NATIONALSTANDARD
OFTHEPEOPLE'SREPUBLICOFCHINA
STANDARDFORCOMPILATIONOFTHE
DESIGNDOCUMENTOFOILDEPOT
GB/T51026-2014
DevelopedbyChinaPetrochemicalCorporation
ApprovedbyTheMinistryofHousingandUrban-RuralDevelopmentof
thePeople'sRepublicofChina
ImplementationDateMay1,2015
ChinaPlanningPress
Beijing2020圖書在版編目(CIP)數據
GB/T51026-2014石油庫設計文件編制標準:英文/
中華人民共和國住房和城鄉(xiāng)建設部組織編譯.--北京:
中國計劃出版社,2021.2
ISBN978-7-5182-1268-2
Ⅰ.①G…Ⅱ.①中…Ⅲ.①油庫—設計規(guī)范—中國
—英文Ⅳ.①TE972-65
中國版本圖書館CIP數據核字(2021)第035355號
ChineseeditionfirstpublishedinthePeople'sRepublicofChinain2014
EnglisheditionfirstpublishedinthePeople'sRepublicofChinain2020
byChinaPlanningPress
rd
3Floor,CTower,GuohongBuilding
No.A11,Muxidi-Beili,XichengDistrict
Beijing,100038
PrintedinChinabyBeijingJingyintangGraphicPrintingCenter
?2014bytheMiinistryofHousingandUrban-RuralDevelopmentof
thePeople'sRepublicofChina
Allrightsreserved.Nopartofthispublicationmaybereproducedortransmittedinanyformor
byanymeans,graphic,electronic,ormechanical,includingphotocopying,recording,
oranyinformationstorageandretrievalsystems,withoutwrittenpermissionofthepublisher.
Thisbookissoldsubjecttotheconditionthatitshallnot,bywayoftradeorotherwise,belent,
resold,hiredoutorotherwisecirculatedwithoutthepublisher'spriorconsentinanyformof
blindingorcoverotherthanthatinwhichthisispublishedandwithoutasimilarcondition
includingthisconditionbeingimposedonthesubsequentpurchaser.
ISBN978-7-5182-1268-2中華人民共和國住房和城鄉(xiāng)建設部公告
2021年第11號
住房和城鄉(xiāng)建設部關于發(fā)布《纖維增強塑料
設備和管道工程技術規(guī)范》等7項
工程建設標準英文版的公告
現批準《纖維增強塑料設備和管道工程技術規(guī)范》(GB51160-2016)、《工業(yè)企業(yè)電氣
設備抗震鑒定標準》(GB50994-2014)、《石油庫設計文件編制標準GB》(/T51026-2014)、
《石油化工工程地震破壞鑒定標準》(GB50992-2014)、《鋼鐵工業(yè)環(huán)境保護設計規(guī)范》
(GB50406-2017)、《鋼鐵工業(yè)資源綜合利用設計規(guī)范GB》(50405-2017)《、尾礦設施設計
規(guī)范》(GB50863-2013)英文版。工程建設標準英文版與中文版出現異議時,以中文版為準。
以上7項工程建設標準英文版由住房和城鄉(xiāng)建設部組織中國計劃出版社有限公司出版
發(fā)行。
中華人民共和國住房和城鄉(xiāng)建設部
2021年1月25日
AnnouncementoftheMinistryofHousingandUrban-Rural
DevelopmentofthePeople'sRepublicofChina
No.526
AnnouncementoftheMinistryofHousingandUrban-RuralDevelopment
ofthePeople'sRepublicofChinaonIssueofNationalStandardTitled
StandardforCompilationoftheDesignDocumentofOilDepot
StandardforCompilationoftheDesignDocumentofOilDepothasbeenapprovedasanational
standardwithaserialnumberofGB/T51026-2a0n1d4,itwillbeimplementedonMay1,2015.
AuthorizedbytheResearchInstituteofStandardsandNormsoftheMinistryofHousingand
Urban-RuralDevelopmentofthePeople'sRepublicofChina,thisstandardispublishedanddistributed
byChinaPlanningPress.
MinistryofHousingandUrban-RuralDevelopmentofthePeople'sRepublicofChina
August27,2014
Foreword
AccordingtotherequirementsofDocumentJIANBIAO[2009]No.88issuedbytheMinistryof
HousingandUrban-RuralDevelopment(MOHURD)“NoticeonPrintingandDistributing‘the
DevelopmentandRevisionPlanofNationalEngineeringConstructionStandardsin’2”0,09reviewed
andfinalizedbasedonwideandextensiveinvestigationsandstudiesmade,practicessummarized,
commentsrequestedaswellasreferencestointernationalcodesandadvancedforeignstandards.
Thestandardconsistsofcha3pters,covering:generalprovisions,basicengineeringdesignand
detailengineeringdesign.
TheMinistryofHousingandUrban-RuralDevelopmentofthePeople'sRepublicofChinaisin
chargeoftheadministrationofthisstandard,ChinaPetroleum&ChemicalCorporation(Sinopec
Group)isresponsibleforitsroutinemanagement,andSinopecLuoyangPetrochemicalEngineering
Corporationisresponsibleforexplanationofspecifictechnicalcontents.Ifanycommentsand
recommendationsareproposedinimplementationofthisstandard,pleasesendyourcomments/
recommendationstoSinopecLuoyangPetrochemicalEngineeringCorporation(Address:No.27
ZhongzhouWestRoad,LuoyangCity,HenanProvince,P.R.China,PostCode:471003,E-mail:
wanghq.lpec@)forreferenceinfuturerevisions.
TheChiefDevelopmentOrganization,ParticipatingDevelopmentOrganization,ChiefDrafters
andChiefReviewersofthestandard:
ChiefDevelopmentOrganization:
SinopecLuoyangPetrochemicalEngineeringCorporation
Co-DevelopmentOrganizations:
CNPCEastChinaDesignInstitute
LiaoningCompanyofChinaKunlunContracting&EngineeringCo.
ChiefDrafters:
WANGHuiqinHELonghuiYUZhaobinDONGJijunWANJun
MIAOPingCHENGYuelanYUEJinfengWANGFulongHUJiandong
JIAPingCHENBijinGUOWenhaoXIAXilinDAIZhixu
LIUJingtaoGUANJieSUNHuishanGOUQinggeLUHuijie
WANGYufuLILanfangFENGHuiWANGShaohua
ChiefReviewers:
ZHANGYanxinZHOUJiaxiangCHENJiWULiguangZHANGHuan
OUXiaoyanLIUGuoqingWANGJinliangWANGHongCUIQiujun
MIAOZhiweiZHANGJunWANGDanYANGChenXIALi
LIJianliuContents
1Generalprovisions(1)
2Basicengineeringdesign(2)
2.1Generalspecification(2)
2.2Process(3)
2.3Piping(7)
2.4Equipment(9)
2.5Generalplotplanandtransportation(10)
2.6Instrumention&control(15)
2.7Electrical(18)
2.8Telecommunication(19)
2.9Architecture(23)
2.10Structure(25)
2.11Heatingandventilation(27)
2.12Chemicalanalysis(28)
2.13Fire-fighting(29)
2.14Watersupplyanddrainage(30)
2.15Costestimation(32)
2.16Fire-fightingdesignreport(33)
2.17Environmentalprotectiondesignreport(34)
2.18Safetyfacilitydesignreport(36)
2.19Occupationalhealthdesignreport(38)
2.20Seismicdesignreport(40)
2.21Energy-savingdesignreport(42)
3Detailengineeringdesign(44)
3.1Process(44)
3.2Piping(44)
3.3Equipment(46)
3.4Generalplotplanandtransportation(47)
3.5Instrumention&control(49)
3.6Electrical(52)
3.7Telecommunication(54)
3.8Architecture(55)
3.9Structure(57)
3.10Heatingandventilation(63)
3.11Chemicalanalysis(63)
3.12Fire-fighting(64)
3.13Watersupplyanddrainage(65)
Explanationofwordinginthisstandard(67)
Addition:Explanationofprovisions(69)1Generalprovisions
1.0.1Thestandardisdevelopedtoimprovetheoildepotengineeringdesignqualityandunifythe
contentanddetailsofdesigndocuments.
