文檔簡介

CSPCNANHAIPETROCHEMICALSPROJECTCSPC南海石化項目WorkingInstruction

OfCoolingWaterPipelinesInstallation循環(huán)水管道安裝作業(yè)指導書ProjectProcedure:WI-8710-8100-2005項目程序:WI-8710-8100-2005SEPCOElectricalPowerConstructionCorporation山東電力基本建設總公司版次日期出版原因編寫校核審查批準A17July03IssueForReviewAndApprovalDiaoyanhuaLiHongJuChenHuiYouDingPeiSheng0031August03IssueforimplementationDiaoyanhuaLiHongJuChenHuiYouDingPeiSheng0127October03ReissueforimplementationLiudongxianTiandexunZhaoxieShideping0215November03ReissueforapprovalLiudongxianTiandexunZhaoxieShideping0328November03ReissueforapprovalLiudongxianTiandexunZhaoxieShideping目錄contents1.0范圍scope32.0目的purpose33.0職責responsibility34.0概述general35.0編制依據(jù)reference46.0施工工藝及要求constructionprocessandrequirement47.0程序升版說明updatedescription178.0附圖attacheddrawing179.0工作安全分析(JSA)17范圍scope本程序適用于南海石化項目汽電聯(lián)產(chǎn)部分,四臺蒸汽輪機循環(huán)冷卻水管道(CW)安裝、檢驗和試驗。ThisprocedureisapplicabletotheCWpipes’erection、inspectionandacceptance.2.0目的purpose本程序規(guī)范循環(huán)水管道的安裝、檢驗和試驗,規(guī)定了管道的安裝工藝、順序以及施工中應注意的事項。Thisproceduredefinesthepipes’erectionprocess、flowandattenteditemstoensuringpipes’erection、inspectionandacceptance.3.0職責responsibility3.1山東電建二公司負責循環(huán)冷卻水(CW)玻璃鋼管道的安裝、檢驗和試驗。SEP2isresponsiblefortheerection,inspectionandacceptanceoftheGRPCWpipe.3.2山東電建一公司負責循環(huán)水管道的管溝開挖。SEP1isresponsibleforthepipechannel’sexcavation.3.3基建總公司負責接口協(xié)調(diào)和質(zhì)量驗收。SEPCOisresponsiblefortheinterfacecoordinationandqualityinspection.4.0概述general4.1廠區(qū)位于大亞灣北海岸附近,地下水位在地表1.5米,循環(huán)水母管管中心標高為3.35mHHD。TheS&PprojectlocatesattheroundofnorthcoastofDayabay.Theundergroundwaterlevelisat1.5moftheearth’ssurface.Thecentralelevationofcentralcoolingwatermainpipeis3.335mHHD.4.2循環(huán)冷卻水管道(CW)采用玻璃鋼夾砂管,剛度為SN5000,設計壓力為0.8MPa,介質(zhì)為淡水,設計溫度為80℃;工作壓力為0.464Mpa;輸送介質(zhì)為河水,水溫為34℃~42℃。ThecoolingwaterpipesareGRPpipe,whichstiffnessisSN5000,andthedesignpressureis0.8Mpa.Thepipesusefreshwater,thedesigntemperatureis80℃,theworkingpressureis0.464Mpa;thetransfermediumisriverwater,andtheworkingtemperatureis34℃~42℃.4.3循環(huán)水管道埋設在地下,主管為變截面設計,規(guī)格有DN2000、DN1500、DN1000,支管為DN800、DN600、DN200。另有少許DN100、DN40、DN15放水排氣管道。進口主管長度約200米,出口主管長度約250米。ThemainpipesofCWpipeswhichareundergroundarevariablecross-sectionpipes.Themainpipes’sizesareDN2000,DN1500andDN1000andthebranchareDN800,DN600andDN200.TherearealsosomedrainagepipeswhichsizesareDN100,DN40,andDN15.Thelengthoftheinletpipeisabout200mandtheoutletisabout250m.4.4DN>200mm的管道間采用雙”O(jiān)”型帶鎖緊承插接頭連接,短接管、支管和主管的連接采用現(xiàn)場開孔、粘結(jié)的方法;DN≤200mm的管道采用套管對接并粘結(jié)的連接方法。 Thepipeswhichdiameterismorethan200mmarejoinedbydoubleOtightsocket,Thenipple、mainandbranchpipesarejoinedthroughtappingorbonding.Thepipeswhichdiameterislessthan200mmarejoinedbysleevejointorbuttfelt.4.4汽機房兩側(cè)的循環(huán)水管道上側(cè)路面為混凝土鋪設的路面。