版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
,D-FMEA,,,,(DESIGNFMEAaccordingtoAIAGstandard),,,,,,,,,,,,,,,,,,,,
,,,,,,System,,Subsystem,,Component,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,,,,
,PartNo.,,Partname,,,Drawing(No.&issue),,,,Customer,,,,,,,FMEA(No.&issue),,,,,,,,
,1000592442V03,,CMG2PCBAssembly,,,HighLevel,,,,Internal,,,,,,,10006324207v01,,,,,,,,
,Project(No.&name),,,,,Keydate(finishdate),,Date(firstissue),,Date(thisrevision),,,,,,,S-Severity/Allvarlighetsgrad,,,,,,,,
,104191-GenericshifterconceptCMG2,,,,,15-03-2015,,04-12-2014,,24-02-2015,,,,,,,O-Occurency/Felintensitet,,,,,,,,
,Issuedby,,,Dept./BA,,Participants,,,,,,,,,,,D-Detection/Uppt?cktssannolikhet,,,,,,,,
,DanielFransson,,,COE,,Seeparticipantssheet,,,,,,,,,,,RPN-RiskPriorityNumber/Risktal,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,,,,
,PART/FUNCTION,,CHARACTERISTICSOFPOTENTIALFAILURES,,,,,,CONTROL,,,,,,,,Action,,,,,RESULT,,,
,Pos,Partname,Potential,Potential,,(KPC),Potential,,Prevention,Prevention,Prevention,Detection,Detection,Detection,,,Actionfor,Actionfor,,Due,Performed,,,,
,No.,anditsfunction,Failuremode,Effectoffailure,S,Class,Causesoffailure,O,"Control(current)
","Implementation
responsible","Implementation
Date","Control(current)
","Implementation
responsible","Implementation
Date",D,RPN,Prevention,Detection,Resp.,Date,Date,S,O,D,RPN
,,Connector,,,,,,,,,,,,,,,,,,,,,,,
,,Connector,TooHighCurrent,Connectorburning,9,,Connectorratingstoolowcomparedtofuseratings,3,"Verifyconnectorratingandderatingintemperaturewhendesigning,Ensureitismatchedwiththefusefromthecar",DanielFransson,,DVtesting,Bernt-OveHansson,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,,,,9,3,,
,,,,,9,,Shortbetweenpins,3,Reviewconnectorchoice,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,9,3,,
,,KL30,PoorConnection,NoorInterruptedPower,8,,Badsoldering,3,"Ensuresolderpastmaskistherightthickness,useKongsbergVaultcomponentswhendesigningtoensurethePasteMaskExpansionfollowsIPCstandards/isvalidatedinproduction",DanielFransson,2015-02-10,Verifythefirstboardswhenwereceivethem,DanielFransson,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,DanielFransson,,2015-02-10,8,3,,
,,,,,8,,Oxide,4,Rightchoiceofmaterial/connector,DanielMartensson,,,,,,,Consultcomponentspecialistwhenchoosingconnector,NoAction,,,,8,4,,
,,,,,8,,Tolerancesofterminals,2,Choiceofterminalisaccordingtoconnectormanufacturerspecs,DanielMartensson,,DVtesting,Bernt-OveHansson,,,,Consultcomponentspecialistwhenchoosingconnector,NoAction,,,,8,2,,
,,,,,8,,Vibration,3,Rightchoiceofconnector,DanielMartensson,,DVtesting,Bernt-OveHansson,,,,Consultcomponentspecialistwhenchoosingconnector,NoAction,,,,8,3,,
,,,,,8,,BadPCBRouting,2,Designmustbereviewedbeforemanufacturing,DanielFransson,2015-02-10,DVtesting,Bernt-OveHansson,,,,Consultcomponentspecialistwhenchoosingconnector,NoAction,DanielFransson,,2015-02-10,8,2,,
,,,Shorttoground,Toohighcurrentflowingthroughconnector,8,,Waterintrusion,3,Correctchoiceofconnector.Useconformalcoating.,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,8,3,,
,,,,,8,,Conductivematerialintrusion,3,Correctchoiceofconnector.Useconformalcoating.,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,8,3,,
,,,,,8,,Electromigration,3,MakesurePCBmanufacturerfollowsIPCstandards,DanielFransson,2015-02-10,,,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,DanielFransson,,2015-02-10,8,3,,
,,,Shorttoacommunicationsignalpin,Noiseinducedonpowerline,5,,Waterintrusion,3,Correctchoiceofconnector.Useconformalcoating.,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,5,3,,
,,,,,5,,Conductivematerialintrusion,3,Correctchoiceofconnector.Useconformalcoating.,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,5,3,,
