NATIONALSTANDARD

OFTHEPEOPLE'SREPUBLICOFCHINA

STANDARDFORCOMPILATIONOFTHE

DESIGNDOCUMENTOFOILDEPOT

GB/T51026-2014

DevelopedbyChinaPetrochemicalCorporation

ApprovedbyTheMinistryofHousingandUrban-RuralDevelopmentof

thePeople'sRepublicofChina

ImplementationDateMay1,2015

ChinaPlanningPress

Beijing2020圖書在版編目(CIP)數據

GB/T51026-2014石油庫設計文件編制標準:英文/

中華人民共和國住房和城鄉(xiāng)建設部組織編譯.--北京:

中國計劃出版社,2021.2

ISBN978-7-5182-1268-2

Ⅰ.①G…Ⅱ.①中…Ⅲ.①油庫—設計規(guī)范—中國

—英文Ⅳ.①TE972-65

中國版本圖書館CIP數據核字(2021)第035355號

ChineseeditionfirstpublishedinthePeople'sRepublicofChinain2014

EnglisheditionfirstpublishedinthePeople'sRepublicofChinain2020

byChinaPlanningPress

rd

3Floor,CTower,GuohongBuilding

No.A11,Muxidi-Beili,XichengDistrict

Beijing,100038

PrintedinChinabyBeijingJingyintangGraphicPrintingCenter

?2014bytheMiinistryofHousingandUrban-RuralDevelopmentof

thePeople'sRepublicofChina

Allrightsreserved.Nopartofthispublicationmaybereproducedortransmittedinanyformor

byanymeans,graphic,electronic,ormechanical,includingphotocopying,recording,

oranyinformationstorageandretrievalsystems,withoutwrittenpermissionofthepublisher.

Thisbookissoldsubjecttotheconditionthatitshallnot,bywayoftradeorotherwise,belent,

resold,hiredoutorotherwisecirculatedwithoutthepublisher'spriorconsentinanyformof

blindingorcoverotherthanthatinwhichthisispublishedandwithoutasimilarcondition

includingthisconditionbeingimposedonthesubsequentpurchaser.

ISBN978-7-5182-1268-2中華人民共和國住房和城鄉(xiāng)建設部公告

2021年第11號

住房和城鄉(xiāng)建設部關于發(fā)布《纖維增強塑料

設備和管道工程技術規(guī)范》等7項

工程建設標準英文版的公告

現批準《纖維增強塑料設備和管道工程技術規(guī)范》(GB51160-2016)、《工業(yè)企業(yè)電氣

設備抗震鑒定標準》(GB50994-2014)、《石油庫設計文件編制標準GB》(/T51026-2014)、

《石油化工工程地震破壞鑒定標準》(GB50992-2014)、《鋼鐵工業(yè)環(huán)境保護設計規(guī)范》

(GB50406-2017)、《鋼鐵工業(yè)資源綜合利用設計規(guī)范GB》(50405-2017)《、尾礦設施設計

規(guī)范》(GB50863-2013)英文版。工程建設標準英文版與中文版出現異議時,以中文版為準。

以上7項工程建設標準英文版由住房和城鄉(xiāng)建設部組織中國計劃出版社有限公司出版

發(fā)行。

中華人民共和國住房和城鄉(xiāng)建設部

2021年1月25日

AnnouncementoftheMinistryofHousingandUrban-Rural

DevelopmentofthePeople'sRepublicofChina

No.526

AnnouncementoftheMinistryofHousingandUrban-RuralDevelopment

ofthePeople'sRepublicofChinaonIssueofNationalStandardTitled

StandardforCompilationoftheDesignDocumentofOilDepot

StandardforCompilationoftheDesignDocumentofOilDepothasbeenapprovedasanational

standardwithaserialnumberofGB/T51026-2a0n1d4,itwillbeimplementedonMay1,2015.

AuthorizedbytheResearchInstituteofStandardsandNormsoftheMinistryofHousingand

Urban-RuralDevelopmentofthePeople'sRepublicofChina,thisstandardispublishedanddistributed

byChinaPlanningPress.

MinistryofHousingandUrban-RuralDevelopmentofthePeople'sRepublicofChina

August27,2014

Foreword

AccordingtotherequirementsofDocumentJIANBIAO[2009]No.88issuedbytheMinistryof

HousingandUrban-RuralDevelopment(MOHURD)“NoticeonPrintingandDistributing‘the

DevelopmentandRevisionPlanofNationalEngineeringConstructionStandardsin’2”0,09reviewed

andfinalizedbasedonwideandextensiveinvestigationsandstudiesmade,practicessummarized,

commentsrequestedaswellasreferencestointernationalcodesandadvancedforeignstandards.

Thestandardconsistsofcha3pters,covering:generalprovisions,basicengineeringdesignand

detailengineeringdesign.

TheMinistryofHousingandUrban-RuralDevelopmentofthePeople'sRepublicofChinaisin

chargeoftheadministrationofthisstandard,ChinaPetroleum&ChemicalCorporation(Sinopec

Group)isresponsibleforitsroutinemanagement,andSinopecLuoyangPetrochemicalEngineering

Corporationisresponsibleforexplanationofspecifictechnicalcontents.Ifanycommentsand

recommendationsareproposedinimplementationofthisstandard,pleasesendyourcomments/

recommendationstoSinopecLuoyangPetrochemicalEngineeringCorporation(Address:No.27

ZhongzhouWestRoad,LuoyangCity,HenanProvince,P.R.China,PostCode:471003,E-mail:

wanghq.lpec@)forreferenceinfuturerevisions.

TheChiefDevelopmentOrganization,ParticipatingDevelopmentOrganization,ChiefDrafters

andChiefReviewersofthestandard:

ChiefDevelopmentOrganization:

SinopecLuoyangPetrochemicalEngineeringCorporation

Co-DevelopmentOrganizations:

CNPCEastChinaDesignInstitute

LiaoningCompanyofChinaKunlunContracting&EngineeringCo.

ChiefDrafters:

WANGHuiqinHELonghuiYUZhaobinDONGJijunWANJun

MIAOPingCHENGYuelanYUEJinfengWANGFulongHUJiandong

JIAPingCHENBijinGUOWenhaoXIAXilinDAIZhixu

LIUJingtaoGUANJieSUNHuishanGOUQinggeLUHuijie

WANGYufuLILanfangFENGHuiWANGShaohua

ChiefReviewers:

ZHANGYanxinZHOUJiaxiangCHENJiWULiguangZHANGHuan

OUXiaoyanLIUGuoqingWANGJinliangWANGHongCUIQiujun

MIAOZhiweiZHANGJunWANGDanYANGChenXIALi

LIJianliuContents

1Generalprovisions(1)

2Basicengineeringdesign(2)

2.1Generalspecification(2)

2.2Process(3)

2.3Piping(7)

2.4Equipment(9)

2.5Generalplotplanandtransportation(10)

2.6Instrumention&control(15)

2.7Electrical(18)

2.8Telecommunication(19)

2.9Architecture(23)

2.10Structure(25)

2.11Heatingandventilation(27)

2.12Chemicalanalysis(28)

2.13Fire-fighting(29)

2.14Watersupplyanddrainage(30)

2.15Costestimation(32)

2.16Fire-fightingdesignreport(33)

2.17Environmentalprotectiondesignreport(34)

2.18Safetyfacilitydesignreport(36)

2.19Occupationalhealthdesignreport(38)

2.20Seismicdesignreport(40)

2.21Energy-savingdesignreport(42)

3Detailengineeringdesign(44)

3.1Process(44)

3.2Piping(44)

3.3Equipment(46)

3.4Generalplotplanandtransportation(47)

3.5Instrumention&control(49)

3.6Electrical(52)

3.7Telecommunication(54)

3.8Architecture(55)

3.9Structure(57)

3.10Heatingandventilation(63)

3.11Chemicalanalysis(63)

3.12Fire-fighting(64)

3.13Watersupplyanddrainage(65)

Explanationofwordinginthisstandard(67)

Addition:Explanationofprovisions(69)1Generalprovisions

1.0.1Thestandardisdevelopedtoimprovetheoildepotengineeringdesignqualityandunifythe

contentanddetailsofdesigndocuments.

1.0.2Thestandardisapplicabletocompilationofdocumentsonbasicengineeringdesignanddetailed

engineeringdesignofgrass-root,expansionandrevampingoildepots.