Theupsideroad’ssurfaceofCWpipeonbothsidesofturbinehallisconcrete.5.0編制依據(jù)reference5.1DEP31.40.10.19《GRPpipelinesandpipingsystems》5.2GB50268-97《給排水管道工程施工及驗收技術(shù)規(guī)范》GB50268-97Supplyanddrainagepipeconstructionandacceptancetechnicalspecification.5.3QC-8420-8300-0002《循環(huán)水管道安裝質(zhì)量檢驗計劃》QC-8420-8300-0002Coolingwaterpipelineerectionqualityinspectionplan5.4施工圖紙constructiondrawing51-8230-8100-300051-8230-8100-3002~300551-8230-8100-3006(1/2)51-8230-8100-3006(2/2)51-8230-8100-3007~301044-8320-8100-0559~056144-8320-8100-0600~06105.5CECS129:01《埋地給水排水玻璃纖維增強熱固性樹脂夾砂管管道工程施工及驗收》Embeddedsupplyanddrainglassfiberreinforcedheathardeningresinsandpipeconstructionandacceptance5.6廠家資料《纖維纏繞玻璃鋼管安裝埋地手冊》Manufacturerdocument:《GRPpipelayingmanual》6.0施工工藝和要求constructionprocessandrequirement6.1循環(huán)水管道安裝的施工工藝流程圖:flowchartforCWpipeerection運輸管子、管件到現(xiàn)場transportpipeandfittingtosite溝槽開挖、驗收trenchexcavationandacceptance施工準備constructionpreparation運輸管子、管件到現(xiàn)場transportpipeandfittingtosite溝槽開挖、驗收trenchexcavationandacceptance施工準備constructionpreparation管溝回填trenchbackfill管道安裝pipeerection承插口打壓試驗hydraulictestforbellandsocket管溝回填trenchbackfill管道安裝pipeerection承插口打壓試驗hydraulictestforbellandsocket管道整體打壓試驗overallhydraulictestforpipe路面鋪砌roadpavement全部回填overallbackfill管道整體打壓試驗overallhydraulictestforpipe路面鋪砌roadpavement全部回填overallbackfill6.2主要機具tools6.2.1主要機具:16t汽車吊、50t汽車吊、潛水泵、手動試壓泵、電動試壓泵。Maintools:16ttruckcrane、50ttruckcrane,submergedpump,manualpump,motorpump6.3施工準備Installationpreparation6.3.1施工前仔細審閱圖紙,熟悉系統(tǒng)。Reviewdrawingscarefullybeforeconstruction.6.3.2了解規(guī)范和標準的要求,掌握質(zhì)量要求和驗收標準,簽質(zhì)量檢驗計劃。Understandtherequirementofspecificationandstandard,andmasterqualityrequirementandacceptancecodeandissueI&TPlan.6.3.3對施工人員進行安全、技術(shù)交底。Makesafetyandtechnologyclarificationtotheconstructionpersonnel.6.3.4溝槽驗收channelacceptance管溝截面尺寸符合圖紙51-8230-810-3002。Thesectionsizeofpipechannelapplieswithdrawing51-8230-810-3002.墊層厚度符合設計要求(150mm),并夯實(夯實程度為95%SPD);墊層應平整,用水準儀每12米檢測一次墊層的標高。Thepipesandbeddingmeetdesignrequirements(150mm)andramdown.(Theramextentis95%SPD).Smooththecushionandchecktheelevationofcushionatevery12metersbyusingoflevel.管溝無滑坡、積水、淤泥。由于開挖深度超過地下水位,應設置臨時排水溝或集水坑。Thereisnoslipslope,seeperandsiltofthetrench.Astheexcavationdepthisoverundergroundwaterlevel,setuptemporarydrainditchandsumppit.承插口安裝處的凹槽開挖完畢,凹槽尺寸符合設計要求,以便于整個管身底部放在砂墊層上,均勻受力。Theexcavationofthejointgrooveiscompletedandthegroovesizemeetsdesignrequirements.Thus,placethebottomofpipeonthesandcushiontobearforceevenly.彎頭、三通、變徑管、盲端、閥門等處的固定支墩充分凝固并安裝完畢,符合設計要求。Thefixedpiersattheelbow,tee,reducingpipe,pipeendsideandvalveshouldbehardenedfullyandcompletederectingtomeetingdesignrequirement.6.3.5管道的運輸及現(xiàn)場布管pipetransportationandlayingatsite裝卸時須使用專用的吊裝索具(纖維繩),防止碰損。運輸時應墊穩(wěn)、綁牢,不得相互撞擊,在運輸?shù)浆F(xiàn)場過程中要有技術(shù)管理人員監(jiān)護。Whenloadingandunloading,specialslingsshouldbeusedtopreventdamage.Thepipeshouldbesteadyandboundfirm.Itisnotallowedtofouleachother.Atechnicalmanagementpersonmustmonitorthetransportation.由于管道安裝為逆水流方向安裝,因此將管子、管道連接附件等依次沿一側(cè)管溝擺放。特別注意應將每根管的承口朝向設計水流相反的方向。管道安裝的詳細順序見附圖1Asthepipeerectiondirectionisthereversecurrentdirection,thepipe,fitting,etc.shouldbeputalongonesideofthechannel.Payspecialattentiontothebelldirection.Itshouldbeexposedtotheoppositedirectionofthecurrent.Thedetailsequenceofpipeerectionseesattacheddrawing1.