高壓變頻器使用手冊(cè)——中英文版_第1頁
高壓變頻器使用手冊(cè)——中英文版_第2頁
高壓變頻器使用手冊(cè)——中英文版_第3頁
高壓變頻器使用手冊(cè)——中英文版_第4頁
高壓變頻器使用手冊(cè)——中英文版_第5頁
已閱讀5頁,還剩5頁未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、第2章Chapter安裝與接線 Installation & Connection 本章簡(jiǎn)要介紹PowerSmartTM變頻器的安裝與接線The chapter introduces installation and connection of PowerSmartTM Drive briefly 2.1 產(chǎn)品確認(rèn)2.1 Product Confirmation拿到產(chǎn)品時(shí),請(qǐng)確認(rèn)下表中所列項(xiàng)目: When you get the product, please confirm the items listed in below table:注意:Notice 1. 受損的變頻器及缺少零部件的變

2、頻器,切勿安裝。有受傷的危險(xiǎn)。1. Do not install the drive that is damaged or is in defect of parts or pieces, or else you will have danger of being injured.表2-1Tab2-1確認(rèn)項(xiàng)目Confirmation Item確認(rèn)方法Confirmation Method與訂購的商品是否一致Whether the goods accord with what you order.請(qǐng)確認(rèn)PowerSmartTM銘牌Please confirm the namebrand of P

3、owerSmartTM是否有受損的地方Whether there is damage.查看整體外觀,檢查運(yùn)輸中是否受損Check the whole appearance; check whether there is damage in transportation.螺絲等緊固部分是否有松動(dòng)Check screw and other fastening parts are loose.必要時(shí),用螺絲刀檢查一下When necessary, check with screwdriver.如有不良情況,請(qǐng)與本公司業(yè)務(wù)部門聯(lián)系。 If there unfavorable condition, pl

4、ease contact with our corporate business sector.2.2 安裝環(huán)境的要求和管理2.2 Requirements and Management of Installation Environment 安裝現(xiàn)場(chǎng) Installation Field安裝變頻器的地點(diǎn)應(yīng)滿足通風(fēng)散熱和操作的要求。變頻器背面離墻的距離不小于600mm,正面離墻的距離不小于1.5米。變頻器頂部(從風(fēng)機(jī)頂部算起)到屋頂?shù)木嚯x不小于500mm。 The site of installing drive should satisfy the requirements of venti

5、lation, heat dispersion and operation. The distance between back face of drive and wall should not be less than 600mm, the distance between front face of drive and wall should not be less than 1.5m. The distance between top of drive (calculated from the top of fan) and ceiling should not be less tha

6、n 500mm.2.2.2 環(huán)境標(biāo)準(zhǔn) Environment Standard變頻器安裝在電氣室內(nèi),工作環(huán)境溫度為040oC。由于工作中變頻器將散發(fā)出大量熱量(約電動(dòng)機(jī)每100KW散發(fā)出3.5KW熱量),電氣室要配備通風(fēng)或空調(diào)裝置。 Drive is installed in electric room with operation environment temperature 040oC. Because the drive will give off much heat (approximately, motor gives off 3.5kw heat per 100KW during

7、) operation, electric room should be equipped with ventilation or air-conditioning device.環(huán)境濕度最高為相對(duì)濕度90%,要避免凝露,例如在潮濕季節(jié),特別是當(dāng)變頻器不工作時(shí),不要將室內(nèi)溫度降得太低。 The maximum environment humidity is relative humidity 90%; condensation should be avoided, for example in damp season, especially when drive does not work,

8、does not lower the temperature to much.安裝高度應(yīng)小于或等于海拔1000米,若超過1000米應(yīng)降容使用,請(qǐng)咨詢本公司。 The installation height should be less than or equal to 1000m, when exceeding 1000m, reduce capacity for use, please consult with our company.安裝地點(diǎn)應(yīng)無明顯的振動(dòng),室內(nèi)僅允許有少量干燥、非導(dǎo)電塵埃,不得有過量灰塵、腐蝕或爆炸性氣體或?qū)щ妷m埃。 The installation site shoul