1.0.3Thedesigndocumentsofoildepotshouldbecompiledonthedisciplineoruni(tmainitem)basis.

1.0.4Thefiledirectoryshouldbepreparedforthedesigndocumentsofoildepot.

1.0.5Preparationofindividualchapterinthebasicengineeringdesigndocumentshallcomplywiththe

requirementsonapplicationforapprovalandconstructionoftheproject.

1.0.6Inadditiontothisstandard,thepreparationofthedesigndocumentforoildepotshallalso

conformtothecurrentapplicablenationalcodesandstandards.

·1·2Basicengineeringdesign

2.1Generalspecification

2.1.1Generalspecificationshallcovertheprojectoverview,designbasis,designprinciple,design

scope,designfundamental,maintechnicalschemes,environmentalprotectionscheme,safetyfacilities

setupscheme,occupationaldiseaseprotectionfacilitiesdesignscheme,energy-savingmeasures,main

tech-economicindicators,staffdeployment,applicablecodesandstandardsondesign,existingproblems

andsuggestions,etc.

2.1.2Projectoverviewshallmakeclearthescaleofproject,thenatureofconstructionandexternal

supportingconditionsavailablefortheproject,etc.

2.1.3Designbasisshallincludethefeasibilitystudyreportandapprovaldocument,specialassessment

reportandapproval,projectdesigncontract,relatedminutesofmeeting,thecorrespondencesfromthe

clientandtheauthority,etc.

2.1.4Designprinciplesshallincludetheapplicablenationalprojectconstructionregulations,policies

andrequirements,technologyselectionprinciples,state-of-the-artprocessandstate-of-the-art

equipmentselectionprinciples,instrument&controllevel,projectconstructionrelianceprinciples,way

andproportionofmaterialinandoutofthewarehouse,safetyandenvironmentalprotection,energy

utilizationprinciplesaswellasmaterialturnoverfrequency,turnoverrate,daysofstorage,etc.

2.1.5Designscopeshalldescribethedesignscopeofprojectandmainworksofproject.

2.1.6Designbasisshalldescribethemainpropertiesofmaterials,utilitiesconditions,meteorological

conditions,geologicalconditions,etc.

2.1.7Thecontentsofmaintechnicalschemesshallcomplywiththefollowingrequirements:

1Theprocessschemeshalldescribethewayofmaterialinandoutofthewarehouse,wayof

storage,transferscheme,meteringscheme,pipinglayoutschemeandselectionofkeyequipment,etc.

2Theinstrument&controlschemeshalldescribetheautomationlevelandcontrolsystem

configuration.

3Thegeneralplotplanandtransportationschemeshalldescribetheoverallplotplan,elevation

arrangement,rainwaterdrainageandtransportationconsiderations,etc.

4Thecivilengineeringschemeshallclearlydescribetheschemesofbuilding,structure,heating

andventilation,etc.

5Theutilitiesschemeshallmakecleartheschemesforwatersupplyanddrainage,powersupply,

telecommunication,heatsupplyandairsupply,etc.

6Thesupportfacilitiesschemeshallmakeclearthewayonhowtoarrangetheofficebuilding,

centralcontrolroomandlabortory,etc.

7Thefire-fightingfacilitiesschemeshalldescribetheavailabilityanddistributionoffire-fighting

facilities,andfiresafety,etc.

2.1.8Theenvironmentalprotectionschemeshalldescribethesourceofpollution,themeasuresof

pollutantdischargeandenvironmentalprotection.

2.1.9Thedesignschemeofsafetyfacilitiesshalloutlinethehazardsandharmfulfactorsinvolvedin

·2·theprojectaswellasthesafetyfacilitiesandmeasuresadoptedinthedesign.

2.1.10Thedesignschemeofoccupationaldiseaseprotectionfacilitiesshalloutlinetheoccupational

diseasehazardsidentifiedintheproductionprocessaswellastheoccupationaldiseaseprotective

facilitiesandmeasuresadoptedinthedesign.

2.1.11Energy-savingmeasuresshallincludethemainenergysavingmeasuresandenergy

consumptionindicators.

2.1.12Themaintech-economicindicatorsshallcomplywiththefollowingrequirements:

1Utilitiesconsumptionsshallincludeannualconsumptionofelectricity,water,compressedair,

steamandnitrogen,etc.

2Themaincostestimateindicatorsshallincludetheprojectinvestment,loaninterestduring

constructionandinitialworkingcapital.

3Theconstructionlandshallclearlylistouttheusedareaandacquisitionarea.

2.1.13Staffdeploymentshallmakeclearthestaffingatdifferentpositionsandtotalstaffing.

2.1.14Thenameandserialnumbersshallbeclearlyindicatedfortheapplicablestandards.

2.1.15Intheexistingproblemsandsuggestionssection,theunimplementedissuesrequiringfurther

optimizationshallbedescribedincludingtheprojecttechnicalschemes,supportingcondition,special

assessmentreportandapproval,etc.

2.2Process

2.2.1Thebasicengineeringdesigndocumentsfortheprocesssectionshallconsistofthefollowing:

1Description;

2Batterylimitconditiontable;

3Pipelist;

4Listofprocessequipment;

5Listofspecialvalves;

6Processequipmentdatasheet;

7Equipmentspecification;

8Processflowdiagram;

9Utilitiesflowdiagram;

10Piping&instrumentdiagram(P&ID);

11Utilitypiping&instrumentdiagram(U&ID).

2.2.2Thecontentofdescriptionshalldescribethefollowingrequirements:

1Designprinciplesshouldincludetheapplicablenationalprojectconstructionregulations,

policiesandspecifications,technologyselectionprinciple,state-of-the-artprocessandstate-of-the-

artequipmentselectionprinciple,instrument&controllevel,projectconstructionsupporting

conditions,wayandproportionofmaterialinandoutofthewarehouse,safetyandenvironmental

protection,energyutilizationprincipleaswellasmaterialturnoverfrequency,turnoverrate,daysof

storage,etc.

2Designscopeshallclearlydescribethedivisionofprocessunit(mainitem)andthemainworks

ofproject.

3Designbasisshallmakeclearthepropertiesofmaterial,utilitiesconditionandmeteorological

condition.

·3·4Designschemeshallclearlydescribethedesigncapacity,equipmentconfiguration,main

processoperatingconditions,wayofheatingandthermalinsulationrequirements,instrument&control

levelandcontrolrequirements,etc.,aswellasthelistofstoragetanks,listofboilers,listofcoolingand

heatexchangeequipment,listofpumps,listofloading&unloadingequipment,statisticsofheatandair

supplyloads,etc.

5Processdescriptionshouldoutlinethefunctionsonanindividualsystembasis,focusingon

storage,transportation,tankswitchingoperation,blending,loading&unloading,dosing,heatsupplyand

airsupply,etc.

6Selectionofmainequipmentshallcoverselectionofstoragetank,boiler,coolingandheat

exchangeequipment,loading&unloadingequipment,pump,compressorandothersmallequipment.

7Consumptionsshouldbeclearlylistedinseparatespreadsheetstheconsumptionofelectricity,

freshwater,coolingwater,hotwater,steam,compressedair,nitrogen,fuelgasandfueloil,etc.,which

shallcomplywiththerequirementsofTable2.2.2-1toTable2.2.2-5.

Table2.2.2-1Listofconsumptionforelectricity

'

Qtyofequip.Motorcapacity

AnnualAnnualelectricity

Equip.VoltageShaftpower

(set)(kW/set)

S/NhoursconsumptionRemark

no.(V)(kW/set)

(h/a)(kWh/a)

OperationStandbyOperationStandby

1

2

Table2.2.2-2Listofconsumptionforfreshwaterandcoolingwater

Norma(lcontinuous/intermittent)Max(.continuous/intermittent)Max.atonetime

S/NLocationRemark

(t/h)(t/h)(t)

1

2

Table2.2.2-3Listofconsumptionforsteamandhotwater

Norma(lcontinuous/intermittent)Max(.continuous/intermittent)Max.atonetime

S/NLocationRemark

(t/h)(t/h)(t)

1

2

Table2.2.2-4Listofconsumptionforcompressedairandnitrogen

Norma(lcontinuous/intermittent)Max(.continuous/intermittent)Max.atonetime

S/NLocationRemark

333

(Nm/min)(Nm/min)(Nm)

1

2

Table2.2.2-5Listofconsumptionsforfuelgasandfueloil

Norma(lcontinuous/intermittent)Max(.continuous/intermittent)Max.atonetime

S/NLocationRemark

(t/h)(t/h)(t)

1

2

·4·8Thesafety&environmentalprotectionschemeshallclearlydescribethemainsafety&environmental

protectionmeasuresadoptedinthedesign.

