試面試真題答案及解析精選
- 系統(tǒng)性紅斑狼瘡-第九版內(nèi)科學(xué)
- 全統(tǒng)定額工程量計(jì)算規(guī)則1994
評(píng)論
0/150
提交評(píng)論