已閱讀5頁(yè),還剩26頁(yè)未讀, 繼續(xù)免費(fèi)閱讀
版權(quán)說(shuō)明:本文檔由用戶(hù)提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
OSHA Office of Training and Education,1,Excavations,OSHA Office of Training and Education,2,Excavation Hazards,Cave-ins are the greatest risk Other hazards include: Asphyxiation due to lack of oxygen Inhalation of toxic materials Fire Moving machinery near the edge of the excavation can cause a collapse Accidental severing of underground utility lines,OSHA Office of Training and Education,3,Injury and Death,Excavating is one of the most hazardous construction operations Most accidents occur in trenches 5-15 feet deep There is usually no warning before a cave-in,OSHA Office of Training and Education,4,Definitions,Excavation a man-made cut, cavity, trench, or depression formed by earth removal. Trench a narrow excavation. The depth is greater than the width, but not wider than 15 feet. Shield - a structure able to withstand a cave-in and protect employees Shoring - a structure that supports the sides of an excavation and protects against cave-ins Sloping - a technique that employs a specific angle of incline on the sides of the excavation. The angle varies based on assessment of impacting site factors.,OSHA Office of Training and Education,5,Focus of Training,The greatest risk at an excavation How to protect employees from cave-ins Factors that pose a hazard to employees working in excavations The role of a competent person at an excavation site,OSHA Office of Training and Education,6,Protection of Employees,Employees should be protected from cave-ins by using an adequately designed protective system Protective systems must be able to resist all expected loads to the system,OSHA Office of Training and Education,7,Requirements for Protective Systems,A well-designed protective system Correct design of sloping and benching systems Correct design of support systems, shield systems, and other protective systems Plus Appropriate handling of materials and equipment Plus Attention to correct installation and removal Equals Protection of employees at excavations,OSHA Office of Training and Education,8,Design of Protective Systems,The employer shall select and construct : slopes and configurations of sloping and benching systems support systems, shield systems, and other protective systems Shield - can be permanent or portable. Also known as trench box or trench shield. Shoring - such as metal hydraulic, mechanical or timber shoring system that supports the sides Sloping - form sides of an excavation that are inclined away from the excavation,OSHA Office of Training and Education,9,Protect Employees Exposed to Potential Cave-ins,Slope or bench the sides of the excavation, Support the sides of the excavation, or Place a shield between the side of the excavation and the work area,OSHA Office of Training and Education,10,Cave-in Hazard,This excavation has inadequate support posts and egress access,Inadequate protective system,OSHA Office of Training and Education,11,Inadequate Protective System,OSHA Office of Training and Education,12,Factors Involved in Designing a Protective System,Soil classification Depth of cut Water content of soil Changes due to weather and climate Other operations in the vicinity,OSHA Office of Training and Education,13,Shoring,General Provides a framework to work in Uses wales, cross braces and uprights Supports excavation walls OSHA tables provide shoring data Must know soil type Must know depth and width of excavation Must be familiar with the OSHA Tables,OSHA Office of Training and Education,14,Trench Shield,A trench shield was built around this work area,OSHA Office of Training and Education,15,Hydraulic Trench Support,Using hydraulic jacks the operator can easily drop the system into the hole Once in place, hydraulic pressure is increased to keep the forms in place Trench pins are installed in case of hydraulic failure,OSHA Office of Training and Education,16,Materials and Equipment,Equipment used for protective systems must not have damage or defects that impair