GB/T 51026-2014 石油庫(kù)設(shè)計(jì)文件編制標(biāo)準(zhǔn):英文_第1頁(yè)
GB/T 51026-2014 石油庫(kù)設(shè)計(jì)文件編制標(biāo)準(zhǔn):英文_第2頁(yè)
GB/T 51026-2014 石油庫(kù)設(shè)計(jì)文件編制標(biāo)準(zhǔn):英文_第3頁(yè)
GB/T 51026-2014 石油庫(kù)設(shè)計(jì)文件編制標(biāo)準(zhǔn):英文_第4頁(yè)
GB/T 51026-2014 石油庫(kù)設(shè)計(jì)文件編制標(biāo)準(zhǔn):英文_第5頁(yè)
已閱讀5頁(yè),還剩83頁(yè)未讀, 繼續(xù)免費(fèi)閱讀

付費(fèi)閱讀全文

版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

NATIONALSTANDARD

OFTHEPEOPLE'SREPUBLICOFCHINA

STANDARDFORCOMPILATIONOFTHE

DESIGNDOCUMENTOFOILDEPOT

GB/T51026-2014

DevelopedbyChinaPetrochemicalCorporation

ApprovedbyTheMinistryofHousingandUrban-RuralDevelopmentof

thePeople'sRepublicofChina

ImplementationDateMay1,2015

ChinaPlanningPress

Beijing2020圖書(shū)在版編目(CIP)數(shù)據(jù)

GB/T51026-2014石油庫(kù)設(shè)計(jì)文件編制標(biāo)準(zhǔn):英文/

中華人民共和國(guó)住房和城鄉(xiāng)建設(shè)部組織編譯.--北京:

中國(guó)計(jì)劃出版社,2021.2

ISBN978-7-5182-1268-2

Ⅰ.①G…Ⅱ.①中…Ⅲ.①油庫(kù)—設(shè)計(jì)規(guī)范—中國(guó)

—英文Ⅳ.①TE972-65

中國(guó)版本圖書(shū)館CIP數(shù)據(jù)核字(2021)第035355號(hào)

ChineseeditionfirstpublishedinthePeople'sRepublicofChinain2014

EnglisheditionfirstpublishedinthePeople'sRepublicofChinain2020

byChinaPlanningPress

rd

3Floor,CTower,GuohongBuilding

No.A11,Muxidi-Beili,XichengDistrict

Beijing,100038

PrintedinChinabyBeijingJingyintangGraphicPrintingCenter

?2014bytheMiinistryofHousingandUrban-RuralDevelopmentof

thePeople'sRepublicofChina

Allrightsreserved.Nopartofthispublicationmaybereproducedortransmittedinanyformor

byanymeans,graphic,electronic,ormechanical,includingphotocopying,recording,

oranyinformationstorageandretrievalsystems,withoutwrittenpermissionofthepublisher.

Thisbookissoldsubjecttotheconditionthatitshallnot,bywayoftradeorotherwise,belent,

resold,hiredoutorotherwisecirculatedwithoutthepublisher'spriorconsentinanyformof

blindingorcoverotherthanthatinwhichthisispublishedandwithoutasimilarcondition

includingthisconditionbeingimposedonthesubsequentpurchaser.

ISBN978-7-5182-1268-2中華人民共和國(guó)住房和城鄉(xiāng)建設(shè)部公告

2021年第11號(hào)

住房和城鄉(xiāng)建設(shè)部關(guān)于發(fā)布《纖維增強(qiáng)塑料

設(shè)備和管道工程技術(shù)規(guī)范》等7項(xiàng)

工程建設(shè)標(biāo)準(zhǔn)英文版的公告

現(xiàn)批準(zhǔn)《纖維增強(qiáng)塑料設(shè)備和管道工程技術(shù)規(guī)范》(GB51160-2016)、《工業(yè)企業(yè)電氣

設(shè)備抗震鑒定標(biāo)準(zhǔn)》(GB50994-2014)、《石油庫(kù)設(shè)計(jì)文件編制標(biāo)準(zhǔn)GB》(/T51026-2014)、

《石油化工工程地震破壞鑒定標(biāo)準(zhǔn)》(GB50992-2014)、《鋼鐵工業(yè)環(huán)境保護(hù)設(shè)計(jì)規(guī)范》

(GB50406-2017)、《鋼鐵工業(yè)資源綜合利用設(shè)計(jì)規(guī)范GB》(50405-2017)《、尾礦設(shè)施設(shè)計(jì)