9、d not have obvious vibration, only little dry and non-conducting dust is allowed in room, there should be no too much dust, corrosion or explosion gas or conducting dust.2.2.3 防范措施 Safeguard Measures安裝作業(yè)時(shí),請(qǐng)將變頻器蓋上防塵罩,防止鉆孔等產(chǎn)生的金屬碎片落入變頻器內(nèi)部,安裝結(jié)束后,請(qǐng)撤去防塵罩。 When installation operation, please cover dust shi

10、eld on drive, prevent mental fragments produced by drilling from dropping into inside of drive, after finishing installation, please remove dust shield.各電氣柜底部四角都有地腳螺釘孔,可用來固定柜體。 There are screw down bolt holes at four corners of every electric cabinet, which are used to fix cabinet body.如果地面不平整,變頻器柜外

11、殼可能發(fā)生變形,由于柜跨距較大,可能導(dǎo)致門發(fā)生錯(cuò)位,甚至無法正常開關(guān)。 If the floor is not level, distortion of drive cabinet shell may emerge, because the span of cabinet is great, which may cause malposition of door, and the door can not be opened or closed normally.2.3 施工安裝方案2.3 Construction and Installation Scheme 設(shè)備的安裝尺寸 Install

12、ation Dimension of Equipment變頻器的外形尺寸由本公司提供,如下圖所示: The appearance dimension of the drive provided by our company follows as below figure:圖2-1Fig2-1A、控制柜 Control CabinetB、功率柜 Power CabinetC、變壓器柜Transformer CabinetD、旁路柜Bypass Cabinet變頻器設(shè)備安裝時(shí),考慮通風(fēng)散熱及操作空間的需要,整套裝置背面離墻距離不得小于1000mm,裝置頂部與屋頂空間距離不得小于1000 mm,裝置

13、正面離墻距離不得小于1500 mm。 When installing drive equipment, please take the demand of ventilation, heat dispersion and operation space, the distance between back face of the whole device and wall should not be less than 600mm, the distance between top of device and ceiling should not be less than 500mm, the

14、 distance between front face of device and wall should not be less than 1.5m.所有柜體應(yīng)牢固安裝于基座之上,并和廠房大地可靠連接。變壓器屏蔽層及接地端子PE也應(yīng)接至廠房大地。各柜體之間應(yīng)相互連接成為一個(gè)整體。 All cabinets should be installed on base fast and connected with workshop ground reliably. The shield layer of drive and grounding terminal should be connect

15、ed to workshop ground. All cabinets should be connected with each others and into a whole.安裝過程中,要防止變頻器受到撞擊和震動(dòng),所有柜體不得倒置,傾斜角度不得超過30。 During process of installation, prevent the drive from knocking and shaking, all cabinets can not be placed with bottom up and angle of inclination should not be more th

16、an 30.2.3.2 安裝電纜 Installation Cable電氣安裝主要包括柜體到現(xiàn)場(chǎng)的輸入輸出高壓電纜、柜體之間的連接線、柜體和現(xiàn)場(chǎng)的控制及信號(hào)線的配線。 The electric installation mainly includes high-voltage cable from cabinet to field, connecting line and wiring of cabinet, on-site control and signal line. 定子電源電纜 Stator Power Cable調(diào)速電機(jī)主繞組電纜,該電纜的一端接至旁路柜,另一端接至調(diào)速電機(jī)定子繞組

17、端。其電纜的規(guī)格詳見安裝施工示意圖。 One end of speed-regulation motor main winding cable is connected to bypass cabinet; the other end is connected to stator winding terminal of speed-regulation motor. Refer to Installation & Construction Diagram for specification of the cable. 高壓電源電纜 High-voltage Power Cable高壓進(jìn)線電纜,

18、該電纜的一端接至旁路柜,另一端接至高壓配電室中的高壓操作柜。其電纜的規(guī)格見安裝施工示意圖。One end of high-voltage inlet cable is connected to bypass cabinet; the other end is connected to high-voltage operation cabinet in high-voltage allocation room. Refer to Installation & Construction Diagram for specification of the cable. 高壓連鎖電纜 High-volt

19、age Interlock Cable高壓聯(lián)鎖電纜是控制柜控制高壓的合閘、分閘、高壓合閘狀態(tài)檢測(cè)等對(duì)高壓開關(guān)的操作。其電纜的規(guī)格見安裝施工示意圖。 High-voltage interlock cable is used for what that control cabinet controls switchingin and opening of high-voltage, high-voltage switchingin status inspection and other operation for high-voltage switch. Refer to Installation

