1、高壓除氧設(shè)備 high pressure deaerating equipment安 裝 使 用 說 明 書Installation and Operation Manual目 錄CONTENTS一、設(shè)備簡介1. Equipment Introduction二、結(jié)構(gòu)及原理2. Construction and Function三、除氧設(shè)備的安裝3. Design, manufacture, installation and inspection of deoxygenating equipment四、除氧設(shè)備的運(yùn)行4. Operation of Deoxygenating Equipment五
2、、除氧設(shè)備的檢驗(yàn)5. Inspection of Deoxygenating Equipment六、除氧設(shè)備的停運(yùn)保護(hù)6. Protection of Non Operating Deoxygenating Equipment七、供貨范圍7. Scope of Supply八、附設(shè)備外形圖8. Outline Drawing of Equipment一、 設(shè)備簡介1. Equipment Introduction本設(shè)備用于鍋爐給水的除氧。This equipment is used to deoxygenate the boiler feedwater.1、本設(shè)備為熱力噴霧淋水盤式除氧裝置,由
3、高壓除氧器與除氧水箱組成,用于電站鍋爐給水的除氧。在正常工作下,利用汽輪機(jī)抽汽或壓力得到控制且具有安全瀉放裝置的汽源作為加熱蒸汽,將進(jìn)入除氧器的水加熱到與除氧器運(yùn)行壓力相對應(yīng)的飽和蒸汽溫度,根據(jù)道爾頓定律,將溶于水的氧與二氧化碳等非凝結(jié)氣體除去,達(dá)到標(biāo)準(zhǔn)規(guī)定的除氧水,儲(chǔ)存在除氧水箱中,隨時(shí)準(zhǔn)備供給用水的需要。1). This deaerating equipmentis of spray and packing type, consisting of high pressure deaerator and storage tank. It is applied to feedwater deo
4、xygenation of power station boiler, hot water boiler and other hot water equipment. In normal working condition, turbine's extraction steam or other steam source which pressure is under control and has safety relief device will be used as heating steam to heat the water entering the deaerator to
5、 the saturation steam temperature corresponding to the operation pressure of the deaerator. According to the Dalton Law, it will eliminate uncondensable gases dissolved in the water, such as oxygen and carbon dioxide, etc., so that the deoxygenated water will satisfy the standard requirements. The d
6、eoxygenated water will be stored in the storage tank for supply at any time.2、本設(shè)備適用于在設(shè)定、滑壓力下作定壓運(yùn)行。定壓運(yùn)行時(shí),備用加熱蒸汽通過電動(dòng)調(diào)節(jié)閥進(jìn)入除氧器。根據(jù)除氧器內(nèi)部的設(shè)定壓力為0.147MPa.a,自動(dòng)調(diào)節(jié)閥開度,以控制入口加熱蒸汽量。2). This equipment is applicable to constant pressure and sliding pressure operation under the set pressure. Constant pressure operati
7、on under the set pressure ,The heating steam of Assistance enters the deaerator through the motor operated adjust valve. According to the internal set pressure (0.147Mpa.a) of the deaerator, it will automatically adjust the valve opening to control the flow of the inlet heating steam.3、高壓除氧器采用雙封頭臥式結(jié)
8、構(gòu),通過支座坐落在水箱筒體上,水箱采用雙封頭臥式結(jié)構(gòu),除氧器及水箱通過下水管和蒸汽連通管進(jìn)行連通,維持除氧器和水箱壓力平衡,保證設(shè)備安全穩(wěn)定運(yùn)行。3). The high pressure deaerator adopts double-head horizontal construction , Pass to pay to install in the storage tank tube body top, The storage tank adopts double-head horizontal structure.connecting with storage tank cylind
9、er by the downcomer and steam connecting pipe, Maintain the pressure balance about the deaerator and the storage tank, Promise an equipments a safety and stabilize to circulate.4、高壓除氧器設(shè)有(A48Y-16C)型彈簧全啟式安全閥作為瀉放裝置,安全閥的開啟壓力和數(shù)量見設(shè)備圖紙。4). The high pressure deaerating equipment is equipped with (A48Y-16C)