9Thenamesandserialnumbersshallbeclearlyindicatedfortheapplicablestandards.

10Intheexistingproblemsandsuggestionssection,theunimplementedissuesrequiringfurther

optimizationshallbedescribedincludingtheprojecttechnicalschemes,supportingcondition,special

assessmentreportandapproval,etc.

2.2.3Thebatterylimitconditiontablesshalllistouttheprocessmaterialsandutilitymediummaterials

goingtoandexitingfromtheprojectofdesignscope,includingnominaldiameterofpipes,medium

name,mediumphasestate,flowdirection,flowrate(normal/max.),operatingtemperature(normal/max.

ormin.),operatingpressure(normal/max.),thermalinsulation,heattracingandwayoftransferring,etc.

2.2.4Thepipelistshalllistoutthepipenumber,nominaldiameter,mediumname,pipestartingand

terminatingpoints,mediumphasestate,density,contentofcorrosivemedium,operatingtemperature

(normal/max.ormin.),operatingpressure(normal/max.),designtemperature,designpressure,pipe

class,thermalinsulation,heattracing,etc.

2.2.5Thelistofprocessequipmentshallbeformulatedontheequipmentcategorybasistoinclude

equipmenttagnumber,name,quantity,operatingtemperature,operatingpressure,designtemperature,

designpressure,specification,principalmaterial,weight,thermalinsulationandcorrosionprotection,

etc.Forthepackageequipmenttobedelivered,thescopeofpackageshallbeindicated.

2.2.6Thelistofspecialvalvesshallindicatethetagnumber,name,mainoperatingparameters,

specificationsandquantityofeachtypeofvalve,suchassafetyvalve,reliefvalve,reducingvalve,

nitrogensealingvalve,breathingvalve,etc.

2.2.7Thecontentofprocessequipmentdatasheetshallcomplywiththefollowingrequirements:

1Theequipmentandvesseldatasheetsshalllistoutthedesigndatanecessaryformechanical

designofequipment,includingoperatingparameter,designparameter,structureparameter,medium

name,contentofspecia(lcorrosive)medium,corrosionallowance,nozzleflangeparameterandthermal

insulation,etc.

2Theboilerdatasheetshalllistoutthedatanecessaryforboilerdesign,selectionandinquiry,

includingevaporationcapacity,steampressureandtemperature,boilertype,steamquality,site

condition,explosion-proofgrade,sootblowingtype,burneratomizationtype,scopeofsupplyandnozzle

flangeparameter,etc.

3Thecoolingandheatexchangeequipmentdatasheetshalllistouttheequipmentname,tag

number,quantity,specification,processoperatingparameter,physicalpropertiesofheatingmedium,

physicalpropertiesofheatedmedium,structureparameter,openingdescription,mechanicaldesigndata,

constructionmaterial,manufactureandinspection,etc.

4Thepumpdatasheetshalllistoutthedatanecessaryforpumpdesign,selectionandinquiry,

includingmediumname,operatingcondition,sitecondition,explosion-proofgrade,construction

parameter,principalmaterial,typeofdrive,flushing,mechanicalseal,inspectionandacceptance,scope

ofsupply,nozzleflangeparameter,etc.

5Thedatasheetofspecialvalvesshalllistouttheseriesnumberofequipmentorpipeunder

protection,servicecondition,typeofvalve,valvematerials,pressurerating,flowrate,constantpressure,

backpressureandallowableoverpressure,etc.

6Thedatasheetofothersmallequipmentshalllistouttheoperatingparameters,design

·5·parameters,constructionparameters,mediumname,nozzleflangeparametersandthermalinsulation,

etc.

'

2.2.8Theequipmentspecificationsshalllistoutthelong-leadequipmentsmainprocessparameters,

structuralform,pressurerating,materialofconstruction,normativereference,scopeofsupply,

inspectionandacceptance,packingandtransportation,qualityinsuranceandfieldservice,vendor

documentreturn,etc.

2.2.9Theprocessflowdiagramshallshowthecompleteprocess,includingnameofmainprocess

equipment,tagnumber,operatingtemperature,operatingpressure,specification,safetyreliefand

vacuum-resistancemeasuresaswellasnominaldiameterofmainprocesspipe,mediumflowrate,

operatingtemperature,operatingpressure,controlvalve,flowratecontrolandmetering,etc.

2.2.10Theutilitiesflowdiagramshallbeplottedonthematerialcategorybasistoindicatethesource

ofmaterialandequipmenthandlingthematerial,includingtheequipmentname,tagnumber,nominal

diameterofstreampipe,mediumflowrate,operatingtemperature,operatingpressure,controlvalve,

flowratecontrolandmetering,etc.

2.2.11Piping&instrumentdiagram(P&ID)shallshowthefollowing:

1Followingshallbeshowfortheequipment:

1)Tagnumber,nameandtypeofallequipment,aswellasthespecifications,heatingandthermal

insulationrequirements,etc.

2)Descriptiononequipmentsafetyrelief,vacuum-resistancemeasuresandsafetyaccessories

shallindicatethesize,parameterandnumberofsafetyvalve,rupturedisc,breathingvalve,

reliefvalve,nitrogensealingvalve,etc.

3)Scopeofsupplyofpackageequipment.

2Followingshallbeshowforthepipe:

1)Allprocesspipesconnectingtotheequipment,themediumflowdirection,mediumcode,pipe

number,nominaldiameter,pipeclass,pipespecbreak,heattracingandthermalinsulation

requirements,etc.

2)Theprocess-relatedvalvesandthoseinstalledforprocessrequirements;Tagnumberof

automaticcontrolvalve.

3)Allsafetyreliefandvacuum-resistancemeasures,includingsafetyvalve,rupturedisc,reducing

valveandreliefvalveaswellastheirtagnumbers,etc.

4)Mainpipeattachments,includingmetalhose,filter,restrictionorificeplateandblind,etc.

3Followingshallbeshowfortheinstrumentation:

1)Measuringinstrumentsaswellascompletesetofinstrumentandcontrolvalvewiredtothe

controlsystem,plustheirtagnumbers.

2)Controlandinterlockrelation.

2.2.12Theutilitypipe&instrumentdiagramshallshowthefollowing:

1Tagnumberandnameofequipmenttransferringutilitiesmedium.

2Pipemediumflowdirection,mediumcode,pipenumber,nominaldiameter,pipeclass,pipespec

break,thermalinsulationandheattracingrequirements,valves,etc.

3Separatelynumberthemeasuringinstrumentsaswellascompletesetofinstrumentandcontrol

valveswiredtothecontrolsystem.

2.2.13Thelegendsandsymbolsintheprocessflowdiagram,utilityflowdiagram,piping&instrument

·6·diagram(P&ID),utilitypiping&instrumentdiagram(U&ID)shallshowthefollowing:

1Meaningofsymbol,abbreviationanddesignationofequipment,pipeandinstrument.

2Specificationsofassigningthelegendanddesignationofequipment,pipeandinstrument.

2.3Piping

2.3.1Thebasicengineeringdesigndocumentsforthepipingsectionshallconsistofthefollowing:

1Description;

2Designspecifications;

3Billofmaterials;

4Pipingandequipmentlayout.

2.3.2Thecontentofdescriptionshalldescribethefollowingrequirements:

1Designprinciplesshallincludetheapplicablenationalprojectconstructionregulations,policies

andrequirements,state-of-the-artmaterialselectionprinciples,supportingconditionsforproject

construction,etc.

2Designscopeshallclearlydescribethedivisionofprocessuni(tmainitem)andthemainworkof

project.

3Designschemeshalldescribethepipingandequipmentlayout,pipethermalinsulationandheat

tracing,pipecorrosionprotectionandcathodeprotectionandpipingstressdesignscheme.

4Pipecomponentsselectionshallincludetherequirementsonselectionofpipe,pipefittings,

connectorsandvalves,etc.

5Thesafetymeasuresshalldescribethesafetymeasuresadoptedinthedesign.