,,,,,5,,Electromigration,3,MakesurethePCBmanufacturerfollowsIPCstandardsandisautomotivequalified,DanielFransson,2015-02-10,,,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,DanielFransson,,2015-02-10,5,3,,
,,KL15,PoorConnection,NoorInterruptedPower,8,,Badsoldering,3,"Ensuresolderpastmaskistherightthickness,useKongsbergVaultcomponentswhendesigningtoensurethePasteMaskExpansionfollowsIPCstandards/isvalidatedinproduction",DanielFransson,2015-02-10,Verifythefirstboardswhenwereceivethem,DanielFransson,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,DanielFransson,,2015-02-10,8,3,,
,,,,,8,,Oxide,4,Rightchoiceofmaterial/connector,DanielMartensson,,,,,,,Consultcomponentspecialistwhenchoosingconnector,Noaction,,,,8,4,,
,,,,,8,,Tolerancesofterminals,2,Choiceofterminalisaccordingtoconnectormanufacturerspecs,DanielMartensson,,DVtesting,Bernt-OveHansson,,,,Consultcomponentspecialistwhenchoosingconnector,Noaction,,,,8,2,,
,,,,,8,,Vibration,3,Rightchoiceofconnector,DanielMartensson,,DVtesting,Bernt-OveHansson,,,,Consultcomponentspecialistwhenchoosingconnector,Noaction,,,,8,3,,
,,,,,8,,BadPCBRouting,3,Designmustbereviewedbeforemanufacturing,DanielFransson,2015-02-10,DVtesting,Bernt-OveHansson,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,DanielFransson,,2015-02-10,8,3,,
,,,Shorttoground,Toohighcurrentflowingthroughconnector,8,,Waterintrusion,3,UseconformalcoatingonPCBA,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,8,3,,
,,,,,8,,Conductivematerialintrusion,3,UseconformalcoatingonPCBA,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,8,3,,
,,,,,8,,Electromigration,3,MakesurePCBmanufacturerfollowsIPCstandards,DanielFransson,2015-02-10,,,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,DanielFransson,,2015-02-10,8,3,,
,,,Shorttoacommunicationsignalpin,Noiseinducedonpowerline,5,,Waterintrusion,3,UseconformalcoatingonPCBA,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,5,3,,
,,,,,5,,Conductivematerialintrusion,3,UseconformalcoatingonPCBA,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,5,3,,
,,,,,5,,Electromigration,3,MakesurePCBmanufacturerfollowsIPCstandards,DanielFransson,2015-02-10,,,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,DanielFransson,,2015-02-10,5,3,,
,,,ShorttoKL30,Ignitionfeaturenotfunctionnalanymore,6,,Waterintrusion,3,UseconformalcoatingonPCBA,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,6,3,,
,,,,,6,,Conductivematerialintrusion,3,UseconformalcoatingonPCBA,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,6,3,,
,,,,,6,,Electromigration,3,MakesurePCBmanufacturerfollowsIPCstandards,DanielFransson,2015-02-10,,,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,DanielFransson,,2015-02-10,6,3,,
,,,,Batterywilldrainoff,8,,Waterintrusion,3,UseconformalcoatingonPCBA,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,8,3,,
,,,,,8,,Conductivematerialintrusion,3,UseconformalcoatingonPCBA,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,8,3,,
,,,,,8,,Electromigration,3,MakesurePCBmanufacturerfollowsIPCstandards,DanielFransson,2015-02-10,,,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,DanielFransson,,2015-02-10,8,3,,
,,Wake,PoorConnection,NoorInterruptedPower,8,,Badsoldering,3,"Ensuresolderpastmaskistherightthickness,useKongsbergVaultcomponentswhendesigningtoensurethePasteMaskExpansionfollowsIPCstandards/isvalidatedinproduction",DanielFransson,2015-02-10,Verifythefirstboardswhenwereceivethem,DanielFransson,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,DanielFransson,,2015-02-10,8,3,,
,,,,,8,,Oxide,4,Rightchoiceofmaterial/connector,DanielMartensson,,,,,,,Consultcomponentspecialistwhenchoosingconnector,Noaction,,,,8,4,,
,,,,,8,,Tolerancesofterminals,2,Choiceofterminalisaccordingtoconnectormanufacturerspecs,DanielMartensson,,DVtesting,Bernt-OveHansson,,,,Consultcomponentspecialistwhenchoosingconnector,Noaction,,,,8,2,,