1.0.2Thestandardisapplicabletocompilationofdocumentsonbasicengineeringdesignanddetailed
engineeringdesignofgrass-root,expansionandrevampingoildepots.
1.0.3Thedesigndocumentsofoildepotshouldbecompiledonthedisciplineoruni(tmainitem)basis.
1.0.4Thefiledirectoryshouldbepreparedforthedesigndocumentsofoildepot.
1.0.5Preparationofindividualchapterinthebasicengineeringdesigndocumentshallcomplywiththe
requirementsonapplicationforapprovalandconstructionoftheproject.
1.0.6Inadditiontothisstandard,thepreparationofthedesigndocumentforoildepotshallalso
conformtothecurrentapplicablenationalcodesandstandards.
·1·2Basicengineeringdesign
2.1Generalspecification
2.1.1Generalspecificationshallcovertheprojectoverview,designbasis,designprinciple,design
scope,designfundamental,maintechnicalschemes,environmentalprotectionscheme,safetyfacilities
setupscheme,occupationaldiseaseprotectionfacilitiesdesignscheme,energy-savingmeasures,main
tech-economicindicators,staffdeployment,applicablecodesandstandardsondesign,existingproblems
andsuggestions,etc.
2.1.2Projectoverviewshallmakeclearthescaleofproject,thenatureofconstructionandexternal
supportingconditionsavailablefortheproject,etc.
2.1.3Designbasisshallincludethefeasibilitystudyreportandapprovaldocument,specialassessment
reportandapproval,projectdesigncontract,relatedminutesofmeeting,thecorrespondencesfromthe
clientandtheauthority,etc.
2.1.4Designprinciplesshallincludetheapplicablenationalprojectconstructionregulations,policies
andrequirements,technologyselectionprinciples,state-of-the-artprocessandstate-of-the-art
equipmentselectionprinciples,instrument&controllevel,projectconstructionrelianceprinciples,way
andproportionofmaterialinandoutofthewarehouse,safetyandenvironmentalprotection,energy
utilizationprinciplesaswellasmaterialturnoverfrequency,turnoverrate,daysofstorage,etc.
2.1.5Designscopeshalldescribethedesignscopeofprojectandmainworksofproject.
2.1.6Designbasisshalldescribethemainpropertiesofmaterials,utilitiesconditions,meteorological
conditions,geologicalconditions,etc.
2.1.7Thecontentsofmaintechnicalschemesshallcomplywiththefollowingrequirements:
1Theprocessschemeshalldescribethewayofmaterialinandoutofthewarehouse,wayof
storage,transferscheme,meteringscheme,pipinglayoutschemeandselectionofkeyequipment,etc.
2Theinstrument&controlschemeshalldescribetheautomationlevelandcontrolsystem
configuration.
3Thegeneralplotplanandtransportationschemeshalldescribetheoverallplotplan,elevation
arrangement,rainwaterdrainageandtransportationconsiderations,etc.
4Thecivilengineeringschemeshallclearlydescribetheschemesofbuilding,structure,heating
andventilation,etc.
5Theutilitiesschemeshallmakecleartheschemesforwatersupplyanddrainage,powersupply,
telecommunication,heatsupplyandairsupply,etc.
6Thesupportfacilitiesschemeshallmakeclearthewayonhowtoarrangetheofficebuilding,
centralcontrolroomandlabortory,etc.
7Thefire-fightingfacilitiesschemeshalldescribetheavailabilityanddistributionoffire-fighting
facilities,andfiresafety,etc.
2.1.8Theenvironmentalprotectionschemeshalldescribethesourceofpollution,themeasuresof
pollutantdischargeandenvironmentalprotection.
2.1.9Thedesignschemeofsafetyfacilitiesshalloutlinethehazardsandharmfulfactorsinvolvedin
·2·theprojectaswellasthesafetyfacilitiesandmeasuresadoptedinthedesign.
2.1.10Thedesignschemeofoccupationaldiseaseprotectionfacilitiesshalloutlinetheoccupational
diseasehazardsidentifiedintheproductionprocessaswellastheoccupationaldiseaseprotective
facilitiesandmeasuresadoptedinthedesign.
2.1.11Energy-savingmeasuresshallincludethemainenergysavingmeasuresandenergy
consumptionindicators.
2.1.12Themaintech-economicindicatorsshallcomplywiththefollowingrequirements:
1Utilitiesconsumptionsshallincludeannualconsumptionofelectricity,water,compressedair,
steamandnitrogen,etc.
2Themaincostestimateindicatorsshallincludetheprojectinvestment,loaninterestduring
constructionandinitialworkingcapital.
3Theconstructionlandshallclearlylistouttheusedareaandacquisitionarea.
2.1.13Staffdeploymentshallmakeclearthestaffingatdifferentpositionsandtotalstaffing.
2.1.14Thenameandserialnumbersshallbeclearlyindicatedfortheapplicablestandards.
2.1.15Intheexistingproblemsandsuggestionssection,theunimplementedissuesrequiringfurther
optimizationshallbedescribedincludingtheprojecttechnicalschemes,supportingcondition,special
assessmentreportandapproval,etc.
2.2Process
2.2.1Thebasicengineeringdesigndocumentsfortheprocesssectionshallconsistofthefollowing:
1Description;
2Batterylimitconditiontable;
3Pipelist;
4Listofprocessequipment;
5Listofspecialvalves;
6Processequipmentdatasheet;
7Equipmentspecification;
8Processflowdiagram;
9Utilitiesflowdiagram;
10Piping&instrumentdiagram(P&ID);
11Utilitypiping&instrumentdiagram(U&ID).
2.2.2Thecontentofdescriptionshalldescribethefollowingrequirements:
1Designprinciplesshouldincludetheapplicablenationalprojectconstructionregulations,
policiesandspecifications,technologyselectionprinciple,state-of-the-artprocessandstate-of-the-
artequipmentselectionprinciple,instrument&controllevel,projectconstructionsupporting
conditions,wayandproportionofmaterialinandoutofthewarehouse,safetyandenvironmental
protection,energyutilizationprincipleaswellasmaterialturnoverfrequency,turnoverrate,daysof
storage,etc.
2Designscopeshallclearlydescribethedivisionofprocessunit(mainitem)andthemainworks
ofproject.
3Designbasisshallmakeclearthepropertiesofmaterial,utilitiesconditionandmeteorological
condition.
·3·4Designschemeshallclearlydescribethedesigncapacity,equipmentconfiguration,main
processoperatingconditions,wayofheatingandthermalinsulationrequirements,instrument&control
levelandcontrolrequirements,etc.,aswellasthelistofstoragetanks,listofboilers,listofcoolingand
heatexchangeequipment,listofpumps,listofloading&unloadingequipment,statisticsofheatandair
supplyloads,etc.
5Processdescriptionshouldoutlinethefunctionsonanindividualsystembasis,focusingon
storage,transportation,tankswitchingoperation,blending,loading&unloading,dosing,heatsupplyand
airsupply,etc.
6Selectionofmainequipmentshallcoverselectionofstoragetank,boiler,coolingandheat
exchangeequipment,loading&unloadingequipment,pump,compressorandothersmallequipment.
7Consumptionsshouldbeclearlylistedinseparatespreadsheetstheconsumptionofelectricity,
freshwater,coolingwater,hotwater,steam,compressedair,nitrogen,fuelgasandfueloil,etc.,which
shallcomplywiththerequirementsofTable2.2.2-1toTable2.2.2-5.
Table2.2.2-1Listofconsumptionforelectricity
'
Qtyofequip.Motorcapacity
AnnualAnnualelectricity
Equip.VoltageShaftpower
(set)(kW/set)
S/NhoursconsumptionRemark
no.(V)(kW/set)
(h/a)(kWh/a)
OperationStandbyOperationStandby
1
2
Table2.2.2-2Listofconsumptionforfreshwaterandcoolingwater
Norma(lcontinuous/intermittent)Max(.continuous/intermittent)Max.atonetime
S/NLocationRemark
(t/h)(t/h)(t)
1
2
Table2.2.2-3Listofconsumptionforsteamandhotwater
Norma(lcontinuous/intermittent)Max(.continuous/intermittent)Max.atonetime
S/NLocationRemark
(t/h)(t/h)(t)
1
2
Table2.2.2-4Listofconsumptionforcompressedairandnitrogen
Norma(lcontinuous/intermittent)Max(.continuous/intermittent)Max.atonetime
S/NLocationRemark
333
(Nm/min)(Nm/min)(Nm)
1
2
Table2.2.2-5Listofconsumptionsforfuelgasandfueloil
Norma(lcontinuous/intermittent)Max(.continuous/intermittent)Max.atonetime
S/NLocationRemark
(t/h)(t/h)(t)
1
2
·4·8Thesafety&environmentalprotectionschemeshallclearlydescribethemainsafety&environmental
protectionmeasuresadoptedinthedesign.
