項(xiàng)目專(zhuān)項(xiàng)施工方案
山大二院北院幕墻工程
專(zhuān)項(xiàng)施工方案
編制單位:中建八局第一建設(shè)有限公司
編制人:
日期:2023年6月
1
項(xiàng)目專(zhuān)項(xiàng)施工方案
目錄
1編制依據(jù)......................................................................................................................................................5
2工程概況......................................................................................................................................................7
2.1工程建設(shè)概況一覽表........................................................................................................................7
2.2設(shè)計(jì)概況............................................................................................................................................7
2.3工程施工條件..................................................................................................................................10
3施工安排....................................................................................................................................................12
3.1項(xiàng)目管理組織..................................................................................................................................12
3.2項(xiàng)目管理目標(biāo)..................................................................................................................................15
3.3各項(xiàng)資源供應(yīng)方式..........................................................................................................................15
3.4施工流水段的劃分及施工工藝流程..............................................................................................17
3.5工程施工重點(diǎn)和難點(diǎn)分析及應(yīng)對(duì)措施..........................................................................................18
3.5.1組織管理重點(diǎn)分析及應(yīng)對(duì)措施..........................................................................................18
3.5.2施工難點(diǎn)分析及應(yīng)對(duì)措施..................................................................................................19
3.6新技術(shù)應(yīng)用要求..............................................................................................................................20
4施工進(jìn)度計(jì)劃............................................................................................................................................21
5施工準(zhǔn)備與資源配置計(jì)劃........................................................................................................................22
5.1施工準(zhǔn)備計(jì)劃..................................................................................................................................22
5.2資源配置計(jì)劃..................................................................................................................................23
6施工方法及工藝要求................................................................................................................................26
6.1測(cè)量放線方案及技術(shù)參數(shù)..............................................................................................................26