檢查管材、管件的合格證,對管材的規(guī)格、配合尺寸、外觀等進行全面檢查。Checkthecertificateoftubesandpipemeterials.Finalcheckthespecification,matchingsizeandappearance.管道存放時應均勻支撐,防止管材變形、碰損。Thepipeshouldbesupportedevenlywhenplacingtopreventdeformationanddamageofthetubes.6.4管道安裝pipeerection6.4.1根據(jù)施工順序及現(xiàn)場情況,吊車的擺放及行走路線見附圖1。Accordingtotheconstructionsequenceandsitecondition,thearrangementofthecraneandtravelingrouteseeattacheddrawing1.6.4.2根據(jù)管道布置圖和管道的安裝方向,將第一根要安裝的管道用起重機緩慢吊入到管溝內(nèi),開始安裝。Accordingtothepipearrangementdrawinganderectiondirectionofthepipe,liftthefirstpipetobeerectedslowlybycranetothetrench,thenbegintoerect.安裝前應對管道進行復查,無標志、無編號或有缺陷者須查清修補后方可使用;承插口、橡膠圈應進行清理,不得有泥沙等雜物黏連。Reviewthepipebeforeerection.Thepipewithoutdesignation,numberandwithdefectcouldbeusedafterrepair.Cleanthebellandsocketandrubberring.Nosilt,etc.shouldadhere.用水準儀檢查管子的標高,標高偏差值值應在+30mm與-30mm之間。Checktheelevationofthepipebywaterlevel.Thetoleranceshallbewithin+30mm/-30mm.用線墜檢查管子的坐標,坐標偏差值應在+30mm與-30mm之間。Checkthecoordinateofthepipebywiregauge.Thetoleranceshallbewithin+30mm/-30mm.6.4.3然后,安裝下一節(jié)管道。連接前檢查承口和插口,在承口上安裝打壓嘴。Then,erectnextpipe.Checkthebellandsocketbeforeconnectinganderectnozzleonthebell.復查承口內(nèi)是否光滑,有無縱向的溝槽或直徑超過1.5mm的氣泡,如發(fā)現(xiàn)有溝槽或直徑超過1.5mm的氣泡,應在廠家技術(shù)人員指導下修復。。Reviewwhetherthesurfacewithinthebellissmoothandwhetherthereisanylongitudinalditchorairbubblewithdiameterover1.5mm.Anylongitudinalditchorairbubblefoundshallberepairedunderthedirectionoftechnicianfrommanufacturer.復查插口,其外表應光滑,無突出處?!癘”型圈槽的臺階及端面應無分層現(xiàn)象。如有則應在廠家技術(shù)人員指導下修復。Reviewwhetherthesurfaceofthesocketissmoothandwhetherthereisanyprotrusion.ThestepandendfaceofOrubberringmustnothaveanydelaminationphenomenon.Thedelaminationifanyshallberepairedunderthedirectionoftechnicianfrommanufacturer.復查“O”型橡膠圈,橡膠圈應無裂紋、氣泡、疙瘩、雜質(zhì)等。如有則應更換“O”型橡膠圈。Reviewwhetherthereisanycrack,airbubble,knobandforeignmatterontheOrubberring.Replacetheringifanyoftheaboveisfound.6.4.4將要連接的管段插口和承口調(diào)平、對中,清理連接區(qū)、環(huán)槽,并均勻涂上一層潤滑油,然后將“O”型圈套在插口環(huán)槽內(nèi),在“O”型圈套上也均勻涂上一層潤滑油。Adjustandalignthesocketandbelltobeconnected.Cleanjointingareaandringchannel.Coatalayeroflubricationevenly.PutOringtotheringchannelofthesocket.CoatalayeroflubricationonthesurfaceofOringevenly.6.4.5管道吊入管溝內(nèi)后,用龍門架(龍門架制造圖見附圖2)和手拉葫蘆等工具進行管口對接。管溝內(nèi)設專人指揮將插口對準前一管的承口,調(diào)整兩管在同一直線上,用兩只倒鏈對稱拉緊,將待安裝的管道拽進已安裝的管道承口內(nèi)。Afterthepipeislifttotheditch,joinbygantryframe(seeattachmentdrawing2)andchainblock.Aspecialpersonshouldbeassignedtodirectthejoin.Adjusttwopipesonthesameline.Tightensymmetricallywithtwochainblocks.Dragthepipetobeerectedintotheerectedbell.通常在插口上畫出深度限位線。安裝時,只需將插口拉進到限位線即可。Generally,drawthedepthlimitinglineonthebell.Itisonlyneedtopullthesockettothelimitinglinewhenerection.檢查管道的標高、坐標。Checktheelevationandcoordinateofthepipe.檢查承插口接頭的轉(zhuǎn)角,不得大于下表中的規(guī)定:Checktheturningontheconnectionofthebellandsocket.Thevalueoftheturningshouldbenomorethanthebelow.