規(guī)范》(GB50863-2013)英文版。工程建設(shè)標(biāo)準(zhǔn)英文版與中文版出現(xiàn)異議時(shí),以中文版為準(zhǔn)。

以上7項(xiàng)工程建設(shè)標(biāo)準(zhǔn)英文版由住房和城鄉(xiāng)建設(shè)部組織中國(guó)計(jì)劃出版社有限公司出版

發(fā)行。

中華人民共和國(guó)住房和城鄉(xiāng)建設(shè)部

2021年1月25日

AnnouncementoftheMinistryofHousingandUrban-Rural

DevelopmentofthePeople'sRepublicofChina

No.526

AnnouncementoftheMinistryofHousingandUrban-RuralDevelopment

ofthePeople'sRepublicofChinaonIssueofNationalStandardTitled

StandardforCompilationoftheDesignDocumentofOilDepot

StandardforCompilationoftheDesignDocumentofOilDepothasbeenapprovedasanational

standardwithaserialnumberofGB/T51026-2a0n1d4,itwillbeimplementedonMay1,2015.

AuthorizedbytheResearchInstituteofStandardsandNormsoftheMinistryofHousingand

Urban-RuralDevelopmentofthePeople'sRepublicofChina,thisstandardispublishedanddistributed

byChinaPlanningPress.

MinistryofHousingandUrban-RuralDevelopmentofthePeople'sRepublicofChina

August27,2014

Foreword

AccordingtotherequirementsofDocumentJIANBIAO[2009]No.88issuedbytheMinistryof

HousingandUrban-RuralDevelopment(MOHURD)“NoticeonPrintingandDistributing‘the

DevelopmentandRevisionPlanofNationalEngineeringConstructionStandardsin’2”0,09reviewed

andfinalizedbasedonwideandextensiveinvestigationsandstudiesmade,practicessummarized,

commentsrequestedaswellasreferencestointernationalcodesandadvancedforeignstandards.

Thestandardconsistsofcha3pters,covering:generalprovisions,basicengineeringdesignand

detailengineeringdesign.

TheMinistryofHousingandUrban-RuralDevelopmentofthePeople'sRepublicofChinaisin

chargeoftheadministrationofthisstandard,ChinaPetroleum&ChemicalCorporation(Sinopec

Group)isresponsibleforitsroutinemanagement,andSinopecLuoyangPetrochemicalEngineering

Corporationisresponsibleforexplanationofspecifictechnicalcontents.Ifanycommentsand

recommendationsareproposedinimplementationofthisstandard,pleasesendyourcomments/

recommendationstoSinopecLuoyangPetrochemicalEngineeringCorporation(Address:No.27

ZhongzhouWestRoad,LuoyangCity,HenanProvince,P.R.China,PostCode:471003,E-mail:

wanghq.lpec@)forreferenceinfuturerevisions.

TheChiefDevelopmentOrganization,ParticipatingDevelopmentOrganization,ChiefDrafters

andChiefReviewersofthestandard:

ChiefDevelopmentOrganization:

SinopecLuoyangPetrochemicalEngineeringCorporation

Co-DevelopmentOrganizations:

CNPCEastChinaDesignInstitute

LiaoningCompanyofChinaKunlunContracting&EngineeringCo.

ChiefDrafters:

WANGHuiqinHELonghuiYUZhaobinDONGJijunWANJun

MIAOPingCHENGYuelanYUEJinfengWANGFulongHUJiandong

JIAPingCHENBijinGUOWenhaoXIAXilinDAIZhixu

LIUJingtaoGUANJieSUNHuishanGOUQinggeLUHuijie

WANGYufuLILanfangFENGHuiWANGShaohua

ChiefReviewers:

ZHANGYanxinZHOUJiaxiangCHENJiWULiguangZHANGHuan

OUXiaoyanLIUGuoqingWANGJinliangWANGHongCUIQiujun

MIAOZhiweiZHANGJunWANGDanYANGChenXIALi

LIJianliuContents

1Generalprovisions(1)

2Basicengineeringdesign(2)

2.1Generalspecification(2)

2.2Process(3)

2.3Piping(7)

2.4Equipment(9)

2.5Generalplotplanandtransportation(10)

2.6Instrumention&control(15)

2.7Electrical(18)

2.8Telecommunication(19)

2.9Architecture(23)

2.10Structure(25)

2.11Heatingandventilation(27)

2.12Chemicalanalysis(28)

2.13Fire-fighting(29)

2.14Watersupplyanddrainage(30)

2.15Costestimation(32)

2.16Fire-fightingdesignreport(33)

2.17Environmentalprotectiondesignreport(34)

2.18Safetyfacilitydesignreport(36)