6.1.1測(cè)量放線概況.......................................................................................................................26
6.1.2測(cè)量放線選用工具...............................................................................................................26
6.1.3測(cè)量準(zhǔn)備...............................................................................................................................27
6.1.4幕墻測(cè)量放線工藝流程和方法...........................................................................................27
6.1.5幕墻測(cè)量放線精度控制.......................................................................................................29
6.2后置埋件施工方案及技術(shù)參數(shù)......................................................................................................32
施工準(zhǔn)備..........................................................................................................................................32
施工措施..........................................................................................................................................33
施工流程..........................................................................................................................................33
技術(shù)參數(shù)..........................................................................................................................................33
施工工藝..........................................................................................................................................33
6.2.6施工要點(diǎn)................................................................................................................................34
6.3玻璃幕墻施工方案及技術(shù)參數(shù)......................................................................................................35
玻璃幕墻方案及技術(shù)參數(shù)..............................................................................................................35
玻璃幕墻施工工藝流程..................................................................................................................36
玻璃幕墻施工要點(diǎn)..........................................................................................................................37
玻璃幕墻驗(yàn)收標(biāo)準(zhǔn)..........................................................................................................................43
6.4鋁單板幕墻施工方案及技術(shù)參數(shù)..................................................................................................45
鋁單板幕墻方案及技術(shù)參數(shù)..........................................................................................................45
鋁單板幕墻施工工藝流程..............................................................................................................46
鋁單板幕墻施工要點(diǎn)......................................................................................................................47
鋁單板幕墻驗(yàn)收標(biāo)準(zhǔn)......................................................................................................................52
6.5玻璃雨棚施工方案及技術(shù)參數(shù)......................................................................................................53
