電大水利水電工程造價管理綜合練習(xí)題二小抄_第1頁
電大水利水電工程造價管理綜合練習(xí)題二小抄_第2頁
電大水利水電工程造價管理綜合練習(xí)題二小抄_第3頁
電大水利水電工程造價管理綜合練習(xí)題二小抄_第4頁
電大水利水電工程造價管理綜合練習(xí)題二小抄_第5頁
已閱讀5頁,還剩1頁未讀, 繼續(xù)免費閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認(rèn)領(lǐng)

文檔簡介

1、專業(yè)好文檔水利水電工程造價管理綜合練習(xí)題二及答案一、選擇題1、進行建設(shè)項目經(jīng)濟評價,()。a. 應(yīng)全部采用動態(tài)經(jīng)濟計算方法進行;b. 應(yīng)當(dāng)遵循費用與效益計算口徑一致的原則;c.對屬于公益性質(zhì)的水利建設(shè)項目,因其沒有或很少有財務(wù)收入,無需再進行財務(wù)分析計算;d.應(yīng)全部采用影子價格進行計算。2、防洪效益一般()。a. 在國民經(jīng)濟評價中計入項目效益;b. 在財務(wù)評價中計入效益;c. 在國民經(jīng)濟評價和財務(wù)評價中均計入項目效益;d. 在國民經(jīng)濟評價和財務(wù)評價中均不計入項目效益。3、水利水電工程概算中的現(xiàn)場經(jīng)費包括()。a. 冬雨季施工增加費;b. 夜間施工增加費;c. 特殊地區(qū)施工增加費;d. 臨時設(shè)施

2、費。4、水利水電工程采用單價合同,進行施工階段價格調(diào)整的原因可能是()。a. 承包人出現(xiàn)財務(wù)虧損;b. 施工期內(nèi)的物價變動和法規(guī)變更;c. 工程量增加;d. 貸款利息提高。5、建設(shè)項目后評價的基本內(nèi)容包括()。a. 國民經(jīng)濟評價、財務(wù)評價;b. 經(jīng)濟評價、社會影響評價;c. 過程評價、效益評價、影響評價和可持續(xù)性評價;d. 經(jīng)濟評價、社會影響評價、環(huán)境影響評價。二、填空題1、按照當(dāng)前我國稅法,江河治理、排灌、農(nóng)田水利、水土保持等水利工程,以及大中小型水力發(fā)電工程,固定資產(chǎn)投資方向調(diào)節(jié)稅稅率為_%。2、與現(xiàn)行價格相比,影子價格能更好地反映_,消除價格扭曲的影響。影子價格是一種_價格。3、因建設(shè)項

3、目占用土地而使國民經(jīng)濟放棄該土地最可行效益的凈現(xiàn)值,稱為土地的_。4、為分析、評價投標(biāo)人報價的合理性,防止串通投標(biāo)、哄抬標(biāo)價及控制招標(biāo)項目投資等,招標(biāo)人應(yīng)編制_。三、判斷題1、由于價值規(guī)律的存在,在商品交換中,商品的價格與價值完全一致。( )2、項目融資的基本特征是歸還債務(wù)的資金來源僅限于項目本身的收益和資產(chǎn)范圍。( )3、水利水電工程概算中的基本預(yù)備費不包括用于支付由于市場價格變動使工程造價增加的費用。( )4、按照競爭程度進行分類,建設(shè)項目招標(biāo)的方式可以分為公開招標(biāo)和邀請招標(biāo)兩類。( )5、水利建設(shè)項目后評價的成果應(yīng)有效地反饋到?jīng)Q策部門,但主要為內(nèi)部掌握,不宜向社會擴散。( )四、簡答題1

