版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)
文檔簡介
1、Welder,s Performance Qualification Test Procedure 焊工技能評定程序PREPARED BY編 制CHECKED BY審 核APPROVED BY批 準(zhǔn)DATE日 期 0Rev.修訂號Date日期Description更改說明Signature簽字Checked By校核1. Scope1.1 The procedure is applied to the qualification of welders performance for P311 project of AA.1.2 This procedure is prepared accord
2、ing to the requirement in section 7.3 of API 650, as well as the Part IX of ASME.2. WeldersWelders participating performance qualification must be skilled workers with many years of experience on tank welding. 3. Contents of Qualification 3.1 Basis: ASME : Part QW, Chapter III; 3.2 Position: for Shi
3、elding Metal Arc Welding (SMAW), 2G (horizontal welding), 3G (vertical welding) and 4G (back welding) will be tested;3.3 For submerged arc welding (SAW), 2G (horizontal welding) welding position will be tested;3.4 For Tungsten argon arc welding and shielding metal arc welding of tube, 6G welding pos
4、ition (the tube is fixed in 45.) will be tested;3.5 For FCAW, the 3G (vertical welding) welding position will be tested;3.6 The welders qualification shall be carried out after the welding process qualification is approved. 4. Approval CriteriaAfter the visual inspection on examination test piece is
5、 acceptable, is must be detected by radio graph. The test piece to be detected shall be 152mm (6in) at least. For tubes, the welding circumference shall be detected. Radio graphic detection shall meet the requirement specified in ASME IX QW-191.2.2, that is:4.1Linear defect:4.1.1 Any type of cracks
6、or poor penetration and lack of fusion;4.l.2 Extending length of slag inclusion is over:a.When the thickness 9.6mm (3/8in), with a length of 3.2mm (1/8in)b. When the thickness 9.657mm (3/82 1/4in), the length of slag is 1/3t。4.1.3 The total accumulative length of linear slag gangs shall not be over
7、1t every 12t (thickness of test piece) unless the distance of continuous defect is over 6L (L means the length of the longest defect in slag gangs). 4.2 Round defect4.2.1 Maximum allowable size is 20%t or 3.2mm (1/8in), the smaller one shall be chosen;4.2.2 For base metal with its thickness less tha
8、n 3.2mm (1/8in), the biggest acceptable round cracks shall not be over 12; if it is shorter than 152mm, the cracks shall be reduced in portion accordingly;4.2.3 For the welds with its thickness of base metal 3.2mm (1/8in), the diagram in Appendix I shows the biggest acceptable round cracks discovere
9、d by detection. If the crack is less than 0.8mm (1/32in), it can be neglected. Appendix I Indication of Round Defects(see QW-192.2)Typical allowable number and size with the length of weld (152mm), thickness 1/4in (6mm) 1/2in (13mm)Typical allowable number and size with the length of weld (152mm), t
10、hickness 1/8in (3.2mm) 1/4in (6mm)Typical allowable number and size with the length of weld 6in (152mm), thickness above 1in Typical allowable number and size with the length of weld 6in (152mm), thickness 1/2in (13mm) 1in (25mm)Appendix II Process Data for Welders Examination Welding processSAW Dat
11、e:WPS No. Test piece and joint70025050+50313 15 2G Position preheatingPreheating Tem.Inter-pass Tem.Gas(GTAW) Shielding gas% Flow ratel /minBack shielding gasCurrent characterReverse Base metalCurrent DC Polarity P- NO.and Group No.andTungsten pole size mm Material and Tube dia.(mm)Welding technique