,,,,,8,,Vibration,3,Rightchoiceofconnector,DanielMartensson,,DVtesting,Bernt-OveHansson,,,,Consultcomponentspecialistwhenchoosingconnector,Noaction,,,,8,3,,
,,,,,8,,BadPCBRouting,3,Designmustbereviewedbeforemanufacturing,DanielFransson,2015-02-10,DVtesting,Bernt-OveHansson,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,DanielFransson,,2015-02-10,8,3,,
,,,Shorttoground,Wake-upfeaturenotfunctionnal/Toohighcurrentflowingthroughconnector,8,,Waterintrusion,3,Mechanicalhousingisdesignedtopreventintrusionofunwantedmaterial/substancesonthePCB/Useconformalcoatingifneeded,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,8,3,,
,,,,,8,,Conductivematerialintrusion,3,Mechanicalhousingisdesignedtopreventintrusionofunwantedmaterial/substancesonthePCB/Useconformalcoatingifneeded,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,8,3,,
,,,,,8,,Electromigration,3,MakesurePCBmanufacturerfollowsIPCstandards,DanielFransson,2015-02-10,,,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,DanielFransson,,2015-02-10,8,3,,
,,,Shorttoacommunicationsignalpin,Wake-upfeatureoscillating,7,,Waterintrusion,3,UseconformalcoatingonPCBA,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,7,3,,
,,,,,7,,Conductivematerialintrusion,3,UseconformalcoatingonPCBA,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,7,3,,
,,,,,7,,Electromigration,3,MakesurePCBmanufacturerfollowsIPCstandards,DanielFransson,2015-02-10,,,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,DanielFransson,,2015-02-10,7,3,,
,,,ShorttoKL30,Wake-upfeaturealwayson/notfunctionnalanymore,6,,Waterintrusion,3,UseconformalcoatingonPCBA,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,6,3,,
,,,,,6,,Conductivematerialintrusion,3,UseconformalcoatingonPCBA,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,6,3,,
,,,,,6,,Electromigration,3,MakesurePCBmanufacturerfollowsIPCstandards,DanielFransson,2015-02-10,,,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,DanielFransson,,2015-02-10,6,3,,
,,LIN,PoorConnection,LossorInterruptedCommunication,8,,Badsoldering,3,"Ensuresolderpastmaskistherightthickness,useKongsbergVaultcomponentswhendesigningtoensurethePasteMaskExpansionfollowsIPCstandards/isvalidatedinproduction",DanielFransson,2015-02-10,Verifythefirstboardswhenwereceivethem,DanielFransson,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,DanielFransson,,2015-02-10,8,3,,
,,,,,8,,Oxide,4,Rightchoiceofmaterial/connector,DanielMartensson,,,,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,,,,8,4,,
,,,,,8,,Tolerancesofterminals,2,Choiceofterminalisaccordingtoconnectormanufacturerspecs,DanielMartensson,,DVtesting,Bernt-OveHansson,,,,Consultcomponentspecialistwhenchoosingconnector,Noaction,,,,8,2,,
,,,,,8,,Vibration,3,Rightchoiceofconnector,DanielMartensson,,DVtesting,Bernt-OveHansson,,,,Consultcomponentspecialistwhenchoosingconnector,Noaction,,,,8,3,,
,,,,,8,,BadPCBRouting,3,Designmustbereviewedbeforemanufacturing,DanielFransson,2015-02-10,DVtesting,Bernt-OveHansson,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,DanielFransson,,2015-02-10,8,3,,
,,,Shorttoground,LINbusnotfunctionnal/Toohighcurrentflowingthroughconnector,8,,Waterintrusion,3,Correctchoiceofconnector.,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,8,3,,
,,,,,8,,Conductivematerialintrusion,3,Correctchoiceofconnector.,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,8,3,,
,,,,,8,,Electromigration,3,MakesurePCBmanufacturerfollowsIPCstandards,DanielFransson,2015-02-10,,,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,DanielFransson,,2015-02-10,8,3,,
,,,Shorttoacommunicationsignalpin,LINbusnotfunctionnal,8,,Waterintrusion,3,"UseconformalcoatingonPCBA.