9Thenamesandserialnumbersshallbeclearlyindicatedfortheapplicablestandards.
10Intheexistingproblemsandsuggestionssection,theunimplementedissuesrequiringfurther
optimizationshallbedescribedincludingtheprojecttechnicalschemes,supportingcondition,special
assessmentreportandapproval,etc.
2.2.3Thebatterylimitconditiontablesshalllistouttheprocessmaterialsandutilitymediummaterials
goingtoandexitingfromtheprojectofdesignscope,includingnominaldiameterofpipes,medium
name,mediumphasestate,flowdirection,flowrate(normal/max.),operatingtemperature(normal/max.
ormin.),operatingpressure(normal/max.),thermalinsulation,heattracingandwayoftransferring,etc.
2.2.4Thepipelistshalllistoutthepipenumber,nominaldiameter,mediumname,pipestartingand
terminatingpoints,mediumphasestate,density,contentofcorrosivemedium,operatingtemperature
(normal/max.ormin.),operatingpressure(normal/max.),designtemperature,designpressure,pipe
class,thermalinsulation,heattracing,etc.
2.2.5Thelistofprocessequipmentshallbeformulatedontheequipmentcategorybasistoinclude
equipmenttagnumber,name,quantity,operatingtemperature,operatingpressure,designtemperature,
designpressure,specification,principalmaterial,weight,thermalinsulationandcorrosionprotection,
etc.Forthepackageequipmenttobedelivered,thescopeofpackageshallbeindicated.
2.2.6Thelistofspecialvalvesshallindicatethetagnumber,name,mainoperatingparameters,
specificationsandquantityofeachtypeofvalve,suchassafetyvalve,reliefvalve,reducingvalve,
nitrogensealingvalve,breathingvalve,etc.
2.2.7Thecontentofprocessequipmentdatasheetshallcomplywiththefollowingrequirements:
1Theequipmentandvesseldatasheetsshalllistoutthedesigndatanecessaryformechanical
designofequipment,includingoperatingparameter,designparameter,structureparameter,medium
name,contentofspecia(lcorrosive)medium,corrosionallowance,nozzleflangeparameterandthermal
insulation,etc.
2Theboilerdatasheetshalllistoutthedatanecessaryforboilerdesign,selectionandinquiry,
includingevaporationcapacity,steampressureandtemperature,boilertype,steamquality,site
condition,explosion-proofgrade,sootblowingtype,burneratomizationtype,scopeofsupplyandnozzle
flangeparameter,etc.
3Thecoolingandheatexchangeequipmentdatasheetshalllistouttheequipmentname,tag
number,quantity,specification,processoperatingparameter,physicalpropertiesofheatingmedium,
physicalpropertiesofheatedmedium,structureparameter,openingdescription,mechanicaldesigndata,
constructionmaterial,manufactureandinspection,etc.
4Thepumpdatasheetshalllistoutthedatanecessaryforpumpdesign,selectionandinquiry,
includingmediumname,operatingcondition,sitecondition,explosion-proofgrade,construction
parameter,principalmaterial,typeofdrive,flushing,mechanicalseal,inspectionandacceptance,scope
ofsupply,nozzleflangeparameter,etc.
5Thedatasheetofspecialvalvesshalllistouttheseriesnumberofequipmentorpipeunder
protection,servicecondition,typeofvalve,valvematerials,pressurerating,flowrate,constantpressure,
backpressureandallowableoverpressure,etc.
6Thedatasheetofothersmallequipmentshalllistouttheoperatingparameters,design
·5·parameters,constructionparameters,mediumname,nozzleflangeparametersandthermalinsulation,
etc.
'
2.2.8Theequipmentspecificationsshalllistoutthelong-leadequipmentsmainprocessparameters,
structuralform,pressurerating,materialofconstruction,normativereference,scopeofsupply,
inspectionandacceptance,packingandtransportation,qualityinsuranceandfieldservice,vendor
documentreturn,etc.
2.2.9Theprocessflowdiagramshallshowthecompleteprocess,includingnameofmainprocess
equipment,tagnumber,operatingtemperature,operatingpressure,specification,safetyreliefand
vacuum-resistancemeasuresaswellasnominaldiameterofmainprocesspipe,mediumflowrate,
operatingtemperature,operatingpressure,controlvalve,flowratecontrolandmetering,etc.
2.2.10Theutilitiesflowdiagramshallbeplottedonthematerialcategorybasistoindicatethesource
ofmaterialandequipmenthandlingthematerial,includingtheequipmentname,tagnumber,nominal
diameterofstreampipe,mediumflowrate,operatingtemperature,operatingpressure,controlvalve,
flowratecontrolandmetering,etc.
2.2.11Piping&instrumentdiagram(P&ID)shallshowthefollowing:
1Followingshallbeshowfortheequipment:
1)Tagnumber,nameandtypeofallequipment,aswellasthespecifications,heatingandthermal
insulationrequirements,etc.
2)Descriptiononequipmentsafetyrelief,vacuum-resistancemeasuresandsafetyaccessories
shallindicatethesize,parameterandnumberofsafetyvalve,rupturedisc,breathingvalve,
reliefvalve,nitrogensealingvalve,etc.
3)Scopeofsupplyofpackageequipment.
2Followingshallbeshowforthepipe:
1)Allprocesspipesconnectingtotheequipment,themediumflowdirection,mediumcode,pipe
number,nominaldiameter,pipeclass,pipespecbreak,heattracingandthermalinsulation
requirements,etc.
2)Theprocess-relatedvalvesandthoseinstalledforprocessrequirements;Tagnumberof
automaticcontrolvalve.
3)Allsafetyreliefandvacuum-resistancemeasures,includingsafetyvalve,rupturedisc,reducing
valveandreliefvalveaswellastheirtagnumbers,etc.
4)Mainpipeattachments,includingmetalhose,filter,restrictionorificeplateandblind,etc.
3Followingshallbeshowfortheinstrumentation:
1)Measuringinstrumentsaswellascompletesetofinstrumentandcontrolvalvewiredtothe
controlsystem,plustheirtagnumbers.
2)Controlandinterlockrelation.
2.2.12Theutilitypipe&instrumentdiagramshallshowthefollowing:
1Tagnumberandnameofequipmenttransferringutilitiesmedium.
2Pipemediumflowdirection,mediumcode,pipenumber,nominaldiameter,pipeclass,pipespec
break,thermalinsulationandheattracingrequirements,valves,etc.
3Separatelynumberthemeasuringinstrumentsaswellascompletesetofinstrumentandcontrol
valveswiredtothecontrolsystem.
2.2.13Thelegendsandsymbolsintheprocessflowdiagram,utilityflowdiagram,piping&instrument
·6·diagram(P&ID),utilitypiping&instrumentdiagram(U&ID)shallshowthefollowing:
1Meaningofsymbol,abbreviationanddesignationofequipment,pipeandinstrument.
2Specificationsofassigningthelegendanddesignationofequipment,pipeandinstrument.
2.3Piping
2.3.1Thebasicengineeringdesigndocumentsforthepipingsectionshallconsistofthefollowing:
1Description;
2Designspecifications;
3Billofmaterials;
4Pipingandequipmentlayout.
2.3.2Thecontentofdescriptionshalldescribethefollowingrequirements:
1Designprinciplesshallincludetheapplicablenationalprojectconstructionregulations,policies
andrequirements,state-of-the-artmaterialselectionprinciples,supportingconditionsforproject
construction,etc.
2Designscopeshallclearlydescribethedivisionofprocessuni(tmainitem)andthemainworkof
project.