6Thenamesandserialnumbersshallbeclearlyindicatedfortheapplicablestandards.

7Intheexistingproblemsandsuggestions,thefollowingshallbedescribedsuchastheholding

pipingandequipmentlayout,supportingconditionsandsuggestions.

2.3.3Thecontentofdesignspecificationsshalldescribethefollowingrequirements:

1Designspecificationsonequipmentlayoutshallincludethefollowing:

1)Applicablestandardsforlayout;

2)Equipmentlayoutprinciples;

3)Roadwidthandspacerequirements;

4)Setupprinciplesforpipesleepers,piperacksandbuildings(specialstructures);

5)Foundationelevationrequirements;

6)Setuprequirementsforplatforms&ladders;

7)Routingrequirementsforopowercablesandinstrumentcables;

8)Equipmentandpumpmaintenancerequirements;

9)Environmentalprotectionrequirements;

10)Designrequirementsforoccupationaldiseaseprotectionfacilities.

2Pipinglayoutdesignspecificationsshallincludethefollowing:

1)Applicablestandardsonpipinglayout;

2)Generalrequirementsonpipinglayout;

3)Pipepurgingrequirements;

4)Pipedrainandventrequirements;

5)Pipeheattracinganddrainrequirements;

·7·6)Pressure-reliefpipeinstallationrequirements;

7)Pipespacingrequirements;

8)Pipegradientrequirements;

9)Pipeburialdepthrequirements;

10)Valveinstallationrequirements;

11)Instrumentelementinstallationrequirements;

12)Safetyvalveinstallationrequirements;

13)Designrequirementsforpipingsupportsandhangers;

14)Pipeprotectivesleevedesignrequirements.

3Designspecificationsofpipematerialsshallincludethefollowing:

1)Mainpipecomponentsselectionstandards;

2)Pipecomponentsselectionprinciples;

3)Requirementsonname,nominaldiameter,pressurerating,materialofconstruction,endface

type,wallthicknessandstandardofpipe,pipefittings,flange,gasket,bolt,nut,valve,aswell

asvalveinternalsmaterialandtype.

4Designspecificationsofpipethermalinsulationshallincludethefollowing:

1)Designprinciplesonpipeheatinsulation,coldinsulationandanti-scalding;

2)Specificationsonselectionofthermalinsulationmaterial,calculationonthicknessofthermal

insulationlayer,anddesign,constructionandacceptanceofthermalinsulationstructure.

5Designspecificationsofpipepaintingshallincludethepipesurfacepretreatmentrequirements,

design,constructionandacceptancerequirementsofcorrosionprotectionpaintingandcorrosion

protectioncoatingandrequirementsonpipesurfacecolorandmark,etc.

6Designspecificationsofpipemechanicalshallincludethefollowing:

1)Pipeflexibilitydesignspecifications;

2)Stressanalysiscalculationbasisandapplicationsoftware;

3)Theapplicablecodesandstandardsonseismicfortificationintensity,seismicdesignforthe

projectsiteandseismicdesignspecificationsforthenon-buriedpipe.

2.3.4Thecontentofbillofmaterialsshallmeetthefollowingrequirements:

1Thelistofpipeequipmentmaterialsshalllistoutalltypesofvalvesusedintheproject,aswell

'

asthevalvesnominaldiameter,pressurerating,technicalrequirements,quantityandstandardetc.based

uponthevalvetype.

2Thelistofpipematerialsshalllistoutthesize,technicalrequirements,quantityandweightof

pipe,thermalinsulationmaterialandanti-corrosionmaterial,etc.

3Thelistofequipmentmaterialsshalllistoutthename,specification,materialofconstruction,

technicalrequirements,unitandquantityofalltypesofsmallprocessequipmentandaccessories,etc.

2.3.5Thelayoutofpipeandequipmentshallshowthefollowing:

1Batterylimitandcoordinate.

2Locationorcoordinateofdike,intermediatedikeandweir.

3Contourandrelativelocationbetweenequipmentandbuildings(specialstructures),relative

locationbetweenpipecorridor,locatingdimensionofequipmentandbuildings(specialstructures).

4Arrangementofpipesleeperandpiperackaswellaswidthandgradientofpipesleeper.

5Equipmenttagnumberandname.

·8·6Locationanddimensionofcontrolroom,substationandauxiliaryroomwithinthebatterylimit

aswellastherelativeelevationofindoorground.

7Billofmainequipment.

8Descriptionofdimensionandcoordinateunit.

9Constructionnorth.

2.4Equipment

2.4.1Thebasicengineeringdesigndocumentsfortheequipmentsectionshallconsistofthefollowing:

1Description;

2Designspecifications;

3Equipmentengineeringdrawing.

2.4.2Thecontentofdescriptionshalldescribethefollowingrequirements:

1Theoverviewshalldescribeequipmenttype,quantityandspecifications;

2Equipmentsummaryshallincludethesummaryofequipmentandmainaccessories;

3Theequipmentstructuralcharacteristicsshallincludestructuraldescriptionsofstoragetank,

sphericaltank,vessel,heatexchanger,etc.;

4Thenamesofleadmaterialsandmainaccessoriesimportedorhome-made,andscopeofsupply

shallbeclearlydescribed.

2.4.3Designspecificationsshallincludespecificationsofverticalcylindricalstoragetank,spherical

storagetank,vesselandheatexchangerbasedontheequipmenttypeandcomplyingwiththefollowing:

1Besidesfundamentalwindpressure,seismicfortificationintensity,referencesnowpressure,

fieldsoilclassificationandgroundroughness,othernecessaryambientconditionsshallbeincludedfor

equipmentcalculationandmaterialselection.Thelowestdailyaveragetemperatureforyearssince

meteorologicalrecordsbeginshallbeincludedforstoragetankdesign.Thehourlymax.precipitation

shallalsobeincludedforthefloatingroofstoragetankdesign.Themin.monthlyaveragetemperature

foryearsshallalsobeincludedforthedesignofstoragepressurevesselinwhichthemetalshell

temperatureisvulnerabletotheatmospherictemperatureimpact,includingsphericaltank.

2Thenamesandserialnumbersshallbeclearlyindicatedfortheapplicablestandards.

3Theleadmaterialanddesigncalculationshallincludetheselectionofleadmaterialanddesign

calculationrequirements.

4Thedesignpressureandtemperatureshallincludedeterminationprinciples.

5Manufacturingandinspectionshallincludetheapplicablemanufacturing&inspection

standardsanddesignrequirements.

6Corrosionprotectiondesignshallincludethecorrosionprotectionmeasuresandlocations,etc.

7Theselectionofthermalinsulationmaterials,requirementsofperformanceandouterprotective

layer,etc.shallbedescribed.

8Accessoryselectionshallincludetheflangestandardandtype,primaryandsecondarysealtype,

drainagetype,agitationandlocationlimittype,rooftypeoftanks,etc.

9Otherrequirementsshallincludetransportationrequirementsaswellasspecialrequirementson

structure,material,accessory,etc.

2.4.4Thecontentofequipmentengineeringdrawingshallincludethedesignconditiondescription,

schematicdiagram,equipmenttype,overalldimension,leadmaterial,mainopening,attachmenttypeand

·9·quantity,mainmaterial,partqualityandtotalquality,etc.Thefollowingequipmentshallhavethe

engineeringdrawings.

1Intheverticalcylindricalstoragetanks,floatingroofstoragetankswithnominalvolumeof

3

morethanorequalto10000m,internalfloatingroofstoragetankswithnominalvolumeofmorethanor

33

equalto1000m,fixedroofstoragetankswithnominalvolumeofmorethanorequalto1000m,

3

stainlesssteelstoragetankswithnominalvolumeofmorethanorequalto500m,low-pressurestorage

tankswithdesignpressureofhigherthanorequalto2000Paandcryogenicstoragetanks.

2Sphericalstoragetank.

3ClassⅢpressurevessel.

4Otherequipmentwithspecialrequirements.

2.5Generalplotplanandtransportation

2.5.1Thebasicengineeringdesigndocumentsforgeneralplotplanandtransportationsectionshall

consistofthefollowing:

1Description;

2Designspecifications;

3Listofequipmentfortransportationandhandling;

4Billofmaterials;

5Regionallocationplanofoildepot;

6Overallplotplanofoildepot;

7Elevationlayoutofoildepot;

8Roadandrainwaterdrainagelayoutinoildepot;

9Earthworkdrawing;

10Uni(tmainitem)elevationlayoutplan.