12、Filling metal Welding course Longitudinal, horizontal swing GradeCleaning before weldingBrandDiameterWelding datapass filler metal current voltage speed diameter (mm) Remark: Welding processSMAW Date:WPS No. Test piece and joint20025050+50313 15 2G Position preheatingPreheating Tem. Indoor Temperatu
13、reInter-pass Tem. 250 MAXGas(GTAW) Shielding gas% Flow ratel /minBack shielding gasCurrent characterReverse Base metalCurrent DC Polarity P- NO.and Group No.andTungsten pole size mm Material A573 And A573 Tube dia.(mm)Welding techniqueFilling metal Welding course Longitudinal,horizontal swing Horizo
14、ntal GradeCleaning before Welding GrindingBrandE7016Diameter3.2;4.0Welding datapass filler metal current voltage speed diameter (mm) 1 3.2 80-12022-26 510others 4 130-170 22-26818Remark:Welding processSMAW Date:WPS No. Test piece and joint250200156050203 3G Position preheatingPreheating Tem. Indoor
15、temperatureInter-pass Tem.250 MaxGas(GTAW) Shielding gas% Flow ratel /minBack shielding gasCurrent characterReverse Base metalCurrent DC Polarity P- NO.and Group No.andTungsten pole size mm Material A573andA573 Tube dia.(mm)Welding techniqueFilling metal Welding course Longitudinal, horizontal swing
16、 Horizontal GradeCleaning before weldingGrindingBrandE7016Diameter3.2;4.0Welding datapass filler metal current voltage speed diameter (mm) 1 3.2 80-12022-26 58others 4 130-170 22-26612Remark: one side weldingdouble side formationWelding processSMAW Date:WPS No. Test piece and joint250200156050203 4G
17、 Position preheatingPreheating Tem. Indoor temperatureInter-pass Tem.250 MaxGas(GTAW) Shielding gas% Flow ratel /minBack shielding gasCurrent characterReverse Base metalCurrent DC Polarity P- NO.and Group No.andTungsten pole size mm Material A573andA573 Tube dia.(mm)Welding techniqueFilling metal SM
18、AW Welding course Longitudinal, horizontal swing Horizontal GradeCleaning before weldingGrindingBrandE7016Diameter3.2;4.0Welding datapass filler metal current voltage speed diameter (mm) 1 3.2 80-12022-26 58others 4 130-170 22-26612Remark: one side weldingdouble side formation Welding processGTAW +S
19、MAW Date:WPS No. Test piece and joint2” 125 1255.56050123 6G Position preheatingPreheating Tem.Inter-pass Tem.Gas(GTAW) Shielding gas% Flow ratel /minBack shielding gasCurrent characterReverse, positive for GATW Base metalCurrent DC Polarity P- NO.and Group No.andTungsten pole size mm Material and Tube dia.(mm)Welding techniqueFilling metal GATW Welding course SMAWLongitudinal, horizontal swing GradeCleaning before weldingBrandDiameterWelding datapass filler
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2024年工程稅收與結(jié)算合同
- 2024年度電競游戲開發(fā)與發(fā)行合同
- 2024年丙方法律咨詢與代理合同
- 2024年應(yīng)急出口指示牌制作安裝合同
- 2024年城市道路泥水施工合同
- 2024年建筑工程所需材料采購協(xié)議
- 2024年度無人機(jī)制造與銷售合同
- 2024園林綠化工程綠化帶規(guī)劃與設(shè)計合同
- 2024騰訊朋友圈廣告合同
- 2024年度醫(yī)院醫(yī)療設(shè)備采購與安裝合同
- 口腔常見疾病的診治
- MOOC 人像攝影-中國傳媒大學(xué) 中國大學(xué)慕課答案
- MOOC 計算機(jī)組成原理-電子科技大學(xué) 中國大學(xué)慕課答案
- 2024年江蘇無錫市江陰市江南水務(wù)股份有限公司招聘筆試參考題庫含答案解析
- 中學(xué)教材、教輔征訂管理制度
- (高清版)DZT 0213-2002 冶金、化工石灰?guī)r及白云巖、水泥原料礦產(chǎn)地質(zhì)勘查規(guī)范
- 消防安全評估消防安全評估方案
- 工程造價專業(yè)《工程經(jīng)濟(jì)》課程標(biāo)準(zhǔn)
- ZARA服裝市場營銷策略研究分析 市場營銷專業(yè)
- 設(shè)備維保的市場化運作與服務(wù)模式創(chuàng)新
- 幼兒園科普知識宣傳
評論
0/150
提交評論