Correctchoiceofconnector.",DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,8,3,,
,,,,,8,,Conductivematerialintrusion,3,"UseconformalcoatingonPCBA.
Correctchoiceofconnector.",DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,8,3,,
,,,,,8,,Electromigration,3,MakesurePCBmanufacturerfollowsIPCstandards,DanielFransson,2015-02-10,,,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,DanielFransson,,2015-02-10,8,3,,
,,,ShorttoKL30,LINbusnotfunctionnal,8,,Waterintrusion,3,"UseconformalcoatingonPCBA.
Correctchoiceofconnector.",DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,8,3,,
,,,,,8,,Conductivematerialintrusion,3,"UseconformalcoatingonPCBA.
Correctchoiceofconnector.",DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,8,3,,
,,,,,8,,Electromigration,3,MakesurePCBmanufacturerfollowsIPCstandards,DanielFransson,2015-02-10,,,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,DanielFransson,,2015-02-10,8,3,,
,,GND,PoorConnection,Noorfloatingground,8,,Badsoldering,3,"Ensuresolderpastmaskistherightthickness,useKongsbergVaultcomponentswhendesigningtoensurethePasteMaskExpansionfollowsIPCstandards/isvalidatedinproduction",DanielFransson,2015-02-10,Verifythefirstboardswhenwereceivethem,DanielFransson,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,DanielFransson,,2015-02-10,8,3,,
,,,,,8,,Oxide,3,Rightchoiceofmaterial/connector,DanielMartensson,,,,,,,Consultcomponentspecialistwhenchoosingconnector,Noaction,,,,8,3,,
,,,,,8,,Tolerancesofterminals,2,Choiceofterminalisaccordingtoconnectormanufacturerspecs,DanielMartensson,,DVtesting,Bernt-OveHansson,,,,Consultcomponentspecialistwhenchoosingconnector,Noaction,,,,8,2,,
,,,,,8,,Vibration,3,Rightchoiceofconnector,DanielMartensson,,DVtesting,Bernt-OveHansson,,,,Consultcomponentspecialistwhenchoosingconnector,Noaction,,,,8,3,,
,,,,,8,,BadPCBRouting,3,Designmustbereviewedbeforemanufacturing,DanielFransson,2015-02-10,DVtesting,Bernt-OveHansson,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,DanielFransson,,2015-02-10,8,3,,
,,,Shorttoacommunicationsignalpin,Noiseinducedintheground/toomuchcurrentinconnector,8,,Waterintrusion,3,"UseconformalcoatingonPCBA.
Correctchoiceofconnector.",DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,8,3,,
,,,,,8,,Conductivematerialintrusion,3,UseconformalcoatingonPCBA.Correctchoiceofconnector.,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,8,3,,
,,,,,8,,Electromigration,3,MakesurePCBmanufacturerfollowsIPCstandards,DanielFransson,2015-02-10,,,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,,DanielFransson,,2015-02-10,8,3,,
,,,Shorttopower/wake-uppin,Toohighcurrentinconnector,8,,Waterintrusion,3,UseconformalcoatingonPCBA.Correctchoiceofconnector.,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,8,3,,
,,,,,8,,Conductivematerialintrusion,3,"UseconformalcoatingonPCBA.