2
項(xiàng)目專(zhuān)項(xiàng)施工方案
玻璃雨棚方案及技術(shù)參數(shù)..............................................................................................................53
玻璃雨棚施工工藝流程..................................................................................................................53
玻璃雨棚施工要點(diǎn)..........................................................................................................................54
6.6鋁合金格柵施工方案及技術(shù)參數(shù)..................................................................................................55
鋁合金格柵方案及技術(shù)參數(shù)..........................................................................................................55
鋁合金格柵施工工藝流程..............................................................................................................56
鋁合金格柵施工要點(diǎn)......................................................................................................................57
6.7雨季施工方案..................................................................................................................................58
6.8驗(yàn)收程序..........................................................................................................................................60
6.9驗(yàn)收內(nèi)容..........................................................................................................................................61
6.10驗(yàn)收人員........................................................................................................................................63
7各項(xiàng)管理計(jì)劃............................................................................................................................................65
7.1綠色施工管理計(jì)劃........................................................................................................................65
材料利用管理計(jì)劃..........................................................................................................................65
資源利用管理計(jì)劃..........................................................................................................................68
綠色施工評(píng)價(jià)計(jì)劃..........................................................................................................................70
7.2進(jìn)度管理計(jì)劃................................................................................................................................71
進(jìn)度計(jì)劃關(guān)鍵控制點(diǎn)......................................................................................................................71
7.2.2.施工進(jìn)度管理組織機(jī)構(gòu)和職責(zé)分工.....................................................................................71
7.2.3.進(jìn)度管理措施.........................................................................................................................71
7.3質(zhì)量管理計(jì)劃................................................................................................................................72