2.5.2Thecontentofdescriptionshalldescribethefollowingrequirements.

1Theoverviewshalldescribethefollowing:

1)Theexistingandplanningneighboringenterprisesorfacilitiesassociatedwiththeproject

aroundtheoildepotaswellastheexistingriver,etc.;

2)Existingtrafficandtransportationconditions;

3)Totalrequiredareaofoildepot,typeoflandused,landrequisitionanddemolitionofbuildings

(specialstructures)andresidentialarea;

4)Topographyandlandform,engineeringgeology,hydrologicaldata,meteorologicalcondition,

seismicintensityandothernaturalconditionsinthesiteofoildepot.

2Designscopeshalldescribethedesignscopeofprojectandmainworksofproject.

3Theoverallplotplanshalldescribethefollowing:

1)Overallplotplanprinciplesofoildepot;

2)Overallplotplanshalldescribedivisionoffunctionalzones,contentofeachfunctionalzone,

respectivelocationrelationshipofeachfunctionalzoneandreservedlandintheoildepot,

distributionofoildepotfence,gateandguardhouse,arrangementofreservedland,etc.;

3)Layoutofmainpipenetworkinoildepotandthepipeconnectionsinbatterylimitofoildepot;

4)Overallplotplanshallcoordinatewithurbanandindustrialdistrictplanning,aswellasmeet

thehealthprotectionandfireseparationdistancerequirements;

·10·5)Fire-spacing-distancebetweenrespectivefacilitiesinoildepot.

4Theelevationlayoutshalldescribethefollowing:

1)Elevationlayoutprinciples;

2)Elevationlayoutdesign,designelevation,designgradientandslopedirection.Fortheterrace

layoutcase,theconnectionoftheterraces,typeandmaterialofretainingwall,typeand

materialoftheslopeprotectionshallbespecified;

3)Inthewayofrainwaterdrainageinoildepotandthetypeofditchstructure,thesectiontype,

material,widthandlongitudinalslopeatthebottomshallbedescribed;

4)Earthworkvolumeandthetreatmentofsurplusanddeficiencyofearth;

5)Theelevationdesignforoildepotshalldescribethefloodcontrolanddischargerequirements.

5Theroadinoildepotshalldescribeiftheroadtypesanddistributionsmaymeettherequirements

fortransportation,fire-fightingandmaintenance.Theroadtypeshallalsodescribetheroadwidth,

gradient,turningradius,space,structuralmaterialandengineeringpractice.

6Transportationshalldescribethefollowing:

1)Totalcargothroughput,transportationscheme,proportionofdifferentmodesoftransportation

andundertakingtransportationvolume.Thelistoftransportationvolume,modeoftransportation

andconfigurationofconveyancesareshownasTable2.5.2-1andTable2.5.2-2fordetails;

Table2.5.2-1Listoftransportationvolumeandmode

Transportationvolumeandmode(t/a)

S/NCargoSub-totalRemark

RailwayRoadPipeShiptransportOthers

Deliveryin

1…

Sub-totalofdeliveryin

Deliveryout

1…

Sub-totalofdeliveryout

Table2.5.2-2Listofconfigurationofconveyances

'

S/NDescriptionModelUnitQtyRemark

1…

2)Thetransportationvolumerailway,track-connectingpointforspecialrailline,wayand

locationofdocking,wayofplacing-inandtaking-outwagon,self-ownedlocomotive,tankcar

dispositionprinciplesandquantity,quantityofraillinesinoildepot,raillinesarrangement,

railwaylength,etc.;

3)Thetransportationvolumebyhighway,truckdispositionprinciplesandquantity;

4)Thetransportationvolumebyship,jettylocationaswellastherelationwiththeoildepot;

5)Thetransportationvolumethroughpipelines,thelocationofpipelinesinandoutofoildepot.

·11·7Landscapingshalldescribelandscapingplanningprinciplesandlandscapingspecificationsinthe

oildepot.

8Theengineeringquantitiesshalllistoutthebillofquantitiesofthegeneralplotplanand

transportationdesign.

9Themaintech-economicindicatorsshallbedescribedasinTable2.5.2-3.

Table2.5.2-3Listofmaintech-economicindicators

S/NItemsUnitQuantityRemark

Siteareaforoildepot,includingha

Siteareaforstoragetankfarmha

Siteareaforloading&unloadingfacilitiesha

1Siteareaforauxiliaryfacilitiesha

Siteareaforadministrativefacilitiesha

Siteareaforreservedlandha

Siteareaforaccessandotheraspectsha

2

Landusecoefficientforstoragetankfarm%

3Landusecoefficientforloading&unloadingfacilities%

4Lengthofroadinoildepotkm

5Oildepotroadcoefficientm/ha

6Railwaylengthkm

7Siteareaforoildepotlandscapingha

8Iandscapingcoefficientinoildepot%

3

Earthworkvolume,including

m

3

9Excavationvolumem

3

Landfillingvolumem

32

10Sitepreparationearthworkcoefficientforoildepotm/m

10Thenamesandserialnumbersshallbeclearlyindicatedfortheapplicablestandards.

11Intheexistingproblemsandsuggestions,theholdingproblems,furtherimprovementand

recommendationsshallbedescribed.

2.5.3Thecontentofdesignspecificationsshalldescribethefollowingrequirements.

1Thegeneralprovisionsshallincludethescopeofapplicationandscopeofdesign.

2Thedesignprinciplesshallincludethefollowing:

1)Overallplotplanprinciples;

2)Elevationlayoutprinciples;

3)Roadandrailwaydesignprinciples;

4)Oildepotrainwaterdrainageandfloodcontrolanddischargedesignprinciples;

5)Truck,forklift,locomotiveandrailcardispositionprinciples;

'

6)Designprinciplesofoildepotsfence,gateandguardhouse;

7)Designprinciplesoflandscapingplanninginoildepot.

3Generalrequirementsshallincludethefollowing:

1)Coordinatesystemusedfortheprojectandconversionformulausedfordifferentcoordinate

systems;

2)Elevationsystemusedfortheprojectandconversionbetweendifferentelevation-systems;

·12·3)Roadtype,roadwidth,roadlongitudinalslope,roadtransverseslope,roadturningradius,

structuralmaterialandengineeringpractice,curbdimension;

4)Classofspecialrailway,typeoftraction,limitslope,min.radiusofcurve,widthofsubgrade,

crossslopeofsubgradeandwayofraindrainage,typeofrail,standard,min.height,modelof

turnout,telecom,typeofsignal,typeofcarbumper,typeoflighting,andwidth&heightof

loading&unloadingplatform;

'

5)Structuralmaterialandengineeringpracticeforgroundpaving,unitsrampandpavement;

6)Materialandengineeringpracticeofopenditch,culvert,cut-offditchandflooddischarge

ditch.

4Thenamesandserialnumbershallbeclearlyindicatedfortheapplicablestandards.

2.5.4Thelistoftransportationloading&unloadingequipmentshalllistoutname,modelandsize,

quantityoflocomotive,trains,varioustrucks,loading&unloadingandliftingequipment,forklift,track

andtruckscales,etc.

2.5.5Billofmaterialshallindicatethename,typeandspecification,quantityofthematerial,etc.

2.5.6Regionallocationplanofoildepotshallshowthefollowing:

1Windrose,legend,description,etc.

2Thelocationsofexistingandplannedadjacentplantsorfacilitiesrelatedtotheproject.

3Locationandbatterylimitbetweentheoildepotandoffsitesupportingfacilities.

4Routeandlocationofrailway,highway,HVtransmissionline,watersupplyanddrainage

'

pipeline,processpipeline,heatingpipeline,floodsdrainageditch,drainageditchinandoutoftheoil

depot.

5Theroad,pipegalleryandotherroutesbetweentheoildepotandthejetty.

2.5.7Overallplotplanofoildepotshouldshowthefollowing:

1Measurementcoordinategrid,buildingcoordinategrid,windrose,legendanddescription,etc.

2Naturallandform,topographyorexistingmap.

3Locationandcoordinateofbatterylimit,fence,gateandguardhouseforoildepotland;location

andcoordinateofoildepotroad,aswellasentranceandexit;locationandcoordinateofrailway,

'

retainingwall,revetmentandfloodsdrainageditchinoildepot.