function. If equipment is damaged, the competent person must examine it to see if it is suitable for continued use. If not suitable, remove it from service until a professional engineer approves it for use.,OSHA Office of Training and Education,17,Protection from Vehicles,Install barricades Hand/mechanical signals Stop logs Grade soil away from excavation Fence or barricade trenches left overnight,OSHA Office of Training and Education,18,Hazardous Conditions,The weight and vibrations of the crane make this a very hazardous condition. They should not be working under this crane.,OSHA Office of Training and Education,19,Spoils,Dont place spoils within 2 feet from edge of excavation Measure from nearest part of the spoil to the excavation edge Place spoils so rainwater runs away from the excavation Place spoil well away from the excavation,OSHA Office of Training and Education,20,Other Excavation Hazards,Water accumulation Oxygen deficiency Toxic fumes Access/Egress Falls Mobile equipment,OSHA Office of Training and Education,21,Water is Hazardous,When water is present in an excavation it is extremely hazardous to enter,Note that these workers are not wearing hardhats to protect them from materials falling into the trench,OSHA Office of Training and Education,22,Water = Cave-in Hazard,These workers must be protected from cave-in. Note the water in the bottom of the trench. This is a very hazardous condition!,OSHA Office of Training and Education,23,Hazardous Atmosphere,Test excavations more than 4 feet before an employee enters the excavation for: Oxygen deficiency High combustible gas concentration High levels of other hazardous substances,OSHA Office of Training and Education,24,Means of Egress,A stairway, ladder, or ramp must be present in excavations that are 4 or more feet deep, and within 25 feet of the employees,This ladder does not meet the requirements of the standard,The ladder should extend 3 feet above the excavation,OSHA Office of Training and Education,25,Access and Egress,These two ladders which are lashed together are not an adequate means of egress The ladder should extend 3 feet above the top of the excavation,OSHA Office of Training and Education,26,Protection from Falls, Falling Loads, and Mobile Equipment,Install barricades Use hand / mechanical signals Grade soil away from excavation Fence or barricade trenches left overnight Use a flagger when signs, signals and barricades are not enough protection,OSHA Office of Training and Education,27,Competent Person,Must have had specific training in and be knowledgeable about: Soils classification The use of protective systems The requirements of the standard Must be capable of identifying hazards, and authorized to immediately eliminate hazards,OSHA Office of Training and Education,28,Inspections of Excavations,A competent person must make daily inspections of excavations, areas around them and protective systems: Before work starts and as needed, After rainstorms, high winds or other occurrence which may increase hazards, and When you can reasonably anticipate an employee will be exposed to hazards.,OSHA Office of Training and Education,29,Inspections of Excavations,If the competent person finds evidence of a possible cave-in, indications of failure of protective systems, hazardous atmospheres, or othe
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 育種基地融資方案
- 杭州橡膠塑膠跑道施工方案
- 2025版酒店水電維修合同范本(1000字)6篇
- 砂礫石施工方案
- 銅梁木紋地板施工方案
- 二零二五版?zhèn)€人房產(chǎn)抵押擔(dān)保合同示范文本
- 2025版環(huán)保設(shè)施驗(yàn)收委托第三方服務(wù)合同2篇
- 二零二五年度個(gè)人股權(quán)變更及收益分配協(xié)議3篇
- 二零二五年度家具清潔與保養(yǎng)委托服務(wù)協(xié)議3篇
- 青海噴泉工程施工方案
- 事業(yè)單位公開(kāi)招聘工作人員考試題(公共基礎(chǔ)知識(shí)試題和答案)
- 2024年智能科技項(xiàng)目開(kāi)發(fā)戰(zhàn)略合作框架協(xié)議
- 精神科健康宣教手冊(cè)-各種精神疾病宣教
- 甲狀腺的科普宣教
- 2024版新能源汽車(chē)充電樁建設(shè)與運(yùn)營(yíng)合作框架協(xié)議3篇
- 掛靠免責(zé)協(xié)議書(shū)范本
- 四年級(jí)全一冊(cè)《勞動(dòng)與技術(shù)》第四單元 活動(dòng)4《飼養(yǎng)動(dòng)物的學(xué)問(wèn)》課件
- 2024年考研英語(yǔ)(一)真題及參考答案
- 定制柜子保修合同協(xié)議書(shū)
- 2023年全國(guó)自學(xué)考試00054管理學(xué)原理試題答案
- GB/T 712-2011船舶及海洋工程用結(jié)構(gòu)鋼
評(píng)論
0/150
提交評(píng)論