20、 & Construction Diagram for specification of the cable.高壓聯(lián)鎖電纜用于控制柜與用戶高壓斷路器的連接,與控制柜中的高壓合閘中間繼電器常開觸點(diǎn)相連;分閘線路接至控制柜中的端子排上,同時(shí)與控制柜中的高壓分閘中間繼電器常開觸點(diǎn)相連,從而控制高壓的合閘、分閘。 High-voltage interlock cable is used for connection between cabinet and high-voltage circuit-breaker of user and normally open contact of high-vol

21、tage switchingin intermediate relay in control cabinet; opening circuit is connected to terminal row of control cabinet, at same time, connected with normally open contact of high-voltage switchingin intermediate relay in control cabinet so as to control high-voltage switchingin and opening.通過該電纜將來自

22、用戶高壓斷路器的一對(duì)無源接點(diǎn)接至控制柜中的端子,從而實(shí)現(xiàn)檢測(cè)高壓斷路器合閘狀態(tài)。 Two non-source points from high-voltage circuit-breaker are connected to terminal of control cabinet via the cable, which realizes inspecting switchingin status of high-voltage circuit-breaker. 交流電源電纜 AC Power Cable交流電源是用戶提供給調(diào)速控制裝置的380VAC/3KW的三相四線制控制電源,作為控制裝置

23、的冷卻電源和開關(guān)操作電源,其電源來自用戶低壓配電室,通過該電纜接至變頻柜中的端子排上。其電纜的規(guī)格見安裝施工示意圖。 AC Power is the 380VAC/3KW power of 3-phase 4-wire system that user supplies to speed-regulation control device, which serves as cooling power and switch operation power of control device, the power comes from low-voltage allocation room, wh

24、ich is connected to terminal row of current-transforming cabinet. Refer to Installation & Construction Diagram for specification of the cable. 遠(yuǎn)控柜操作電纜 Remote-control Cabinet Operation Cable遠(yuǎn)控柜操作電纜為用戶在遠(yuǎn)控柜處對(duì)調(diào)速電機(jī)進(jìn)行操作控制的操作電纜,通過該電纜將遠(yuǎn)控柜操作系統(tǒng)連接至控制柜中的端子排上,實(shí)現(xiàn)遠(yuǎn)控柜對(duì)高壓開關(guān)的合閘、分閘操作控制。其規(guī)格型號(hào)見安裝施工示意圖。 Remote-control ca

25、binet operation cable is the operation cable via which user performs operation control for speed-regulation motor at the site of remote-control cabinet; the cable connects operation system of remote-control cabinet with terminal row of control cabinet, which realizes the operation control of remote

26、cabinet for high-voltage switchingin and opening. Refer to Installation & Construction Diagram for specification of the cable. 遠(yuǎn)控柜指示電纜 Remote-control Cabinet Indication Cable遠(yuǎn)控柜指示電纜用于將調(diào)速系統(tǒng)的狀態(tài)指示信號(hào)傳至遠(yuǎn)控柜,在遠(yuǎn)控柜位置處顯示調(diào)速電機(jī)的工作狀態(tài)。其規(guī)格可見安裝施工示意圖。 Remote-control cabinet cable is used for transmitting the status i

27、ndicating signal of speed-regulation system to remote-control cabinet and displaying the operation status of speed-regulation motor. Refer to Installation & Construction Diagram for specification of the cable. 遠(yuǎn)控柜觸摸屏通訊電纜 Communication Cable of Remote-control Cabinet Touch Screen該電纜一端接至控制柜觸摸屏,一端接至遠(yuǎn)控柜

28、觸摸屏。實(shí)現(xiàn)兩個(gè)觸摸屏通訊。其電纜的規(guī)格見安裝施工示意圖。 One end of the cable is connected to control cabinet touch screen, the other end is connected to remote-control cabinet touch screen, which can realize the communication of two touch screen. Refer to Installation & Construction Diagram for specification of the cable. 遠(yuǎn)控

29、柜急停電纜 Remote-control Cabinet Emergency-stop Cable該電纜一端接至控制柜。一端接遠(yuǎn)控柜。電機(jī)在運(yùn)行中出現(xiàn)緊急情況無法正常停車時(shí),在遠(yuǎn)控位置進(jìn)行緊急停車,使其直接作用于分閘回路。其規(guī)格可見安裝施工示意圖。 One end of the cable is connected to control cabinet; the other end is connected to remote-control cabinet. When there is emergency case and the motor can not be stopped norma