管道直徑Pipediameter(mm)許用轉(zhuǎn)角Allowableturning(°)管道偏移量(mm)Pipedeviation管道曲率半徑(m)Pipecurvatureradius3m6m12m3m6m12m<500315731462857115229500—900210520941986172344900--1800152105209172344688>18000.526527834468813766.4.6承插口打壓試驗,檢查雙"O"型密封圈的密封效果。Whenmakingbulgetestonthebellandsocket,checkthesealonthedoubleOsealingring.如承口上的打壓嘴在管道正上方,按照下列圖示連好裝置,加水打壓至管道設計壓力的1.5倍(12bar)。Ifthebulgemoutherectedonthebellandsocketisdirectlyaboveonthepipe,erectequipmentsaccordingtotheabovedrawing.Wateringuntilthepressurereach1.5timesofthepipedesignpressure(12bar).如承口上的打壓嘴不在管道正上方,按照下列圖示連好裝置,加水打壓至管道設計壓力的1.5倍(12bar)。Ifthebulgemoutherectedonthebellandsocketisnotdirectlyabovethepipe,erectequipmentsaccordingtothedrawingbelow.Wateringuntilthepressurereach1.5timesofthepipedesignpressure(12bar).試驗介質(zhì)采用潔凈的水。Thetestmediumusecleanwater.保壓10分鐘,根據(jù)壓降情況和泄漏情況檢查承插口的壓密性。Keepthepressurefor10minutes.Checkthetightnessofthebellandsocketaccordingtothepressuredropandleakage.如果承插口水壓試驗時不合格,須將不合格管段退出,重新進行安裝、試驗。退管應在廠家技術(shù)人員的指導下進行,防止退管時損壞管道承插口。Ifthebellandsocketisnotqualifiedwhenhydraulictest,dropouttheunqualifiedpipesection.Erectandtestagain.Pipewithdrawingshouldbedoneunderthemanufacturer’stechnicianinstruction.Bellandsocketofthepipeispreventedtobedamagedwhenpipewithdrawing.試驗完畢進行泄壓,因水量很少,直接排出少量水即可。Relievepressureaftertest.Dischargesomewaterdirectlyfortheamountofwaterisnotmuch.6.4.7試驗合格后,通過承口端的鎖緊棒的穿孔插入尼龍棒,通過尼龍棒的抗剪切能力來抗管道產(chǎn)生的軸向應力,插入前要在尼龍棒上均勻涂上潤滑油,不得有泄露,通過承口上的插入孔,向內(nèi)擠壓尼龍棒,注意應保證尼龍棒始終沿插口的切線方向推進,在推進的過程中要均勻用力,防止尼龍棒折斷。直到規(guī)定的長度完全插入。Afterthetestisqualified,insertthenylonbarthroughtheholeofthelockingrodonthebell.Usetheshearresistantabilitytoresisttheaxialstressarousedbythepipe.Thenylonbarshouldbecoatedlubricationoilevenlybeforeinsertion.Noleakageisallowed.Squeezethenylonbarthroughtheinsertholeonthebell.Payattentiontoensurethenylonbarshallbepushedalongtangentdirectionofthebell.Forceevenlywhenpushingtopreventthenylonbarbreakingtillthespecifiedlengthinsertcomplete.6.4.8上述工作完成后立即回填,承插口處應預留。管區(qū)采用分層回填,回填要求應符合GB50268-97《給排水管道工程施工及驗收技術(shù)規(guī)范》及圖紙51-8230-8100-3002上的要求。Backfillimmediatelyafterthecompletionoftheabovework,thesocketlshallbeobligated.Layeringbackfillshallbeadopted.BackfillrequirementsshallapplywithGB50268-97Supplyanddrainagepipeconstructionandacceptancetechnicalspecificationanddrawing51-8230-8100-3002.6.5部分主管和支管的連接采取現(xiàn)場開孔、粘結(jié)的連接方法,黏結(jié)處整體水壓試驗前不可回填,黏結(jié)工作由廠家技術(shù)人員完成,黏結(jié)時應考慮天氣對黏結(jié)工作的影響,并要有防塵保護措施。膠結(jié)過程應在2小時內(nèi)完成。由廠家檢測黏結(jié)質(zhì)量。黏結(jié)部位待整體水壓試驗合格后進行回填,。Theconnectionofthemainpipeandbranchusesitetappingandbonding.Nobackfillisallowedbeforeoverallhydraulictestofthebonding.Bondingworkshallbedonebytechnicianfrommanufacurer.Considertheinfluenceoftheweathertothebondinganddustprotectionmeasuresshouldbetaken.Cementingshouldbefinishedwithin2hours.Backfillaftertheoverallhydraulictestisqualified.6.6閥門的安裝Erectionofvalves6.6.1閥門到貨后應對閥門進行全面檢查,廠家資料應齊全,表面無沙眼,操作機構(gòu)靈活,水壓試驗合格。