Correctchoiceofconnector.",DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,8,3,,
,,,,,8,,Electromigration,3,MakesurePCBmanufacturerfollowsIPCstandards,DanielFransson,2015-02-10,,,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,DanielFransson,,2015-02-10,8,3,,
,,CAN-HIGH,PoorConnection,NoorInterruptedCommunication,8,,Badsoldering,3,"Ensuresolderpastmaskistherightthickness,useKongsbergVaultcomponentswhendesigningtoensurethePasteMaskExpansionfollowsIPCstandards/isvalidatedinproduction",DanielFransson,2015-02-10,Verifythefirstboardswhenwereceivethem,DanielFransson,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,DanielFransson,,2015-02-10,8,3,,
,,,,,8,,Oxide,3,Rightchoiceofmaterial/connector,DanielMartensson,,,,,,,Consultcomponentspecialistwhenchoosingconnector,Noaction,,,,8,3,,
,,,,,8,,Tolerancesofterminals,2,Choiceofterminalisaccordingtoconnectormanufacturerspecs,DanielMartensson,,DVtesting,Bernt-OveHansson,,,,Consultcomponentspecialistwhenchoosingconnector,NoAction,,,,8,2,,
,,,,,8,,Vibration,3,Rightchoiceofconnector,DanielMartensson,,DVtesting,Bernt-OveHansson,,,,Consultcomponentspecialistwhenchoosingconnector,NoAction,,,,8,3,,
,,,,,8,,BadPCBRouting,3,Designmustbereviewedbeforemanufacturing,DanielFransson,2015-02-10,DVtesting,Bernt-OveHansson,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,DanielFransson,,2015-02-10,8,3,,
,,,Shorttopower/wake-uppin,CANbusnotworking,8,,Waterintrusion,3,UseconformalcoatingonPCBA,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,8,3,,
,,,,,8,,Conductivematerialintrusion,3,UseconformalcoatingonPCBA,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,8,3,,
,,,,,8,,Electromigration,3,MakesurePCBmanufacturerfollowsIPCstandards,DanielFransson,2015-02-10,,,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,DanielFransson,,2015-02-10,8,3,,
,,,Shorttoothercommunicationpin,CANbusnotworking,8,,Waterintrusion,3,UseconformalcoatingonPCBA,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,8,3,,
,,,,,8,,Conductivematerialintrusion,3,UseconformalcoatingonPCBA,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,8,3,,
,,,,,8,,Electromigration,3,MakesurePCBmanufacturerfollowsIPCstandards,DanielFransson,2015-02-10,,,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,DanielFransson,,2015-02-10,8,3,,
,,CAN-LOW,PoorConnection,NoorInterruptedCommunication,8,,Badsoldering,3,"Ensuresolderpastmaskistherightthickness,useKongsbergVaultcomponentswhendesigningtoensurethePasteMaskExpansionfollowsIPCstandards/isvalidatedinproduction",DanielFransson,2015-02-10,Verifythefirstboardswhenwereceivethem,DanielFransson,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,DanielFransson,,2015-02-10,8,3,,
,,,,,8,,Oxide,3,Rightchoiceofmaterial/connector,DanielMartensson,,,,,,,Consultcomponentspecialistwhenchoosingconnector,NoAction,,,,8,3,,
