


免費預覽已結(jié)束,剩余1頁可下載查看
下載本文檔
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)
文檔簡介
Checklist PEMS, Clause 14 ofIEC 60601-1, Third edition, 2005Company name:Product type designation:Intertek project number:Instructions:This checklist is intended to facilitate the review of the PEMS documentation.Please note that this checklist includes only summaries of the standard text and it is therefore of utmost importance that the standard itself is scrutinized when filling in this checklist.The “Result- Remark” column shall be filled in with comments and document id. ref. as applicable. For large documents, also note the location of the information e.g. page, chapter or section.When a requirement is deemed not applicable, this shall be supported by a motive (if not obvious to any third party reviewer) and the letter N shall be put into the “Verdict” column. Other verdicts shall only be filled in by Intertek.Return the checklist in Word format to your project engineer at Intertek.Checklist PEMS, Clause 14, rev.1.docIEC 60601-1, clause 14ClauseRequirement + TestResult - RemarkVerdict14PROGRAMMABLE ELECTRICAL MEDICAL SYSTEMS (PEMS)14.1Requirements of this clause not applied to pess when it provided no basic safety or essential performance; orwhen application of ISO 14971 showed that failure of pess does not lead to unacceptable riskSee Attachment # for ISO 14971 informationEvery process has been followed throughout the pems development life-cycle and a record of process has been made available as confirmed by examination of risk management file and assessment of processes cited in this ClauseSee Attachment #Manufacturer considered the need for additional risk control measures when unable to follow all processes identified in Clause 14 for each constituent component of pems as confirmed by examination of risk management file and assessment of processes cited in this ClauseSee Attachment #Assessment of processes cited in this Clause made by internal auditsSee Attachment #14.2Documents produced from application of Clause 14 have been maintained and form a part of risk management file in addition to records and documents required by ISO 14971See Attachment #Documents required by Clause 14 reviewed, approved, issued and changed in accordance with a formal document control procedureSee Attachment #14.3Risk management plan required by 3.5 of ISO 14971 includes reference to pems validation plan See Attachment #14.4A pems development life-cycle including a set of defined milestones has been documented See Attachment #At each milestone, activities to be completed, and verification methods to be applied to activities have been definedSee Attachment #Each activity including its inputs and outputs defined, and each milestone identifies risk management activities that must be completed before that milestoneSee Attachment #Pems development life-cycle tailored for a specific development by making plans detailing activities, milestones, and schedulesSee Attachment #Pems development life-cycle includes documentation requirementsSee Attachment #14.5A documented system for problem resolution within and between all phases and activities of pems development life-cycle has been developed and maintained where appropriateSee Attachment #Problem resolution system meets the prescribed criteria depending on type of product: it is documented as a part of pems development life-cycleSee Attachment # it allows reporting of potential or existing problems affecting basic safety or essential performance it includes an assessment of each problem for associated risks it identifies criteria that must be met for the issue to be closed it identifies the action to be taken to resolve each problem14.6Risk management process14.6.1Manufacturer considered hazards associated with software and hardware aspects of pems including network/data coupling, components of third-party origin and legacy subsystems when compiling list of known or foreseeable hazards See Attachment #In addition to the material in ISO 14971, Annex D, list of possible sources for hazards associated with pems includes specified causes See Attachment # failure of network/data coupling to provide characteristics necessary for pems to achieve its basic safety or essential performance undesired feedback physical and data (possibilities include: unsolicited input, out of range or inconsistent input, and input originating from electromagnetic interference) unavailable data lack of integrity of data incorrect data incorrect timing of data unintended interactions within and among pess unknown aspects or quality of third-party software unknown aspects or quality of third-party pess lack of data security, particularly vulnerability to tampering, unintended interaction with other programs and viruses14.6.2Suitably validated tools and procedures assuring each risk control measure reduces identified risk(s) satisfactorily provided in addition to pems requirements in Clause 6.1 of ISO 14971See Attachment #14.7There is a documented requirement specification for pems and each of its subsystems (e.g. for a pess) which includes essential performance and risk control measures implemented by that system or subsystemSee Attachment #14.8An architecture satisfying the requirement is specified for pems and each of its subsystemsSee Attachment #The architecture specification makes use of considers the specified items to reduce risk to an acceptable level, where appropriate:a) Components with high-integrity characteristicsb) fail-safe functionsc) redundancyd) diversity;e) partitioning of functionalityf) defensive design potentially limiting hazardous effects by restricting available output power or by introducing means to limit travel of actuatorsg) allocation of risk control measures to subsystems and components of pemsh) failure modes of components and their effects;i) common cause failuresj) systematic failuresk) test interval duration and diagnostic coveragel) maintainabilitym) protection from reasonably foreseeable misusen) network/data coupling specification, when applicable14.9Design is broken up into subsystems, each with a design and test specification where appropriate, and descriptive data on design environment included in risk management fileSee Attachment #14.10A verification plan containing the specified information used to verify and document functions implementing basic safety, essential performance, or risk control measures:See Attachment # milestone(s) when verification is to be performed for each function selection and documentation of verification strategies, activities, techniques, and appropriate level of independence of the personnel performing the verification selection and utilization of verification tools coverage criteria for verification14.11A pems validation plan containing validation of basic safety and essential performance and requiring checks for unintended functioning of pems used to perform and document pems validationSee Attachment #The person with overall responsibility for pems validation is independent of design team, and no member of a design team can be responsible for pems validation of their own designSee Attachment #All professional relationships of members of pems validation team with members of design team documented in risk management file referencing methods and results of pems validation See Attachment #14.12This Clause applied when any or all of the design was result of a modification of an earlier designContinued validity of previous design documentation assessed under a documented modification/change procedureSee Attachment #14.13Technical description includes the following information when pems is intended to be connected to other equipment outside control of pems manufacturer by network/data coupling:See Attachment #a) characteristics of network/data coupling necessary for pems to achieve its i
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 購買進口相機合同協(xié)議
- 購車貸款免息合同協(xié)議
- 誤簽拆遷協(xié)議書范本
- 豆芽合同協(xié)議書范本
- 購買私人碎石合同協(xié)議
- 2025屆浙江省G12名校協(xié)作體高三上學期返???地理試題(含答案)
- 財務(wù)管理公司合同協(xié)議
- 購車合同協(xié)議終修訂版
- 貼地板合同協(xié)議
- 2025屆山東省泰安市肥城市高三上學期開學考-地理試題(含答案)
- SYT 6169-2021 油藏分類-PDF解密
- 24春國家開放大學《兒童心理學》期末大作業(yè)參考答案
- 交規(guī)記心中安全伴我行
- 父母教養(yǎng)方式對大班幼兒攻擊性行為的影響及教育建議
- 個人裝修施工合同范本
- 慢性肝病的預防與管理
- 體育產(chǎn)業(yè)與生態(tài)環(huán)境的共同保護
- 讀后續(xù)寫制作稻草人(T8聯(lián)考)講義-高考英語作文復習專項
- 食堂員工培訓內(nèi)容-食堂從業(yè)人員培訓資料
- 中職電子商務(wù)班級建設(shè)方案
- 基于文化創(chuàng)意視角的媽祖文化旅游地產(chǎn)發(fā)展研究莆田媽祖文化旅游地產(chǎn)發(fā)展條件及思路研究
評論
0/150
提交評論