4、.價格有哪些職能?2.什么是資本金制度?3.水利水電工程概算中的預(yù)備費包括哪幾項?4.簡述你對我國水利水電建設(shè)項目后評價的認(rèn)識。五、計算題某企業(yè)進行某水利水電工程投標(biāo)時,由專業(yè)人員初步計算的基礎(chǔ)標(biāo)價為1238萬元。針對工程及企業(yè)的具體情況,從標(biāo)價組成各方面挖掘潛力,估算出基礎(chǔ)標(biāo)價可能降低的挖潛盈余額為89萬元;經(jīng)分析施工中可能出現(xiàn)的各種不利因素,估算可能產(chǎn)生的費用增加額為112萬元。因未來情況具有不確定性,對于挖潛盈余額和費用增加額均應(yīng)進行必要的修正(挖潛盈余額修正系數(shù)可采用0.5,費用增加額修正系數(shù)可采用0.6)。試計算企業(yè)投標(biāo)報價的低標(biāo)價和高標(biāo)價。綜合練習(xí)題二參考答案一.選擇題1、b;2、

5、a;3、d;4、b;5、c二填空題1、0;2、價值、理論;3、機會成本;4、標(biāo)底。三判斷題1、;2、;3、;4、;5、。四問答題1.價格有哪些職能?答:價格的職能主要有以下三方面。(1)表價職能價格最基本的職能是表現(xiàn)商品的價值。(2)調(diào)節(jié)職能價格的調(diào)節(jié)職能實際上是價值規(guī)律作用的表現(xiàn)。一方面,價格使商品的生產(chǎn)者了解到自己商品的個別價值和社會價值之間的差別(即商品的個別勞動時間與社會必要勞動時間的差別),促使生產(chǎn)者不斷采取措施,降低自己的個別價值,并調(diào)整其產(chǎn)品品種、結(jié)構(gòu)和投資方向,適應(yīng)市場的需要。另一方面,價格能夠刺激或抑制消費者的需求。價格對于生產(chǎn)和消費所具有的雙向的調(diào)節(jié)職能,使社會再生產(chǎn)得以順

6、利進行,使資源實現(xiàn)合理配置,并使社會經(jīng)濟結(jié)構(gòu)趨于優(yōu)化。(3)核算職能企業(yè)、行業(yè)以至于整個國民經(jīng)濟都借助于價值的貨幣形式價格進行核算。由于有了價格,企業(yè)可進行成本和盈虧核算,社會經(jīng)濟的不同部門和整個社會都可進行經(jīng)濟核算、比較和分析。價格是國民經(jīng)濟中通用的計算工具和手段。2.什么是資本金制度?答:項目資本金是指在項目總投資中,由投資者認(rèn)繳的出資額。國家對于各種經(jīng)營性投資項目,包括國有單位的基本建設(shè)、技術(shù)改造、房地產(chǎn)開發(fā)項目和集體投資項目試行資本金制度。投資項目必須首先落實資本金才能進行建設(shè)。資本金屬于自有資金。按照有關(guān)規(guī)定,資本金可以用貨幣出資,也可以用實物、工業(yè)產(chǎn)權(quán)、非專利技術(shù)、土地使用權(quán)作價出

7、資。資本金占總投資的比例,根據(jù)不同行業(yè)和項目的經(jīng)濟效益等因素確定。其中,電力(含水電)、建材等項目資本金比例一般為20%及以上。資本金一次認(rèn)繳,并根據(jù)批準(zhǔn)的建設(shè)進度按比例逐年到位。對資本金未按照規(guī)定進度和數(shù)額到位的投資項目,投資管理部門不發(fā)給投資許可證,金融部門不予貸款。國家對于公益性投資項目(包括以社會效益為主的水利建設(shè)項目)不實行資本金制度。3.水利水電工程概算中的預(yù)備費包括哪幾項?答:水利水電工程概算中的預(yù)備費包括基本預(yù)備費和價差預(yù)備費兩項。其中:基本預(yù)備費主要為解決在工程施工過程中,設(shè)計變更和國家政策性變動,以及為解決意外事故所增加的工程項目和費用;價差預(yù)備費主要為解決在工程項目建設(shè)過