7.3.1工程施工質(zhì)量分解目標(biāo)........................................................................................................72
7.3.2項(xiàng)目質(zhì)量管理的組織機(jī)構(gòu)并明確職責(zé)................................................................................73
7.3.3確定質(zhì)量控制點(diǎn)....................................................................................................................73
7.3.4現(xiàn)場(chǎng)質(zhì)量管理制度................................................................................................................73
7.3.5質(zhì)量保證措施........................................................................................................................74
7.4安全管理計(jì)劃................................................................................................................................75
7.4.1職業(yè)健康安全管理目標(biāo)........................................................................................................75
7.4.2現(xiàn)場(chǎng)職業(yè)健康安全管理組織機(jī)構(gòu)和職責(zé)分工....................................................................75
7.4.3職業(yè)健康安全重大危險(xiǎn)源....................................................................................................75
7.4.4職業(yè)健康安全資源配置計(jì)劃。............................................................................................76
7.4.5專(zhuān)項(xiàng)施工安全方案編制計(jì)劃。............................................................................................76
7.4.6施工現(xiàn)場(chǎng)安全生產(chǎn)管理制度................................................................................................76
7.4.7職業(yè)健康安全保證措施........................................................................................................78
7.5成品保護(hù)計(jì)劃................................................................................................................................86
7.5.1成品保護(hù)管理目標(biāo)................................................................................................................86
7.5.2成品和設(shè)備保護(hù)的組織機(jī)構(gòu)與職責(zé)....................................................................................86
7.5.3成品和設(shè)備保護(hù)的管理制度................................................................................................86
7.5.4成品和設(shè)備保護(hù)措施............................................................................................................87
8應(yīng)急預(yù)案....................................................................................................................................................89
8.1應(yīng)急指揮機(jī)構(gòu)及職責(zé).......................................................................................................................89
8.2事故風(fēng)險(xiǎn)分析...................................................................................................................................89
8.3應(yīng)急救援程序...................................................................................................................................92
8.4應(yīng)急處置措施...................................................................................................................................92
