1、廣南高速公路廣元連接線K3+245-K3+700混凝土擋土墻工程專項(xiàng)施工設(shè)計(jì)方案編制日期:二0一三年九月目 錄一、 編制說明·······································
2、3;······01二、 編制依據(jù)及原則········································0121編制依據(jù)
3、183;··········································0122編制原則······
4、·····································01三、工程管理目標(biāo)···········
5、183;·······························02四、工程概況·················
6、······························0241工程地理位置及地質(zhì)情況·················
7、83;··········0242工程范圍及規(guī)模····································0343工程主要特點(diǎn)
8、······································03五、設(shè)備、人員動(dòng)員周期及材料組織供應(yīng)········
9、3;··············0351人員、設(shè)備動(dòng)員周期·································035
10、2技術(shù)準(zhǔn)備···········································0453材料組織供應(yīng)····
11、83;··································05六、施工準(zhǔn)備及臨時(shí)設(shè)施·············
12、183;······················0561臨時(shí)房屋設(shè)施·························
13、3;·············0562水、電設(shè)施···································&
14、#183;·····06七、 施工組織機(jī)構(gòu)的建立····································0671 組織機(jī)構(gòu)設(shè)置····
15、··································0672施工組織管理機(jī)構(gòu)的運(yùn)作·············
16、83;···············07八、施工計(jì)劃·································&
17、#183;·············078.1 工期進(jìn)度計(jì)劃··································&
18、#183;···078.2 施工設(shè)備計(jì)劃·······································078.3 各施工隊(duì)人員構(gòu)成···
19、;································098.4 材料供應(yīng)計(jì)劃及措施···············
20、183;·················09九、施工方法·······························
21、·················1091擋土墻構(gòu)造·······························
22、83;··········1092施工工藝流程······································
23、;··1093衡重式擋土墻施工····································13十、工程質(zhì)量保證措施········
24、;·································16101技術(shù)保證措施···············
25、························16102質(zhì)量管理措施························&
26、#183;··············19103施工組織措施·································
27、183;·····25十一、安全保證措施:··········································26
28、111安全施工主要措施···································26112安全保證體系···········
29、183;···························33十二、文明施工,加強(qiáng)環(huán)保····················
30、················37121文明施工································
31、83;··········37122施工現(xiàn)場(chǎng)環(huán)境保護(hù)··································39十三、施工進(jìn)度保證措施:·
32、·····································40131一般保證措施···········&
33、#183;···························41132組織保證措施····················
34、183;··················43133技術(shù)保證措施·····························
35、83;·········4413。4.經(jīng)濟(jì)保證措施······································
36、183;·4713.5。合同保證措施········································48十四、雨季施工技術(shù)措施····
37、···································4849施工組織設(shè)計(jì)一、 編制說明在編制本標(biāo)的工程施工組織設(shè)計(jì)的過程中,根據(jù)施工場(chǎng)地狀況,以信守合同、確保質(zhì)量工期、安全文明生產(chǎn)、注重環(huán)保、合理控制工程造價(jià)為指導(dǎo)思想,經(jīng)過細(xì)心研究
38、形成了本施工組織設(shè)計(jì)主要內(nèi)容,其中闡述了本工程實(shí)施時(shí)的施工設(shè)備、施工計(jì)劃安排、施工技術(shù)方案、施工組織實(shí)施方法及順序,確保工程質(zhì)量和工期的主要措施,以及安全、文明、環(huán)境保護(hù)措施.在編制過程中,擇優(yōu)選擇施工方案,做到科學(xué)合理、經(jīng)濟(jì)方便,為工程施工統(tǒng)籌安排提供技術(shù)支持.二、 編制依據(jù)及原則 21編制依據(jù)1、本工程招投標(biāo)文件、設(shè)計(jì)圖紙及有關(guān)參考資料。2、施工現(xiàn)場(chǎng)對(duì)實(shí)際情況的詳細(xì)考察及有關(guān)會(huì)議精神.3、混凝土結(jié)構(gòu)設(shè)計(jì)規(guī)范、公路路基設(shè)計(jì)規(guī)范及現(xiàn)行國(guó)家相關(guān)標(biāo)準(zhǔn)及規(guī)范。22編制原則1、根據(jù)工程特點(diǎn)、自然條件及工期要求,在確保工程質(zhì)量與施工安全的前提下,采用科學(xué)合理的施工作業(yè)方法,籌劃人力安排,調(diào)配所需的機(jī)械設(shè)