30、lly in operation, perform emergency-stop at remote place and make it to act on opening circuit directly. Refer to Installation & Construction Diagram for specification of the cable. 上位機(jī)操作電纜 Upper Machine Operation Cable該電纜一端接至控制柜。一端接至上位機(jī)。上位機(jī)操作電纜為用戶在DCS系統(tǒng)處對(duì)調(diào)速電機(jī)進(jìn)行操作控制的操作電纜,通過該電纜將用戶DCS操作系統(tǒng)連接至控制柜中的端子排上,

31、實(shí)現(xiàn)DCS系統(tǒng)對(duì)調(diào)速電機(jī)的各種操作控制。其規(guī)格可見安裝施工示意圖。 One end of the cable is connected to control cabinet; the other end is connected to upper machine. Upper machine operation cable is the operation cable that user performs operation control for speed-regulation at the position of DCS system, via which user DCS operat

32、ion system is connected with terminal row of control cabinet and all kind of operation control of DCS system for speed-regulation motor is realized. Refer to Installation & Construction Diagram for specification of the cable. 上位機(jī)指示電纜 Upper Machine Indication Cable該電纜一端接至控制柜。一端接至上位機(jī)。上位機(jī)指示電纜用于將調(diào)速系統(tǒng)的狀態(tài)

33、指示信號(hào)傳至上位機(jī)系統(tǒng),在上位機(jī)位置處顯示調(diào)速電機(jī)的工作狀態(tài)。其規(guī)格可見安裝施工示意圖。 One end of the cable is connected to control cabinet; the other end is connected to upper machine. Upper machine operation cable is used for transmitting the status indicating signal of speed-regulation system to upper machine system and displaying the op

34、eration status of speed-regulation motor at the position of upper machine. Refer to Installation & Construction Diagram for specification of the cable. 上位機(jī)轉(zhuǎn)速給定電纜 Upper Machine Speed Given Cable通過該電纜將DCS給定信號(hào)(來自用戶420mA)接至控制柜中的端子排,實(shí)現(xiàn)DCS對(duì)變頻器的轉(zhuǎn)速控制。其電纜的規(guī)格見安裝施工示意圖。 The cable connects the DCS given signal (

35、4-20mA coming from user) to terminal row of control cabinet, which realizes the speed control of DCS for drive. Refer to Installation & Construction Diagram for specification of the cable. 上位機(jī)模擬信號(hào)上傳電纜 Upper Machine Analogue Signal Uploading Cable將調(diào)速系統(tǒng)運(yùn)行中的調(diào)速電機(jī)的轉(zhuǎn)速信號(hào)通過該電纜由控制柜中的端子排傳至上位機(jī)DCS系統(tǒng),供DCS系統(tǒng)采集監(jiān)控。

36、其規(guī)格可見安裝施工示意圖。 The speed signal of speed-regulation motor in speed-regulation system operation is uploaded from terminal row of control cabinet to DCS system of upper machine via the cable for collection and supervision of DCS system. Refer to Installation & Construction Diagram for specification of

37、the cable. 上位機(jī)急停電纜 Upper Machine Emergency-stop Cable該電纜一端接至控制柜。一端接至上位機(jī)。電機(jī)在運(yùn)行中出現(xiàn)緊急情況無法正常停車時(shí),上位機(jī)系統(tǒng)進(jìn)行緊急停車,使其直接作用于分閘回路。其規(guī)格可見安裝施工示意圖。 One end of the cable is connected to control cabinet; the other end is connected to upper machine. When there is emergency case and the motor can not be stopped normally

38、in operation, upper machine performs emergency-stop and make it to act on opening circuit directly. Refer to Installation & Construction Diagram for specification of the cable. 閉環(huán)反饋電纜 Close-loop Feedback Cable通過該電纜將電機(jī)調(diào)速運(yùn)行中自身的閉環(huán)反饋信號(hào)(來自用戶420mA)接至控制柜中的端子排,實(shí)現(xiàn)調(diào)速系統(tǒng)自身的閉環(huán)運(yùn)行。其電纜的規(guī)格見安裝施工示意圖。 The self close-loop feedback signal (4-20mA coming from user) in speed-regulation operation of mo

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論