4Layoutofbatterylimitandcoordinateofeachfacilityaswellasthatofmainequipmentand

building(specialstructure)withinthefacility.

5Locationandcoordinateofrailline,meteringfacilitiesandtransportationloading&unloading

facilities.Thecoordinatesofbatterylimitraillinesinsideandoutsidetheoildepot.

6Fireandsafetyprotectionspacingwiththemainneighboringfacilities.

7Routingofmainpipenetworkinoildepot.

2.5.8Elevationlayoutofoildepotshallshowthefollowing:

1Constructionnorth,legend,descriptionandbillofquantities,etc.

2Location,coordinateandelevationofcontrolpointofoildepotfence,gateandguardhouse,

batterylimitforeachfacility,road,railway,retainingwall,revetment,etc.

3Nameofeachfacilitiesandmainbuildings(specialstructure).

4Designelevationorslopedirectionofoildepotandeachfacilityaswellasindoorandoutdoor

floorelevationformainbuildings.

5Finaldesignelevationoftheoildepotground.

·13·2.5.9Roadanddrainagelayoutofoildepotshouldshowthefollowing:

1Constructionnorth,legend,descriptionandbillofquantities,etc.

2Planpositionofoildepotfence,gateandguardroom;batterylimit,nameandcoordinateof

eachfacility.Layoutandcoordinateofrailwayline,meteringfacilityandloading&unloadingfacilities,

etc.

3Roadplanpositionandcentercoordinate,widthofsubgrade,subgradedesignelevationatroad

junctionandgradientchangepoint,slopedirection,gradientandslopelengthofroadlongitudinalslope,

locationofgradecrossing,squareandturnaround.Locationofrainditch,bridgeculvert,torrentgutter

andhydraulicdropfacility,andthewidth,gradientandslopedirectionofdrainageditch,ditchlength,

ditchbottomelevationatthestartingandendingpoints.

4Sectionaldrawingofroad,ditch,etc.

2.5.10Theearthworkdrawingshallshowtheappropriatediagramsasbelow.

1Whenthegridcalculationmethodisadopted,theearthworkdrawingshallshowthefollowing:

1)Constructionnorth,legendanddescription;

2)Locationofsitepreparationscopeline,batterylimitforeachfacility,fencegateandsiteroad;

3)Thegridchartshouldbeplottedwiththegridof20m×20mor40m×40m,andthe

elevationofnaturalground,designelevationandconstructionheightareindicatedateach

cornerofgridchart;

4)Plotthefillandexcavationbatterylimit,calculatetheearthworkvolumeinthegridandsummarize

thetotalamountoffillandexcavation.

2Fortheearthworkcalculationwithsectionmethod,theearthworkdrawingshallshowthe

following:

1)Definethelocationofselectedsectionandnumberitinthesitepreparationdrawing;

2)Plotthenaturalgroundlineanddesigngroundlineinthesectionaldrawing,andcalculatethe

sectionareaoffillandexcavation;

3)Calculatethetotalamountoffillandexcavationbasedonthefillandexcavationareasofeach

sectionaswellasthedistancebetweeneachsection.

2.5.11Theuni(tmainitem)elevationlayoutplanshallshowthefollowing:

1Constructionnorth,legend,descriptionandbillofquantities,etc.

2Locationofunit(mainitem)batterylimitandthelayoutofequipmentandbuilding(special

structure)withinthebatterylimit.

3Coordinateofuni(tmainitem)batterylimit.

4Designelevationandslopedirection.Theelevationlayoutofanindividualbuildingshallalso

indicatetheindoorgroundelevation.

5Driveway/sidewalkpaving,sidewalkandturnaroundlooplocation,turningradiusand

dimension.Rainditchlocation,width,gradient,slopedirection,ditchlength,elevationofbottomof

trenchatthestartingandendingpoints.Firedikeandintermediatedikelocations,coordinateanddike

crestelevation.Locationsofculvert,crossoverladder,crossoverbridge,oil-interceptiondrainvalve,

catchpit,etc.

6Thegrounddesignelevationandslopedirectionoutsideoftheunit(mainitem)batterylimit.

Sectionramplocation,coordinate,roadwidth,turningradius,roaddesignelevationattheintersection

andgradientchangepoint,ramplongitudinalslopedirection,gradientandslopelength.

·14·2.6Instrumention&control

2.6.1Thebasicengineeringdesignforinstrumention&controlsectionshallconsistofthefollowing:

1Description;

2Designspecification;

3Instrumentindex;

4Instrumentspecification;

5Instrumentpane(lcabinet)specification;

6On-lineanalyzerspecification;

7Billofmaterials;

8Instrumentlist;

9Centralcontrolroom(CCR)layout;

10Flammableandtoxicgasdetectorlayout;

11Instrumentmaincabletrayorrouting;

12Interlockdiagrams;

13Sequentialcontrollogic(timesequence)diagram;

14Complexloopcontroldiagrams(description).

2.6.2Thespecificationsshallbeprovidedwhendistributedcontrolsystem(DCS),safetyinstrumented

system(SIS),programmablelogiccontrol(PLC)systemandsupervisorycontrolanddataacquisition

(SCADA)systemareapplied.

2.6.3Thecontentofdescriptionshalldescribethefollowingrequirements:

1Inthesectionofprocess,theprocessautomaticcontrollevel,flowmeterdesignaswellas

accuracyshallbedescribed.

2Inthesectionofmeasurementandprocesscontrolphilosophy,thespecialinstrument,sequence

controlandsafetyinstrumentsystem,etc.shallbebrieflydescribed.

3Inthesectionofthemaininstrumentselectionandprocesscontrolsystemfunctionand

hardwareconfiguration,thesizeandquantityofoperatingconsole,printer,auxillaryconsole,instrument

panelandcabinet,etc.shallbespecified.

4Inthesectionofthesafetyinstrumentedsystemandgasdetectionsystem,explosion-proof,

flammableandtoxicgasdetector,etc.shallbespecified.

5InthesectionofInstrumentprotection,thefollowingshallbespecifiedsuchasexplosion-proof,

thermalinsulation,cloggingprevention,corrosionprotection,grounding,lightningprotection,

electromagneticcompatibilityandradiationprotection,etc.

6Inthesectionoflayoutofcontrolroomandfieldcabinetroom,thesizeandlayoutincluding

auxiliaryfacilitiesshallbespecified.

7Inthesectionofutilityfeederandconsumption,instrumentpowersupply,instrumentairand

heattracingshallbespecified.

8Thescopeforpackageinstrumentandcontrolsystemshallbespecifiedfortheinstruments

suppliedwiththeequipment.

2.6.4Thecontentofdesignspecificationsshallcomplywiththefollowingrequirements:

1Thegeneralprovisionsshalldescribethescopeofapplicationanddesign.

2Thenamesandserialnumbersshallbeclearlyindicatedfortheapplicablestandards.

·15·3Instrumentsignaltransmissionandunitsofmeasurementshallbespecifiedinthedesignbasis.

4Theselectionprincipleofinstrumentandcontrolsystemshallbedescribed,andforcontrol

system,DCS,PLC,SCADA,SIS,etc.shouldbeincluded.Forfieldinstruments,temperature

instruments,pressureinstruments,flowinstruments,levelinstruments,controlvalvesandon-offvalves,

analyzersandotherinstrumentsshouldbeincludedwhereapplicable.

5Thefollowingspecificationsoffieldinstrumentsincludingingressprotection,explosion-proof,

electromagneticcompatibility,groundingandlightningprotection,etc.shallbespecified.

6Therequirementofinstrumentpowersupply,airsupplyandhea(tcooling)supply,etc.shallbe

specifiedforinstrumentpowersupply.Thesource,voltage,frequency,capacity,sparecapacityand

terms,uninterruptedpowersupply(UPS),etc.shouldbeincluded.Forinstrumentairsupply,the

pressure,mass,dewpointtemperature,airconsumptionandsparecapacity,etc.shouldbeincluded.The

instrumentheating(cooling)sourcesshouldincludethetype,temperature,pressureandconsumption,

etc.