39、備,以滿足施工生產(chǎn)的需要,確保人力、物力充分發(fā)揮作用,使績(jī)效最大化。2、詳細(xì)辨別各分項(xiàng)工程之間的施工順序和相互制約關(guān)系,認(rèn)真研究,統(tǒng)籌安排,理清控制因素與被控制因素,形成連貫合理的施工工藝流程.3、對(duì)施工的重點(diǎn)工序和難點(diǎn)工序進(jìn)行科學(xué)分析、采用成熟的施工技術(shù)和經(jīng)驗(yàn),做到切實(shí)可行、合理經(jīng)濟(jì)。4、根據(jù)各級(jí)政府部門質(zhì)量、安全、文明施工、環(huán)境保護(hù)要求,建立各項(xiàng)保證體系前制定完善的保證措施,確保施工生產(chǎn)各項(xiàng)管理目標(biāo)的順利實(shí)現(xiàn).5、充分利用我公司人力資源、機(jī)具設(shè)備、可動(dòng)員資源以及工程區(qū)域內(nèi)可利用的社會(huì)資源.三、工程管理目標(biāo)工期目標(biāo):168日歷天計(jì)劃工期:2013年9月10日至2014年2月28日質(zhì)量目標(biāo):工
40、程一次驗(yàn)收合格率100%。安全目標(biāo):執(zhí)行國(guó)家頒布的各種施工安全規(guī)程,杜絕傷亡、重大交通、火災(zāi)、機(jī)損等事故.環(huán)境目標(biāo):保護(hù)環(huán)境,文明施工.根據(jù)國(guó)家有關(guān)政策,保護(hù)好沿線自然生態(tài)環(huán)境,滅塵降噪,減少污染。掛牌上崗、文明施工。四、工程概況41工程地理位置及地質(zhì)概況本項(xiàng)目位于合同段內(nèi)K3+245K3+700距合同段起點(diǎn)3。245公里,距合同段止點(diǎn)7。613公里。地處龍?zhí)多l(xiāng)勝利村與元山村交界處。屬于高挖方段落,在K3+245K3+295段左側(cè)挖方邊坡高度最大為42m,K3+475K3+640段落挖方邊坡最高位51m。山體為礫巖、泥巖、砂巖互層,開挖完成后需對(duì)山體邊坡進(jìn)行框架梁防護(hù)處治。右側(cè)為路肩墻防護(hù)支檔
41、段落.屬于典型的半挖半填路基結(jié)構(gòu)形式段落.山勢(shì)陡峭,植被茂盛,在基坑開挖及便道修建過程中需特別注意施工安全作業(yè)及環(huán)保要求.42工程范圍及規(guī)模本工程共分三個(gè)主要段落,第一段為K3+245K3+295,最大高度12.88m,最小高度12。25m;第二段為K3+382K3+510,最大高度12。76m,最小高度7。15m;第三段為K3+620K3+700,最大高度24。88m,最小高度5。29m.本項(xiàng)目區(qū)域范圍內(nèi)的擋土墻施工將結(jié)合地形,根據(jù)地質(zhì)報(bào)告及埋深構(gòu)造,采用衡重式擋土墻.基礎(chǔ)為C20片石砼,墻身為C15片石砼結(jié)構(gòu).其中K3+585-K3+605為7。5砂漿砌筑片塊石擋土墻。43工程主要特點(diǎn)1、
42、本工程基坑土石方量大,施工作業(yè)面長(zhǎng),工期短,且各分段施工采用不同類型的擋土墻施工。2、施工時(shí)要充分考慮在施工過程中對(duì)高邊坡的影響,主要預(yù)防上邊坡處便道車輛通行及滾石傷人和下邊坡基坑開挖過程中土石毀壞林木及傷人的情況,安全防范措施.3、本工程擋土墻分為衡重式片石砼擋土墻和衡重式片石漿砌擋土墻。4、施工時(shí)需組織好基槽開挖、堆放、運(yùn)輸、工程測(cè)量等作業(yè),做到安全文明施工。5、在擋土墻施工過程中要與場(chǎng)平施工處密切配合,確保擋土墻后填料對(duì)稱、均勻回填和場(chǎng)平回填質(zhì)量。五、設(shè)備、人員動(dòng)員周期及材料組織供應(yīng)51 人員、設(shè)備動(dòng)員周期1、在簽署合同協(xié)議后在規(guī)定的進(jìn)場(chǎng)時(shí)間內(nèi) ,組織人員、施工機(jī)械及設(shè)備進(jìn)場(chǎng)并展開作業(yè)。
43、進(jìn)場(chǎng)后主要工作是清理現(xiàn)場(chǎng)、接通施工點(diǎn)的水電、通訊,安裝機(jī)械、搭建臨時(shí)房屋、水池、查閱工程處混凝土、砂漿施工配合比等。2、各種專用設(shè)備、材料進(jìn)場(chǎng)采用汽車運(yùn)輸?shù)姆绞竭M(jìn)行,并安裝、調(diào)試完畢,能及時(shí)投入生產(chǎn)使用.3、在施工設(shè)備進(jìn)場(chǎng)的同時(shí),組織所有進(jìn)入該項(xiàng)目的工程技術(shù)人員和工程管理人員分批進(jìn)入施工現(xiàn)場(chǎng),開始施工處的籌建工作.4、人員安排表序 號(hào)人 員人 數(shù)備 注1管理人員42技術(shù)人員63施工人員6052 技術(shù)準(zhǔn)備人員進(jìn)場(chǎng)后立即開展技術(shù)準(zhǔn)備工作,技術(shù)準(zhǔn)備工作分為內(nèi)業(yè)準(zhǔn)備工作和外業(yè)準(zhǔn)備工作。1、內(nèi)業(yè)準(zhǔn)備1)、審核、分析設(shè)計(jì)圖紙,提供實(shí)施性施工圖紙。2)、臨時(shí)工程的設(shè)計(jì)與施工,包括料場(chǎng)建設(shè)、臨時(shí)用房修建、拌合
44、站及臨時(shí)施工便道的修建等。3)、編寫實(shí)施性施工組織設(shè)計(jì),對(duì)施工具體人員安排、機(jī)械設(shè)備配備、場(chǎng)地布置、施工工序、施工進(jìn)度都做具體周密的說明。4)、編制質(zhì)量計(jì)劃,落實(shí)質(zhì)量管理體系、提出質(zhì)量管理標(biāo)準(zhǔn)、明確保障措施。5)、編制施工工藝標(biāo)準(zhǔn)及保證措施,一切要以技術(shù)規(guī)范、設(shè)計(jì)圖紙為準(zhǔn)則。6)、制定技術(shù)管理辦法和實(shí)施細(xì)則,盡量作到細(xì)而準(zhǔn).7)、進(jìn)行崗前培訓(xùn),著重培訓(xùn)員工的崗位職業(yè)技能、工程質(zhì)量意識(shí)、安全生產(chǎn)意識(shí).2、外業(yè)準(zhǔn)備 1)、租賃工程處辦公和生活用房。 2)、平整臨時(shí)場(chǎng)地,清理施工現(xiàn)場(chǎng).3)、測(cè)量控制體系的建立。4)、各類實(shí)驗(yàn)儀器的配備。5)、拌合站的建設(shè)和設(shè)備調(diào)試。6)、各類小型施工設(shè)備的安裝和調(diào)試