3Designschemeshalldescribethepipingandequipmentlayout,pipethermalinsulationandheat
tracing,pipecorrosionprotectionandcathodeprotectionandpipingstressdesignscheme.
4Pipecomponentsselectionshallincludetherequirementsonselectionofpipe,pipefittings,
connectorsandvalves,etc.
5Thesafetymeasuresshalldescribethesafetymeasuresadoptedinthedesign.
6Thenamesandserialnumbersshallbeclearlyindicatedfortheapplicablestandards.
7Intheexistingproblemsandsuggestions,thefollowingshallbedescribedsuchastheholding
pipingandequipmentlayout,supportingconditionsandsuggestions.
2.3.3Thecontentofdesignspecificationsshalldescribethefollowingrequirements:
1Designspecificationsonequipmentlayoutshallincludethefollowing:
1)Applicablestandardsforlayout;
2)Equipmentlayoutprinciples;
3)Roadwidthandspacerequirements;
4)Setupprinciplesforpipesleepers,piperacksandbuildings(specialstructures);
5)Foundationelevationrequirements;
6)Setuprequirementsforplatforms&ladders;
7)Routingrequirementsforopowercablesandinstrumentcables;
8)Equipmentandpumpmaintenancerequirements;
9)Environmentalprotectionrequirements;
10)Designrequirementsforoccupationaldiseaseprotectionfacilities.
2Pipinglayoutdesignspecificationsshallincludethefollowing:
1)Applicablestandardsonpipinglayout;
2)Generalrequirementsonpipinglayout;
3)Pipepurgingrequirements;
4)Pipedrainandventrequirements;
5)Pipeheattracinganddrainrequirements;
·7·6)Pressure-reliefpipeinstallationrequirements;
7)Pipespacingrequirements;
8)Pipegradientrequirements;
9)Pipeburialdepthrequirements;
10)Valveinstallationrequirements;
11)Instrumentelementinstallationrequirements;
12)Safetyvalveinstallationrequirements;
13)Designrequirementsforpipingsupportsandhangers;
14)Pipeprotectivesleevedesignrequirements.
3Designspecificationsofpipematerialsshallincludethefollowing:
1)Mainpipecomponentsselectionstandards;
2)Pipecomponentsselectionprinciples;
3)Requirementsonname,nominaldiameter,pressurerating,materialofconstruction,endface
type,wallthicknessandstandardofpipe,pipefittings,flange,gasket,bolt,nut,valve,aswell
asvalveinternalsmaterialandtype.
4Designspecificationsofpipethermalinsulationshallincludethefollowing:
1)Designprinciplesonpipeheatinsulation,coldinsulationandanti-scalding;
2)Specificationsonselectionofthermalinsulationmaterial,calculationonthicknessofthermal
insulationlayer,anddesign,constructionandacceptanceofthermalinsulationstructure.
5Designspecificationsofpipepaintingshallincludethepipesurfacepretreatmentrequirements,
design,constructionandacceptancerequirementsofcorrosionprotectionpaintingandcorrosion
protectioncoatingandrequirementsonpipesurfacecolorandmark,etc.
6Designspecificationsofpipemechanicalshallincludethefollowing:
1)Pipeflexibilitydesignspecifications;
2)Stressanalysiscalculationbasisandapplicationsoftware;
3)Theapplicablecodesandstandardsonseismicfortificationintensity,seismicdesignforthe
projectsiteandseismicdesignspecificationsforthenon-buriedpipe.
2.3.4Thecontentofbillofmaterialsshallmeetthefollowingrequirements:
1Thelistofpipeequipmentmaterialsshalllistoutalltypesofvalvesusedintheproject,aswell
'
asthevalvesnominaldiameter,pressurerating,technicalrequirements,quantityandstandardetc.based
uponthevalvetype.
2Thelistofpipematerialsshalllistoutthesize,technicalrequirements,quantityandweightof
pipe,thermalinsulationmaterialandanti-corrosionmaterial,etc.
3Thelistofequipmentmaterialsshalllistoutthename,specification,materialofconstruction,
technicalrequirements,unitandquantityofalltypesofsmallprocessequipmentandaccessories,etc.
2.3.5Thelayoutofpipeandequipmentshallshowthefollowing:
1Batterylimitandcoordinate.
2Locationorcoordinateofdike,intermediatedikeandweir.
3Contourandrelativelocationbetweenequipmentandbuildings(specialstructures),relative
locationbetweenpipecorridor,locatingdimensionofequipmentandbuildings(specialstructures).
4Arrangementofpipesleeperandpiperackaswellaswidthandgradientofpipesleeper.
5Equipmenttagnumberandname.
·8·6Locationanddimensionofcontrolroom,substationandauxiliaryroomwithinthebatterylimit
aswellastherelativeelevationofindoorground.
7Billofmainequipment.
8Descriptionofdimensionandcoordinateunit.
9Constructionnorth.
2.4Equipment
2.4.1Thebasicengineeringdesigndocumentsfortheequipmentsectionshallconsistofthefollowing:
1Description;
2Designspecifications;
3Equipmentengineeringdrawing.
2.4.2Thecontentofdescriptionshalldescribethefollowingrequirements:
1Theoverviewshalldescribeequipmenttype,quantityandspecifications;
2Equipmentsummaryshallincludethesummaryofequipmentandmainaccessories;
3Theequipmentstructuralcharacteristicsshallincludestructuraldescriptionsofstoragetank,
sphericaltank,vessel,heatexchanger,etc.;
4Thenamesofleadmaterialsandmainaccessoriesimportedorhome-made,andscopeofsupply
shallbeclearlydescribed.
2.4.3Designspecificationsshallincludespecificationsofverticalcylindricalstoragetank,spherical
storagetank,vesselandheatexchangerbasedontheequipmenttypeandcomplyingwiththefollowing:
1Besidesfundamentalwindpressure,seismicfortificationintensity,referencesnowpressure,
fieldsoilclassificationandgroundroughness,othernecessaryambientconditionsshallbeincludedfor
equipmentcalculationandmaterialselection.Thelowestdailyaveragetemperatureforyearssince
meteorologicalrecordsbeginshallbeincludedforstoragetankdesign.Thehourlymax.precipitation
shallalsobeincludedforthefloatingroofstoragetankdesign.Themin.monthlyaveragetemperature
foryearsshallalsobeincludedforthedesignofstoragepressurevesselinwhichthemetalshell
temperatureisvulnerabletotheatmospherictemperatureimpact,includingsphericaltank.
2Thenamesandserialnumbersshallbeclearlyindicatedfortheapplicablestandards.
3Theleadmaterialanddesigncalculationshallincludetheselectionofleadmaterialanddesign
calculationrequirements.
4Thedesignpressureandtemperatureshallincludedeterminationprinciples.
5Manufacturingandinspectionshallincludetheapplicablemanufacturing&inspection
standardsanddesignrequirements.
6Corrosionprotectiondesignshallincludethecorrosionprotectionmeasuresandlocations,etc.
7Theselectionofthermalinsulationmaterials,requirementsofperformanceandouterprotective
layer,etc.shallbedescribed.
8Accessoryselectionshallincludetheflangestandardandtype,primaryandsecondarysealtype,
drainagetype,agitationandlocationlimittype,rooftypeoftanks,etc.
9Otherrequirementsshallincludetransportationrequirementsaswellasspecialrequirementson
structure,material,accessory,etc.
2.4.4Thecontentofequipmentengineeringdrawingshallincludethedesignconditiondescription,
schematicdiagram,equipmenttype,overalldimension,leadmaterial,mainopening,attachmenttypeand
·9·quantity,mainmaterial,partqualityandtotalquality,etc.Thefollowingequipmentshallhavethe
engineeringdrawings.
1Intheverticalcylindricalstoragetanks,floatingroofstoragetankswithnominalvolumeof
3
morethanorequalto10000m,internalfloatingroofstoragetankswithnominalvolumeofmorethanor
33
equalto1000m,fixedroofstoragetankswithnominalvolumeofmorethanorequalto1000m,
3
stainlesssteelstoragetankswithnominalvolumeofmorethanorequalto500m,low-pressurestorage
tankswithdesignpressureofhigherthanorequalto2000Paandcryogenicstoragetanks.