2.19Occupationalhealthdesignreport(38)

2.20Seismicdesignreport(40)

2.21Energy-savingdesignreport(42)

3Detailengineeringdesign(44)

3.1Process(44)

3.2Piping(44)

3.3Equipment(46)

3.4Generalplotplanandtransportation(47)

3.5Instrumention&control(49)

3.6Electrical(52)

3.7Telecommunication(54)

3.8Architecture(55)

3.9Structure(57)

3.10Heatingandventilation(63)

3.11Chemicalanalysis(63)

3.12Fire-fighting(64)

3.13Watersupplyanddrainage(65)

Explanationofwordinginthisstandard(67)

Addition:Explanationofprovisions(69)1Generalprovisions

1.0.1Thestandardisdevelopedtoimprovetheoildepotengineeringdesignqualityandunifythe

contentanddetailsofdesigndocuments.

1.0.2Thestandardisapplicabletocompilationofdocumentsonbasicengineeringdesignanddetailed

engineeringdesignofgrass-root,expansionandrevampingoildepots.

1.0.3Thedesigndocumentsofoildepotshouldbecompiledonthedisciplineoruni(tmainitem)basis.

1.0.4Thefiledirectoryshouldbepreparedforthedesigndocumentsofoildepot.

1.0.5Preparationofindividualchapterinthebasicengineeringdesigndocumentshallcomplywiththe

requirementsonapplicationforapprovalandconstructionoftheproject.

1.0.6Inadditiontothisstandard,thepreparationofthedesigndocumentforoildepotshallalso

conformtothecurrentapplicablenationalcodesandstandards.

·1·2Basicengineeringdesign

2.1Generalspecification

2.1.1Generalspecificationshallcovertheprojectoverview,designbasis,designprinciple,design

scope,designfundamental,maintechnicalschemes,environmentalprotectionscheme,safetyfacilities

setupscheme,occupationaldiseaseprotectionfacilitiesdesignscheme,energy-savingmeasures,main

tech-economicindicators,staffdeployment,applicablecodesandstandardsondesign,existingproblems

andsuggestions,etc.

2.1.2Projectoverviewshallmakeclearthescaleofproject,thenatureofconstructionandexternal

supportingconditionsavailablefortheproject,etc.

2.1.3Designbasisshallincludethefeasibilitystudyreportandapprovaldocument,specialassessment

reportandapproval,projectdesigncontract,relatedminutesofmeeting,thecorrespondencesfromthe

clientandtheauthority,etc.

2.1.4Designprinciplesshallincludetheapplicablenationalprojectconstructionregulations,policies

andrequirements,technologyselectionprinciples,state-of-the-artprocessandstate-of-the-art

equipmentselectionprinciples,instrument&controllevel,projectconstructionrelianceprinciples,way

andproportionofmaterialinandoutofthewarehouse,safetyandenvironmentalprotection,energy

utilizationprinciplesaswellasmaterialturnoverfrequency,turnoverrate,daysofstorage,etc.

2.1.5Designscopeshalldescribethedesignscopeofprojectandmainworksofproject.

2.1.6Designbasisshalldescribethemainpropertiesofmaterials,utilitiesconditions,meteorological

conditions,geologicalconditions,etc.

2.1.7Thecontentsofmaintechnicalschemesshallcomplywiththefollowingrequirements:

1Theprocessschemeshalldescribethewayofmaterialinandoutofthewarehouse,wayof

storage,transferscheme,meteringscheme,pipinglayoutschemeandselectionofkeyequipment,etc.

2Theinstrument&controlschemeshalldescribetheautomationlevelandcontrolsystem

configuration.

3Thegeneralplotplanandtransportationschemeshalldescribetheoverallplotplan,elevation

arrangement,rainwaterdrainageandtransportationconsiderations,etc.

4Thecivilengineeringschemeshallclearlydescribetheschemesofbuilding,structure,heating

andventilation,etc.

5Theutilitiesschemeshallmakecleartheschemesforwatersupplyanddrainage,powersupply,

telecommunication,heatsupplyandairsupply,etc.

6Thesupportfacilitiesschemeshallmakeclearthewayonhowtoarrangetheofficebuilding,

centralcontrolroomandlabortory,etc.

7Thefire-fightingfacilitiesschemeshalldescribetheavailabilityanddistributionoffire-fighting

facilities,andfiresafety,etc.

2.1.8Theenvironmentalprotectionschemeshalldescribethesourceofpollution,themeasuresof

pollutantdischargeandenvironmentalprotection.