45、.53材料組織供應(yīng)1、水泥:擬采用大廠生產(chǎn)的合格水泥進(jìn)行施工,用汽車運(yùn)至施工現(xiàn)場(chǎng).2、鋼材(鋼筋)擬定專業(yè)的供應(yīng)商就近購(gòu)買,用汽車運(yùn)至施工現(xiàn)場(chǎng).3、碎石、砂:擬從沿線各料場(chǎng)購(gòu)買,用汽車運(yùn)至施工現(xiàn)場(chǎng)。 其余小型材料就近組織購(gòu)買,運(yùn)抵施工現(xiàn)場(chǎng)。六、施工準(zhǔn)備及臨時(shí)設(shè)施61臨時(shí)房屋設(shè)施工程處準(zhǔn)備在現(xiàn)場(chǎng)附近租用民房。以方便與業(yè)主、監(jiān)理、當(dāng)?shù)卣嚷?lián)系。62水、電設(shè)施1、施工用水、用電沿線水源豐富,在工地修建蓄水池,通過潛水泵、輸水管送至施工點(diǎn)的方法解決。2、生產(chǎn)、生活用電生產(chǎn)用電采用自備發(fā)電機(jī)組解決電源。生活用電可取自當(dāng)?shù)鼐用裼秒娋W(wǎng)。生活用水則取自當(dāng)?shù)仫嬘盟c(diǎn)。在施工區(qū),生活用電可下接高壓線或自備發(fā)電機(jī)
46、組供給,生活用水則取自當(dāng)?shù)仫嬘盟c(diǎn)或自備井供應(yīng)。3、混凝土拌和場(chǎng)在K3+700處平整場(chǎng)地做混凝土拌合站。4、交通、通訊工程處安裝電話、傳真機(jī),以便于和業(yè)主、監(jiān)理及當(dāng)?shù)卣3致?lián)系。每個(gè)施工隊(duì)用手機(jī)于與經(jīng)理部保持聯(lián)系,協(xié)調(diào)工作,保持工程處與施工隊(duì)統(tǒng)一指揮、協(xié)調(diào).充分利用電腦、電子信箱,與外界進(jìn)行信息交換與溝通,獲取對(duì)本項(xiàng)目有用的信息。工程處配備行政車、材料采購(gòu)車、生活用車各一臺(tái),解決各施工隊(duì)的交通、材料及平時(shí)生活問題。七、 施工組織機(jī)構(gòu)的建立71 組織機(jī)構(gòu)設(shè)置1、我公司高度重視本工程,將列為我公司的路基重點(diǎn)工程,為優(yōu)質(zhì)按期完成本工程施工任務(wù),在全公司范圍內(nèi)抽調(diào)管理水平高、具有豐富施工經(jīng)驗(yàn)的人員組
47、成施工工程處。工程處下設(shè)六個(gè)職能部門,配備足夠數(shù)量且具有施工管理和施工經(jīng)驗(yàn)的技術(shù)及各專業(yè)骨干,負(fù)責(zé)工程建設(shè)全過程的管理、組織、協(xié)調(diào),以確保各項(xiàng)工程管理目標(biāo)的實(shí)現(xiàn),按對(duì)項(xiàng)目法人的要求控制工程進(jìn)度、質(zhì)量、安全和文明施工等。2、工程處設(shè)工程負(fù)責(zé)人一人,技術(shù)負(fù)責(zé)人二人,調(diào)度指揮一人,工程處內(nèi)設(shè)施工技術(shù)科、安全質(zhì)量科、計(jì)劃財(cái)務(wù)科、物資設(shè)備科、測(cè)試中心、綜合辦公室六個(gè)職能部門。72施工組織管理機(jī)構(gòu)的運(yùn)作1、主要管理人員配備1) 、工程處的負(fù)責(zé)人由本公司具有豐富施工經(jīng)驗(yàn)、承擔(dān)過類似工程建設(shè)的工程師擔(dān)任,負(fù)責(zé)施工生產(chǎn)過程的組織、指揮及協(xié)調(diào)工作。工程處的負(fù)責(zé)人和技術(shù)負(fù)責(zé)人承擔(dān)各自分管責(zé)任,指派有豐富經(jīng)驗(yàn)的人員擔(dān)
48、任。2) 、專業(yè)技術(shù)負(fù)責(zé)人,按照相關(guān)專業(yè),配備多人配合項(xiàng)目技術(shù)負(fù)責(zé)人做好施工技術(shù)管理工作。2、管理職能部門及工作1)、工程處的管理機(jī)構(gòu)為施工技術(shù)科、安全質(zhì)量科、計(jì)劃財(cái)務(wù)科、物資設(shè)備科、測(cè)試中心、綜合辦公室六個(gè)職能部門。每個(gè)部門按責(zé)任制執(zhí)行,有條不紊開展工作.2)、工程處的施工技術(shù)科、安全質(zhì)量科等部門派專人指導(dǎo)現(xiàn)場(chǎng)的相關(guān)工作,并與業(yè)主、監(jiān)理、設(shè)計(jì)院及有關(guān)單位、部門保持有效聯(lián)系,及時(shí)解決施工中出現(xiàn)的各種問題。八、施工計(jì)劃8.1 工期進(jìn)度計(jì)劃1、本工程施工總工期為168日歷天.2、開工日期以甲方下達(dá)的開工令為準(zhǔn),在規(guī)定的施工日歷天之內(nèi),全部工程應(yīng)完成,并通過驗(yàn)收。3、施工工期進(jìn)度計(jì)劃:根據(jù)要求,我公
49、司將該工程的工期定為168天:1)、施工準(zhǔn)備期:在簽訂合同一周內(nèi),我公司將組織人員進(jìn)入施工現(xiàn)場(chǎng)開始施工前期工作,作施工前的各項(xiàng)準(zhǔn)備工作。預(yù)計(jì)在5天內(nèi)完成。2)、施工期:在準(zhǔn)備工作完成后,將展開全面施工作業(yè),采用流水作業(yè)分隊(duì)分段施工,將按照事前制定的計(jì)劃有條不紊的進(jìn)行各項(xiàng)工作,預(yù)計(jì)在152天內(nèi)完成.3)、施工收尾及交驗(yàn)期:主體工程完工后,在最后8天內(nèi)應(yīng)加緊其余零星工程的施工和工程的全面清理工作,以達(dá)到業(yè)主要求的工程交工條件。4、我公司就上述工期節(jié)點(diǎn)要求,結(jié)合施工現(xiàn)場(chǎng)實(shí)際情況,對(duì)本工程施工計(jì)劃進(jìn)行了科學(xué)合理的安排,力爭(zhēng)在業(yè)主指定的工期內(nèi)順利完成本工程。8.2 施工設(shè)備計(jì)劃1、為滿足施工生產(chǎn),落實(shí)施
50、工機(jī)械配置計(jì)劃,以單位主要領(lǐng)導(dǎo)掛帥,快速抽調(diào)足夠數(shù)量性能良好的機(jī)械設(shè)備運(yùn)抵施工現(xiàn)場(chǎng)。對(duì)于個(gè)別類型的機(jī)械,數(shù)量不足的,將采取新購(gòu)或租賃的辦法補(bǔ)齊。2、主要機(jī)械設(shè)備配制序號(hào)機(jī) 械 名 稱規(guī) 格單 位數(shù) 量1內(nèi)燃空壓機(jī)100kw臺(tái)12混凝土振動(dòng)棒ZN50臺(tái)43混凝土攪拌機(jī)J500臺(tái)14抽水機(jī)100mm臺(tái)35履帶式挖掘機(jī)1m3臺(tái)26自動(dòng)翻斗車8t臺(tái)47全站儀NTS202臺(tái)28經(jīng)緯儀M310378臺(tái)29水準(zhǔn)儀M214516臺(tái)28.3各施工隊(duì)伍人員構(gòu)成1、工程處在選擇施工隊(duì)伍時(shí),注重進(jìn)場(chǎng)隊(duì)伍的施工信譽(yù)、人員的技術(shù)素質(zhì)、配套情況及近階段的實(shí)際表現(xiàn),施工能力和施工質(zhì)量能否滿足需要。2、對(duì)進(jìn)場(chǎng)的隊(duì)伍實(shí)施動(dòng)態(tài)管理