2Sphericalstoragetank.
3ClassⅢpressurevessel.
4Otherequipmentwithspecialrequirements.
2.5Generalplotplanandtransportation
2.5.1Thebasicengineeringdesigndocumentsforgeneralplotplanandtransportationsectionshall
consistofthefollowing:
1Description;
2Designspecifications;
3Listofequipmentfortransportationandhandling;
4Billofmaterials;
5Regionallocationplanofoildepot;
6Overallplotplanofoildepot;
7Elevationlayoutofoildepot;
8Roadandrainwaterdrainagelayoutinoildepot;
9Earthworkdrawing;
10Uni(tmainitem)elevationlayoutplan.
2.5.2Thecontentofdescriptionshalldescribethefollowingrequirements.
1Theoverviewshalldescribethefollowing:
1)Theexistingandplanningneighboringenterprisesorfacilitiesassociatedwiththeproject
aroundtheoildepotaswellastheexistingriver,etc.;
2)Existingtrafficandtransportationconditions;
3)Totalrequiredareaofoildepot,typeoflandused,landrequisitionanddemolitionofbuildings
(specialstructures)andresidentialarea;
4)Topographyandlandform,engineeringgeology,hydrologicaldata,meteorologicalcondition,
seismicintensityandothernaturalconditionsinthesiteofoildepot.
2Designscopeshalldescribethedesignscopeofprojectandmainworksofproject.
3Theoverallplotplanshalldescribethefollowing:
1)Overallplotplanprinciplesofoildepot;
2)Overallplotplanshalldescribedivisionoffunctionalzones,contentofeachfunctionalzone,
respectivelocationrelationshipofeachfunctionalzoneandreservedlandintheoildepot,
distributionofoildepotfence,gateandguardhouse,arrangementofreservedland,etc.;
3)Layoutofmainpipenetworkinoildepotandthepipeconnectionsinbatterylimitofoildepot;
4)Overallplotplanshallcoordinatewithurbanandindustrialdistrictplanning,aswellasmeet
thehealthprotectionandfireseparationdistancerequirements;
·10·5)Fire-spacing-distancebetweenrespectivefacilitiesinoildepot.
4Theelevationlayoutshalldescribethefollowing:
1)Elevationlayoutprinciples;
2)Elevationlayoutdesign,designelevation,designgradientandslopedirection.Fortheterrace
layoutcase,theconnectionoftheterraces,typeandmaterialofretainingwall,typeand
materialoftheslopeprotectionshallbespecified;
3)Inthewayofrainwaterdrainageinoildepotandthetypeofditchstructure,thesectiontype,
material,widthandlongitudinalslopeatthebottomshallbedescribed;
4)Earthworkvolumeandthetreatmentofsurplusanddeficiencyofearth;
5)Theelevationdesignforoildepotshalldescribethefloodcontrolanddischargerequirements.
5Theroadinoildepotshalldescribeiftheroadtypesanddistributionsmaymeettherequirements
fortransportation,fire-fightingandmaintenance.Theroadtypeshallalsodescribetheroadwidth,
gradient,turningradius,space,structuralmaterialandengineeringpractice.
6Transportationshalldescribethefollowing:
1)Totalcargothroughput,transportationscheme,proportionofdifferentmodesoftransportation
andundertakingtransportationvolume.Thelistoftransportationvolume,modeoftransportation
andconfigurationofconveyancesareshownasTable2.5.2-1andTable2.5.2-2fordetails;
Table2.5.2-1Listoftransportationvolumeandmode
Transportationvolumeandmode(t/a)
S/NCargoSub-totalRemark
RailwayRoadPipeShiptransportOthers
Deliveryin
1…
…
Sub-totalofdeliveryin
Deliveryout
1…
…
Sub-totalofdeliveryout
Table2.5.2-2Listofconfigurationofconveyances
'
S/NDescriptionModelUnitQtyRemark
1…
…
2)Thetransportationvolumerailway,track-connectingpointforspecialrailline,wayand
locationofdocking,wayofplacing-inandtaking-outwagon,self-ownedlocomotive,tankcar
dispositionprinciplesandquantity,quantityofraillinesinoildepot,raillinesarrangement,
railwaylength,etc.;
3)Thetransportationvolumebyhighway,truckdispositionprinciplesandquantity;
4)Thetransportationvolumebyship,jettylocationaswellastherelationwiththeoildepot;
5)Thetransportationvolumethroughpipelines,thelocationofpipelinesinandoutofoildepot.
·11·7Landscapingshalldescribelandscapingplanningprinciplesandlandscapingspecificationsinthe
oildepot.
8Theengineeringquantitiesshalllistoutthebillofquantitiesofthegeneralplotplanand
transportationdesign.
9Themaintech-economicindicatorsshallbedescribedasinTable2.5.2-3.
Table2.5.2-3Listofmaintech-economicindicators
S/NItemsUnitQuantityRemark
Siteareaforoildepot,includingha
Siteareaforstoragetankfarmha
Siteareaforloading&unloadingfacilitiesha
1Siteareaforauxiliaryfacilitiesha
Siteareaforadministrativefacilitiesha
Siteareaforreservedlandha
Siteareaforaccessandotheraspectsha
2
Landusecoefficientforstoragetankfarm%
3Landusecoefficientforloading&unloadingfacilities%
4Lengthofroadinoildepotkm
5Oildepotroadcoefficientm/ha
6Railwaylengthkm
7Siteareaforoildepotlandscapingha
8Iandscapingcoefficientinoildepot%
3
Earthworkvolume,including
m
3
9Excavationvolumem
3
Landfillingvolumem
32
10Sitepreparationearthworkcoefficientforoildepotm/m
10Thenamesandserialnumbersshallbeclearlyindicatedfortheapplicablestandards.
11Intheexistingproblemsandsuggestions,theholdingproblems,furtherimprovementand
recommendationsshallbedescribed.
2.5.3Thecontentofdesignspecificationsshalldescribethefollowingrequirements.
1Thegeneralprovisionsshallincludethescopeofapplicationandscopeofdesign.
2Thedesignprinciplesshallincludethefollowing:
1)Overallplotplanprinciples;
2)Elevationlayoutprinciples;
3)Roadandrailwaydesignprinciples;
4)Oildepotrainwaterdrainageandfloodcontrolanddischargedesignprinciples;
5)Truck,forklift,locomotiveandrailcardispositionprinciples;
'
6)Designprinciplesofoildepotsfence,gateandguardhouse;
7)Designprinciplesoflandscapingplanninginoildepot.
3Generalrequirementsshallincludethefollowing:
1)Coordinatesystemusedfortheprojectandconversionformulausedfordifferentcoordinate
systems;
2)Elevationsystemusedfortheprojectandconversionbetweendifferentelevation-systems;
·12·3)Roadtype,roadwidth,roadlongitudinalslope,roadtransverseslope,roadturningradius,
structuralmaterialandengineeringpractice,curbdimension;
4)Classofspecialrailway,typeoftraction,limitslope,min.radiusofcurve,widthofsubgrade,
crossslopeofsubgradeandwayofraindrainage,typeofrail,standard,min.height,modelof
turnout,telecom,typeofsignal,typeofcarbumper,typeoflighting,andwidth&heightof
loading&unloadingplatform;
'
5)Structuralmaterialandengineeringpracticeforgroundpaving,unitsrampandpavement;
6)Materialandengineeringpracticeofopenditch,culvert,cut-offditchandflooddischarge
ditch.
4Thenamesandserialnumbershallbeclearlyindicatedfortheapplicablestandards.
2.5.4Thelistoftransportationloading&unloadingequipmentshalllistoutname,modelandsize,
quantityoflocomotive,trains,varioustrucks,loading&unloadingandliftingequipment,forklift,track
andtruckscales,etc.
2.5.5Billofmaterialshallindicatethename,typeandspecification,quantityofthematerial,etc.
2.5.6Regionallocationplanofoildepotshallshowthefollowing:
1Windrose,legend,description,etc.
2Thelocationsofexistingandplannedadjacentplantsorfacilitiesrelatedtotheproject.
3Locationandbatterylimitbetweentheoildepotandoffsitesupportingfacilities.