7Therequirementsforcontrolroomlayout,area,architecture,structure,heating,ventilationand

airconditioning(HVAC),lighting,etc.shallbespecified.Thecontrolroomshouldconsistofoperating

room,engineerstation,cabinetroomaswellasfieldauxillaryroom,UPSroom,HVACroom,shift

changeroom,lockerroomandtoilet,etc.

8Theprinciplesforselectionofwire(cable),instrumentcabletray,instrumentimpulselines,

instrumentairlines,heattracinglines,valves,fittingsandthermalinsulationmaterials,etc.shallbe

specifiedinthebillofmaterials.

2.6.5Instrumentindexshallconsistofalltheinstrumentsandauxiliaryinstrumentsforindicationand

controlloopincludingtagnumber,service,instrumenttype,signaltransmissiontype,instrument

specification,specificationnumber,installationlocation,P&IDnumberandpipingorequipment

number,shallbeinthesequenceofP&ID,U&IDandthealphabeticalorderofmeasuredvariables,orin

theotheragreedsequenceorder.

2.6.6Theinstrumentspecificationshallspecifythespecificationsanddataofallinstrumentsaccording

totheinstrumenttype,inwhichtheinstrumenttagnumber,name,service,processoperatingcondition,

quantity,protectionandexplosion-proofgrade,type,scopeofmeasurement,accuracy,signal

transmissiontype,powersupply,processconnectionandelectricalconnection,etc.shallbeincluded.

TheinstrumentspecificationshouldalsoprovidetheP&IDnumber,location,pipingorequipment

numberandpipeclass.Fortheon-lineprocessanalyzers,theinstrumentspecificationshallalsoprovide

thecompositionsofprocessstreamandbackgroundgas,processoperatingandutilityconditions,

technicalspecificationandattachments.

2.6.7Theinstrumentpanel(cabinet)specificationshallincludetheoverallsize,quantity,technical

requirementsofinstrumentpane(lcabinet)includingitsattachments.

2.6.8Theon-lineprocessanalyzerroomspecificationshallincluderequirementsforanalyzersand

instrumentsinstalledintheroomandotherfacilitieswithinanalyzerpackagesscopesuchaspre-sample

conditioningsystem,sampleconditioningsystem,ventsystem,samplerecoverysystem,utilityand

electricalwiring,etc.

2.6.9Billofmaterialsshallincludeallnecessarymainmaterialsusedforinstrumentinstallation,

includingthetype,specificationsandquantityofsteel,wire(cable),impulselines,airlines,heat

tracinglines,conduits,valves,fittings,junctionbox,instrumentboxwithorwithoutinsulationand

·16·cabletray,etc.

2.6.10Instrumentlistshallincludethename,specificationsandquantityofallinstrumentsandcontrol

systems.

2.6.11DCSspecificationshallspecifythegeneralrequirementsforsystem,hardwareandbasic

softwarerequirements,etc.,whichshouldprovidethespecificationandconfigurationrequirementsfor

controller,input/outpu(tI/O)card,operationconsole,printer,communicationsystem.Scopeofsupply,

I/Otypeandquantity,systemredundancyandstandby,spareparts,communicationinterface,

configurationsoftwaredescription,applicationsoftwaredescription,networkinganddataaccess

requirementsshouldalsobespecified.

2.6.12SISspecificationshallspecifythegeneralrequirementsforsystem,hardwareconfiguration

andbasicsoftwarerequirements,etc.,whichshouldprovidethespecificationsandconfiguration

requirementsforPLC,I/Ocard,monitoringstation(includingauxiliaryconsole),printer,

communicationsystem,configurationandprogrammingterminal,sequenceeventrecorder,etc.,Scope

ofsupply,I/Otypeandquantity,systemredundancyandstandby,spareparts,communicationinterface,

configurationsoftwaredescription,applicationsoftwaredescription,networkinganddataaccess

requirements,safetyinstrumentsystemlogicdiagramorinterlocklogicblockdiagramshouldalsobe

specified.

2.6.13PLCspecificationshallspecifythegeneralrequirementsforsystem,hardwareconfiguration

andbasicsoftwarerequirements,etc,whichshouldprovidethetechnicalspecificationandconfiguration

requirementsforcentralprocessingunit,I/Ocard,operationconsole,printer,programmingterminal,

communicationinterface.Scopeofsupply,I/Otypeandquantity,systemredundancyandstandby,spare

partsandprogrammingsoftwarerequirementsshouldalsobespecified.

2.6.14SCADAspecificationshallspecifythegeneralrequirementsforsystem,hardwareconfiguration

andbasicsoftwarerequirements,etc.whichshouldprovidethespecificationsandconfiguration

requirementsforcentralprocessingunit,remotedataacquisitionunit,I/Ocard,operationconsole,

printer,communicationsystem,etc.Scopeofsupply,I/Otypeandquantity,systemredundancyand

standby,spareparts,communicationinterfaceandconfigurationsoftwaredescriptionshouldalsobe

specified.

2.6.15DCSspecification,SISspecification,PLCspecificationandSCADAspecificationshallspecify

therequirementsforthevendorsincludingengineeringservice,training,configuration,testand

acceptance,commissioningservice,qualityassuranceandprojecthand-overdocuments,etc.

2.6.16Thecontrolroomcomposition,dimension,floorelevationandlocationsofcabinet,terminal

cabinet,powercabinet,operationconsole,printerandauxiliaryconsole,etc.shallbeshowninthe

controlroomlayout.

2.6.17Detectortagnumber,locationandinstallationelevation,etc.shallbespecifiedintheflammable

andtoxicgasdetectorlayout.

2.6.18Therelativelocationofcontrolroomandeachunit,themaincabletrayrouting,elevationand

dimensionshallbespecifiedintheInstrumentcabletrayrouting.

2.6.19Causeandeffectbetweeninputandoutputshallbespecifiedininterlockdiagrams.

2.6.20Duringthesequenceprocesscontrol,operatingstatusandlogicrelationsbetweeninvolved

equipmentsshallbespecifiedinthesequencecontrollogic(timesequence)diagram.

2.6.21Complexloopcontrolphilosophyandcompositionshallbespecifiedincomplexloopcontrol

·17·diagrams(description).

2.7Electrical

2.7.1Thebasicengineeringdesigndocumentsfortheelectricalsectionshouldconsistofthefollowing:

1Description;

2Designspecifications;

3Calculationsheet;

4Listofelectricalloads;

5Billofequipmentandmaterials;

6Equipmentspecification;

7Overallkeysinglelinediagraminoildepot;

8TopologydiagramofSCADAsystem;

9Classificationofhazardousareainoildepot;

10Cableroutinginoildepot;

11Lightningprotectionandgroundinglayoutinoildepot;

12Singlelinediagram;

13Equipmentlayoutofsubstation.

2.7.2Thecontentofdescriptionshalldescribethefollowingrequirements:

1Theoverviewshalldescribethescopeofdesign,loadclassification,powerrequirements,total

electricloads,annualpowerconsumption,emergencyload,emergencypowersupply,classificationsof

explosionriskmaterials,etc.

2Thesectionofpowersupplyanddistributionengineeringshoulddescribetheexternalpower

supplyandpowerlineparameters,theconnectionsoffeedersandoperation,arrangementofautomatic

unitandoperation,energy-savingmeasures,substationarrangementandscopeofpowersupply,process

interlockandspecialcontrolrequirements,cableselectionandcabling,etc.

3Lightingshoulddescribethelightingkinds,powersupply,controlandcablingrequirement.

4Thelightningprotection,anti-electrostaticandgroundingshoulddescribetheclassificationof

structurestobeprotectedagainstlightning,anti-electrostaticmeasures,groundingtypeandrequired

groundingresistance.

5Electricalmaintenanceandrepairshoulddescribetheavailabilityofsupports.

6Intheexistingproblemsandsuggestions,theholdingsupportingconditionsandthosewhich

needoptimizationshallbedescribed.

2.7.3Thecontentofdesignspecificationsshallcomplywiththefollowingrequirements:

1Designbasisshalldescribethepowerdata,relativeagreement,minutesofmeeting,

meteorologicalandgeologicalinformation.

2Thenamesandserialnumbersshallbeclearlyindicatedfortheapplicablestandards.

3Thepowersupplyanddistributionsystemshoulddescribethesubstationpowersystem,relay

protection,powerdistributionandmonitoringsystem,reactivepowercompensation,substationlayout,

'

cablingandequipmentselectionandinstallation,therelativedisciplinesrequirementonsubstation.

