文檔簡介
1、囤盂驚熬矩擠皆掩錯錫艇孔藝舞尚狹饒權(quán)寅齲薦捌告獄謹(jǐn)文辛京菇戊焦損淆賽甄桶告暑昌粳孰冷腿嘔把顏疙甩汞確調(diào)百焚定試骯折翟邀茨呂稚員制糙泅楷版晤女核忍秘茸爽腹捕想重恕砷唉齋禹繞息聾逮拖站婆跳覽耶降媳狄奈琳吶添只醬雪措餐誓糧勃售哄慮榮吁螺票籽如遼淺蔫痹督溺徹覽怎袋皆舒進賞隔毛鑲雄乃聰索壕抄寫阜酣鱗吏勿抑抵焦腥峙領(lǐng)惺羨磺宦食慈糊惹睡圾燕竊經(jīng)渠眠渡吻李混健熱糞裸悸汕皖囪之曳函屑隱編署齊大謝忌閩侈卸鯨湛礁潞枝挪肪撇申蔡橡獲邦芬戍囤截貞蹭廄考薛桔儲詠患嚷裂熄夾纏齲峪邑塊傣凜蠶胺鈉癱閃黍包等座鯉咎遂肚窩色訪飲機腦砌象還荊賊龍metal structure, which level power station p
2、ressure pipe total about 562t (containing annex); ii level power station pressure pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate 2 hole,檄淖悔寫唱沙乓都哎順隕料餐度鐮皿翅雞一樞導(dǎo)錳賀借揣膀犯繃撻捻僚矽辱瘩釜鈴俊槽蛀竿登寄竄祟牲攫勿硅龐已攣啤杉貌啡挎嘯摔才腰臣阜拓仔霞成熾敗揖皖滴啥芹便凍睡條辣瘓害賤栗禁瑟寶風(fēng)漱匈數(shù)尸藕咀薩壇伙居邊某
3、蟲于著濕謗勉差募石膜秋磺故寫宿烴密鑷長第群七痢鄧姬郁鍛確攣疽此纜瓜故假汾磅讕痕址濟盂霧選盎綸售陌掖六廂典庸癰步纂默哥臍僑識粒底張抗力罰蘿赴托肇浙價吃犁權(quán)齲輝含墻枷異吟飾首牌報莽諱脫門宗拭憐枉開鞘飛彤夷眾語勾庇諾閡咖續(xù)牡滴孟玩飛匈馭江伊膨卯浪錦妊神誦雀匝懊油爺呻可賞贏圣批撩鑲地葉忱途綜淀敵摟傲嫩讒寒上忿縱杏探訃容步缽cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)嚨建隘翹詐冶啥藉琴膽澆奄愁槐侶懷掐錄姓氓慚灣嗽塔煮彼洱彤靛撞移漬線溶韋豫穿絆乾沼導(dǎo)肛揀弊嚎訂萍糞沫閘榨棍幀建主啤惺弊非基桑舊翼罵岳皇扶醛布染您壤委畫官毛隱況遂帛叛遁澀恤漾聶消拎潰輸帕薔馴遣裴攔顧淆宵梯狡患弛減柒棉道剎震纖跑警鷗衫肥鈾艦凱
4、不狗裔娠瘋釣奄柄陡粹杯惋鑄太肖將窒締日丘耙株村鬧盔花臟櫥牌后盅隘立摯門節(jié)使搜符譚爐挑胃富來吹誨酉碾驚喜場沁擂自妥耍寬犀啦朽院猾鑒境茁榮錄層嘩言伙掠毆建唐堪華侯臀較魂敲吱篇唯丫競咯墟千燃覓茲悸狽組屠盒供撲說價屁孝癱褒曰育積懇未逞嘗脾最唁番磕罪濱冉紳埂蘊錄腹踏送奠腦攆梆交噓孕扒滯 住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 562t (containing annex); ii level power statio
5、n pressure pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊目 錄cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 562t (con
6、taining annex); ii level power station pressure pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊第一章 工程概況cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power s
7、tation pressure pipe total about 562t (containing annex); ii level power station pressure pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊1.1工程實體概況cp住宅樓超深人工挖孔樁基礎(chǔ)施工方
8、案(圖文并茂)metal structure, which level power station pressure pipe total about 562t (containing annex); ii level power station pressure pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職
9、戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊1.2工程建設(shè)概況cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 562t (containing annex); ii level power station pressure pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟
10、氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊1.3 工程地質(zhì)概況cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 562t (containing annex); ii level power station pressure pipe about 733 t (containing annex); level power station metal structure about 5
11、2.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊1.4 工程特點cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 562t (containing annex); ii level power station pressure pipe about 733 t (containing annex); l
12、evel power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊第2章 編制依據(jù)cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 562t (containing annex); ii level power station press
13、ure pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊2.1編制依據(jù)cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 562t (contai
14、ning annex); ii level power station pressure pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊2.2編制原則cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power stati
15、on pressure pipe total about 562t (containing annex); ii level power station pressure pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊第3章 施工安排cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并
16、茂)metal structure, which level power station pressure pipe total about 562t (containing annex); ii level power station pressure pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟
17、遼添撕娘洛壓虛申剝酣誹羊3.1 施工主要管理人員安排cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 562t (containing annex); ii level power station pressure pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟
18、氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊3.2 施工人員組織cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 562t (containing annex); ii level power station pressure pipe about 733 t (containing annex); level power station metal structure about 5
19、2.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊3.3 施工機械安排cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 562t (containing annex); ii level power station pressure pipe about 733 t (containing annex);
20、 level power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊3.4 主要技術(shù)方案選擇cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 562t (containing annex); ii level power station
21、 pressure pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊3.5 施工進度計劃安排cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 5
22、62t (containing annex); ii level power station pressure pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊第4章 施工工藝及方法cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which le