4Routeandlocationofrailway,highway,HVtransmissionline,watersupplyanddrainage
'
pipeline,processpipeline,heatingpipeline,floodsdrainageditch,drainageditchinandoutoftheoil
depot.
5Theroad,pipegalleryandotherroutesbetweentheoildepotandthejetty.
2.5.7Overallplotplanofoildepotshouldshowthefollowing:
1Measurementcoordinategrid,buildingcoordinategrid,windrose,legendanddescription,etc.
2Naturallandform,topographyorexistingmap.
3Locationandcoordinateofbatterylimit,fence,gateandguardhouseforoildepotland;location
andcoordinateofoildepotroad,aswellasentranceandexit;locationandcoordinateofrailway,
'
retainingwall,revetmentandfloodsdrainageditchinoildepot.
4Layoutofbatterylimitandcoordinateofeachfacilityaswellasthatofmainequipmentand
building(specialstructure)withinthefacility.
5Locationandcoordinateofrailline,meteringfacilitiesandtransportationloading&unloading
facilities.Thecoordinatesofbatterylimitraillinesinsideandoutsidetheoildepot.
6Fireandsafetyprotectionspacingwiththemainneighboringfacilities.
7Routingofmainpipenetworkinoildepot.
2.5.8Elevationlayoutofoildepotshallshowthefollowing:
1Constructionnorth,legend,descriptionandbillofquantities,etc.
2Location,coordinateandelevationofcontrolpointofoildepotfence,gateandguardhouse,
batterylimitforeachfacility,road,railway,retainingwall,revetment,etc.
3Nameofeachfacilitiesandmainbuildings(specialstructure).
4Designelevationorslopedirectionofoildepotandeachfacilityaswellasindoorandoutdoor
floorelevationformainbuildings.
5Finaldesignelevationoftheoildepotground.
·13·2.5.9Roadanddrainagelayoutofoildepotshouldshowthefollowing:
1Constructionnorth,legend,descriptionandbillofquantities,etc.
2Planpositionofoildepotfence,gateandguardroom;batterylimit,nameandcoordinateof
eachfacility.Layoutandcoordinateofrailwayline,meteringfacilityandloading&unloadingfacilities,
etc.
3Roadplanpositionandcentercoordinate,widthofsubgrade,subgradedesignelevationatroad
junctionandgradientchangepoint,slopedirection,gradientandslopelengthofroadlongitudinalslope,
locationofgradecrossing,squareandturnaround.Locationofrainditch,bridgeculvert,torrentgutter
andhydraulicdropfacility,andthewidth,gradientandslopedirectionofdrainageditch,ditchlength,
ditchbottomelevationatthestartingandendingpoints.
4Sectionaldrawingofroad,ditch,etc.
2.5.10Theearthworkdrawingshallshowtheappropriatediagramsasbelow.
1Whenthegridcalculationmethodisadopted,theearthworkdrawingshallshowthefollowing:
1)Constructionnorth,legendanddescription;
2)Locationofsitepreparationscopeline,batterylimitforeachfacility,fencegateandsiteroad;
3)Thegridchartshouldbeplottedwiththegridof20m×20mor40m×40m,andthe
elevationofnaturalground,designelevationandconstructionheightareindicatedateach
cornerofgridchart;
4)Plotthefillandexcavationbatterylimit,calculatetheearthworkvolumeinthegridandsummarize
thetotalamountoffillandexcavation.
2Fortheearthworkcalculationwithsectionmethod,theearthworkdrawingshallshowthe
following:
1)Definethelocationofselectedsectionandnumberitinthesitepreparationdrawing;
2)Plotthenaturalgroundlineanddesigngroundlineinthesectionaldrawing,andcalculatethe
sectionareaoffillandexcavation;
3)Calculatethetotalamountoffillandexcavationbasedonthefillandexcavationareasofeach
sectionaswellasthedistancebetweeneachsection.
2.5.11Theuni(tmainitem)elevationlayoutplanshallshowthefollowing:
1Constructionnorth,legend,descriptionandbillofquantities,etc.
2Locationofunit(mainitem)batterylimitandthelayoutofequipmentandbuilding(special
structure)withinthebatterylimit.
3Coordinateofuni(tmainitem)batterylimit.
4Designelevationandslopedirection.Theelevationlayoutofanindividualbuildingshallalso
indicatetheindoorgroundelevation.
5Driveway/sidewalkpaving,sidewalkandturnaroundlooplocation,turningradiusand
dimension.Rainditchlocation,width,gradient,slopedirection,ditchlength,elevationofbottomof
trenchatthestartingandendingpoints.Firedikeandintermediatedikelocations,coordinateanddike
crestelevation.Locationsofculvert,crossoverladder,crossoverbridge,oil-interceptiondrainvalve,
catchpit,etc.
6Thegrounddesignelevationandslopedirectionoutsideoftheunit(mainitem)batterylimit.
Sectionramplocation,coordinate,roadwidth,turningradius,roaddesignelevationattheintersection
andgradientchangepoint,ramplongitudinalslopedirection,gradientandslopelength.
·14·2.6Instrumention&control
2.6.1Thebasicengineeringdesignforinstrumention&controlsectionshallconsistofthefollowing:
1Description;
2Designspecification;
3Instrumentindex;
4Instrumentspecification;
5Instrumentpane(lcabinet)specification;
6On-lineanalyzerspecification;
7Billofmaterials;
8Instrumentlist;
9Centralcontrolroom(CCR)layout;
10Flammableandtoxicgasdetectorlayout;
11Instrumentmaincabletrayorrouting;
12Interlockdiagrams;
13Sequentialcontrollogic(timesequence)diagram;
14Complexloopcontroldiagrams(description).
2.6.2Thespecificationsshallbeprovidedwhendistributedcontrolsystem(DCS),safetyinstrumented
system(SIS),programmablelogiccontrol(PLC)systemandsupervisorycontrolanddataacquisition
(SCADA)systemareapplied.
2.6.3Thecontentofdescriptionshalldescribethefollowingrequirements:
1Inthesectionofprocess,theprocessautomaticcontrollevel,flowmeterdesignaswellas
accuracyshallbedescribed.
2Inthesectionofmeasurementandprocesscontrolphilosophy,thespecialinstrument,sequence
controlandsafetyinstrumentsystem,etc.shallbebrieflydescribed.
3Inthesectionofthemaininstrumentselectionandprocesscontrolsystemfunctionand
hardwareconfiguration,thesizeandquantityofoperatingconsole,printer,auxillaryconsole,instrument
panelandcabinet,etc.shallbespecified.
4Inthesectionofthesafetyinstrumentedsystemandgasdetectionsystem,explosion-proof,
flammableandtoxicgasdetector,etc.shallbespecified.
5InthesectionofInstrumentprotection,thefollowingshallbespecifiedsuchasexplosion-proof,
thermalinsulation,cloggingprevention,corrosionprotection,grounding,lightningprotection,
electromagneticcompatibilityandradiationprotection,etc.
6Inthesectionoflayoutofcontrolroomandfieldcabinetroom,thesizeandlayoutincluding
auxiliaryfacilitiesshallbespecified.
7Inthesectionofutilityfeederandconsumption,instrumentpowersupply,instrumentairand
heattracingshallbespecified.
8Thescopeforpackageinstrumentandcontrolsystemshallbespecifiedfortheinstruments
suppliedwiththeequipment.
2.6.4Thecontentofdesignspecificationsshallcomplywiththefollowingrequirements:
1Thegeneralprovisionsshalldescribethescopeofapplicationanddesign.
2Thenamesandserialnumbersshallbeclearlyindicatedfortheapplicablestandards.
·15·3Instrumentsignaltransmissionandunitsofmeasurementshallbespecifiedinthedesignbasis.
4Theselectionprincipleofinstrumentandcontrolsystemshallbedescribed,andforcontrol
system,DCS,PLC,SCADA,SIS,etc.shouldbeincluded.Forfieldinstruments,temperature
instruments,pressureinstruments,flowinstruments,levelinstruments,controlvalvesandon-offvalves,
analyzersandotherinstrumentsshouldbeincludedwhereapplicable.
5Thefollowingspecificationsoffieldinstrumentsincludingingressprotection,explosion-proof,
electromagneticcompatibility,groundingandlightningprotection,etc.shallbespecified.