10、spring full opening safety valve as pressure relief device. For the opening pressure of safety valve and number , please refer to the equipment drawing.5、在水箱筒體上設(shè)有2對就地磁翻板水位計(jì),用于現(xiàn)場觀察,還根據(jù)需要設(shè)有3對平衡容器,用于遠(yuǎn)方水位顯示及報(bào)警、控制水位,當(dāng)水位高于預(yù)定值時(shí),及時(shí)發(fā)出高水位溢流放水信號,自動(dòng)開啟氣動(dòng)調(diào)節(jié)閥進(jìn)行排水,以維持水箱中的正常水位,保證設(shè)備穩(wěn)定運(yùn)行。另設(shè)2對備用水位測量接口,便于用戶根據(jù)需要設(shè)置水位控制儀表。
11、5). There is two group local magnetic conversion water level gauge equipped on the storage tank cylinder for local observation. According to requirement, it is also equipped with three group of balance vesse for remote water level indication and alarm. When water level is higher than the predefined
12、value, it will give emergency drain signal and automatically open the air control regulates valve. It is equipped with two group of balance vessel to provide water level automatic adjust valve with water level signal to control the water level of the storage tank and for remote indication or as a st
13、andby.二、 結(jié)構(gòu)及原理2. Construction and Function1、高壓除氧器按水流方向,由上而下,分為排汽區(qū)段,空間區(qū)(除氧區(qū))和填料區(qū)段。主凝結(jié)水及補(bǔ)給水,以及各處合格的疏水進(jìn)入除氧器水室內(nèi),在壓差的作用下,經(jīng)多只彈簧噴嘴,在壓差的作用下形成射流噴射,形成傘狀的水膜裙,加熱蒸汽由淋水盤填料層側(cè)面進(jìn)入,在淋水盤間折流穿行,與入口水逐級相遇,進(jìn)行熱質(zhì)交換。將入口水加熱到與除氧器運(yùn)行壓力相對應(yīng)的飽和蒸汽溫度,溶解于水中的氧氣及不凝結(jié)氣體,自水中逸出,經(jīng)除氧器(頭)上部的汽水分離裝置和排汽管匯集管,排入大氣,排氧門可以根據(jù)出水含氧量指標(biāo)的變化,及時(shí)進(jìn)行調(diào)整開度,以保證在出水含氧
14、量達(dá)標(biāo)的情況下節(jié)能。入口水在空間區(qū)內(nèi)完成一次除氧,在淋水盤層完成二次除氧。除氧水由除氧器自流而下,經(jīng)下水管自由下落,匯集于除氧水箱內(nèi)。除氧器端部還設(shè)有高加疏水管,為減少高加疏水對除氧器內(nèi)件的沖擊,設(shè)有不銹鋼擋板,對進(jìn)入的高加疏水進(jìn)行汽水分離。這種除氧器的傳熱系數(shù)較高,可在較短的時(shí)間內(nèi)將水加熱到要求的狀態(tài),達(dá)到除氧效果。1). According to the flowing direction of the water, from top to bottom, the high pressure deaerator is divided into steam venting section,
15、spray device (consisting of water inlet pipe assembly and nozzle), space section and packing section. The main condensed water, feedwater make-up and all other qualified drains enter the spray device of the deaerator. Under the effect of pressure difference, the rotational water spray down like the
16、shape of membrane from the Several spring coils spray a mouth. Heat steam from pour the water dish filler layer on the side into, at pour the water dish fold to flow to wear a line. The primary heating steam rises from the bottom of the packing, passing through the packing and the water distribution
17、 spacers, it passes through the hollow part and outside surface of the water skirt inside, and gradually meets the inlet water to perform heat exchange. When the inlet water is heated to the saturation steam temperature corresponding to the operation pressure of the deaerator, the oxygen and other u
18、ncondensable gases dissolved in the water will be isolated from the water and vented to the atmosphere through the vent pipe of the steam/water separator at the top of the deaerator. The inlet water implements the first deoxygenation in the spray atomization section and finishes the second deoxygena
