三峽工程英文介紹_第1頁
三峽工程英文介紹_第2頁
三峽工程英文介紹_第3頁
三峽工程英文介紹_第4頁
全文預(yù)覽已結(jié)束

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、.IntroductionThe Three Gorges Dam which is located in YiChang of China is the biggest hydropower project all over the world and the whole project costs 16 years from Dec. 14th 1994 to 2009. There are two important parts, the main building works and diversion projects, included in the project. The in

2、vestment of the project is 248.537 billion Yuan in total: dam Project costs 126.385 billion Yuan, power transmission project spends 36.499 billion Yuan, and the amount of resettlement funds is 85.653 billion Yuan.Why this project was selected for reviewSo far, as the biggest hydroelectric project, t

3、his project costs a huge number of money, time as well as numerous human and material resources, at the same time, it creates world record in many ways. The project needs not only very strict requirements in technical aspect, but also the harsh demanding in project management. So this project meets

4、the requirements of the course, which will help us understand senior project management intuitively and deeply by studying this case.Brief explanation of project objectives, proposed scope and key stakeholders;1:project objectives:(1) The benefit of Flood controlThree Gorges Dams primary objective i

5、s to reduce the losses and;.damage by controlling the frequent and hazardous floods of Yangtze River(2) The capacity of electric power generationThe dams secondary benefits are producing cheap and clean electric power which is equivalent with 15 nuclear plants.(3) The benefit of shippingThe Gorges D

6、am project that has improved more than 600 km navigation mileages and increased the shipping capacity will accelerates the waterborne traffic and lower cost.(4)The function of drought resistingThree Gorges Dam of the huge storage can effectively ease the drought situation by adjusting the water rele

7、ase.2:Proposed scope:This project will form a huge reservoir which is 600 km long. The length of the dam crest is 3035 meters; the height of the dam is 185 meters. The ordinary water level is 175 meters with water storage of 39.3 billion cubic meters, of which flood control storage capacity is 22.15

8、 billion cubic meters.3:key stakeholders:China Three Gorges Corporation which is the legal entity for Three Gorges Dam Project is in the charge of the State Council. Its;.responsibilities include the financing, constructing, operating and balancing the economy benefits and the environment protection

9、.The Three Gorges DamProject led to the biggest immigrant throughout our country history. Immigrants who lose their land and home were placed separately to 11 provinces from the reservoir region according to the principle of local settlement and relocated settlement.Outline of key success criteria a

10、nd deliverables1. The criteria of flood controlFlood always causes more terrible impact in this region than others owing to its rich agricultural land and prosperous cities. There are some criteria for flood control of the dam. First, the flood control standard of this project should be upgraded to

11、a level of preventing 100-year floods. With such flood coming, the dam can regular the flow which will not exceed 56700 cubic meters every second. Secondly, The Three Gorges project need to reduce the sediment by the scour of flood into the Dongting lake. Not only can we effectively mitigate the thr

12、eat to Dongting lake, but also extend the life of the Dongting lake. Thirdly, it should strengths the flexibility and reliability of control flood to avoid terrible losses such as the destroy to Wuhan, the terminal of Jinghan trunk railways, and the damage to people and their property2. The criteria

13、 of electric power generationThe project has been predicted that 26 turbine-generator units;.can generate electricity in 2003.From then on, they can put 2.8 million KW every year. The dam should be able to product the energy for central and east of China to satisfy their need of reducing cost and ac

14、celerating the development of economy. Whatsmore, this benefit should gives impetus to replace the thermal power which used to be dominated in China by this kind of clean and green energy which can reduce large amounts of carbon dioxide and more than 2 million tons harmful gas emissions a year.3 The

15、 criteria of navigationThe significant criteria of navigation is accelerating the prosperity of waterborne traffic and lowering cost. For one hand, By the Three Gorges reservoir sregulation, in dry season, the water release can get 5860 cubic meters per second which is larger than the amount of natural circumstances that ensure the ton fleet from Chongqing to Shanghai easily. For another hand, the completion of the dam

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論