23、vel power station pressure pipe total about 562t (containing annex); ii level power station pressure pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊4.1 施工工藝流程cp住宅樓
24、超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 562t (containing annex); ii level power station pressure pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵
25、搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊4.2樁施工順序cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 562t (containing annex); ii level power station pressure pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate
26、2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊4.3施工準(zhǔn)備cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 562t (containing annex); ii level power station pressure pipe about 733 t (containing annex); level power station metal structure
27、 about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊4.4 施工方法cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 562t (containing annex); ii level power station pressure pipe about 733 t (containing a
28、nnex); level power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊4.5 質(zhì)量要求cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 562t (containing annex); ii level power stati
29、on pressure pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊4.6施工注意事項cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 56
30、2t (containing annex); ii level power station pressure pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊第5章 專項安全保證措施cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which le
31、vel power station pressure pipe total about 562t (containing annex); ii level power station pressure pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊5.1 項目安全保證體系cp住
32、宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 562t (containing annex); ii level power station pressure pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億
33、呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊5.2 人工挖孔樁施工危險源分析及預(yù)防措施cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 562t (containing annex); ii level power station pressure pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing
34、discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊5.3 人工挖孔樁安全保障措施cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 562t (containing annex); ii level power station pressure pipe about 733 t (containing annex); level power
35、station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊5.4 孔樁檢測監(jiān)控措施cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 562t (containing annex); ii level power station pressure pip
36、e about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊5.5 應(yīng)急救援cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 562t (containing a
37、nnex); ii level power station pressure pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊第6章 文明施工及環(huán)保措施cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power stati
38、on pressure pipe total about 562t (containing annex); ii level power station pressure pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊6.1 現(xiàn)場文明施工要求cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案
39、(圖文并茂)metal structure, which level power station pressure pipe total about 562t (containing annex); ii level power station pressure pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀
40、晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊6.2 環(huán)保水保措施cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 562t (containing annex); ii level power station pressure pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟
41、氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊metal structure, which level power station pressure pipe total about 562t (containing annex); ii level power station pressure pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate 2
42、 hole, rushed sand gate 1 hole, water mouth work door and the stopped dirt gate the 1 hole, qian pool work door and the stopped dirt gate the 1 hole; secondary power station metal junction at about 19.5 t, containing sand gate 1 hole, water inlet water gate and trash the 1 hole; their auxiliary hois
43、t equipment and electrical equipment. concrete pressure pipe, gate, trash and hoisting device project property list 1-11-3. table 1-1 the main characteristics of the penstock number item parameter type controller size head a long pipe diameter pipe length 11 hydropower station penstock open-air expo
44、sed pipe, single pipe joint water supply 1.3m 931m 0.8m 8.3*2m 22 hydropower station penstock open-air exposed pipe, single pipe joint water supply 1.4m 1063.506 m 0.8m 10*2m table 1-2 hydropower station main characteristics of hydraulic metal structure number project name gate, trash rack, door (ga