51、,不允許擅自擴(kuò)充和隨意抽調(diào),以確保施工隊(duì)伍的素質(zhì)和人員相對(duì)穩(wěn)定。3、未經(jīng)有關(guān)質(zhì)量、安全方面培訓(xùn)的操作工人不許上崗。凡進(jìn)場(chǎng)的隊(duì)伍必須配備一定數(shù)量的專職協(xié)調(diào)質(zhì)量、安全的管理人員。8.4 材料供應(yīng)計(jì)劃及措施1、本工程材料供應(yīng)由工程處統(tǒng)一負(fù)責(zé)。材料供應(yīng)將采取統(tǒng)一采購(gòu)、統(tǒng)一調(diào)運(yùn)的原則進(jìn)行,所有材料的供應(yīng)均應(yīng)符合業(yè)主提出的要求,并得到監(jiān)理工程師的同意。2、所有用于本工程的材料、貨物和各種類型的物品,無論是天然狀態(tài)的、經(jīng)過加工的或者是制造出來的均應(yīng)該是新的,并符合合同要求的類型和質(zhì)量。3、作為用于正式工程中的材料和制成品的樣品(包括材料樣品和工地現(xiàn)場(chǎng)制成品的樣品),經(jīng)監(jiān)理工程師批準(zhǔn)后,妥善保存至監(jiān)理工程師準(zhǔn)
52、許其自行處置時(shí)為止.4、當(dāng)技術(shù)規(guī)范或有關(guān)的參照標(biāo)準(zhǔn)要求有材料生產(chǎn)商和供應(yīng)商的測(cè)試證明書時(shí),施工處將提供每份證明書的原件或復(fù)印件。證明書對(duì)被證明的材料采用系列編號(hào)或參考編號(hào),使人一目了然。證明書中包括有關(guān)參考標(biāo)準(zhǔn)和技術(shù)規(guī)定條款所要求的內(nèi)容.5、施工處將對(duì)全部材料的取樣和測(cè)試,施工工藝,設(shè)備和量測(cè)裝置進(jìn)行日常檢查,以控制其質(zhì)量并保證它們與技術(shù)規(guī)定和批準(zhǔn)的試樣相一致。6、材料與試樣的試驗(yàn),原則上有工地試驗(yàn)室自檢后委托由監(jiān)理工程師工地試驗(yàn)室檢驗(yàn)合格后方能使用,必須外委的材料和實(shí)驗(yàn)項(xiàng)目應(yīng)經(jīng)過監(jiān)理工程師同意委托具有相應(yīng)資質(zhì)的試驗(yàn)單位來承擔(dān)。7、材料質(zhì)量是工程質(zhì)量的生命,為此必須嚴(yán)格控制材料進(jìn)貨渠道,把好材
53、料質(zhì)量關(guān),做好質(zhì)量自檢工作.九、施工方法91擋土墻構(gòu)造1、擋土墻一般間隔1020m應(yīng)設(shè)置一道變形縫(或伸縮縫)。當(dāng)墻身高度不一、墻后荷載變化較大或地基條件較差時(shí),應(yīng)采用較小的變形縫間隔.變形縫寬度20mm.縫內(nèi)沿墻的內(nèi)、外、頂三邊填塞瀝青麻筋或涂瀝青木板,塞入深度不宜小于200mm。2、在地基巖性變化處、墻高突處和其他建(構(gòu))筑物連接處應(yīng)設(shè)沉降縫。3、擋土墻頂應(yīng)設(shè)置護(hù)欄,護(hù)欄高度及形式待總圖確定.92施工工藝流程澆筑面板混凝土錨桿筋錨固1、基礎(chǔ)處理,在設(shè)計(jì)基礎(chǔ)尺寸與基礎(chǔ)處理厚度均與地基承載力有關(guān),基礎(chǔ)處理的材料采用石灰粉煤灰穩(wěn)定砂礫.如該基礎(chǔ)處理層以下的地基承載力不能滿足設(shè)計(jì)要求,應(yīng)采取換土等
54、其他的處理措施,使其達(dá)到設(shè)計(jì)要求,基礎(chǔ)處理層以下的處理需要設(shè)計(jì)、監(jiān)理及甲方共同確認(rèn)后給出處理意見. 2、澆注擋墻基礎(chǔ)混凝土1)、混凝土配比必須符合設(shè)計(jì)強(qiáng)度要求.2)、混凝土要振搗密實(shí),杯槽位置更應(yīng)加強(qiáng)加細(xì)振搗,以防出現(xiàn)蜂窩狗洞。3)、預(yù)埋件按設(shè)計(jì)位置與基礎(chǔ)鋼筋焊接,以免振搗混凝土?xí)r發(fā)生變形和位移。 3、澆注墻頂混凝土1)、測(cè)量人員按照設(shè)計(jì)的縱斷高程嚴(yán)格控制模板高程.2)、模板內(nèi)側(cè)壓緊薄塑料條,嚴(yán)禁跑漿;3)、澆注前,將墻頂鑿毛刷素漿,以利混凝土上下結(jié)合。4、漿砌塊石擋土墻施工方法1)、由測(cè)量人員嚴(yán)格按照?qǐng)D紙進(jìn)行放線。2)、溝槽采用人工挖槽,底層進(jìn)行地基處理,基礎(chǔ)采用木模支搭現(xiàn)澆混凝土基礎(chǔ)。3)
55、、墻體砌筑采用分段砌筑,位置依圖紙?jiān)O(shè)置在基礎(chǔ)變形縫位置,相鄰砌筑高差不宜超過1。2m。縫板安裝應(yīng)位置準(zhǔn)確、牢固,縫板材料符合設(shè)計(jì)規(guī)定。4)、墻體每天連續(xù)砌筑高度不宜超過1。2m,相鄰擋土墻高差較大時(shí)先砌筑高墻段.砌筑中板縫不得移位變形。5)、在擋土墻高度大于50cm時(shí),設(shè)泄水孔,距地面25cm,間距35m,采用PVC管,管徑5cm;在泄水孔內(nèi)側(cè)用直徑2-5cm砂礫,堆成30cm圓弧狀,外包透水土工布。6)、擋土墻每隔1015m應(yīng)設(shè)沉降縫,縫寬1cm,用油氈或木絲板填實(shí),沉降縫填土側(cè)一并設(shè)置20mm寬的乳化瀝青和油氈防水層。7)、擋土墻外露面留1-2cm勾縫,砌塊及勾凹縫處采用水泥砂漿.8)、擋
56、土墻裝飾砌塊與普通砌塊之間采用專用夾子連接,使之成為一體.5、擋墻附屬工程 1)、沉降縫 擋土墻基礎(chǔ)分段長(zhǎng)度不大于16m,在基礎(chǔ)錯(cuò)臺(tái)處或分段處應(yīng)留沉降縫,基礎(chǔ)沉降縫刷23道乳化瀝青或貼2層油氈,填土一側(cè)墻面應(yīng)設(shè)三油兩氈防水層.2)、排水孔 排水孔設(shè)置在兩墻面板之間,間距2米,排水管采用30mm的鍍鋅鋼管,漏出墻板外側(cè)10mm,墻內(nèi)側(cè)20mm,3的橫坡??卓谶M(jìn)水處采用直徑2。5-7cm的礫石堆料,堆料直徑不小于50mm6、擋墻檢驗(yàn)的允許偏差: 現(xiàn)澆擋墻基礎(chǔ)允許偏差表:序號(hào)項(xiàng)目允許偏差(mm)檢驗(yàn)頻率1混凝土抗壓強(qiáng)度必須符合規(guī)范及設(shè)計(jì)要求2斷面尺寸高±1020m寬±10杯口寬+
57、20 03杯槽軸線位移10020m4杯槽底面高程+50 20020m5蜂窩麻面不大于模板接觸面120m漿砌塊石擋土墻允許偏差:項(xiàng)次檢驗(yàn)項(xiàng)目允許偏差(mm)1平面位置502頂面邊棱直順度303豎直度或坡度0。5H4頂面高程±205斷面尺寸不小于設(shè)計(jì)值93衡重式擋土墻施工澆注混凝土前,應(yīng)對(duì)支架、模板、鋼筋和預(yù)埋件進(jìn)行檢查,并做好記錄,符合設(shè)計(jì)要求后方可澆注.模板內(nèi)的雜物、積水和鋼筋上的污垢應(yīng)清理干凈.模板如有縫隙,應(yīng)填塞嚴(yán)密,模板內(nèi)面應(yīng)涂刷脫模劑。澆注混凝土前,應(yīng)檢查混凝土的均勻性和坍落度.自高處向模板內(nèi)傾卸混凝土?xí)r為防止混凝土離析,應(yīng)符合下列規(guī)定:1、從高處直接傾卸時(shí),其自由傾落高度不