8.5應(yīng)急物質(zhì)準(zhǔn)備...................................................................................................................................94
3
項(xiàng)目專(zhuān)項(xiàng)施工方案
8.6應(yīng)急響應(yīng)、響應(yīng)結(jié)束、演練...........................................................................................................96
8.7防疫專(zhuān)篇.........................................................................................................................................103
新冠疫情防控組織措施................................................................................................................103
新冠疫情預(yù)防措施........................................................................................................................104
9計(jì)算書(shū)和相關(guān)圖紙..................................................................................................................................106
4
項(xiàng)目專(zhuān)項(xiàng)施工方案
1編制依據(jù)
序號(hào)類(lèi)別文件名稱編號(hào)
1《建設(shè)工程質(zhì)量管理?xiàng)l例》國(guó)務(wù)院令第687號(hào)
2《建設(shè)工程安全生產(chǎn)管理?xiàng)l例》國(guó)務(wù)院令第393號(hào)
國(guó)家行政文件
3《安全生產(chǎn)許可證條例》國(guó)務(wù)院令第653號(hào)
建設(shè)部建質(zhì)2018第
4危險(xiǎn)性較大的分部分項(xiàng)工程安全管理辦法
[31]號(hào)文件
山東省人民政府令第
5地方行政文件山東省建筑安全生產(chǎn)管理規(guī)定
172號(hào)
6建筑節(jié)能工程施工質(zhì)量驗(yàn)收標(biāo)準(zhǔn)GB50411-2023
7玻璃幕墻工程技術(shù)規(guī)范JGJ102-2003
8建筑玻璃應(yīng)用技術(shù)規(guī)程JGJ113-2015
9玻璃幕墻工程質(zhì)量檢驗(yàn)標(biāo)準(zhǔn)JGJ/T139-2023
10建筑幕墻氣密、水密、抗風(fēng)壓性能檢測(cè)方法GB/T15227-2007
11建筑幕墻抗震性能振動(dòng)臺(tái)試驗(yàn)方法GB/T18575-2017
GB50016-2014(2018
12建筑設(shè)計(jì)防火規(guī)范(2018年版)
年版)
13建筑抗震設(shè)計(jì)規(guī)范GB50011-2010
14建筑物防雷設(shè)計(jì)規(guī)范GB50057-2010
15外墻外保溫工程技術(shù)標(biāo)準(zhǔn)JGJ144-2023
國(guó)家行業(yè)規(guī)范
16建筑施工高處作業(yè)安全技術(shù)規(guī)范JGJ80-2016
17混凝土結(jié)構(gòu)后錨固技術(shù)規(guī)程JGJ145-2013
18金屬與石材幕墻工程技術(shù)規(guī)范JGJ133-2001
19施工現(xiàn)場(chǎng)臨時(shí)用電安全技術(shù)規(guī)范JGJ46-2005
20建筑施工工具式腳手架安全技術(shù)規(guī)范JGJ202-2010
21建設(shè)工程施工現(xiàn)場(chǎng)環(huán)境與衛(wèi)生標(biāo)準(zhǔn)JGJ146-2013
22高處作業(yè)吊籃GB/T19155-2017
23建筑機(jī)械使用安全技術(shù)規(guī)程JGJ33-2012
24建筑工程資料管理規(guī)程JGJ/T185-2009
25鋼結(jié)構(gòu)焊接規(guī)范GB50661-2011
5
項(xiàng)目專(zhuān)項(xiàng)施工方案
26工業(yè)建筑防腐蝕設(shè)計(jì)標(biāo)準(zhǔn)GB/T50046-2018
27工程質(zhì)量通病防治手冊(cè)CSCEC81-TB-2016
企業(yè)管理文件
28工程實(shí)體質(zhì)量實(shí)測(cè)實(shí)量操作手冊(cè)CSCEC81-JC-2016
29設(shè)計(jì)文件山大二院北院xx幕墻施工圖紙/
30其他《ZLP系列高處作業(yè)吊籃使用說(shuō)明書(shū)》/
6
項(xiàng)目專(zhuān)項(xiàng)施工方案
2工程概況
2.1工程建設(shè)概況一覽表
工程名稱工程性質(zhì)醫(yī)院
建設(shè)規(guī)模550萬(wàn)元工程地址
建筑高度16.5m建筑面積5508.25平方米
項(xiàng)目承包
建設(shè)單位幕墻工程
范圍
玻璃幕墻、鋁單板幕墻、20mm蜂窩
主要分包
設(shè)計(jì)單位鋁單板幕墻、玻璃雨棚、鋁合金格柵、
工程
幕墻亮化工程。
符合現(xiàn)行的國(guó)家、省、市、法律、法
勘察單位質(zhì)量
規(guī)及規(guī)范要求合格
計(jì)劃工期:61日歷天
計(jì)劃開(kāi)工日期:2023年6月1日
監(jiān)理單位工期
合同計(jì)劃竣工日期:2023年7月31日
要求具體開(kāi)工日期以開(kāi)工令為準(zhǔn)。
嚴(yán)格遵守當(dāng)?shù)仃P(guān)于安全生產(chǎn)、環(huán)境保
總承包單位安全護(hù)、文明施工等的法律、法規(guī)及政策
要求,確保工程施工過(guò)程零事故。
分包單位科技工法1篇、專(zhuān)利2篇、論文2篇
工程主要功能或
用于傳染性疾病的治療
用途
2.2設(shè)計(jì)概況
主體結(jié)構(gòu)型
幕墻面積6000平方米鋼結(jié)構(gòu)