19、tion in the packing. The deoxygenated water flows down in the deaerator, passing through the water distribution pipe of the storage tank, It is collected in the storage tank. Establish H.P. heater drain inlet at the end of deaerator , For reduce H.P. heater drain inlet to in addition to the impact o
20、f the piece inside the oxygen machine, Establish the stainless steel blocks plank, H.P. heater drain inlet to carry on separation towards enter of highly.The heat transfer coefficient of this kind of deaerator is high; it can heat the water to satisfy the requirements in short time and reach the deo
21、xygenation and heating effect.2、除氧水箱由臥式筒體和兩個(gè)封頭焊制而成,水箱兩端設(shè)有兩個(gè)供檢修和維護(hù)用的人孔。筒體內(nèi)設(shè)有多道T型加強(qiáng)圈,以保證水箱的強(qiáng)度和剛性。除氧水箱內(nèi)設(shè)不銹鋼再沸騰輔助加熱管,啟動(dòng)時(shí)或需要時(shí),加熱蒸汽通過沸騰管上的小孔,沸騰鼓泡,將水箱內(nèi)給水進(jìn)行再加熱升溫。水箱底部設(shè)有3個(gè)除氧水(下水管)出口,下水管頂部設(shè)有特殊的防旋渦裝置,防止出水在給水泵處產(chǎn)生汽蝕。水箱側(cè)面設(shè)有高位排水(溢流)管,當(dāng)水箱水位超過高水位時(shí),由DCS發(fā)出信號,開啟氣動(dòng)調(diào)節(jié)閥進(jìn)行高水位放水,以保證設(shè)備正常運(yùn)行。在水箱上部還設(shè)有設(shè)有給水再循環(huán)接管,該管深入水箱上部空間,給水由管上諸
22、多小孔均勻噴出,均勻的灑在水箱水箱面上,以減少水面波動(dòng),水箱上部可能滯留的氣體,通過蒸汽連通管排至除氧器空間內(nèi),直至通過除氧器頂部的排氧門排出,維持除氧器穩(wěn)定安全運(yùn)行。水箱上留有就地水位測量接口和遠(yuǎn)傳水位測量接口,就地壓力、溫度和遠(yuǎn)傳壓力、溫度測口,便于就地觀察水位、壓力和溫度,并實(shí)現(xiàn)遠(yuǎn)方控制水位、壓力和溫度。). Ys-180 storage tank is welded by horizontal cylinder and two heads, and there are two manholes at its two ends for checking and maintenance.
23、There are a lot of T-shaped stiffeners in the cylinder to guarantee the strength and rigidity of the storage tank. The storage tank is equipped with reboiling auxiliary heating pipe, this heating pipe adopts main pipe branch structure, if necessary, the heating steam boils and bubbles up through the
24、 nozzles and holes in the boiling pipe to heat the feedwater. The storage tank bottom establishes 3 in addition to the oxygen water(enter water a tube) export, It is equipped with a special anti-vortex device to prevent cavitations in the feedwater pump. There are high level drain (Overflow to flow
25、)pipes a on the side of the storage tank, when the water level of the storage tank exceeds the high water level, the electric contacts will give signals to open motor operated valve for draining. At the top part of the storage tank, there is equipped with feedwater recycle nozzle, this pipe is deepl
26、y inserted in the upper space of the storage tank, the feedwater sparges out through the holes in it and is evenly sprinkled on the surface of the storage tank to reduce the fluctuating of the water. The gas which may be detained in the top of the tank will be vented to the deaerator through the pip
27、es connecting storage tank and deaerator, so as to maintain the stable and secure operation of the deaerator. Stay the water level diagraph to connect and Far EasTone Telecommunications Co., Ltd water level diagraph to connect right on the spot on the water tank, right on the spot the pressure,tempe