Carryoutanoverallinspectionafterthearrivalofvalves.Manufacturer’sdocumentshallbecomplete.Thereisn’tanyairpocketonthevalvesurfaceandtheoperationalpartshallbeflexible.6.6.2閥門搬運時不得損壞閥門,應按廠家要求儲存閥門。Donothurtvalvesduringtransportation.Storethemaccordingtomanufacturerrequirements.6.6.3閥門安裝根據(jù)介質(zhì)流向確定其安裝方向。Determinetheerectiondirectionaccordingtothemediumflowdirection.6.6.4檢驗閥門安裝的支撐,確定牢固后進行閥門的安裝,閥門的安裝位置應準確無誤。Inspectthesupportofvalveerectionandmakesureitisfirm.Theerectionpositionofthevalveshouldbecorrect.6.6.5閥門的墊片應平整,表面光滑,如表面有氣泡、溝槽,應更換合格墊片。Thevalvegasketshallbeflatandsmooth.Anygasketwithairbubbleorditchchannelonthesurfaceshallbereplaced.6.6.6閥門安裝前應清理干凈,自然連接,無強力連接。Beforeerection,valvesshallbecleanedupandtheconnectionshallbenaturely,withoutanyforcedconnection.6.6.7將安裝上的閥門進行調(diào)整,調(diào)整合適后將底角螺栓進行澆灌,固定閥門。Adjusttheerectedvalvesandthenpourthebaseboltstoanchorvalves.6.6.8檢查閥門的操作機構(gòu),操作機構(gòu)應靈活準確,無卡澀現(xiàn)象。Inspecttheoperationalpartofvalve.Makesureitisflexiblyandprecise.Noblockandunsmoothexist.6.6.9轉(zhuǎn)矩限制機構(gòu)的保護動作準確、可靠。開度指示機構(gòu)指示位置應正確。Protectionactionoftorquelimitmechanismshallbecorrectandreliable.Thedenotingpositionoftheopeningdenotingmechnismshallbecorrect.6.7過路管的安裝erectionofthepipecrossingroad6.7.1管道過路采用C20混凝土包層對玻璃鋼管道進行保護。GRPpipeshouldbeprotectedbyC20concretecladwhenthepipeiscrossingtheroad.6.7.2安裝過路管時,須在玻璃鋼管外表面纏上橡膠板或墊板作保護材料,同時在路的另一側(cè)設置一固定鋼支架,將倒鏈或緊繩器將玻璃鋼管從混凝土包層內(nèi)拉出,然后按正常連接方法將管道連接。Whenerectingthepipecrossingtheroad,twistrubberplateorbackplateontheoutsidesurfaceoftheGRPpipeasprotectionmaterial.Atthesametime,setafixedsteelsupportontheothersideoftheroad.DrawtheGRPpipefromtheconcretecladusingchainblockoreuphroe.Thenconnectthepipeusingthenormalconnectingmethod.6.7.3管道和混凝土包層間應采用水泥砂漿進行填充,填充時的最大灌漿壓力不得大于0.54bar。Fillthespacebetweenthepipeandtheconcretecladusingcementmortar.Themaximumgroutingpressureshouldbenomorethan0.54barwhenfilling.6.8 管道法蘭安裝erectionofpipeflange6.8.1法蘭安裝前,應檢查法蘭的壓力等級、規(guī)格、尺寸等參數(shù)是否符合設計要求,廠家資料應齊全。Checkwhetherthepressureclass,specificationandsizeoftheflangemeetthedesignrequirementbeforeerection.Manufacturer’sdocumentshallbeallcomplete.6.8.2 對檢查法蘭的密封面及密封墊片進行外觀檢驗,不得有影響密封性能的缺陷存在。Checkthesealingsurfaceandsealinggasketoftheflangevisually.Nodefectaffectingsealingperformanceexists.6.8.3檢查法蘭端面的垂直度,偏差不大于1mm。Checktheverticalityoftheflangeend.Thedeviationshouldbenomorethan1mm.6.8.4搬運法蘭不得碰壞法蘭的接觸面,應按生產(chǎn)廠家的要求進行存放。Theflangeinterfacemustnotbecollidedduringtransportation.Flangestorageshallmeetthemanufacturer’srequirements.6.8.5法蘭連接應保持同軸,并使用同一規(guī)格螺栓、螺母,安裝方向應一致,緊力均勻,并應露出2~3扣,螺紋處涂二硫化鉬。Theflangeconnectionshouldkeeponthesameaxleandusetheboltwithsamespecificationandsameerectiondirection.Tightensymmetricallyandevenly.Theextrusionlengthofthescrewshouldbe2-3timesofthepitch.Supramolyshallbecoatedonthescrewthread. 現(xiàn)場水壓試驗hydraulictestonsite管道在試驗前應具備下列條件:Thefollowingconditionsshouldbeavailablebeforetest:管道的坐標、標高、坡度檢查合格,除黏結(jié)處及承插口處露外,回填完畢。Thecoordinate,elevationandslopeofthepipeshouldbecheckedqualified.Backfillcompleteexceptthebondingconnectionandtheexposurepartofsocket.