8、程中,因人工工資、材料和設(shè)備價格上漲以及費用標(biāo)準(zhǔn)調(diào)整而增加的投資。4.簡述你對我國水利水電建設(shè)項目后評價的認(rèn)識。答:水利和水電都屬于國民經(jīng)濟基礎(chǔ)產(chǎn)業(yè),水利水電工程屬于國民經(jīng)濟基礎(chǔ)設(shè)施。和其他建設(shè)項目相比,水利水電建設(shè)項目的經(jīng)濟社會效益及影響情況一般更為復(fù)雜。我國已建成的水利水電工程大部分興建于計劃經(jīng)濟時期,由于建設(shè)期的社會、經(jīng)濟環(huán)境與目前有較大差別,更加大了后評價工作的難度。為使水利水電建設(shè)項目后評價工作符合“客觀、公正、科學(xué)”原則,使后評價成果具有較高的可信度,并實現(xiàn)后評價工作的規(guī)范化,應(yīng)注重按照我國的具體情況研究項目后評價的有關(guān)理論和方法。五計算題解:低標(biāo)價 = 基礎(chǔ)標(biāo)價 -(挖潛盈余修正

9、系數(shù)1)=1238-(890.5) =1193.5(萬元)高標(biāo)價 = 基礎(chǔ)標(biāo)價 +(費用增加修正系數(shù)2)=1238+(1120.6) =1305.2(萬元)winger tuivasa-sheck, who scored two tries in the kiwis 20-18 semi-final win over england, has been passed fit after a lower-leg injury, while slater has been named at full-back but is still recovering from a knee injury a

10、ggravated against usa.both sides boast 100% records heading into the encounter but australia have not conceded a try since josh charnleys effort in their first pool match against england on the opening day.aussie winger jarryd hayne is the competitions top try scorer with nine, closely followed by t

11、uivasa-sheck with eight.but it is recently named rugby league international federation player of the year sonny bill williams who has attracted the most interest in the tournament so far.the kiwi - with a tournament high 17 offloads - has the chance of becoming the first player to win the world cup

12、in both rugby league and rugby union after triumphing with the all blacks in 2011.id give every award back in a heartbeat just to get across the line this weekend, said williams.the (lack of) air up there watch mcayman islands-based webb, the head of fifas anti-racism taskforce, is in london for the

13、 football associations 150th anniversary celebrations and will attend citys premier league match at chelsea on sunday.i am going to be at the match tomorrow and i have asked to meet yaya toure, he told bbc sport.for me its about how he felt and i would like to speak to him first to find out what his

14、 experience was.uefa hasopened disciplinary proceedings against cskafor the racist behaviour of their fans duringcitys 2-1 win.michel platini, president of european footballs governing body, has also ordered an immediate investigation into the referees actions.cska said they were surprised and disap

15、pointed by toures complaint. in a statement the russian side added: we found no racist insults from fans of cska. baumgartner the disappointing news: mission aborted.the supersonic descent could happen as early as sunda.the weather plays an important role in this mission. starting at the ground, con

16、ditions have to be very calm - winds less than 2 mph, with no precipitation or humidity and limited cloud cover. the balloon, with capsule attached, will move through the lower level of the atmosphere (the troposphere) where our day-to-day weather lives. it will climb higher than the tip of mount ev

17、erest (5.5 miles/8.85 kilometers), drifting even higher than the cruising altitude of commercial airliners (5.6 miles/9.17 kilometers) and into the stratosphere. as he crosses the boundary layer (called the tropopause),e can expect a lot of turbulence.the balloon will slowly drift to the edge of spa

18、ce at 120,000 feet ( then, i would assume, he will slowly step out onto something resembling an olympic diving platform.they blew it in 2008 when they got caught cold in the final and they will not make the same mistake against the kiwis in manchester.five years ago they cruised through to the final

19、 and so far history has repeated itself here - the last try they conceded was scored by englands josh charnley in the opening game of the tournament.that could be classed as a weakness, a team under-cooked - but i have been impressed by the kangaroos focus in their games since then.they have been concentrating on the sort of stuff that wins you tough, even contests - strong defence, especially on their own goal-line, completing sets and a good kick-chase. theyve been great at all the unglamorous stu

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論