58、宜超過2m,以不發(fā)生離析為度。2、當(dāng)傾落高度超過2m時(shí),應(yīng)通過串筒、溜管或振動(dòng)溜管等設(shè)施下落;傾落高度超過10m時(shí),應(yīng)設(shè)置減速裝置(在串筒的不同高度設(shè)多向擋板)。3、在串筒出料筒下面,混凝土堆積高度不宜超過1m.4、澆注混凝土使用插入式振動(dòng)器時(shí),移動(dòng)間距不應(yīng)超過振動(dòng)器作用半徑的1。5倍;與側(cè)模應(yīng)保持50-100mm的距離;插入下層混凝土50100mm;每一處振動(dòng)完畢后應(yīng)邊振動(dòng)邊徐徐提出振動(dòng)棒;應(yīng)避免振動(dòng)棒碰撞模板、鋼筋及其他預(yù)埋件。對(duì)每一振動(dòng)部位,必須振動(dòng)到該部位混凝土密實(shí)為止。密實(shí)的標(biāo)志是混凝土停止下沉,不再冒出氣泡,表面呈現(xiàn)平坦、泛漿.5、混凝土的澆注應(yīng)連續(xù)進(jìn)行,如因故必須間斷時(shí),其間斷時(shí)
59、間應(yīng)小于前層混凝土的初凝時(shí)間或能重塑的時(shí)間?;炷恋倪\(yùn)輸、澆注及間歇的全部時(shí)間不得超過表的規(guī)定,當(dāng)需要超過時(shí)應(yīng)預(yù)留施工縫。6、施工縫的位置應(yīng)在混凝土澆注之前確定,宜留置在結(jié)構(gòu)受剪力和彎矩較小且便于施工的部位,并應(yīng)按下列要求進(jìn)行處理: 1)、應(yīng)鑿除處理層混凝土表面的水泥砂漿和松軟層,但鑿除時(shí),處理層混凝土須達(dá)到下列強(qiáng)度:洗鑿毛時(shí),須達(dá)到0。5Mpa;用人工鑿除時(shí),須達(dá)到2。5Mpa;用風(fēng)動(dòng)機(jī)鑿毛時(shí),須達(dá)到10Mpa; 2)、經(jīng)鑿毛處理的混凝土面,應(yīng)用水沖洗干凈,在澆注層次混凝土前,對(duì)垂直施工縫宜刷一層水泥凈漿,對(duì)水平縫宜鋪一層厚度為1020mm的1:2的水泥砂漿。 3)、施工縫為斜面時(shí)應(yīng)澆注成或
60、鑿成臺(tái)階狀. 4)、施工縫處理后,須待處理層混凝土達(dá)到一定強(qiáng)度后才能繼續(xù)澆注混凝土.需要達(dá)到的強(qiáng)度,一般最低為1。2Mpa,當(dāng)結(jié)構(gòu)物為鋼筋混凝土?xí)r,不得低于2.5Mpa。7、在澆注過程中或澆注完成時(shí),如混凝土表面泌水較多,須在不擾動(dòng)已澆注混凝土的條件下,采取措施將水排除。繼續(xù)澆注混凝土?xí)r,應(yīng)查明原因,采取措施減少泌水。8、結(jié)構(gòu)混凝土澆注完成后,對(duì)混凝土裸露面應(yīng)及時(shí)進(jìn)行休整、抹平,待定漿后再抹第二遍并壓光或拉毛。當(dāng)裸露面面積較大或氣候不良時(shí),應(yīng)加蓋防護(hù),但在開始養(yǎng)生前,覆蓋物不得接觸混凝土面。9、澆注混凝土期間,應(yīng)設(shè)專人檢查支架、模板、鋼筋和預(yù)埋件等穩(wěn)固情況,當(dāng)發(fā)現(xiàn)有松動(dòng)、變形、移位時(shí),應(yīng)及時(shí)處
61、理.10、摻加片石技術(shù)要求: 1)、片石摻加前應(yīng)清除表面的雜物、泥土等。 2)、片石摻入量一般不超過總圬工體積的25%,摻入時(shí)不可亂投亂放,石塊應(yīng)分布均勻,凈距不小于100mm,距結(jié)構(gòu)側(cè)面和頂面的凈距不小于150mm,石塊不得接觸預(yù)埋件,不可直接接觸基底、模板. 3)、施工完畢及時(shí)覆蓋養(yǎng)生15天11、衡重式擋土墻施工工藝流程:衡重式擋土墻工程施工順序詳.否是復(fù)核地形及地質(zhì)情況基坑開挖地基處理回填基礎(chǔ)、墻身澆(砌)筑承載力檢測(cè)是否滿足要求圖41衡重式擋土墻工程施工順序圖十、工程質(zhì)量保證措施101技術(shù)保證措施1、擋土墻下設(shè)C15素混凝土墊層,厚100mm,每邊寬出基礎(chǔ)100mm.2、擋土墻基底縱向
62、坡度不宜大于5.當(dāng)大于5時(shí),應(yīng)在縱向?qū)⒒A(chǔ)做成臺(tái)階式.臺(tái)階高度不宜大于0.5m。3、基槽開挖后,嚴(yán)禁地表清潤(rùn)地基土,同時(shí)應(yīng)做好釬探工作.4、開槽后必須會(huì)同有關(guān)部門共同驗(yàn)槽,滿足設(shè)計(jì)要求后方可進(jìn)行下一步施工。5、混凝土的澆注環(huán)境溫度宜控制在20左右,應(yīng)避開高溫或低溫作業(yè).6、混凝土應(yīng)振搗密實(shí),不得漏振,少振。保證構(gòu)件表面光滑平整,無蜂窩、麻面、裂縫等。7、混凝土澆注完畢后,應(yīng)在12小時(shí)內(nèi)加覆蓋和澆水,澆水養(yǎng)護(hù)不得少于14晝夜.8、平均氣溫低于5時(shí),不得澆水,應(yīng)采取保溫措施,在炎熱氣候下應(yīng)采取降溫措施。9、拆模后,混凝土表面應(yīng)加覆蓋,防止陽(yáng)光暴曬和寒潮襲擊.10、墻后填料應(yīng)對(duì)稱均勻進(jìn)行施工,施工時(shí)
63、應(yīng)控制填料對(duì)擋土墻的不利影響。填料施工,應(yīng)在砌體或混凝土強(qiáng)度達(dá)到設(shè)計(jì)強(qiáng)度的75以上進(jìn)行。11、施工現(xiàn)場(chǎng)使用水泥堆放整齊,袋裝水泥堆放高度一般不超過10包,堆寬以510袋為限,臨時(shí)露天堆放應(yīng)用用防雨蓬布遮蓋。 12、水泥貯存時(shí)間一般不超過3個(gè)月,對(duì)水泥質(zhì)量有懷疑和沒把握時(shí),使用前復(fù)查試驗(yàn),并按試驗(yàn)結(jié)果使用。 13、現(xiàn)場(chǎng)所用砂、水泥分開堆放整齊,不準(zhǔn)混雜,砂保持清潔,嚴(yán)禁混入泥土。 14、漿砌石砌筑砂漿必須具有時(shí)當(dāng)?shù)牧鲃?dòng)性和良好的和易性,以確保砌體灰縫充分填滿和壓實(shí)。 15、
64、現(xiàn)場(chǎng)簡(jiǎn)易檢驗(yàn)方法為,用手捏成小團(tuán),以指封不出漿,松手后不松散為合格。 16、不同施工部位、結(jié)構(gòu)形式砌筑用砂漿標(biāo)號(hào)嚴(yán)格按照設(shè)計(jì)要求進(jìn)行控制,漿砌石墻體砌筑嚴(yán)禁使用混合砂漿. 17、砌筑砂漿要定量分批做強(qiáng)度試驗(yàn),最多100m3砌體做一組評(píng)定砂漿強(qiáng)度試件。當(dāng)水泥品種、標(biāo)號(hào)或配合比等有變動(dòng)時(shí),均應(yīng)另做試件一組,并以此作為衡量砂漿質(zhì)量的依據(jù)。 18、截水墻立板與墻體板連接采用剛釘. 19、木板泄水孔鉆孔采用電鉆,鉆孔位置與木板連接縫要錯(cuò)開。20、一般測(cè)量定位儀器選用經(jīng)緯儀,穿越大型
