


全文預覽已結束
下載本文檔
版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
SALES CONTRACT NO.: SMST/24116 DATE: Jul.15., 2006 THE SELLER: SAMSUNG CORPORATIONSAMSUNG-PLAZA BUILDING 263, SEOHYEON-DONG,BUNDANG-GU, SEONGNAM, GYEONGGI-DO, KOREA 463-721TEL: 82-2-2145-2500 FAX: 82-2-2145-2596THE BUYER: ZHEJIANG ALISON IMP. & EXP. CO., LTD.C-719,WORLD TRADE CENTRE OFFICE BUILDING122 SHUGUANG ROAD, HANGZHOU,310007 CHINATel: 0086-571-87631686 Fax: 0086-571-87950611This Contract is made by and between the Buyer and Seller, whereby the Buyer agree to buy and the Seller agree to sell the under-mentioned commodity according to the terms and conditions stipulated below:Commodity & specificationQuantityUnit priceAmountHDPE GRADE NO.9004HDPE GRADE NO.3234204MT198MTCFR SHANGHAIUSD937.00/MTUSD927.00/MT USD191148.00USD183546.00TOTAL402MTUSD374,694.00TOTAL CONTRACT VALUE: SAY U.S. DOLLARS. THREE HUNDRED SEVENTY FOUR THOUSAND SIX HUNDRED AND NINTY FOUR ONLY. PACKING: 0.2 MT are packed in one export standard MARKS:Shipping mark includes SAMSUNG, S/C no., grade no., port of destination and carton no.TIME OF SHIPMENT : Not later than AUG.10., 2006PORT OF LOADING AND DESTINATION: From Shanghai, ANY TAIWAN PORTTransshipment is allowed and partial shipment is allowed.TERMS OF PAYMENT : By irrevocable Letter of Credit at 90 days after B/L, reaching the seller not later than Jul.25, 2006 and remaining valid for negotiation in China for further 21 days after the effected shipment. In case of late arrival of the L/C, the seller shall not be liable for any delay in shipment and shall have the right to rescind the contract and /or claim for damages.DOCUMENTS:+ Signed Invoice in triplicate, indicating L/ C No. and Contract No. + Full set (3/3) of clean on board ocean Bill of Lading marked “freight prepaid” made out to order blank endorsed notifying the applicant.+ Packing List in triplicate.+ Certificate of Quality and Weight in 3 copies issued by manufacturer+ Beneficiarys Certified copy of fax dispatched to the applicant within 2 days after shipment advising the contract number, name of commodity, quantity, invoice value, bill of loading, bill of loading date, the ETA date and shipping Co.CLAIMS:In case discrepancy on the quality or quantity (weight) of the goods is found by the buyer, after arrival of the goods at the port of destination, the buyer may, within 30 days and 15 days respectively after arrival of the goods at the port of destination, lodge with the seller a claim which should be supported by an Inspection Certificate issued by a public surveyor approved by the seller. The seller shall, on the merits of the claim, either make good the loss sustained by the buyer or reject their claim, it being agreed that the seller shall not be held responsible for any loss or losses due to natural cause failing within the responsibility of Shipowners of the Underwriters. The seller shall reply to the buyer within 30 days after receipt of the claim.LATE DELIVERY AND PENALTY:In case of late delivery, the Buyer shall have the right to cancel this contract, reject the goods and lodge a claim against the Seller. Except for Force Majeure, if late delivery occurs, the Seller must pay a penalty, and the Buyer shall have the right to lodge a claim against the Seller. The rate of penalty is charged at 0.5% for every 7 days, odd days less than 7 days should be counted as 7 days. The total penalty amount will not exceed 5% of the shipment value. The penalty shall be deducted by the paying bank or the Buyer from the payment.FORCE MAJEURE:The seller shall not held responsible if they, owing to Force Majeure cause or causes, fail to make delivery within the time stipulated in the Contract or cannot deliver the goods. However, in such a case, the seller shall inform the buyer immediately by cable and if it is requested by the buyer, the seller shall also deliver to buyer by registered letter, a certificate attesting the existence of such a cause or causes.ARBITRATION:All disputes in connection with this contract or the execution thereof shall be settled amicably by negotiation. In case no settlement can be reached, the case shall then be submitted to the China International Economic Trade Arbitration Commission for settlement by arbitration in accordance with the Commissions arbitration rules. The award rendered by the commission shall be final and binding on both parties. The fees for arbitration shall be borne by the losing party unless otherwise awarded.This contract is made in four original copies and becomes valid after signature, two copies to be held by each party. Signed by: THE SELLER: THE BUYER:SAMSUNG CORPORATION ZHEJIANG ALISON IMP. & EXP. CO., LTD. Peter White
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 《整式加減(1)》教案1
- 北京行測題庫2024
- 創(chuàng)造力在雜技表演中的作用研究
- 2024年梧州市“三支一扶”招募筆試真題
- 激素與增生相關性-洞察及研究
- 微生物發(fā)酵強化-洞察及研究
- 查詢優(yōu)化與數(shù)據(jù)壓縮-洞察及研究
- 電動車主充電行為分析-洞察及研究
- 成長與成功講課件
- 2025屆廣東省江門蓬江區(qū)五校聯(lián)考八下英語期中質量檢測模擬試題含答案
- 園林行業(yè)職業(yè)道德
- 副校長筆試題庫及答案
- 2025年湖北恩施州檢察機關招聘雇員制檢察輔助人員40人歷年高頻重點模擬試卷提升(共500題附帶答案詳解)
- 陜西省濱河2025屆中考生物模擬預測題含解析
- 招標代理招標服務實施方案
- 《煤礦事故分析與預防》課件
- 幼兒園園長,教師輪訓工作制度及流程
- 2025下半年江蘇南京市浦口區(qū)衛(wèi)健委所屬部分事業(yè)單位招聘人員24人高頻重點提升(共500題)附帶答案詳解
- 省級溫室氣體清單編制指南
- 醫(yī)院醫(yī)用耗材SPD服務項目投標方案
- 廈門大學海洋科學導論課件(水文部分)l
評論
0/150
提交評論