28、rature and Far EasTone Telecommunications Co., Ltd pressure,temperature measure, easy to observe the water level,pressure and temperature right on the spot, and carry out the far-away place control water level,pressure and temperature.三、除氧設(shè)備的安裝3. Design, manufacture, installation and inspection of d
29、eoxygenating equipment1、本設(shè)備的安裝,應(yīng)符合固定式壓力容器安全技術(shù)監(jiān)察規(guī)程,GB150-1998鋼制壓力容器,電站壓力式除氧器安全技術(shù)規(guī)定,JB/T10325-2002鍋爐除氧器技術(shù)條件及電力建設(shè)施工及驗(yàn)收技術(shù)規(guī)范(汽輪機(jī)機(jī)組篇)的規(guī)定。油漆,包裝,運(yùn)輸按JB/T4711-2003壓力容器涂敷與運(yùn)輸包裝執(zhí)行。1). Design, fabrication, inspection, test and acceptance criteria of this equipment shall comply with the requirements of GB150-1998
30、"Steel Pressure Vessels", "Supervision Regulation on Safety Technology For Stationary Pressure Vessel " and JB/T10325-2002 " Boiler in addition to oxygen machine technique condition ",and under supervision of "Supervision Specification For Technology And Safety of
31、Pressure Vessels"and The installation of the equipment shall be in accordance with DLJ53-81 "Construction And Acceptance Criteria of Power Plant Building (turbine)". Painting, packing and transportation of the equipment shall comply with the requirements of JB/T4711-2003 "Paintin
32、g, Packing And Transportation Of Pressure Vessels".2、現(xiàn)場組裝的焊縫應(yīng)符合設(shè)計(jì)圖紙(設(shè)備系統(tǒng)圖)技術(shù)要求中的規(guī)定。2). The welding seam assembled at site shall comply with the regulations of the technical requirements in the design drawings.3、水箱安裝式就位找平,除氧器保持垂直。水箱的鞍座面及基礎(chǔ)臺(tái)板,在水箱就位前,必須清掃干凈平整?;瑒?dòng)支座的滾體,位置安裝應(yīng)適當(dāng),滑動(dòng)支座底板長圓孔在安裝時(shí),應(yīng)在水箱膨脹方向
33、留有足夠的膨脹間距。滑動(dòng)支座的地腳螺栓應(yīng)采用兩個(gè)螺母,第一個(gè)擰緊后,倒退一圈。再用第二個(gè)螺母鎖緊。3). The storage tank shall be horizontal, and the deaerator shall be perpendicular to the base plate and seating support of the storage tank. Before the storage tank takes its place, the movable seating support must be cleaned clearly, and the install
34、ation position shall be proper. When installing, the oblong hole of the movable seating support shall have sufficient expansion space in the storage tank's expansion direction. The anchor bolt of the movable seating support shall be fastened by two nuts, after the first one is tightened, unscrew
35、 it one turn, then use the second nut to tighten it up.4、設(shè)備組裝完畢后,保溫前按圖紙要求進(jìn)行水壓試驗(yàn),若發(fā)現(xiàn)缺陷,及時(shí)采取措施處理,處理后再做水壓試驗(yàn),直至合格。 4). After the equipment is assembled, it shall be hydrostatic tested before performing thermal insulation according to the requirements in the drawing. If defect is found, timely measures s
36、hall be taken to deal with it. After the treatment, perform hydraulic test again, till the equipment is acceptable.5、水壓試驗(yàn)合格后,將設(shè)備內(nèi)部清掃干凈,外表面補(bǔ)涂防銹漆,然后進(jìn)行保溫施工,保溫按設(shè)計(jì)院設(shè)計(jì)要求進(jìn)行。5). After passing the hydraulic test, clean the inside of the equipment, paint it with antirust paint according to the drawing, then p