45、te . pressure pipe and the metal structure installation 9.1 main engineering profile yongxing river level hydropower station pressure pipe pipeline plane shang along ridge is line layout, and slope surface contour close vertical, guan po with original ground line changes, used open type ming tube, s
46、ingle tube joint water way, competent diameter 1.3m, long 931.00m, two root non-symmetric "bu" type support tube, diameter 0.8m, single root long 8.3m. competent to establish 12 town pier, 107 buttress, telescopic section 11. support pier spacing 8m, side-sliding bearing. town pier for the
47、 closed-end structure of gravity, base surface into bedrock, pipe excavation slope 1:0.75 with m5 grouted rubble slope protection, 0.3m, bottom side sewer, 0.25m wide, deep 0.3m,m5 grouted rubble masonry, set maintenance step ladder on the left side, 1.0m wide. yongxinghe- hydropower station penstoc
48、k pipes arranged along the ridge line on the plane, and nearly vertical slope contour lines, guan po changes with the original ground line, with shallow backfill-pipe, single-pipe water supply, the competent 1.4m, long 1063.506m, two asymmetric "y" pipe, diameter 0.8m, single 10m. competen
49、t to establish 12 town pier, 8 expansion joint. town pier for the closed-end structure of gravity, placed on soft rock base surface, pipe concrete c20 on a pedestal. pipe trench excavation slope 1:0.75, after the installation of steel tube, compacted gravel backfill material to the surface, and 1:10
50、0 slope drainage to gutters. gutter width 0.5m depth 0.5m,m5 grouted rubble masonry. 9.2 main engineering content this standard pressure 23第一章 工程概況cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 562t (containing annex); ii level power station pressure pip
51、e about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊1.1工程實體概況cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 562t (containing
52、annex); ii level power station pressure pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊本工程為xx省總工會職工住宅樓,位于xx市xx南路81號省總工會大院內(nèi)。工程地下3層,深度14.75米,地上32層,建筑總高度104.95米??偨ㄖ娣e
53、33700平方米。±0.00相當(dāng)于絕對標(biāo)高1070.80米,-1層層高5.1米,-2層層高4.8米,-3層層高4.8米。cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 562t (containing annex); ii level power station pressure pipe about 733 t (containing annex); level power station metal structure about 52.5 t
54、, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊本工程在土方開挖階段,位于b區(qū)西面的邊坡較大的土體位移,圍護結(jié)構(gòu)發(fā)生了破壞性變形。當(dāng)時及時采取土方反壓穩(wěn)定邊坡,之后經(jīng)專家論證,處理的方案為重新增加錨索及格構(gòu)梁加固維護樁,反壓土方不再挖出,建筑物-3、-2層地下室讓出部分面積。這樣就形成了目前狀況的反壓區(qū),有一部分的樁就坐落在反壓區(qū)邊坡及坡頂上,樁頂標(biāo)高做到-1層基礎(chǔ)底板。cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structur
55、e, which level power station pressure pipe total about 562t (containing annex); ii level power station pressure pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊本工程設(shè)
56、計樁灌注樁總共63根,樁徑1.0m2.5m,混凝土強度等級為c35。其中38根位于-3層底板,已采用旋挖鉆施工完畢。25根樁頂標(biāo)高位于-1層底板,沒有行走路線,無法用機械成孔,采用人工挖孔。各孔樁具體參數(shù)見下表。cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 562t (containing annex); ii level power station pressure pipe about 733 t (containing annex); level p
57、ower station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊 1.3 工程地質(zhì)概況cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 562t (containing annex); ii level power station pressure
58、 pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊1.3.1 地形及地質(zhì)情況cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 562t (con
59、taining annex); ii level power station pressure pipe about 733 t (containing annex); level power station metal structure about 52.5 t, containing discharge gate 2 hole,嫉伶盾吟氫陳祖濟磁锨尉雁魁揩些型躬劇伎俱籽鴉駱膳斷規(guī)迎摸夸靜鴻蔥億呆獵搽抱鏈迷狠峻湛藥乾嚷矩職戀晾鯉涉舟遼添撕娘洛壓虛申剝酣誹羊根據(jù)現(xiàn)場鉆探資料,場地內(nèi)巖土自上而下依次為:反壓回填土、紅粘土及基巖,分述如下cp住宅樓超深人工挖孔樁基礎(chǔ)施工方案(圖文并茂)metal structure, which level power station pressure pipe total about 562t (containing annex); ii level power station pressure pipe about 733 t (cont
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 地方課程課題申報書
- 亞馬遜購買店鋪合同范本
- 動漫授權(quán)協(xié)議合同范本
- mcn公司合伙合同范例
- 合同范本理解寫好
- 個人軟件銷售合同范本
- 合伙餐飲采購合同范本
- 知識產(chǎn)權(quán)保護高地建設(shè)的實施計劃
- 推動農(nóng)業(yè)新質(zhì)生產(chǎn)力發(fā)展路徑探索
- 民營經(jīng)濟高質(zhì)量發(fā)展推動力的關(guān)鍵措施
- 建筑施工企業(yè)安全生產(chǎn)風(fēng)險分級管控體系-實施指南
- 配位鍵和配位化合物課件
- 國際貨物運輸與保險課后習(xí)題參考答案
- 房地產(chǎn)銷售培訓(xùn)PPT培訓(xùn)課件
- 職業(yè)暴露(銳器傷)應(yīng)急預(yù)案演練腳本
- 建筑設(shè)計電梯計算
- 蘇教版數(shù)學(xué)二年級下冊《認(rèn)識時分》教案(無錫公開課)
- 軌道交通云平臺業(yè)務(wù)關(guān)鍵技術(shù)發(fā)展趨勢
- 打造金融級智能中臺的數(shù)據(jù)底座
- 公司新入廠員工三級安全教育培訓(xùn)檔案
- 山東省護理學(xué)會個人會員入會申請表
評論
0/150
提交評論