6Therequirementofinstrumentpowersupply,airsupplyandhea(tcooling)supply,etc.shallbe
specifiedforinstrumentpowersupply.Thesource,voltage,frequency,capacity,sparecapacityand
terms,uninterruptedpowersupply(UPS),etc.shouldbeincluded.Forinstrumentairsupply,the
pressure,mass,dewpointtemperature,airconsumptionandsparecapacity,etc.shouldbeincluded.The
instrumentheating(cooling)sourcesshouldincludethetype,temperature,pressureandconsumption,
etc.
7Therequirementsforcontrolroomlayout,area,architecture,structure,heating,ventilationand
airconditioning(HVAC),lighting,etc.shallbespecified.Thecontrolroomshouldconsistofoperating
room,engineerstation,cabinetroomaswellasfieldauxillaryroom,UPSroom,HVACroom,shift
changeroom,lockerroomandtoilet,etc.
8Theprinciplesforselectionofwire(cable),instrumentcabletray,instrumentimpulselines,
instrumentairlines,heattracinglines,valves,fittingsandthermalinsulationmaterials,etc.shallbe
specifiedinthebillofmaterials.
2.6.5Instrumentindexshallconsistofalltheinstrumentsandauxiliaryinstrumentsforindicationand
controlloopincludingtagnumber,service,instrumenttype,signaltransmissiontype,instrument
specification,specificationnumber,installationlocation,P&IDnumberandpipingorequipment
number,shallbeinthesequenceofP&ID,U&IDandthealphabeticalorderofmeasuredvariables,orin
theotheragreedsequenceorder.
2.6.6Theinstrumentspecificationshallspecifythespecificationsanddataofallinstrumentsaccording
totheinstrumenttype,inwhichtheinstrumenttagnumber,name,service,processoperatingcondition,
quantity,protectionandexplosion-proofgrade,type,scopeofmeasurement,accuracy,signal
transmissiontype,powersupply,processconnectionandelectricalconnection,etc.shallbeincluded.
TheinstrumentspecificationshouldalsoprovidetheP&IDnumber,location,pipingorequipment
numberandpipeclass.Fortheon-lineprocessanalyzers,theinstrumentspecificationshallalsoprovide
thecompositionsofprocessstreamandbackgroundgas,processoperatingandutilityconditions,
technicalspecificationandattachments.
2.6.7Theinstrumentpanel(cabinet)specificationshallincludetheoverallsize,quantity,technical
requirementsofinstrumentpane(lcabinet)includingitsattachments.
2.6.8Theon-lineprocessanalyzerroomspecificationshallincluderequirementsforanalyzersand
instrumentsinstalledintheroomandotherfacilitieswithinanalyzerpackagesscopesuchaspre-sample
conditioningsystem,sampleconditioningsystem,ventsystem,samplerecoverysystem,utilityand
electricalwiring,etc.
2.6.9Billofmaterialsshallincludeallnecessarymainmaterialsusedforinstrumentinstallation,
includingthetype,specificationsandquantityofsteel,wire(cable),impulselines,airlines,heat
tracinglines,conduits,valves,fittings,junctionbox,instrumentboxwithorwithoutinsulationand
·16·cabletray,etc.
2.6.10Instrumentlistshallincludethename,specificationsandquantityofallinstrumentsandcontrol
systems.
2.6.11DCSspecificationshallspecifythegeneralrequirementsforsystem,hardwareandbasic
softwarerequirements,etc.,whichshouldprovidethespecificationandconfigurationrequirementsfor
controller,input/outpu(tI/O)card,operationconsole,printer,communicationsystem.Scopeofsupply,
I/Otypeandquantity,systemredundancyandstandby,spareparts,communicationinterface,
configurationsoftwaredescription,applicationsoftwaredescription,networkinganddataaccess
requirementsshouldalsobespecified.
2.6.12SISspecificationshallspecifythegeneralrequirementsforsystem,hardwareconfiguration
andbasicsoftwarerequirements,etc.,whichshouldprovidethespecificationsandconfiguration
requirementsforPLC,I/Ocard,monitoringstation(includingauxiliaryconsole),printer,
communicationsystem,configurationandprogrammingterminal,sequenceeventrecorder,etc.,Scope
ofsupply,I/Otypeandquantity,systemredundancyandstandby,spareparts,communicationinterface,
configurationsoftwaredescription,applicationsoftwaredescription,networkinganddataaccess
requirements,safetyinstrumentsystemlogicdiagramorinterlocklogicblockdiagramshouldalsobe
specified.
2.6.13PLCspecificationshallspecifythegeneralrequirementsforsystem,hardwareconfiguration
andbasicsoftwarerequirements,etc,whichshouldprovidethetechnicalspecificationandconfiguration
requirementsforcentralprocessingunit,I/Ocard,operationconsole,printer,programmingterminal,
communicationinterface.Scopeofsupply,I/Otypeandquantity,systemredundancyandstandby,spare
partsandprogrammingsoftwarerequirementsshouldalsobespecified.
2.6.14SCADAspecificationshallspecifythegeneralrequirementsforsystem,hardwareconfiguration
andbasicsoftwarerequirements,etc.whichshouldprovidethespecificationsandconfiguration
requirementsforcentralprocessingunit,remotedataacquisitionunit,I/Ocard,operationconsole,
printer,communicationsystem,etc.Scopeofsupply,I/Otypeandquantity,systemredundancyand
standby,spareparts,communicationinterfaceandconfigurationsoftwaredescriptionshouldalsobe
specified.
2.6.15DCSspecification,SISspecification,PLCspecificationandSCADAspecificationshallspecify
therequirementsforthevendorsincludingengineeringservice,training,configuration,testand
acceptance,commissioningservice,qualityassuranceandprojecthand-overdocuments,etc.
2.6.16Thecontrolroomcomposition,dimension,floorelevationandlocationsofcabinet,terminal
cabinet,powercabinet,operationconsole,printerandauxiliaryconsole,etc.shallbeshowninthe
controlroomlayout.
2.6.17Detectortagnumber,locationandinstallationelevation,etc.shallbespecifiedintheflammable
andtoxicgasdetectorlayout.
2.6.18Therelativelocationofcontrolroomandeachunit,themaincabletrayrouting,elevationand
dimensionshallbespecifiedintheInstrumentcabletrayrouting.
2.6.19Causeandeffectbetweeninputandoutputshallbespecifiedininterlockdiagrams.
2.6.20Duringthesequenceprocesscontrol,operatingstatusandlogicrelationsbetweeninvolved
equipmentsshallbespecifiedinthesequencecontrollogic(timesequence)diagram.
2.6.21Complexloopcontrolphilosophyandcompositionshallbespecifiedincomplexloopcontrol
·17·diagrams(description).
2.7Electrical
2.7.1Thebasicengineeringdesigndocumentsfortheelectricalsectionshouldconsistofthefollowing:
1Description;
2Designspecifications;
3Calculationsheet;
4Listofelectricalloads;
5Billofequipmentandmaterials;
6Equipmentspecification;
7Overallkeysinglelinediagraminoildepot;
8TopologydiagramofSCADAsystem;
9Classificationofhazardousareainoildepot;
10Cableroutinginoildepot;
11Lightningprotectionandgroundinglayoutinoildepot;
12Singlelinediagram;
13Equipmentlayoutofsubstation.
2.7.2Thecontentofdescriptionshalldescribethefollowingrequirements:
1Theoverviewshalldescribethescopeofdesign,loadclassification,powerrequirements,total
electricloads,annualpowerconsumption,emergencyload,emergencypowersupply,classificationsof
explosionriskmaterials,etc.
2Thesectionofpowersupplyanddistributionengineeringshoulddescribetheexternalpower
supplyandpowerlineparameters,theconnectionsoffeedersandoperation,arrangementofautomatic
unitandoperation,energy-savingmeasures,substationarrangementandscopeofpowersupply,process
interlockandspecialcontrolrequirements,cableselectionandcabling,etc.
3Lightingshoulddescribethelightingkinds,powersupply,controlandcablingrequirement.
