1、無The condensate pipe sizing chartThe condensate pipe sizing chart (Figure 14.3.5) can beused to size any type of condensate line, including:Drain lines containing no flash steam.Lines consisting of two-phase flow, such as trapdischarge lines, which are selected according to thepressures either side
2、of the trap.The chart (Figure 14.3.5):Works around acceptable flash steam velocities of 15- 20 m/s, according to the pipe size and the proportionof flash steam formed.Can be used with condensate temperatures lowerthan the steam saturation temperature, as will be thecase when using thermostatic steam
3、 traps.Is used to size trap discharge lines on full-loadconditions. It is not necessary to consider anyoversizing factors for start-up load or the removal ofnon-condensable gases.無May also be used to estimate sizes for pumped linescontaining condensate below 100C. This will bediscussed in Tutorial 1
4、4.4.Fig. 14.3.5 Condensate pipe sizing chart無Using the condensate pipe sizing chart (Also available inAppendix 14.3.2)Establish the point where the steam and condensate pressuresmeet (lower part of the chart, Figure 14.3.5). From this point, movevertically up to the upper chart to meet the required
5、condensaterate. If the discharge line is falling (non-flooded) and the selection ison or between lines, choose the lower line size. If the discharge lineis rising, and therefore likely to be flooded, choose the upper linesize.Note: The reasoning employed for the sizing of a steam trap isdifferent to
6、 that used for a discharge line, and it is perfectly normalfor a trap discharge line to be sized different to the trap it is serving.However, when the trap is correctly sized, the usual ancillaryequipment associated with a steam trap station, such as isolationvalves, strainer, trap testing chamber,
7、and check valve, can be thesame size as the trapping device selected, whatever the dischargeline size.A steam trap passing a full-load of 1000 kg/h at 6 bar g saturatedsteam pressure through a falling discharge line down to a flashvessel at 1.7 bar g.As the discharge line is non-flooded, the lower f
8、igure of 25 mm isselected from the chart (Figure 14.3.5).無Fig. 14.3.6 A non-flooded pressurised trap discharge line (referto Example 14.3.3)A steam trap passing a full-load of 1000 kg/h at 18 bar g saturatedsteam pressure through a discharge line rising 5 m up to apressurised condensate return line
9、at 3.5 bar g.Add the 0.5 bar static pressure (5 m head) to the 3.5 barcondensate pressure to give 4 bar g backpressure.As the discharge line is rising and thus flooded, the upper figure of32 mm is selected from the chart, (Figure 14.3.5).無Fig. 14.3.7 A flooded trap discharge line (refer to Example14
10、.3.4)A steam trap passing a full-load of 200 kg/h at 2 bar g saturatedsteam pressure through a sloping discharge line falling down to avented condensate receiver at atmospheric pressure (0 bar g).As the line is non-flooded, the lower figure of 20 mm is selectedfrom the chart, (Figure 14.3.5).無Fig. 1
11、4.3.8 A non-flooded vented trap discharge line (refer toExample 14.3.5)A pump-trap passing a full-load of 200 kg/h at 4 bar g saturatedsteam space pressure through a discharge line rising 5 m up to anon-flooded condensate return line at atmospheric pressure.The 5 m static pressure contributes the to
12、tal backpressure of 0.5bar g.As the trap discharge line is rising, the upper figure of 25 mm isselected from the chart, (Figure 14.3.5).無Fig. 14.3.9 A flooded trap discharge line (refer to Example14.3.6)Consider a condensate load of 200 kg/h to a receiver and pump.The pump discharge rate for this me
13、chanical type pump is taken assix times the filling rate, hence, the condensate rate taken for thisexample is 6 x 200 = 1 200 kg/h.Because the condensate will have lost its flash steam content toatmosphere via the receiver vent, the pump will only be pumpingliquid condensate. In this instance, it is only necessary to use thetop part of the chart in Figure 14.3.5. As the line from the pump isrising, the upper figure of 25 mm is chosen.Note: If the pumped line were longer than 100 m, the next largersize must be taken, which for
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 園林道路綠化設(shè)計(jì)答辯
- 國(guó)慶假期安全教育指南
- 特來電合同協(xié)議
- 工廠貨物轉(zhuǎn)讓協(xié)議書范本
- 電子設(shè)備合同協(xié)議模板
- 地產(chǎn)公司分紅合同協(xié)議
- 心肌梗死溶栓后護(hù)理
- 夜市小吃當(dāng)?shù)仫L(fēng)味特色的探索
- 中醫(yī)理療的安全性與療效
- 幼兒園安全課程
- 技能興威第一屆威海市職業(yè)技能大賽“CAD機(jī)械設(shè)計(jì)”賽項(xiàng)樣題
- 檢查結(jié)果互認(rèn)制度培訓(xùn)
- 農(nóng)業(yè)昆蟲學(xué)-形考測(cè)試二-國(guó)開(ZJ)-參考資料
- 2024年高考真題-地理(河北卷) 含答案
- 2024年上海客運(yùn)駕駛員從業(yè)資格證考試
- 小學(xué)勞動(dòng)教育實(shí)施情況調(diào)查問卷(含教師卷和學(xué)生卷)及調(diào)查結(jié)論
- 2024年資格考試-良好農(nóng)業(yè)規(guī)范認(rèn)證檢查員考試近5年真題集錦(頻考類試題)帶答案
- 麻疹經(jīng)典課件
- 社區(qū)居家養(yǎng)老服務(wù)設(shè)計(jì)方案范文
- 初二地理生物會(huì)考動(dòng)員家長(zhǎng)會(huì)發(fā)言稿
- 人教版三年級(jí)數(shù)學(xué)下冊(cè)暑假作業(yè)
評(píng)論
0/150
提交評(píng)論