65、沖溝陡坡上構(gòu)筑物定位測(cè)量選用全站儀,經(jīng)緯儀、全站儀須經(jīng)重新校驗(yàn)合格方可使用,開工前先進(jìn)行儀器報(bào)驗(yàn),要有校驗(yàn)合格證。21、構(gòu)筑物測(cè)量定位工程坐標(biāo)及標(biāo)高引自管線藍(lán)圖設(shè)計(jì)樁點(diǎn)坐標(biāo)點(diǎn)。22、放線時(shí)采用經(jīng)緯儀測(cè)構(gòu)筑物各角點(diǎn)的位置,并埋設(shè)控制樁作為施工位置依據(jù)及以后樁位傳遞的依據(jù),并現(xiàn)場(chǎng)畫出草圖以作記錄。23、漿砌石石墻采用交錯(cuò)組砌法,按石料形狀掛雙線分皮臥砌,第一層石塊大面向下平整的一面朝下,上下石塊相互錯(cuò)縫,內(nèi)外搭接,擺鋪穩(wěn)定,分皮疊砌。 24、漿砌石應(yīng)用鋪漿漿法砌筑,灰縫應(yīng)飽滿,并插搗密實(shí),灰縫一般為2030mm,鋪漿厚度約4060mm,較大空隙應(yīng)用碎石塊嵌于砂漿中,不允許先填碎石在塞砂漿
66、。 25、漿砌塊石不得形成水平或縱向通縫,不得有結(jié)搓. 26、用塊石填腹時(shí),水平灰縫寬度不得大于3cm,豎向灰縫不大于4cm,填腹石的灰縫應(yīng)彼此錯(cuò)開。 27、砌體表面的勾縫,無特殊要求時(shí),應(yīng)在砌筑時(shí)留出2cm深的空縫,隨即用水泥砂漿將縫勾完,否則應(yīng)待砌體砂漿凝固后,將空縫清洗干凈再勾縫。 28、砌體表面勾縫采用平縫,勾縫所用砂漿標(biāo)號(hào)不低于砌筑砂漿標(biāo)號(hào)。 29、砌體砌筑一次性砌完,不允許隨意留施工縫. 30、漿砌塊石不得形成水平或縱向通縫,不得有結(jié)搓,砂漿飽滿.&
67、#160; 31、砌體表面的勾縫,無特殊要求時(shí),應(yīng)在砌筑時(shí)留出2cm深的空縫,隨即用水泥砂漿將縫勾完,否則應(yīng)待砌體砂漿凝固后,將空縫清洗干凈再勾縫. 32、砌體表面勾縫采用平縫,勾縫所用砂漿標(biāo)號(hào)不低于砌筑砂漿標(biāo)號(hào)。102、質(zhì)量管理措施我司根據(jù)GB/T19000-2000建立了ISO9001:2000質(zhì)量管理體系,在所有承建項(xiàng)目均嚴(yán)格執(zhí)行相關(guān)的質(zhì)量管理規(guī)定,在施工項(xiàng)目上設(shè)置監(jiān)督質(zhì)量管理體系運(yùn)行的審核員、內(nèi)審員,確保質(zhì)量管理體系的有效運(yùn)行。負(fù)責(zé)人根據(jù)總公司的質(zhì)量管理體系內(nèi)容,在開工前,制定本工程的質(zhì)量目標(biāo)、質(zhì)量保證體系、質(zhì)量保證措施等內(nèi)容,并
68、嚴(yán)格執(zhí)行。1、質(zhì)量目標(biāo)本工程施工滿足設(shè)計(jì)及相關(guān)技術(shù)規(guī)范要求,工程質(zhì)量一次驗(yàn)收合格率100,優(yōu)良率90%以上,爭(zhēng)創(chuàng)精品工程.2、質(zhì)量管理保證體系(框圖)工作內(nèi)容經(jīng)理部技術(shù) 負(fù)責(zé)人質(zhì)檢組施工 技術(shù)組計(jì)劃 預(yù)算組分隊(duì)供應(yīng)組測(cè)量組施工準(zhǔn)備階段接收技術(shù)資料l圖紙審查草擬施工方案nlooo編制施工規(guī)劃x¡l編制施工組織設(shè)計(jì)xl±y現(xiàn)場(chǎng)測(cè)量控制網(wǎng)點(diǎn)xool施工圖紙?jiān)O(shè)計(jì)交底±l±o±±±±施工圖紙自審、會(huì)審¡±l±o±±施工方案技術(shù)交底±±o±
69、7;±編制創(chuàng)優(yōu)工程規(guī)劃¡xol±±施工階段建立工序管理點(diǎn)¡±ly開展QC活動(dòng)loy組織技術(shù)攻關(guān)nn±l±組織均衡施工¡oly±工序交接管理¡l班組自檢l專檢¡y±l聯(lián)檢±±l±±材料檢驗(yàn)¡¡°l施工技術(shù)問題處理n¡l計(jì)量管理¡ly質(zhì)量信息管理nloy±質(zhì)量珍斷±lu±±竣工驗(yàn)收工程資料整理xol±±創(chuàng)優(yōu)工程檢驗(yàn)
70、1;lo´oo工程質(zhì)量評(píng)定¡l±±±組織工程交工¡l±´±技術(shù)總結(jié)¡l´服務(wù)用戶回訪¡l±±±圖例n 決策 l 主辦 ´ 協(xié)同 o 協(xié)辦 ± 參加¡ 督促 y 執(zhí)行 x 審批 u 會(huì)審 ° 診斷3、質(zhì)量檢驗(yàn)體系(框圖)質(zhì)量檢驗(yàn)體系框圖4、技術(shù)管理體系(見框圖)5、質(zhì)量檢查程序工序班組自檢現(xiàn)場(chǎng)質(zhì)檢員檢查內(nèi)部工程師檢查現(xiàn)場(chǎng)監(jiān)理工程師檢查下道工序6、技術(shù)管理體系框圖工程監(jiān)理總工程師測(cè)量組技術(shù)組質(zhì)檢組試驗(yàn)霜組土石方
71、施工負(fù)責(zé)人施工負(fù)責(zé)人附屬結(jié)構(gòu)施工負(fù)責(zé)人道路及排水7、管理措施1)、全面開展質(zhì)量管理2)、積極開展勞動(dòng)競(jìng)賽3)、嚴(yán)格執(zhí)行監(jiān)理工程師指令4)、嚴(yán)把材料關(guān)8、技術(shù)措施1)、建立每個(gè)分項(xiàng)工程,每道工序,每個(gè)施工環(huán)節(jié)的質(zhì)量標(biāo)準(zhǔn)和技術(shù)標(biāo)準(zhǔn),并在施工中嚴(yán)格執(zhí)行.加強(qiáng)職工隊(duì)伍培訓(xùn),提高職工安全質(zhì)量和技術(shù)素質(zhì).2)、嚴(yán)格履行技術(shù)復(fù)核和質(zhì)量管理檢查制,對(duì)測(cè)量放樣應(yīng)進(jìn)行復(fù)核,測(cè)量資料及其它施工技術(shù)資料由專人保管、收集、整理,和施工同步.3)、組織強(qiáng)有力的施工隊(duì)伍及具有經(jīng)驗(yàn)的工程技術(shù)人員及訓(xùn)練有素的技術(shù)人員參加施工。4)、開工前認(rèn)真審閱圖紙及各種技術(shù)文件,及時(shí)編制施工組織設(shè)計(jì)與質(zhì)量計(jì)劃,進(jìn)行分項(xiàng)、分部工程劃分,分解創(chuàng)