37、erform thermal insulation, the thermal insulation shall be done as the design requirements of the Designing Institute.6、檢查設(shè)備內(nèi)部部件完整、齊全,并按圖紙安裝正確。安裝后,對各部件進(jìn)行調(diào)試,各閥門開啟靈活、可靠、無卡澀現(xiàn)象,動(dòng)作準(zhǔn)確無誤。水箱在充水過程中,觀察水位計(jì)指示準(zhǔn)確。6). Check if the inner parts of the equipment are complete, and properly installed according to the d
38、rawings. After installation, adjust each part and check if the valves are flexible and reliable without block and if the action is correct. During feeding water in the storage tank, observe if the indication of water level meter is correct.7、安全閥在安裝時(shí),應(yīng)先調(diào)整其開啟壓力,并應(yīng)保證其靈活、無卡澀現(xiàn)象,關(guān)閉后,無泄漏現(xiàn)象。7). When install
39、ing the safety valve, adjust its opening pressure first and guarantee it is flexible without block; after closing, it has no leakage phenomenon.8、(單室)平衡容器的水位高度,采用模擬信號,使其在水箱正常水位高度時(shí),差壓變送器輸出的電流信號為0mA,水箱水位變化時(shí),遠(yuǎn)方顯示水位裝置所顯示的水位,與就地水位計(jì)保持一致。 8). Control the water level of the balance vessel, and use analog si
40、gnal to make the current signal sent by the differential pressure transmitter is 0mA when the storage tank is at the normal water level. When the water level of the storage tank changes, the water level displayed by the remote indication shall be the same as that of local water level gauge.9、氣動(dòng)高水位溢流
41、調(diào)節(jié)閥用DCS信號試驗(yàn),動(dòng)作靈活、準(zhǔn)確。與水箱水位保持一致,在高水位位置時(shí),應(yīng)發(fā)出高水位信號,開啟氣動(dòng)電動(dòng)調(diào)節(jié)閥放水。9). Use analog signal test to check if the action of the motor(the air control) operated water level adjust valve is flexible and correct, and consistent with the water level of the storage tank. In the high level position, it shall give hig
42、h water level signal to open the drain motor (the air control)operated valve.四、除氧設(shè)備的運(yùn)行4. Operation of Deoxygenating Equipment本設(shè)備的運(yùn)行,由電廠根據(jù)熱力系統(tǒng)的具體情況擬訂運(yùn)行規(guī)程。The operation rules of this equipment shall be made by the power station according to the specific condition of its heating system.本說明書所列,僅供參考。This
43、 manual is only for reference.運(yùn)行方式要點(diǎn):The main points of its operation modes:1、啟動(dòng)。1,start. 在初次啟動(dòng)和經(jīng)過較長期停用后啟動(dòng),水箱內(nèi)空洞無水,應(yīng)首先經(jīng)管道輸入化學(xué)除鹽水或凝結(jié)水。啟動(dòng)時(shí),必須以打循環(huán)的方式加熱存水。從水箱流出的水經(jīng)過管道流向?qū)S玫脑傺h(huán)泵,升壓后流向除氧器,打開備用汽源,在除氧器內(nèi)加熱再循環(huán)水,加熱后此水流入水箱,如此往復(fù),水箱內(nèi)存水逐步加熱升溫,在除氧器內(nèi)壓力由大氣壓上升到0.147MPa.a時(shí),可以做定壓運(yùn)行。啟動(dòng)時(shí),適當(dāng)開啟除氧器上部排汽門、水位計(jì)、及平衡容器操作閥門,其它閥門暫時(shí)關(guān)閉
44、。Because the water tank is empty in first startup and startup after non-operation for a long time, it should be filled with chemical desalting water or condensed water through the pipe. When startup, do heat the remaining water in cycle mode. The water flowing out of the tank flows into the special