所有支管設置好堵板。Closureplateshallbeequippedforallbranchpipes.管道內(nèi)部雜物清理干凈。Cleantheinnersundriesinsidethepipe.管道系統(tǒng)上不參與試壓的設備、儀表、閥門等隔開,不得有安全閥、水錘消除器等附件。Blockofftheequipment,instrumentandvalvewhicharenotinvolvedinthetest.Noattachment,suchassafetyvalve,waterhammerandsilencerexist.試驗用臨時管道、閥門及壓力表等安裝完成,試驗用壓力表采用Y-150型,精度不低于1.5級,使用前應校正。Theerectionoftemporarypipe,valveandmanometerfortestarecomplete.UsethepressureguageofY-150.Theprecisionofthemanometerisnolessthan1.5degree.Adjustitbeforeuse.試驗段兩端封閉完成,不得采用閘閥作為堵板。臨時排水管道完成。Afterthebothendsofthetestsectionarefinished,itisnotallowedtousewedgevalveasplug.Temporarydrainagepipeiscomplete.管件的支墩、錨固設計已經(jīng)達到設計強度,未設支墩及錨固設施的管件,應采取加固措施。Thepierandanchorofthepipeisuptothedesignstrength.Reinforcementmeasuresshouldbetakenforthepipewithoutpierandanchor.注入試驗用水:waterfortestfilling試驗用水用Ф100的軟管從距試驗點最近的水源取水。ThewaterfortestisgotfromthenearestwatersourcefromthetestpointbyФ100hose.充水時為防止水錘沖擊,應緩慢充水,充水速度約為0.6m/s,最大不超過1.8m/s。此時,應打開管道高處的排氣閥1,待水灌滿后,關(guān)閉排氣閥和進水閥。Fillslowlytopreventwaterhammerstrikingduringwaterfilling.Thefillingspeedisabout0.6m/sandnotover1.8m/s.Atthistime,openeachhighventvalveonthepipe,Closetheventvalveandinletvalvewhenthewaterisfilledfull.將管道進行充分浸泡,浸潤時間為24小時。Soakthepipecompletelyfor24hours.用電動試壓泵試壓,壓力逐漸升高,加壓到一定數(shù)值時,停下來對管道進行檢查,無問題時繼續(xù)加壓,升至試驗壓力的時間不得小于1小時,以減少沖擊力。水壓試驗用于檢驗管道的強度,試驗壓力為1.5倍的設計壓力(12bar)。Testthepressurebymanualhydraulictestpumpormotortestpump.Thepressurewillbeincreasedgradually.Whenthepressurereachesacertainvalue,stopandcheckthepipe.Ifthereisnoproblem,increasethepressurecontinually.Thetimeforpressureincreasingtothetestpressureisnolessthan1hourthustodecreasetheimpactforce.Thehydraulictestisusedtotestthestrengthofthepipe.Thetestpressureis1.5timesofthedesignpressure(12bar).用泵加壓至工作壓力(4.64bar)時,暫停打壓,檢查管道有無泄漏。如無泄漏,繼續(xù)升壓到試驗壓力,保壓30分鐘,檢查接口、管身及壓力表等部件無破損及漏水現(xiàn)象時,如在試驗溫度下觀察10分鐘,下降壓力值不超過0.05Mpa,可認為合格。特別是三通、四通等現(xiàn)場粘結(jié)的附件,應檢查位置是否偏移、有無超過驗收標準規(guī)定的可見缺陷。Whenthepressureisincreasedtotheworkingpressurebypump(4.64bar),stopandchecktheleakageofthepipe.Ifthereisnoleakage,increasethepressurecontinuallytothetestpressure.Keepthepressurefor30minutes.Checktheconnection,pipebodyandmanometer.Ifitisobservedfor10minundertesttemperatureandthepressurereduceiswithin0.05Mpa,thenitisconsideredeligible.Whencheckingtheteeandcross,checktheobviousdefects,suchasdeviationandoverthestatementoftheacceptancestandard.水壓試驗合格后,可進行管道嚴密性試驗,用于檢驗管道的嚴密性。Afterthehydraulictestisqualified,makeleakagetestofthepipetochecktheleakage.嚴密性試驗壓力為1.1倍的設計壓力Thepressureforleakagetestis1.1timesofthedesignpressure.保壓時間不少于24小時,符合滲水量的標準可認為合格。滲水量標準見下表:Thetimeforkeepingthepressureshouldbenolessthan24hours.Itcannotbeconsideredeligibleuntiltheseepagestandardreaches.Theseepagestandardseethebelow:滲水量試驗管徑(mm)pipediameterforseepagequantitytest管道水壓試驗允許滲水量(L/min?Km)Allowableseepageforpipehydraulictest檢驗方法和器具Checkmethodandinstrument1001.40按GB50268進行。Accordingtothearticle64inGB502682001.986003.448003.9610004.4215005.0020006.26試驗過程中,每30分鐘記錄一次管道壓力。