2.1.9Thedesignschemeofsafetyfacilitiesshalloutlinethehazardsandharmfulfactorsinvolvedin

·2·theprojectaswellasthesafetyfacilitiesandmeasuresadoptedinthedesign.

2.1.10Thedesignschemeofoccupationaldiseaseprotectionfacilitiesshalloutlinetheoccupational

diseasehazardsidentifiedintheproductionprocessaswellastheoccupationaldiseaseprotective

facilitiesandmeasuresadoptedinthedesign.

2.1.11Energy-savingmeasuresshallincludethemainenergysavingmeasuresandenergy

consumptionindicators.

2.1.12Themaintech-economicindicatorsshallcomplywiththefollowingrequirements:

1Utilitiesconsumptionsshallincludeannualconsumptionofelectricity,water,compressedair,

steamandnitrogen,etc.

2Themaincostestimateindicatorsshallincludetheprojectinvestment,loaninterestduring

constructionandinitialworkingcapital.

3Theconstructionlandshallclearlylistouttheusedareaandacquisitionarea.

2.1.13Staffdeploymentshallmakeclearthestaffingatdifferentpositionsandtotalstaffing.

2.1.14Thenameandserialnumbersshallbeclearlyindicatedfortheapplicablestandards.

2.1.15Intheexistingproblemsandsuggestionssection,theunimplementedissuesrequiringfurther

optimizationshallbedescribedincludingtheprojecttechnicalschemes,supportingcondition,special

assessmentreportandapproval,etc.

2.2Process

2.2.1Thebasicengineeringdesigndocumentsfortheprocesssectionshallconsistofthefollowing:

1Description;

2Batterylimitconditiontable;

3Pipelist;

4Listofprocessequipment;

5Listofspecialvalves;

6Processequipmentdatasheet;

7Equipmentspecification;

8Processflowdiagram;

9Utilitiesflowdiagram;

10Piping&instrumentdiagram(P&ID);

11Utilitypiping&instrumentdiagram(U&ID).

2.2.2Thecontentofdescriptionshalldescribethefollowingrequirements:

1Designprinciplesshouldincludetheapplicablenationalprojectconstructionregulations,

policiesandspecifications,technologyselectionprinciple,state-of-the-artprocessandstate-of-the-

artequipmentselectionprinciple,instrument&controllevel,projectconstructionsupporting

conditions,wayandproportionofmaterialinandoutofthewarehouse,safetyandenvironmental

protection,energyutilizationprincipleaswellasmaterialturnoverfrequency,turnoverrate,daysof

storage,etc.

2Designscopeshallclearlydescribethedivisionofprocessunit(mainitem)andthemainworks

ofproject.

3Designbasisshallmakeclearthepropertiesofmaterial,utilitiesconditionandmeteorological

condition.

·3·4Designschemeshallclearlydescribethedesigncapacity,equipmentconfiguration,main

processoperatingconditions,wayofheatingandthermalinsulationrequirements,instrument&control

levelandcontrolrequirements,etc.,aswellasthelistofstoragetanks,listofboilers,listofcoolingand

heatexchangeequipment,listofpumps,listofloading&unloadingequipment,statisticsofheatandair

supplyloads,etc.

5Processdescriptionshouldoutlinethefunctionsonanindividualsystembasis,focusingon

storage,transportation,tankswitchingoperation,blending,loading&unloading,dosing,heatsupplyand

airsupply,etc.

6Selectionofmainequipmentshallcoverselectionofstoragetank,boiler,coolingandheat

exchangeequipment,loading&unloadingequipment,pump,compressorandothersmallequipment.

7Consumptionsshouldbeclearlylistedinseparatespreadsheetstheconsumptionofelectricity,

freshwater,coolingwater,hotwater,steam,compressedair,nitrogen,fuelgasandfueloil,etc.,which

shallcomplywiththerequirementsofTable2.2.2-1toTable2.2.2-5.

Table2.2.2-1Listofconsumptionforelectricity

'

Qtyofequip.Motorcapacity

AnnualAnnualelectricity

Equip.VoltageShaftpower

(set)(kW/set)

S/NhoursconsumptionRemark

no.(V)(kW/set)

(h/a)(kWh/a)

OperationStandbyOperationStandby

1

2

Table2.2.2-2Listofconsumptionforfreshwaterandcoolingwater

Norma(lcontinuous/intermittent)Max(.continuous/intermittent)Max.atonetime

S/NLocationRemark

(t/h)(t/h)(t)

1

2

Table2.2.2-3Listofconsumptionforsteamandhotwater

Norma(lcontinuous/intermittent)Max(.continuous/intermittent)Max.atonetime

S/NLocationRemark

(t/h)(t/h)(t)