式
1.安裝位置:一至三層外立面透明位置
2.骨架材料種類(lèi)、規(guī):格、中距:采用140系列鋁型材;
框架橫梁采用100系列鋁型材;主次龍骨采用M6不
銹鋼螺栓連接。橫梁材質(zhì)采用6063-T6,立柱材質(zhì)采
用6063-T6,型材室外可視面采用氟碳噴涂處理(三
玻璃幕墻面積:1113.38㎡涂?jī)煽?,室內(nèi)可視面采用粉沫噴涂處理,不可視面
主
采用陽(yáng)極氧化處理。
要
3.材采用一層玻璃幕墻玻璃面板采用
幕
8+15Ar+8Low-e中空鋼化玻璃;二、三層、機(jī)房層玻
墻
璃幕墻玻璃面板采用6+15Ar+6Low-e中空鋼化玻璃。
系
4.玻璃幕墻最大分格尺寸為1350*3000mm,位于一層。
統(tǒng)
1.安裝位置:一至三層層間位置
2.鋁單板幕墻豎向龍骨采用90X60X4mm熱鍍鋅鋼管,
鋁板幕墻面積:336.12㎡
橫向龍骨采用60X60X4mm熱鍍鋅鋼管,豎向龍骨與鋼
結(jié)構(gòu)主體通過(guò)連接件固定,連接件與龍骨采用M10不
7
項(xiàng)目專(zhuān)項(xiàng)施工方案
銹鋼螺栓連接,連接件與鋼結(jié)構(gòu)主體焊接固定;橫向
龍骨與豎向龍骨采用焊接規(guī)定。鋁單板與龍骨采用不
銹鋼螺釘固定,鋁合金角碼與龍骨之間采用柔性墊片
隔開(kāi),防止雙金屬腐蝕。
3.面層材料3mm厚鋁單板,表面氟碳噴涂
4.鋁單板幕墻最大分格尺寸為:2750*300mm
1.安裝位置:一至三層層間位置
2.蜂窩鋁單板幕墻豎向龍骨采用90X60X4mm熱鍍鋅
鋼管,橫向龍骨采用60X60X4mm熱鍍鋅鋼管,豎向龍
骨與鋼結(jié)構(gòu)主體通過(guò)連接件固定,連接件與龍骨采用
M10不銹鋼螺栓連接,連接件與鋼結(jié)構(gòu)主體焊接固定;
蜂窩鋁板幕墻面積:3077.36㎡橫向龍骨與豎向龍骨采用焊接規(guī)定。鋁單板與龍骨采
用不銹鋼螺釘固定,鋁合金角碼與龍骨之間采用柔性
墊片隔開(kāi),防止雙金屬腐蝕。
3.蜂窩鋁板為20mm厚鋁蜂窩板,外板為1.2mm,內(nèi)
板為0.8mm,外表面氟碳噴涂,內(nèi)表面陽(yáng)極氧化。
4.蜂窩鋁單板最大的分格尺寸為:2750*1000mm
1.玻璃品種、規(guī)格、顏色:TP8+1.52PVB+TP8鋼化夾
膠玻璃
2.粘結(jié)塞口材料種類(lèi):硅酮結(jié)構(gòu)膠、硅酮密封膠
3.本系統(tǒng)龍骨采用熱鍍鋅鋼方管間隔布置,主龍骨
玻璃雨棚面積:142.54㎡
采用90X60X4熱鍍鋅鋼方管,次龍骨采用60X60X4熱
鍍鋅鋼方管,主龍骨與次龍骨采用焊接固定。
4.面層材料:鋼結(jié)構(gòu)外包3mm氟碳漆鋁板
5.玻璃雨棚的最大分格尺寸為1281*1900mm
1.龍骨材料種類(lèi)、規(guī)格、中距:80x60x3mm鍍鋅鋼方
管/70x50x3mm鍍鋅鋼方管、100*6鋼板等
鋁合金格柵面積:1317.81㎡
2.面層材料品種、規(guī)格、顏色:鋁合金裝飾條,表面
氟碳噴涂
1.門(mén)代號(hào)及洞口尺寸:詳設(shè)計(jì)圖紙
2.門(mén)框或扇外圍尺寸:詳見(jiàn)圖紙
地彈門(mén)面積:36.37㎡3.門(mén)框、扇材質(zhì):鋁合金
4.玻璃品種、厚度8+15Ar+8Low-E中空鋼化玻璃
5.包含門(mén)鎖、把手、地彈簧、五金件等所有內(nèi)容
建筑高度:16.50m層數(shù):地上3層、地下1層
建筑設(shè)計(jì)年限50年幕墻設(shè)計(jì)年限25年
抗震設(shè)防烈度為7度,基本地震
耐火等級(jí)一級(jí)抗震設(shè)計(jì)
加速度值為0.10g。
基本風(fēng)壓0.5kN/m2基本雪壓0.35kN/m2
8
項(xiàng)目專(zhuān)項(xiàng)施工方案
建筑總平面布置圖
9
項(xiàng)目專(zhuān)項(xiàng)施工方案
2.3工程施工條件
建設(shè)氣極端最高溫度及期限42.5℃、8月最大雨量及雨季時(shí)間685mm/年、7-8月
10
項(xiàng)目專(zhuān)項(xiàng)施工方案
地點(diǎn)溫
8-9級(jí)、北風(fēng)、7-9
氣象極端最低溫度及期限-11℃、1月最大風(fēng)力、風(fēng)向及發(fā)生時(shí)間
狀況月
鋁材:100及80系列鋁合金橫梁立柱
鋼材:方鋼(90*60*4)、方鋼(60*60*4)
當(dāng)?shù)毓こ逃弥鞑墓?yīng)情況
鋁板:3mm鋁單板、20mm蜂窩鋁單板
資源
玻璃:中空雙鋼化玻璃
供應(yīng)
情況
總包單位根據(jù)分包各單位提供的二級(jí)箱數(shù)量統(tǒng)一配備,項(xiàng)目部根
電力供應(yīng)情況
據(jù)最大用電量統(tǒng)一配備三級(jí)箱,以滿足幕墻施工要求
施工
吊籃施工使用吊籃進(jìn)行幕墻施工
措施
濟(jì)南新舊動(dòng)能轉(zhuǎn)換先行區(qū)崔寨街道辦事處,G220以西,解營(yíng)村與
周?chē)缆?/p>
施工天興村交界處,周?chē)缆吠〞场?/p>
區(qū)域
現(xiàn)場(chǎng)正處于幕墻施工階段,材料堆放場(chǎng)地、加工區(qū)、辦公區(qū)、生
環(huán)境材料堆放
活區(qū)已劃分完成。
11
項(xiàng)目專(zhuān)項(xiàng)施工方案
3施工安排
3.1項(xiàng)目管理組織
3.1.1項(xiàng)目管理組織機(jī)構(gòu)
3.1.2項(xiàng)目管理人員及職責(zé)權(quán)限
項(xiàng)目管理人員及職責(zé)分工
序號(hào)管理職務(wù)姓名職稱(資質(zhì))職責(zé)和權(quán)限
明確項(xiàng)目的各項(xiàng)管理目標(biāo)并分解落實(shí);
監(jiān)督檢查項(xiàng)目管理人員履行其職責(zé);
組織項(xiàng)目管理和產(chǎn)品實(shí)現(xiàn)過(guò)程的策劃,編制項(xiàng)目管理
策劃書(shū)、施工組織設(shè)計(jì)等管理文件;
1項(xiàng)目經(jīng)理中級(jí)工程師組織進(jìn)行機(jī)械設(shè)備、材料、周轉(zhuǎn)工具、勞務(wù)人員等資
源的配置;
做好與業(yè)主、監(jiān)理等的協(xié)調(diào)與溝通工作;
做好分包的協(xié)調(diào)與管理工作;
組織做好項(xiàng)目資金、成本、預(yù)結(jié)算的管理。
1)負(fù)責(zé)項(xiàng)目部的深化設(shè)計(jì)、技術(shù)和質(zhì)量工作的展開(kāi);
2)審核編制施工組織設(shè)計(jì)與施工方案;
3)與設(shè)計(jì)、監(jiān)理保持溝通,保證設(shè)計(jì)、監(jiān)理的要求
與指令在項(xiàng)目部中貫徹實(shí)施;