Recordthepipepressureevery30minutesduringtest.6.9.5水壓試驗完畢后,將進水管上閥門關(guān)閉,打壓用水不再排出。Afterthehydraulictestiscomplete,closethevalveontheinletpipe.Thewaterforthehydraulictestwillnotbedrained.6.9.6水壓試驗時,用專用堵頭封住試壓段的兩端,并和支撐貼緊,以防止打壓時管道沿軸向位移。Closethebothendsofthehydraulicsectionwithspecialplugwhenhydraulictestingandkeepclosetothesupporttopreventthepipedisplacingalongtheaxialdirection.6.9.7如果進行嚴密性試驗時,試驗壓力下降,那么可以采用下列方法決定管道是否嚴密:Ifthetestpressuredropswhenmakealeakagetest,determinewhetherthepipeistightusingthefollowingmethod:試驗段打壓至試驗壓力(1.1倍的設計壓力)后,每個小時記錄試驗壓力。如果壓力下降,采用補充水后重新加壓至試驗壓力。這樣通過補水重新打壓的方法保持24小時。Afterthepressureofthetestsectionreachesthetestpressure(1.1timesofthedesignpressure),recordthetestpressureeachhour.Ifthepressuredrops,increasethepressureagaintothetestpressurebyrefillingwater.Thismethodshouldbeusedwithin24hours.如果發(fā)現(xiàn)的每小時補水數(shù)量逐漸減少,應觀察補水量是否符合以上規(guī)定,如符合,那么就可以認為管道嚴密;如果不符合,那么可以認定管道不嚴密。Ifitisfoundthatthequantityofrefillingwaterisdecreasinggradually,observewhetherthequantityofrefillingwatermeettheabovestatement.Ifso,thepipeisconsideredtight.Ifnot,thepipeisconsiderednottight.6.9.8水壓試驗合格后進行整體回填并夯實,發(fā)現(xiàn)問題應及時處理,處理完畢重新進行試驗,只到水壓試驗合格為止。Afterthehydraulictestisqualified,makeanoverallbackfillandramdown.Treatwiththeproblemfoundintime.Thenmakeahydraulictestagaintillthetestisqualified.7.0附圖。Attacheddrawing8.0工作安全分析(JSA)附后。JSAisattachedbelow.DrawingDrawing:1附圖:1UNIT:mm單位:mm15000InstallOrderFromWestToEast安裝順序由東向西15000150001500015000InstallOrderFromWestToEast安裝順序由西向東15000CraneTravelAndPutLine吊車行走及擺放路線CraneTravelAndPutLine吊車行走及擺放路線constructioninceptdrop施工起始點CraneTravelAndPutLine吊車行走及擺放路線InstallOrderFromNorthToSouth安裝順序由北向南InstallOrderFromSouthtoNorth安裝順序由南向北UNIT:mm單位:mm15000InstallOrderFromWestToEast安裝順序由東向西15000150001500015000InstallOrderFromWestToEast安裝順序由西向東15000CraneTravelAndPutLine吊車行走及擺放路線CraneTravelAndPutLine吊車行走及擺放路線constructioninceptdrop施工起始點CraneTravelAndPutLine吊車行走及擺放路線InstallOrderFromNorthToSouth安裝順序由北向南InstallOrderFromSouthtoNorth安裝順序由南向北200030002500200030002500AJOBSAFETYANALYSIS工作安全分析Date(日期):JobTitle工作名稱:PipeTransportation管道運輸Location地點:Jobsite施工現(xiàn)場JSANoJSA編號:DEPARTMENT部門:汽機工程處SUPERVISOR主管人:TITLEOFPERSONWHODOESJOB工作執(zhí)行人職務:PREPAREDBY編制:REVIEWEDBY審查:APPROVEDBY批準:EnvironmentalConditions:環(huán)境條件Inside內(nèi)部Outside外部Cold冷Heat熱Wet濕Dust灰塵Vapors/Mist水汽Noise噪音Vibration震動Other其它HeavyRain大雨P(guān)rimaryJobFunctions&Position基本工作行動Lifting舉重Grasping抓取Pushing推Sitting座Reaching延伸Bending彎曲Kneeling跪Standing直立Pulling拖Squatting蹲Other其它SEQUENCEOFBASICJOBSTEPS工作步驟POTENTIALHAZARD潛在危險風險評估RAM(H、M、L)RECOMMENDEDACTIONORPROCEDURE控制行動措施ACTIONBY執(zhí)行人DATEDUE完成日期REMARK備注Controlofdriver駕駛?cè)藛T的控制Specialinjurycausedbycollisionorupsetofvehicle由撞車、翻車等引起的特殊傷害Mdrivershallundertakehisworkwithhislicense.hemusthavemuchexperienceondriving.itisstrictlyprohibitedtodrinkduringtransportation.車輛駕駛?cè)藛T要持證上崗,并且駕駛經(jīng)驗豐富,駕駛?cè)藛T在運輸過程中,嚴禁飲酒.Requirementfortransportvehicle運輸車輛的要求Injurebymovingvehicle車輛移動傷害Ltransportationvehiclemusthavegoodsafetyperformance.