45、re-circulating pump through pipe and then into the deaerator after pressure rise. Turn on the standby steam source and heat the re-circulating water in the deaerator, after which this water will flow into the tank. The remaining water in the tank will be gradually heated and warmed up by repeated do
46、ing like this. When the pressure in the deaerator rises from atmospheric pressure to 0.147MPa.a, run at fixed pressure. When startup, open the upper exhaust valve, water gauge and balancing vessel operating valve of deaerator appropriately and close other valves temporarily.2、轉(zhuǎn)入正常運(yùn)行2,Turn to go into
47、 normal movement 啟動(dòng)過程結(jié)束后,轉(zhuǎn)入正常運(yùn)行時(shí),可以先通水側(cè),把來自低壓加熱器的主凝結(jié)水等水源通入除氧器水室,以進(jìn)入除氧器除氧,可在0.147MPa.a下做定壓運(yùn)行,其余各進(jìn)出閥門開啟,除氧水箱的出水流向給水泵升壓送入高加或鍋爐。Turn to go into after starting the process be over normal circulate, Can first water side, Come from low-pressure heating apparatus of main condense a water etc. The headwaters
48、 open into in addition to the oxygen machine water room with enter in addition to in addition to oxygen, The oxygen machine can do to certainly press movement under the 0.147 MPa.a, The rest is each to pass in and out the valve door to open, In addition to of the oxygen water tank water current is t
49、oward the water supply pump rises to press to send to go into high add or boiler.當(dāng)機(jī)組負(fù)荷升至20%時(shí),應(yīng)把汽源自動(dòng)切換到四段抽汽,同時(shí)關(guān)閉備用汽源,除氧器自動(dòng)進(jìn)入滑壓除氧。Should derive from a vapor to move to cut over to fourth segments to take out a vapor when crash a set of burden rise to 20%, Close the back up vapor source in the meantime
50、, In addition to the oxygen machine enters to slip to press automatically in addition to oxygen.在正常滑壓運(yùn)行時(shí),加熱蒸汽(四段抽汽)不需調(diào)節(jié),主汽管不設(shè)調(diào)節(jié)閥。用戶必須在備用汽源上設(shè)置蒸汽調(diào)節(jié)閥,當(dāng)?shù)拓?fù)荷或需要投入備用汽源時(shí),對備用汽源作壓力調(diào)節(jié),也可在此工作狀況下做定壓運(yùn)行。In normal sliding pressure operation, it is not required to control the heat-up of the steam (section 4 steam ex
51、traction) or set control valve on the main steam pipe. The user must set the steam control valve on the standby steam source and control the pressure at low load operation or running the standby steam source is necessary, or run at fixed pressure in this operating condition. 除氧器本體設(shè)有遠(yuǎn)傳壓力傳輸,一旦運(yùn)行壓力超過設(shè)定
52、壓力,應(yīng)實(shí)現(xiàn)報(bào)警。此時(shí)應(yīng)關(guān)閉汽源,防止除氧器超壓或爆破。用戶應(yīng)考慮把甩負(fù)荷信號連接到加熱蒸汽(四段抽汽)管道上的抽汽止回閥,一旦汽輪機(jī)突然甩負(fù)荷時(shí)立即關(guān)閉抽汽止回閥,防止除氧器內(nèi)蒸汽反沖入汽輪機(jī)。In addition to the oxygen machine essence establishes the Far EasTone Telecommunications Co., Ltd pressure to deliver, Once circulating pressure to exceed enactment pressure should carry out to report t
53、o the police.Should close the vapor source at this time, Prevent°from in addition to the oxygen machine is super to press or blow up.The customer should consider jilt the burden signal to link to heat the vapor check valve in take out of the steam(four the segments take out a vapor) piping, onc