1

2

Table2.2.2-4Listofconsumptionforcompressedairandnitrogen

Norma(lcontinuous/intermittent)Max(.continuous/intermittent)Max.atonetime

S/NLocationRemark

333

(Nm/min)(Nm/min)(Nm)

1

2

Table2.2.2-5Listofconsumptionsforfuelgasandfueloil

Norma(lcontinuous/intermittent)Max(.continuous/intermittent)Max.atonetime

S/NLocationRemark

(t/h)(t/h)(t)

1

2

·4·8Thesafety&environmentalprotectionschemeshallclearlydescribethemainsafety&environmental

protectionmeasuresadoptedinthedesign.

9Thenamesandserialnumbersshallbeclearlyindicatedfortheapplicablestandards.

10Intheexistingproblemsandsuggestionssection,theunimplementedissuesrequiringfurther

optimizationshallbedescribedincludingtheprojecttechnicalschemes,supportingcondition,special

assessmentreportandapproval,etc.

2.2.3Thebatterylimitconditiontablesshalllistouttheprocessmaterialsandutilitymediummaterials

goingtoandexitingfromtheprojectofdesignscope,includingnominaldiameterofpipes,medium

name,mediumphasestate,flowdirection,flowrate(normal/max.),operatingtemperature(normal/max.

ormin.),operatingpressure(normal/max.),thermalinsulation,heattracingandwayoftransferring,etc.

2.2.4Thepipelistshalllistoutthepipenumber,nominaldiameter,mediumname,pipestartingand

terminatingpoints,mediumphasestate,density,contentofcorrosivemedium,operatingtemperature

(normal/max.ormin.),operatingpressure(normal/max.),designtemperature,designpressure,pipe

class,thermalinsulation,heattracing,etc.

2.2.5Thelistofprocessequipmentshallbeformulatedontheequipmentcategorybasistoinclude

equipmenttagnumber,name,quantity,operatingtemperature,operatingpressure,designtemperature,

designpressure,specification,principalmaterial,weight,thermalinsulationandcorrosionprotection,

etc.Forthepackageequipmenttobedelivered,thescopeofpackageshallbeindicated.

2.2.6Thelistofspecialvalvesshallindicatethetagnumber,name,mainoperatingparameters,

specificationsandquantityofeachtypeofvalve,suchassafetyvalve,reliefvalve,reducingvalve,

nitrogensealingvalve,breathingvalve,etc.

2.2.7Thecontentofprocessequipmentdatasheetshallcomplywiththefollowingrequirements:

1Theequipmentandvesseldatasheetsshalllistoutthedesigndatanecessaryformechanical

designofequipment,includingoperatingparameter,designparameter,structureparameter,medium

name,contentofspecia(lcorrosive)medium,corrosionallowance,nozzleflangeparameterandthermal

insulation,etc.

2Theboilerdatasheetshalllistoutthedatanecessaryforboilerdesign,selectionandinquiry,

includingevaporationcapacity,steampressureandtemperature,boilertype,steamquality,site

condition,explosion-proofgrade,sootblowingtype,burneratomizationtype,scopeofsupplyandnozzle

flangeparameter,etc.

3Thecoolingandheatexchangeequipmentdatasheetshalllistouttheequipmentname,tag

number,quantity,specification,processoperatingparameter,physicalpropertiesofheatingmedium,

physicalpropertiesofheatedmedium,structureparameter,openingdescription,mechanicaldesigndata,

constructionmaterial,manufactureandinspection,etc.

4Thepumpdatasheetshalllistoutthedatanecessaryforpumpdesign,selectionandinquiry,

includingmediumname,operatingcondition,sitecondition,explosion-proofgrade,construction

parameter,principalmaterial,typeofdrive,flushing,mechanicalseal,inspectionandacceptance,scope

ofsupply,nozzleflangeparameter,etc.

5Thedatasheetofspecialvalvesshalllistouttheseriesnumberofequipmentorpipeunder

protection,servicecondition,typeofvalve,valvematerials,pressurerating,flowrate,constantpressure,

backpressureandallowableoverpressure,etc.

6Thedatasheetofothersmallequipmentshalllistouttheoperatingparameters,design

·5·parameters,constructionparameters,mediumname,nozzleflangeparametersandthermalinsulation,

etc.

'

2.2.8Theequipmentspecificationsshalllistoutthelong-leadequipmentsmainprocessparameters,

structuralform,pressurerating,materialofconstruction,normativereference,scopeofsupply,

inspectionandacceptance,packingand

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論