運輸車輛車況安全性能必須良好,Pollutionduetooilspill車輛露油造成環(huán)境污染Lleakageisstrictlyprohibited.嚴禁有泄露現(xiàn)象的發(fā)生。Pipeenclose管道的封閉Strikingagainstorstruckbymovingobject移動物體打擊Mitisnotallowedtomovevehicleduringpipeenclose.donotcastfastenrope.管道封閉過程中,車輛嚴禁移動。封車繩不可拋扔。Pipeslideduetounstableenclose管道封閉不牢滑落Lafterloadingonpipes,enclosepipesecurelyinthetruck.checktheropeconditionattimes.管道應封車牢固,運輸過程中要定時檢查。Traveloftransportationvehicle運輸車輛的行駛Injurebymovingvehicle車輛移動傷害Lthespeedoftransportationvehiclecannotexceed30km/handcannotexceed15km/hafterenteringjobsite.運輸車輛在行駛的過程中,車速不得超過30公里/小時,進入現(xiàn)場車速不得超過15公里/小時。Controlofcompetentpersonnel監(jiān)護人員的控制Slip,triporfallonsamelevel滑倒、絆倒或墜落;Ltakecareoftheroadunderfootwhilewalking.行走過程中注意腳下。Injurebymovingvehicle車輛移動傷害;Mduringtransportation,competentpersonnelcannotsitinthecarriageorwalkinfrontofthevehicle,keepatleast2mawayfromthevehicle運輸車輛在行駛過程中,監(jiān)護人員不得坐在車廂內(nèi),不得在車輛前走動,距行使車輛距離應在2米外。ListofSpecificHazards詳細風險列表:潛在危險編號中第3、6、7、12、13、17、21項。ChemicalList化學列表JSA實施總結(jié)及措施改進施工主管人:日期:CodeofPotentialHazards潛在危險編號Trappedinorbetweenobjects.圍困2.Injuredwhistliftingorcarrying.舉起或搬運受傷3.Slip,triporfallonsamelevel滑倒絆倒或墜落4Fallofpersonfromheight高空墜落5Strikingagainstfixedorstationaryobject固定物體打擊6.Strikingagainstorstruckbymovingobject移動物體打擊7steppingonobject踏在物體上8Exposuretoorcontactwithharmfulsubstance接觸或揭漏有害物9Contactwithelectricityorelectricdischarge觸電10Trappedbycollapsingoroverturningobject毀壞或傾翻物體而受限11struckbyfallingobject落物傷人12Injurebymovingvehicle車輛移動傷害13contactwithmovingmachineryorobjectbeingmachined接觸移動機械14Exposuretofire火災15Exposuretoexplosion爆炸16Injurybyhandtool傳遞工具傷害17Injurebyfallofground地面跌倒傷害18Asphyxiation窒息19Contactwithhotsurfaceorsubstance燙傷20poising懸空21specific特殊參加培訓交底人員簽字:HSE監(jiān)護人簽字:施工主管人簽字:BJOBSAFETYANALYSIS工作安全分析Date(日期):JobTitle工作名稱:loadingandunloadingofpipe管道裝卸車LOCATION地點:Jobsite施工現(xiàn)場JSANoJSA編號:DEPARTMENT部門:汽機工程處SUPERVISOR主管人:TITLEOFPERSONWHODOESJOB工作執(zhí)行人職務:PREPAREDBY編制:REVIEWEDBY審查:APPROVEDBY批準:EnvironmentalConditions環(huán)境條件Inside內(nèi)部Outside外部Cold冷Heat熱Wet濕Dust灰塵Vapors/Mist水汽Noise噪音Vibration震動Other其它HeavyRain大雨P(guān)rimaryJobFunctions&Position基本工作行動Lifting舉重Grasping抓取Pushing推Sitting座Reaching延伸Bending彎曲Kneeling跪Standing直立Pulling拖Squatting蹲Other其它SEQUENCEOFBASICJOBSTEPS工作步驟POTENTIALHAZARD潛在危險風險評估RAM(H、M、L)RECOMMENDEDACTIONORPROCEDURE控制行動措施ACTIONBY執(zhí)行人DATEDUE完成日期REMARK備注Loading裝車舉起或搬運受傷DamagewhenliftingandhandlingL搬運物體注意周圍環(huán)境。Payattentiontothearoundwhenhandling.觸電ElectricshockM車上方有電線時,要有防觸電措施。Electricshockmeasuresshouldbetakenwhenthetherearewiresoverheadonthevehicle.移動物體打擊StrikingbymovingobjectH管件不可拋扔,管道放置時小心謹慎。Thepipefittingscannotbethrew.Takenoticewhenplacingthepipe.高空墜落FallfromoverheadM當車的高度高于1.8米時,應有防墜落措施。Fallpreventionmeasuresshouldbetakenwhentheheightofthevehicleisabove1.8m.車輛移動傷害Damagebyvehiclemovin

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
  • 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論