,,,,,8,,Tolerancesofterminals,2,Choiceofterminalisaccordingtoconnectormanufacturerspecs,DanielMartensson,,DVtesting,Bernt-OveHansson,,,,Consultcomponentspecialistwhenchoosingconnector,NoAction,,,,8,2,,
,,,,,8,,Vibration,3,Rightchoiceofconnector,DanielMartensson,,DVtesting,Bernt-OveHansson,,,,Consultcomponentspecialistwhenchoosingconnector,NoAction,,,,8,3,,
,,,,,8,,BadPCBRouting,3,Designmustbereviewedbeforemanufacturing,DanielFransson,2015-02-10,DVtesting,Bernt-OveHansson,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,DanielFransson,,2015-02-10,8,3,,
,,,Shorttopower/wake-uppin,CANbusnotworking,8,,Waterintrusion,3,UseconformalcoatingonPCBA,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,8,3,,
,,,,,8,,Conductivematerialintrusion,3,UseconformalcoatingonPCBA,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,8,3,,
,,,,,8,,Electromigration,3,MakesurePCBmanufacturerfollowsIPCstandards,DanielFransson,2015-02-10,,,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,DanielFransson,,2015-02-10,8,3,,
,,,Shorttoothercommunicationpin,CANbusnotworking,8,,Waterintrusion,3,UseconformalcoatingonPCBA,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,8,3,,
,,,,,8,,Conductivematerialintrusion,3,UseconformalcoatingonPCBA,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,8,3,,
,,,,,8,,Electromigration,3,MakesurePCBmanufacturerfollowsIPCstandards,DanielFransson,2015-02-10,,,,,,FollowIPCandKAguidelinesregardingPCBmanufacturing,VisualinspectionwhenreceivingthefirstPCBassemblies,DanielFransson,,2015-02-10,8,3,,
,,PowerSupply,,,,,,,,,,,,,,,,,,,,,,,
,,Deliver5V,TooHighVoltage,Breakcomponentsandlossofprimaryfunction,8,,Shortcircuitbetweeninputandoutputofregulator,1,UseconformalcoatingonPCBA,DanielFransson,,DVtesting,Bernt-OveHansson,,,,Testinlab,Dointegrationtestsearly,,,,8,1,,
,,,TooLowVoltage,lossofprimaryfunctionorUnexpectedbehaviorduetounknownlogicstate,9,,Opencircuitinpowerdeliverychain,2,ImplementadequateuClowvoltagereset,DanielFransson,2015-02-10,DVtesting,Bernt-OveHansson,,,,Runsimulationstoseethebehaviorofthepowersupply,RunelectricaltestinginlabBEFOREgoingtoDVtestingandpushtheboarduntilitbreakstoseeitslimits,DanielFransson,,2015-02-10,9,2,,
,,,,,9,,Toohighloadatoutput,3,ImplementadequateuClowvoltagereset,DanielFransson,2015-02-10,,,,,,Runsimulationstoseethebehaviorofthepowersupply,RunelectricaltestinginlabBEFOREgoingtoDVtestingandpushtheboarduntilitbreakstoseeitslimits,DanielFransson,,2015-02-10,9,3,,
,,,,,9,,Shortcircuittogroundonoutput,3,ImplementadequateuClowvoltagereset,DanielFransson,2015-02-10,DVtesting,Bernt-OveHansson,,,,Runsimulationstoseethebehaviorofthepowersupply,RunelectricaltestinginlabBEFOREgoingtoDVtestingandpushtheboarduntilitbreakstoseeitslimits,DanielFransson,,2015-02-10,9,3,,
,,,,,9,,Shortcircuittogroundatinput,3,ImplementadequateuClowvoltagereset,DanielFransson,2015-02-10,DVtesting,Bernt-OveHansson,,,,Runsimulationstoseethebehaviorofthepowersupply,RunelectricaltestinginlabBEFOREgoingtoDVtestingandpushtheboarduntilitbreakstoseeitslimits,DanielFransson,,2015-02-10,9,3,,