72、優(yōu)指標(biāo),提出創(chuàng)優(yōu)計(jì)劃的實(shí)施期限。5)、編制各分項(xiàng)、分部工程施工實(shí)施細(xì)則,規(guī)范施工工期、方法、質(zhì)量標(biāo)準(zhǔn),檢測(cè)手段并嚴(yán)格實(shí)施。6)、嚴(yán)格履行技術(shù)復(fù)核和質(zhì)量管理檢查制,對(duì)測(cè)量進(jìn)行復(fù)核,符合制度方能放線。測(cè)量資料及其他施工技術(shù)資料必須有專人保管、收集、整理,且和施工同步.7)、認(rèn)真進(jìn)行工程技術(shù)、質(zhì)量及施工安全技術(shù)交底,施工順序進(jìn)度安排均要作交底,并作好書面記錄備查。8)、嚴(yán)格按照有關(guān)的施工規(guī)范及設(shè)計(jì)圖紙施工,工程質(zhì)量評(píng)定及隱蔽工程驗(yàn)收,必須經(jīng)監(jiān)理工程師評(píng)定簽認(rèn)后,方可進(jìn)行下步工序施工。9)、施工中,如對(duì)結(jié)構(gòu)和其它原因需進(jìn)行設(shè)計(jì)修改,必須在辦理工程聯(lián)系單、設(shè)計(jì)修改通知單后方可施工.10)、在保證建設(shè)監(jiān)理
73、工程師充分履行職責(zé)和行使權(quán)力的前提下,建立工程處內(nèi)部監(jiān)理工程師制,各班組設(shè)質(zhì)量檢查員,實(shí)行質(zhì)量否決制度.與工程監(jiān)理密切配合搞好質(zhì)量管理工作,做好事前質(zhì)量控制,施工過程質(zhì)量控制,竣工驗(yàn)收等工作。103施工組織措施1、以合同文件要求和設(shè)計(jì)圖紙為依據(jù),以技術(shù)規(guī)范為標(biāo)準(zhǔn),制定項(xiàng)目創(chuàng)優(yōu)規(guī)劃,確定各分項(xiàng)目的質(zhì)量管理目標(biāo)和各工序的質(zhì)量管理標(biāo)準(zhǔn),以工序質(zhì)量標(biāo)準(zhǔn)的實(shí)現(xiàn)來保證分項(xiàng)目質(zhì)量目標(biāo)的實(shí)現(xiàn),以分項(xiàng)質(zhì)量目標(biāo)的實(shí)現(xiàn)來保證工程項(xiàng)目質(zhì)量創(chuàng)優(yōu)目標(biāo)的實(shí)現(xiàn)。 2、實(shí)行負(fù)責(zé)人質(zhì)量負(fù)責(zé)制和技術(shù)質(zhì)量雙向承包責(zé)任制,逐層簽定技術(shù)質(zhì)量責(zé)任狀,以激發(fā)全體參與項(xiàng)目施工人員的創(chuàng)優(yōu)積極性,促進(jìn)工程質(zhì)量的提高。 3、加強(qiáng)教育,貫徹制度,科學(xué)
74、管理,促進(jìn)創(chuàng)優(yōu).在整個(gè)工程施工中力求做到“五不施工"(施工圖未復(fù)核、測(cè)量未復(fù)核、材料未實(shí)驗(yàn)或無合格證、技術(shù)未交底、隱蔽工程未簽證不施工);“三不交接”(無自檢記錄、無施工記錄、無專職質(zhì)檢人員簽字不交接);“三教育”(工前培訓(xùn)、工中指導(dǎo)、工后講評(píng))。 4、加強(qiáng)現(xiàn)場(chǎng)質(zhì)量控制和質(zhì)量檢查。按照合同文件和技術(shù)規(guī)范的規(guī)定,設(shè)立工地試驗(yàn)站和質(zhì)量監(jiān)測(cè)站,配備滿足檢測(cè)需要的各種測(cè)試儀器設(shè)備,對(duì)工程所用的各種材料、設(shè)備和施工的各工序進(jìn)行有效的檢測(cè)控制。 5、施工中采用先進(jìn)的施工工藝和精良的施工設(shè)備,不斷優(yōu)化施工組織設(shè)計(jì)方案,推廣應(yīng)用“四新"成果,突破創(chuàng)優(yōu)難點(diǎn),采用先進(jìn)的技術(shù)和科學(xué)的管理相結(jié)合。
75、大力組織“兩化"施工,使工程質(zhì)量一次成優(yōu)。 6、虛心聽取和接受工程師及其代表的指導(dǎo)和監(jiān)督,堅(jiān)決執(zhí)行工程師及其代表的指示,及時(shí)落實(shí)工程師及代表的改進(jìn)意見。提供滿足工程師及其代表在現(xiàn)場(chǎng)檢測(cè)需要的人員和儀器設(shè)備,搞好與工程師及其代表的配合工作,同心協(xié)力創(chuàng)優(yōu)。 7、作好各種試驗(yàn)、檢測(cè)記錄,為施工提供準(zhǔn)確可靠的各種數(shù)據(jù),收集整理工程質(zhì)量和施工技術(shù)資料,及時(shí)編制竣工文件.8、建立施工與建設(shè)、監(jiān)理、設(shè)計(jì)各方組成的質(zhì)量監(jiān)控網(wǎng)絡(luò),使整個(gè)工程在施工過程中始終處于受控狀態(tài).9、工程預(yù)驗(yàn)收前,承包商組織有關(guān)人員按設(shè)計(jì)施工圖和施工標(biāo)準(zhǔn)的要求對(duì)其施工工程進(jìn)行全面的檢查,如有不符立即進(jìn)行整改。 10、當(dāng)全部工程完
76、工并符合合同規(guī)定時(shí),承包商應(yīng)向業(yè)主或監(jiān)理申請(qǐng)交工驗(yàn)收。 11、承包商對(duì)業(yè)主或監(jiān)理組織的預(yù)驗(yàn)收提出的問題,應(yīng)在業(yè)主或監(jiān)理規(guī)定的期限內(nèi)整改完,再次提出交工申請(qǐng)。 12、交工資料由業(yè)主或監(jiān)理組織驗(yàn)收,驗(yàn)收后辦理交工資料交接手續(xù).十一、安全保證措施111安全施工主要措施 1、成立環(huán)境保護(hù)領(lǐng)導(dǎo)機(jī)構(gòu):工程處成立環(huán)境保護(hù)委員會(huì),指定一名副經(jīng)理負(fù)責(zé)環(huán)境保護(hù)工作的組織領(lǐng)導(dǎo)、規(guī)章制度的制訂和檢查落實(shí)。各工程隊(duì)成立環(huán)境保護(hù)領(lǐng)導(dǎo)小組,隊(duì)主管領(lǐng)導(dǎo)任小組組長(zhǎng),各施工工長(zhǎng)及后勤保障部門負(fù)責(zé)人為成員,負(fù)責(zé)日常性的環(huán)境保護(hù)工作的檢查和落實(shí)。 2、積極與所在地聯(lián)成環(huán)境保護(hù)網(wǎng)絡(luò),認(rèn)真聽取地方環(huán)保部門的意見,虛心接受其監(jiān)督和落實(shí)。3
77、、根據(jù)本工程項(xiàng)目的作業(yè)特點(diǎn),制訂如下保護(hù)措施:1)、在砌筑操作之前必須檢查操作環(huán)境是否符合安全要求,道路是否暢通,機(jī)具是否完好、牢固,安全設(shè)施和防護(hù)用品是否齊全,經(jīng)檢查符合要求后才可施工。2)、砌筑(澆筑)基礎(chǔ)時(shí),應(yīng)經(jīng)常檢查和注意基坑邊坡的土體變化情況,有無開裂、位移現(xiàn)象。堆放石材料應(yīng)離槽(坑)邊1m以上。3)、砌筑高度超過施工操作面1。2m以上時(shí)應(yīng)搭設(shè)腳手架.腳手架上堆放材料不得超過規(guī)定荷載值,同一塊腳手板上操作人員不得超過兩人。不準(zhǔn)用放不穩(wěn)固的工具或物品在腳手板上墊高操作,更不準(zhǔn)在未經(jīng)計(jì)算和加固的情況下,在腳手板上再隨意疊搭一層腳手板。應(yīng)按規(guī)定搭設(shè)安全網(wǎng)。4)、在腳手架施工時(shí),堆放材料、施