54、e the vapor round the machine jilts burden suddenly close to take out the vapor check valve immediately, Prevent°from in addition to the oxygen steam inside the machine is anti- to hurtle into the vapor round machine.3、在升負(fù)荷至額定工況過程中,水位自動(dòng)調(diào)節(jié)等各自動(dòng)控制設(shè)施投入運(yùn)行,并調(diào)整合適。調(diào)整排汽閥門開度在合適位置,注意觀察各項(xiàng)儀表。3,During the pe
55、riod of rising to carry to the sum to settle the work condition, The water level regulates to wait each auto control facilities devotion movement automatically, And adjust accommodation.Adjust the row vapor valve door opens a degree in the suitable position, Noticing to observe various appearances.4
56、、當(dāng)負(fù)荷降至20%以下時(shí),應(yīng)自動(dòng)關(guān)閉抽汽閥門,同時(shí)打開備用起源進(jìn)汽閥,使除氧器維持在0.147MPa.a壓力下定壓運(yùn)行。4,Be burden to decline to 20% following, Should the auto close take out the vapor valve door, Openning the back up origins to enter the vapor valve in the meantime, Make in addition to the oxygen machine maintains under the 0.147 MPa.a pres
57、sure to certainly press movement.5、停運(yùn)時(shí)先停汽,關(guān)閉抽汽閥門,然后再停水側(cè)。5,Stop luck stop a vapor first, Close to take out the vapor valve door, Then stop a water side. 在突然甩負(fù)荷時(shí),應(yīng)立即關(guān)閉進(jìn)汽閥,防止蒸汽倒灌汽輪機(jī)。While jilting burden suddenly, Should close immediately into the vapor valve, Keep steam from pour to infuse the vapor ro
58、und machine.6、運(yùn)行中需注意事項(xiàng)6.Precautions in operation6.1 加熱蒸汽采用汽輪機(jī)低一級抽汽,不得采用高一級抽汽。當(dāng)機(jī)組啟動(dòng)或低負(fù)荷運(yùn)行時(shí),可根據(jù)加熱蒸汽參數(shù)(或另用輔助汽源)。 確定除氧器的運(yùn)行壓力,如必須使用高一級抽汽時(shí),應(yīng)考慮十足的安全措施。本設(shè)備在任何情況下,嚴(yán)禁超設(shè)計(jì)壓力運(yùn)行.6.1The heated steam shall adopt low-level extraction steam of turbine, not high-level extraction steam . When the unit is started or in
59、low load operation, the operation pressure of the deaerator could be determined according to the parameters of the heating steam (or use another auxiliary steam source). If it must use high level extraction steam, adequate safety measures must be taken into consideration. In any cases, it is strictly forbidden to operate this equipment under the pressure exceeding the design pressure.6.2 開進(jìn)水閥向除氧器送水時(shí),水量應(yīng)緩慢地增加或減少,不允許有較
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 養(yǎng)魚技巧與知識培訓(xùn)課件
- 2025年度海洋動(dòng)物運(yùn)輸與供應(yīng)鏈管理合同3篇
- 綠森鋼化中空玻璃遷擴(kuò)建項(xiàng)目可行性研究報(bào)告模板-立項(xiàng)拿地
- 全國清華版信息技術(shù)小學(xué)四年級下冊新授課 第4課 獨(dú)特景觀-在幻燈片中插入文本框 說課稿
- Unit7 Grammar Focus 說課稿 2024-2025學(xué)年人教版英語七年級上冊
- 貴州省安順市(2024年-2025年小學(xué)六年級語文)統(tǒng)編版競賽題(下學(xué)期)試卷及答案
- 安徽省合肥市新站區(qū)2024-2025學(xué)年九年級上學(xué)期期末化學(xué)試卷(含答案)
- 二零二五年度周轉(zhuǎn)材料租賃與施工現(xiàn)場安全生產(chǎn)合同3篇
- 陜西省商洛市(2024年-2025年小學(xué)六年級語文)部編版小升初真題(上學(xué)期)試卷及答案
- 貴州黔南經(jīng)濟(jì)學(xué)院《手繪表現(xiàn)技法景觀》2023-2024學(xué)年第一學(xué)期期末試卷
- 洛欒高速公路薄壁空心墩施工方案爬模施工
- 事業(yè)單位公開招聘工作人員政審表
- GB/T 35199-2017土方機(jī)械輪胎式裝載機(jī)技術(shù)條件
- GB/T 28591-2012風(fēng)力等級
- 思博安根測儀熱凝牙膠尖-說明書
- 數(shù)字信號處理(課件)
- 出院小結(jié)模板
- HITACHI (日立)存儲(chǔ)操作說明書
- (新版教材)蘇教版二年級下冊科學(xué)全冊教案(教學(xué)設(shè)計(jì))
- 61850基礎(chǔ)技術(shù)介紹0001
- 電鏡基本知識培訓(xùn)
評論
0/150
提交評論