,,,,,9,,Incorrectinputfromcar,3,ImplementadequateuClowvoltagereset,DanielFransson,2015-02-10,DVtesting,Bernt-OveHansson,,,,Runsimulationstoseethebehaviorofthepowersupply,RunelectricaltestinginlabBEFOREgoingtoDVtestingandpushtheboarduntilitbreakstoseeitslimits,DanielFransson,,2015-02-10,9,3,,
,,,Unstablevoltageoutput,Breakcomponentsandlossofprimaryfunction,8,,Toobigloadatoutput,3,Reviewdesignofschematic,DanielFransson,2015-02-10,,,,,,Runsimulationstoseethebehaviorofthepowersupply,RunelectricaltestinginlabBEFOREgoingtoDVtestingandpushtheboarduntilitbreakstoseeitslimits,DanielFransson,,2015-02-10,8,3,,
,,,,,8,,Wrongchoiceofcomponents,3,Reviewdesignofschematic,DanielFransson,2015-02-10,DVtesting,Bernt-OveHansson,,,,Runsimulationstoseethebehaviorofthepowersupply,RunelectricaltestinginlabBEFOREgoingtoDVtestingandpushtheboarduntilitbreakstoseeitslimits,DanielFransson,,2015-02-10,8,3,,
,,,,,8,,Frequencyandamplitudeofoutputcurrent,7,Simulation/Calculationtoverify/validatedesign,DanielFransson,2015-02-10,DVtesting,Bernt-OveHansson,,,,Runsimulationstoseethebehaviorofthepowersupply,RunelectricaltestinginlabBEFOREgoingtoDVtestingandpushtheboarduntilitbreakstoseeitslimits,DanielFransson,,2015-02-10,8,7,,
,,,,Unexpectedbehaviorduetounknownlogicstate,9,,Toobigloadatoutput,3,ImplementadequateuClowvoltagereset,DanielFransson,2015-02-10,,,,,,Runsimulationstoseethebehaviorofthepowersupply,RunelectricaltestinginlabBEFOREgoingtoDVtestingandpushtheboarduntilitbreakstoseeitslimits,DanielFransson,,2015-02-10,9,3,,
,,,,,9,,Wrongchoiceofcomponents,3,ImplementadequateuClowvoltagereset,DanielFransson,2015-02-10,DVtesting,Bernt-OveHansson,,,,Runsimulationstoseethebehaviorofthepowersupply,RunelectricaltestinginlabBEFOREgoingtoDVtestingandpushtheboarduntilitbreakstoseeitslimits,DanielFransson,,2015-02-10,9,3,,
,,,,,9,,Frequencyandamplitudeofoutputcurrent,7,ImplementadequateuClowvoltagereset,DanielFransson,2015-02-10,DVtesting,Bernt-OveHansson,,,,Runsimulationstoseethebehavi
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2024年度LED屏幕亮度調(diào)節(jié)與節(jié)能改造合同
- 2024年度知識(shí)產(chǎn)權(quán)保護(hù)合同:MLB棒球帽正品知識(shí)分享
- 2024年度物業(yè)服務(wù)合同標(biāo)的及安全生產(chǎn)責(zé)任書
- 2024年多功能空調(diào)維修合作協(xié)議
- 2024裝修合同該如何寫范文
- 2024辦公家具購買合同
- 2024年城市基礎(chǔ)設(shè)施建設(shè)合同 with 工程質(zhì)量與投資預(yù)算
- 2024年出版發(fā)行代理合同
- 【初中生物】脊椎動(dòng)物(第2課時(shí)兩棲動(dòng)物和爬行動(dòng)物) 2024-2025學(xué)年七年級(jí)生物上學(xué)期(人教版2024)
- 2024加工貿(mào)易合同
- 小學(xué)校本課程-海上飛行家教學(xué)設(shè)計(jì)學(xué)情分析教材分析課后反思
- GB/T 19973.1-2023醫(yī)療保健產(chǎn)品滅菌微生物學(xué)方法 第1部分:產(chǎn)品上微生物總數(shù)的確定
- ISO27001信息安全管理體系整套資料匯編
- 鑒賞家-教學(xué)講解課件
- 5.11.互聯(lián)網(wǎng)上網(wǎng)服務(wù)營業(yè)場所安全審查意見書
- 注塑成型參數(shù)條件表
- 苯-甲苯二元混合液連續(xù)精餾的工藝設(shè)計(jì)和塔設(shè)備設(shè)計(jì)-化工課程設(shè)計(jì)
- 普通話考試說話題談?wù)劼殬I(yè)道德
- 撬裝式加油站安全操作規(guī)程
- 認(rèn)識(shí)實(shí)習(xí)任務(wù)書土木工程
- 業(yè)主警告物業(yè)管理公司的致物業(yè)管理公司告知函
評(píng)論
0/150
提交評(píng)論