4Thelightingdesignshoulddescribethedesignprinciples,equipmentselectionandinstallation

requirements.

5Thesectionoflightningprotection,anti-electrostaticandgroundingdesignshoulddescribethe

·18·lightningprotection,anti-electrostatic,groundingdesignprinciple,equipmentselectionandinstallation

requirements.

2.7.4Thecalculationsheetshalllistoutthemethods,conditions,inputdataandoutputresultsof

calculation,andshouldanalyzethecalculationresults.Electricalcalculationshouldcovertheload,

transformerselection,emergencyload,reactivepowercompensation,short-circuitcurrent,electrical

equipmentselection,voltagedeviationduringthemotorstartandrestart,capacitancecurrent,power

cablesizeselection,depotroadlightingandothercalculations.

2.7.5Thelistofelectricalloadsshalllistoutthename,ratedvoltage,ratedcapacity,calculated

capacity,annualpowerconsumption,installedcapacityandthequantitiesofrunningequipment.The

loadsummaryshalldescribethetotalinstalledcapacity,thecalculatedcapacityandallelectricalcapacity

intheoildepot.

2.7.6Thebilloftheequipmentandmaterialsmaybelistedoutbasedonthecatalogofpower

distribution,cabling,lighting,lightningprotectionandgrounding.Itshoulddescribethename,type,

specification,unit,quantity,remarks,etc.

2.7.7Specificationsofequipmentshalllistoutthemainpowersupplyequipmentinsubstations,and

'

shouldincludethescopeofapplication,sellersresponsibility,applicablecodesandstandards,technical

requirementsofdesign,requirementsoftesting,inspectionandcorrosionprotection,nameplateor

'

marksandsellersdocuments,etc.

2.7.8Thesinglelinediagramintheoildepotshouldshowtherelatedparametersofouterfeeders,the

substationsarrangementandtheirelectricalrelations,thedataofthemainelectricalequipment,the

'

substationspowersupplyscopeandload.

2.7.9SchematicdiagramofSCADAsystemshouldshowtheequipmentarrangementand

telecommunicationrelationsamongthemasterstationandthesub-stations.Itshouldalsoindicatethe

telecommunicationrelationsoftheSCADAsystemoftheoildepotandtheecternalenvironment.

2.7.10Classificationofhazardousareainexplosivegasatmosphereshouldbeshowninplotplan

layout.Thetypicalandsectionviewmaybeusedifnecessary.Theparametersofexplosivematerials,

theprocessoperatingconditions,theminimumrequirementofelectricalequipmentanditsexplosion-

proofcertificationshouldbedescribedinthedrawing.

2.7.11Thecablingdrawingshallshowthemaincablerouteandinstallationintheoildepot.

2.7.12Thedrawingoflightningprotectionandgroundinglayoutinoildepotshouldshowthelayoutof

thegroundinggrids,therelationshipbetweendifferentgroundingsystemsandrequirementsfor

groundingresistance,thedesignofeletro-staticgroundingandpracticeinoildepot.

2.7.13Singlelinediagramshouldshowthebusconnection,relayprotectiondesign,andautomaticunit

arrangement.Metering,measuring,designofmeters,electricpowerparameters,designofcompensation

unitandpowerdistributioncircuitsshouldbeindicated.

2.7.14Substationequipmentlayoutshallshowthesubstationstructureandsize,locationand

dimensionofsubstationequipmentarrangement,andlocationanddimensionofsafetyexit.

2.8Telecommunication

2.8.1Thebasicengineeringdesigndocumentsforthetelecommunicationsectionshouldconsistofthe

following:

1Description;

·19·2Designspecifications;

3Billofequipmentandmaterials;

4Equipmentspecifications;

5Telephonewiringsystemdiagramorstructuredcablingsystemdiagram;

6Wirelesscommunicationsystemdiagram;

7Automaticfirealarmandfire-fightingcontrolsystemdiagram;

8Publicaddresssystemdiagram;

9Televisionmonitoringsystemdiagram;

10Intelligentcardsystemdiagram;

11Perimeteralarmsystemdiagram;

12Telecommunicationequipmentconfigurationdiagram.

2.8.2Thecontentofdescriptionshalldescribethefollowingrequirements:

1Designscopeshalldescribethedesignscopeofprojectandmainworksofproject.

2Thecontentoftelecommunicationsystemshallcomplywiththefollowingrequirements:

1)Theadministrationtelephone,dispatchtelephoneanddirect-dialtelephonesystemshalldescribe

thetypeoftelephone,designschemeoftelephonestation,modeofrelay,powersupplyand

grounding,etc.;

2)Thestructuredcablingsystemshallclearlydescribethesystemscheme,composition,function

andinformationsocketinstallationlocation;

3)Thewirelesstelecommunicationsystemshallclearlydescribethesystemscheme,composition,

'

workingway,characteristicsofuserslocationandfrequencyofuseandpower;

4)Theautomaticfirealarmandfire-fightingcontrolsystemsshalldescribethesystemscheme,

composition,function,controller,fireconsoleorPLCcontrolcabinetmountinglocations,

mountinglocationofdifferentalarmdevices,integratedfire-fightingcontrollogicrelation,net-

workingtelecommunication,alarmdeviceandemergencybroadcastingschemes;

5)Thepublicaddresssystemshalldescribethesystemscheme,composition,function,capacity,

loopquantity,wayofpowersupply,installationlocationofhostcomputer,intercomstation,

loudspeakermountinglocationandconnectionrelationwithothersystems;

6)Thetelevisionmonitoringsystemshallclearlydescribethesystemscheme,composition,

function,wayofsignaltransmission,waysofpowersupply,objectsmonitoredbythecamera,

themountinglocationsofmonitor,controllerandconsole,andconnectionswithother

systems;

7)Theintelligentcardsystemshalldescribethesystemscheme,composition,function,mounting

locationsofcardreaderandcontrollerandsignaltransmissionmode;

8)Theperimeteralarmsystemshalldescribethesystemscheme,composition,function,

mountinglocationofdetectorandcontrollerandsignaltransmissionmode;

9)Thetypeoftelecommunicationline,cableandfiberopticcableselections,routeselectionand

wayofcabling,etc.shallbedescribedfortelecommunicationlines;

10)Thelistoftelecommunicationusersshallshowthemountinglocation,nameandquantityof

userequipment,environmentalcharacteristics,etc.Thelistoftelecommunicationusers

shouldcomplywiththerequirementsofTable2.8.2.

·20·

·21·

Table2.8.2Listoftelecommunicationusers

Television

monitoring,Publicaddress

Firealarmandfire-fightingcontrolsystem

perimeteralarmsystem

system

Administra-Direct-

UnitUni(tmainDispatchLANWirelessEnvironmental

S/NtiondialingRemarks

numberitem)telephoneterminaltelephonecharacteristiccs

telephonetelephone

Smokeand

Dete-Cam-Mon-ManualFlameAlarmControl/IntercomLouds-

temperature

ctoreraitoralarmdetectorunitdisplaystationpeaker

detector

1

2

Total2.8.3Thecontentofdesignspecificationsshallcomplywiththefollowingrequirements:

1Generalprovisionsshalldescribethescopeofdesignandscopeofapplication.

2Designbasisshalldescribethesupportingtelecommunicationconditionsandmeteorological

conditions,etc.

3Thenamesandserialnumbersshallbelistedforthemainapplicablestandards.

4Thecontentoftelecommunicationsystemshallcomplywiththefollowingrequirements:

1)Theadministrationtelephonesystemshalldescribethesystemscheme,telephonestation

capacityandfunctionconfiguration,modeofrelay,numberingplan,principleonselectionof

auxiliaryequipmentinthetelephonestation,telephonestationprocessrequirements,wiring

design,powersupply,lightningprotectionandgrounding,etc.;

2)Thedispatchtelephonesystemshalldescribethesystemscheme,telephonestationcapacity

andfunctionconfiguration,powersupply,lightningprotectionandgrounding,etc.;

3)Thestructuredcablingsystemshalldescribethesystemsolution,composition,function,cable

selectionandcabling,etc.;

4)Thewirelesstelecommunicationsystemshalldescribethesystemscheme,composition,

function,basestation,antenna,vehicle-locatingset,radiosetupprinciple,powersupply,

lightningprotectionandgrounding,etc

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
  • 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
  • 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論