4)組織對(duì)本項(xiàng)目的關(guān)鍵技術(shù)難題進(jìn)行科技攻關(guān),進(jìn)
2項(xiàng)目總工中級(jí)工程師
行新工藝、新技術(shù)的研究,確保本項(xiàng)目順利進(jìn)行;
5)及時(shí)組織技術(shù)人員解決工程施工中出現(xiàn)的技術(shù)問(wèn)
題;
6)直接領(lǐng)導(dǎo)各級(jí)技術(shù)人員,施工員和有關(guān)職能部門(mén)
人員的技術(shù)工作,承擔(dān)項(xiàng)目的技術(shù)領(lǐng)導(dǎo)責(zé)任,貫徹執(zhí)
12
項(xiàng)目專(zhuān)項(xiàng)施工方案
行技術(shù)規(guī)范、標(biāo)準(zhǔn),制訂施工項(xiàng)目的技術(shù)管理制度,
組織工程的施工驗(yàn)收工作,領(lǐng)導(dǎo)工程安全事故的預(yù)防
和處理工作,組織工程的施工安全驗(yàn)收工作等。
7)對(duì)工程的施工生產(chǎn)、進(jìn)度計(jì)劃、現(xiàn)場(chǎng)總平面協(xié)調(diào)
及管理全面負(fù)責(zé),確保工程施工順利進(jìn)行;
8)對(duì)工程施工與其他各專(zhuān)業(yè)項(xiàng)目部之間的施工生產(chǎn)
進(jìn)行協(xié)調(diào);
9)負(fù)責(zé)施工中各工種之間和其它專(zhuān)業(yè)的協(xié)調(diào)及配合,
組織實(shí)施各專(zhuān)業(yè)管理人員、施工日常工作的落實(shí),組
織各項(xiàng)工程的施工、驗(yàn)收工作,及時(shí)解決施工中出現(xiàn)
的各種問(wèn)題。
1)參與圖紙會(huì)審,做到對(duì)設(shè)計(jì)文件、圖紙、資料、
規(guī)范、標(biāo)準(zhǔn)透徹了解,提出會(huì)審建議。
2)參與項(xiàng)目施工組織設(shè)計(jì)和施工方案的編制,對(duì)資
源的合理配置及商務(wù)用語(yǔ)的合理性提出建議。
3)成本核算、簽證組價(jià)、人工工資測(cè)算、工程量的
跟蹤審計(jì)、各主要材料的招標(biāo)定標(biāo)等。
4)負(fù)責(zé)對(duì)合同責(zé)任進(jìn)行分解、包合同交底工作,確
保合同責(zé)任分解及交底有針對(duì)性和可操作性。
3商務(wù)工程師助理工程師5)負(fù)責(zé)圖紙、當(dāng)?shù)匚募⒍~、工程造價(jià)資料等的
收集、整理、歸檔,并達(dá)到靈活運(yùn)用。
6)牽頭組織項(xiàng)目部索賠及反索賠策劃,并督導(dǎo)實(shí)施,
負(fù)責(zé)將重大變更、索賠、簽證按公司規(guī)定程序及時(shí)上
報(bào)。
7)按招議標(biāo)計(jì)劃在規(guī)定的時(shí)間內(nèi)參加分包招(議)
標(biāo)活動(dòng)。
8)牽頭組織項(xiàng)目部商務(wù)例會(huì),按要求填制例會(huì)紀(jì)要
并上報(bào)公司。
1)領(lǐng)導(dǎo)深化設(shè)計(jì)室,落實(shí)項(xiàng)目深化設(shè)計(jì)人員配備。
2)在設(shè)計(jì)階段重點(diǎn)協(xié)調(diào)安排好幕墻與其他各專(zhuān)業(yè)的
審圖工作,加強(qiáng)各專(zhuān)業(yè)間的互審,保證建筑和結(jié)構(gòu)、
土建、機(jī)電和精裝各專(zhuān)業(yè)之間在設(shè)計(jì)上應(yīng)一致、準(zhǔn)確、
可行,在規(guī)定時(shí)間內(nèi)及時(shí)反饋審核意見(jiàn)和建議。同時(shí)
要保證不同設(shè)計(jì)單位的專(zhuān)項(xiàng)設(shè)計(jì)圖紙和深化圖紙與
設(shè)計(jì)院的施工圖紙相吻合,尤其是有相關(guān)要求的各專(zhuān)
業(yè)的銜接上要完整和準(zhǔn)確。
4設(shè)計(jì)總監(jiān)中級(jí)工程師3)在施工階段要及時(shí)了解其它專(zhuān)業(yè)分包的施工進(jìn)度
計(jì)劃,準(zhǔn)確全面掌握影響現(xiàn)場(chǎng)施工的設(shè)計(jì)圖紙情況,
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025-2030年中國(guó)煤炭檢測(cè)實(shí)驗(yàn)分析儀器行業(yè)全國(guó)市場(chǎng)開(kāi)拓戰(zhàn)略制定與實(shí)施研究報(bào)告
- 2025-2030年中國(guó)燃料電池電堆行業(yè)商業(yè)模式創(chuàng)新戰(zhàn)略制定與實(shí)施研究報(bào)告
- 新形勢(shì)下物業(yè)管理行業(yè)可持續(xù)發(fā)展戰(zhàn)略制定與實(shí)施研究報(bào)告
- 2025-2030年中國(guó)有限服務(wù)酒店行業(yè)開(kāi)拓第二增長(zhǎng)曲線戰(zhàn)略制定與實(shí)施研究報(bào)告
- 2025-2030年中國(guó)溫度控制器行業(yè)并購(gòu)重組擴(kuò)張戰(zhàn)略制定與實(shí)施研究報(bào)告
- 2025-2030年中國(guó)汗蒸館行業(yè)開(kāi)拓第二增長(zhǎng)曲線戰(zhàn)略制定與實(shí)施研究報(bào)告
- 市政道路工程監(jiān)理竣工質(zhì)量評(píng)估報(bào)告
- 學(xué)校修建綜合樓申請(qǐng)報(bào)告
- 四年級(jí)數(shù)學(xué)(小數(shù)加減運(yùn)算)計(jì)算題專(zhuān)項(xiàng)練習(xí)與答案
- 皮草面料知識(shí)培訓(xùn)課件
- 銀行反恐應(yīng)急預(yù)案及方案
- 關(guān)于推某某同志擔(dān)任教育系統(tǒng)實(shí)職領(lǐng)導(dǎo)職務(wù)的報(bào)告(職務(wù)晉升)
- 2023消防安全知識(shí)培訓(xùn)
- 鄰近鐵路營(yíng)業(yè)線施工安全監(jiān)測(cè)技術(shù)規(guī)程 (TB 10314-2021)
- Exchange配置與規(guī)劃方案專(zhuān)項(xiàng)方案V
- 三年級(jí)上冊(cè)脫式計(jì)算練習(xí)200題及答案
- 新生兒腭裂護(hù)理查房課件
- 二年級(jí)下冊(cè)科學(xué)課程綱要
- 前交叉韌帶重建術(shù)后康復(fù)訓(xùn)練
- 河南近10年中考真題數(shù)學(xué)含答案(2023-2014)
- 八年級(jí)上學(xué)期期末家長(zhǎng)會(huì)課件
評(píng)論
0/150
提交評(píng)論