78、工機(jī)具等物品不得超過使用荷載,否則,必須經(jīng)過驗(yàn)算并采取有效的加固措施后,方可堆放和施工。5)、不準(zhǔn)站在墻頂面上劃線、磚砌、刮縫、清理墻面和檢查大腳垂直度等工作;修石時(shí)應(yīng)面向墻面砍,并要注意防止碎石跳出傷人,垂直往上、往下人工投遞石料時(shí),要支搭站人用的寬度不小于0。6m的專用腳手架,并認(rèn)真?zhèn)鬟f,以防傷人。6)、不準(zhǔn)在墻頂上或腳手架上修鑿石材,以免墻體受到振動(dòng),影響墻體質(zhì)量或石塊掉下傷人。不準(zhǔn)勉強(qiáng)在超過胸部的墻上砌筑片石,以免不宜控制墻面垂直度、碰撞石墻或上石時(shí)失手掉下造成事故.不用的石塊不得由上往下投擲,運(yùn)石上下的坡道要加固定牢,并訂設(shè)防滑條、欄桿扶手等。7)、已砌好的山墻應(yīng)用臨時(shí)系桿(如檀條等
79、)放置在各跨山墻上,使其連接穩(wěn)定,或采用其他加固措施,雨期每天下班前應(yīng)用防雨材料遮蓋,以防雨水沖掉砂漿,致使砌體倒塌. 4、進(jìn)出場(chǎng)便道,經(jīng)常灑水養(yǎng)護(hù),避免造成塵土飛揚(yáng),污染周圍環(huán)境。 5、施工設(shè)備停置有序,材料堆放井井有條,環(huán)境衛(wèi)生專人打掃,施工營(yíng)區(qū)、生活區(qū)干凈整齊.6、施工管理人員及現(xiàn)場(chǎng)施工人員均掛牌上崗。7、質(zhì)量員對(duì)現(xiàn)場(chǎng)所進(jìn)行的與質(zhì)量有關(guān)的活動(dòng)進(jìn)行觀察、監(jiān)督與檢查.檢查現(xiàn)場(chǎng)的施工工作是否按已批準(zhǔn)的程序進(jìn)行.8、現(xiàn)場(chǎng)檢查活動(dòng)是隨機(jī)的,無特殊原因,原則上每天都要進(jìn)行,對(duì)觀察發(fā)現(xiàn)的不足或缺陷要作出記錄,并將不足或缺陷按重要性的不同以書面或口頭形式通知責(zé)任方。9、每周末,技術(shù)部要總結(jié)檢查情況,進(jìn)行
80、講評(píng)和通報(bào),保證重點(diǎn)項(xiàng)目和重要過程不漏檢。10、項(xiàng)目工地每月召開一次由各部門和負(fù)責(zé)人參加的質(zhì)量小結(jié)會(huì)。技術(shù)部在會(huì)上向大家匯報(bào)當(dāng)月質(zhì)量體系運(yùn)行情況,及時(shí)找出存在的問題,督促有問題的部門積極采取糾正措施,抓緊整改.11、現(xiàn)場(chǎng)發(fā)現(xiàn)的所有質(zhì)量問題,其改正行動(dòng)都要按程序文件規(guī)定的格式記錄下來,且隨著工程進(jìn)展,逐步向下一階段移交,作為竣工狀態(tài)證明質(zhì)量達(dá)到要求的記錄文件。12、項(xiàng)目工地對(duì)質(zhì)量體系運(yùn)行中出現(xiàn)與質(zhì)量管理文件有沖突或無法執(zhí)行的情況時(shí),要及時(shí)向公司報(bào)告,以求得問題的及時(shí)解決。13、施工現(xiàn)場(chǎng)平面布置符合有關(guān)安全衛(wèi)生規(guī)定,機(jī)具擺放整齊有序,各種標(biāo)志、標(biāo)識(shí)正確醒目,達(dá)到文明施工標(biāo)準(zhǔn).14、如出現(xiàn)危及或可能
81、傷及人員的危險(xiǎn)時(shí),所有相關(guān)的工作應(yīng)停止直至危險(xiǎn)狀態(tài)得到消除。15、任何表現(xiàn)出不安全因素的設(shè)備和工具必須立即停止使用,直至處于安全狀態(tài)或從施工區(qū)域移出或更換。16、若現(xiàn)場(chǎng)發(fā)生事故,應(yīng)立即采取應(yīng)急措施并在第一時(shí)間向業(yè)主提交書面報(bào)告,按業(yè)主和監(jiān)理的相關(guān)規(guī)定及本公司事故處理程序進(jìn)行事故的調(diào)查和處理。17、施工現(xiàn)場(chǎng)主要道路應(yīng)符合標(biāo)準(zhǔn)要求,特殊地況設(shè)蓋板、安全護(hù)欄。18、施工現(xiàn)場(chǎng)根據(jù)消防要求配置消防設(shè)施和器具,保持消防通道暢通。19、晚上施工時(shí),在獲監(jiān)理認(rèn)可后,工程處提供具有足夠照明強(qiáng)度的設(shè)備,確保安全生產(chǎn).20、控制箱電氣開關(guān)、閘刀等須放置在防雨棚或防雨罩,設(shè)漏電保護(hù)器以防漏電.21、作業(yè)現(xiàn)場(chǎng)應(yīng)經(jīng)常打掃并保持清潔,垃圾應(yīng)集中堆放并及時(shí)清理、運(yùn)送至指定地點(diǎn)。22、熟悉與安全和健康有關(guān)的法律責(zé)任和義務(wù),熟悉工程處全面的、綜合的安全和健康程序的細(xì)節(jié)。23、對(duì)違反安全程序的有關(guān)人員將依據(jù)工程處相關(guān)規(guī)定,采取適當(dāng)?shù)膽土P性措施.違反安全規(guī)定并危及生命和財(cái)產(chǎn)安全的人員將被從施工隊(duì)伍中清除出去。24、施工人員工作前應(yīng)按規(guī)定穿戴好與作業(yè)相適應(yīng)的防護(hù)用品,檢查作業(yè)場(chǎng)地、施工機(jī)具及設(shè)備的完好情況,記錄每次檢查的日期、發(fā)現(xiàn)的問題、所采取的補(bǔ)救措施等。25、施工人員工作中應(yīng)遵守崗位安全技術(shù)操作規(guī)程,做到文明施工.26、施工人員在工作前和工作中均不得食用酒
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 道路安全學(xué)習(xí)心得體會(huì)
- 護(hù)理人員職業(yè)道德培訓(xùn)
- 油庫(kù)應(yīng)急處理流程
- 初中歷史教案反思
- 布藝扎染教案反思
- 白露主題班會(huì)教案
- 和的認(rèn)識(shí)說課稿
- 文化創(chuàng)意承銷協(xié)議書范本
- 水利工程機(jī)械施工合同
- 土建項(xiàng)目協(xié)議書范本
- 護(hù)理人員資質(zhì)審核規(guī)定與流程
- 醫(yī)院醫(yī)療不良事件上報(bào)登記本
- 南京大學(xué)新聞傳播碩士專業(yè)學(xué)位研究生
- 貴州省普通話考試說話題目30篇經(jīng)典范文
- 學(xué)校滿意度調(diào)查表學(xué)生版
- 最新RBT214-2017檢驗(yàn)檢測(cè)機(jī)構(gòu)資質(zhì)認(rèn)定全套體系文件匯編(質(zhì)量手冊(cè)+程序文件)
- DB11-T 1580-2018 生產(chǎn)經(jīng)營(yíng)單位安全生產(chǎn)應(yīng)急資源調(diào)查規(guī)范
- 《水產(chǎn)動(dòng)物營(yíng)養(yǎng)與飼料學(xué)》課件第6課-能量營(yíng)養(yǎng)
- 框架剪力墻工程施工方案設(shè)計(jì)
- DB37∕2375-2013 山東省工業(yè)爐窯大氣污染物排放標(biāo)準(zhǔn)
- 班主任先進(jìn)工作經(jīng)驗(yàn)交流分享班主任工作經(jīng)驗(yàn)交流稿
評(píng)論
0/150
提交評(píng)論