4Thelightningprotection,anti-electrostaticandgroundingshoulddescribetheclassificationof
structurestobeprotectedagainstlightning,anti-electrostaticmeasures,groundingtypeandrequired
groundingresistance.
5Electricalmaintenanceandrepairshoulddescribetheavailabilityofsupports.
6Intheexistingproblemsandsuggestions,theholdingsupportingconditionsandthosewhich
needoptimizationshallbedescribed.
2.7.3Thecontentofdesignspecificationsshallcomplywiththefollowingrequirements:
1Designbasisshalldescribethepowerdata,relativeagreement,minutesofmeeting,
meteorologicalandgeologicalinformation.
2Thenamesandserialnumbersshallbeclearlyindicatedfortheapplicablestandards.
3Thepowersupplyanddistributionsystemshoulddescribethesubstationpowersystem,relay
protection,powerdistributionandmonitoringsystem,reactivepowercompensation,substationlayout,
'
cablingandequipmentselectionandinstallation,therelativedisciplinesrequirementonsubstation.
4Thelightingdesignshoulddescribethedesignprinciples,equipmentselectionandinstallation
requirements.
5Thesectionoflightningprotection,anti-electrostaticandgroundingdesignshoulddescribethe
·18·lightningprotection,anti-electrostatic,groundingdesignprinciple,equipmentselectionandinstallation
requirements.
2.7.4Thecalculationsheetshalllistoutthemethods,conditions,inputdataandoutputresultsof
calculation,andshouldanalyzethecalculationresults.Electricalcalculationshouldcovertheload,
transformerselection,emergencyload,reactivepowercompensation,short-circuitcurrent,electrical
equipmentselection,voltagedeviationduringthemotorstartandrestart,capacitancecurrent,power
cablesizeselection,depotroadlightingandothercalculations.
2.7.5Thelistofelectricalloadsshalllistoutthename,ratedvoltage,ratedcapacity,calculated
capacity,annualpowerconsumption,installedcapacityandthequantitiesofrunningequipment.The
loadsummaryshalldescribethetotalinstalledcapacity,thecalculatedcapacityandallelectricalcapacity
intheoildepot.
2.7.6Thebilloftheequipmentandmaterialsmaybelistedoutbasedonthecatalogofpower
distribution,cabling,lighting,lightningprotectionandgrounding.Itshoulddescribethename,type,
specification,unit,quantity,remarks,etc.
2.7.7Specificationsofequipmentshalllistoutthemainpowersupplyequipmentinsubstations,and
'
shouldincludethescopeofapplication,sellersresponsibility,applicablecodesandstandards,technical
requirementsofdesign,requirementsoftesting,inspectionandcorrosionprotection,nameplateor
'
marksandsellersdocuments,etc.
2.7.8Thesinglelinediagramintheoildepotshouldshowtherelatedparametersofouterfeeders,the
substationsarrangementandtheirelectricalrelations,thedataofthemainelectricalequipment,the
'
substationspowersupplyscopeandload.
2.7.9SchematicdiagramofSCADAsystemshouldshowtheequipmentarrangementand
telecommunicationrelationsamongthemasterstationandthesub-stations.Itshouldalsoindicatethe
telecommunicationrelationsoftheSCADAsystemoftheoildepotandtheecternalenvironment.
2.7.10Classificationofhazardousareainexplosivegasatmosphereshouldbeshowninplotplan
layout.Thetypicalandsectionviewmaybeusedifnecessary.Theparametersofexplosivematerials,
theprocessoperatingconditions,theminimumrequirementofelectricalequipmentanditsexplosion-
proofcertificationshouldbedescribedinthedrawing.
2.7.11Thecablingdrawingshallshowthemaincablerouteandinstallationintheoildepot.
2.7.12Thedrawingoflightningprotectionandgroundinglayoutinoildepotshouldshowthelayoutof
thegroundinggrids,therelationshipbetweendifferentgroundingsystemsandrequirementsfor
groundingresistance,thedesignofeletro-staticgroundingandpracticeinoildepot.
2.7.13Singlelinediagramshouldshowthebusconnection,relayprotectiondesign,andautomaticunit
arrangement.Metering,measuring,designofmeters,electricpowerparameters,designofcompensation
unitandpowerdistributioncircuitsshouldbeindicated.
2.7.14Substationequipmentlayoutshallshowthesubstationstructureandsize,locationand
dimensionofsubstationequipmentarrangement,andlocationanddimensionofsafetyexit.
2.8Telecommunication
2.8.1Thebasicengineeringdesigndocumentsforthetelecommunicationsectionshouldconsistofthe
following:
1Description;
·19·2Designspecifications;
3Billofequipmentandmaterials;
4Equipmentspecifications;
5Telephonewiringsystemdiagramorstructuredcablingsystemdiagram;
6Wirelesscommunicationsystemdiagram;
7Automaticfirealarmandfire-fightingcontrolsystemdiagram;
8Publicaddresssystemdiagram;
9Televisionmonitoringsystemdiagram;
10Intelligentcardsystemdiagram;
11Perimeteralarmsystemdiagram;
12Telecommunicationequipmentconfigurationdiagram.
2.8.2Thecontentofdescriptionshalldescribethefollowingrequirements:
1Designscopeshalldescribethedesignscopeofprojectandmainworksofproject.
2Thecontentoftelecommunicationsystemshallcomplywiththefollowingrequirements:
1)Theadministrationtelephone,dispatchtelephoneanddirect-dialtelephonesystemshalldescribe
thetypeoftelephone,designschemeoftelephonestation,modeofrelay,powersupplyand
grounding,etc.;
2)Thestructuredcablingsystemshallclearlydescribethesystemscheme,composition,function
andinformationsocketinstallationlocation;
3)Thewirelesstelecommunicationsystemshallclearlydescribethesystemscheme,composition,
'
workingway,characteristicsofuserslocationandfrequencyofuseandpower;
4)Theautomaticfirealarmandfire-fightingcontrolsystemsshalldescribethesystemscheme,
composition,function,controller,fireconsoleorPLCcontrolcabinetmountinglocations,
mountinglocationofdifferentalarmdevices,integratedfire-fightingcontrollogicrelation,net-
workingtelecommunication,alarmdeviceandemergencybroadcastingschemes;
5)Thepublicaddresssystemshalldescribethesystemscheme,composition,function,capacity,
loopquantity,wayofpowersupply,installationlocationofhostcomputer,intercomstation,
loudspeakermountinglocationandconnectionrelationwithothersystems;
6)Thetelevisionmonitoringsystemshallclearlydescribethesystemscheme,composition,
function,wayofsignaltransmission,waysofpowersupply,objectsmonitoredbythecamera,
themountinglocationsofmonitor,controllerandconsole,andconnectionswithother
systems;
7)Theintelligentcardsystemshalldescribethesystemscheme,composition,function,mounting
locationsofcardreaderandcontrollerandsignaltransmissionmode;
8)Theperimeteralarmsystemshalldescribethesystemscheme,composition,function,
mountinglocationofdetectorandcontrollerandsignaltransmissionmode;
9)Thetypeoftelecommunicationline,cableandfiberopticcableselections,routeselectionand
wayofcabling,etc.shallbedescribedfortelecommunicationlines;
10)Thelistoftelecommunicationusersshallshowthemountinglocation,nameandquantityof
userequipment,environmentalcharacteristics,etc.Thelistoftelecommunicationusers
shouldcomplywiththerequirementsofTable2.8.2.
·20·
·21·
Table2.8.2Listoftelecommunicationusers
Television
monitoring,Publicaddress
Firealarmandfire-fightingcontrolsystem
perimeteralarmsystem
system
Administra-Direct-
UnitUni(tmainDispatchLANWirelessEnvironmental
S/NtiondialingRemarks
numberitem)telephoneterminaltelephonecharacteristiccs
telephonetelephone
Smokeand
Dete-Cam-Mon-ManualFlameAlarmControl/IntercomLouds-
temperature
ctoreraitoralarmdetectorunitdisplaystationpeaker
detector
1
2
Total2.8.3Thecontentofdesignspecificationsshallcomplywiththefollowingrequirements:
1Generalprovisionsshalldescribethescopeofdesignandscopeofapplication.
2Designbasisshalldescribethesupportingtelecommunicationconditionsandmeteorological
conditions,etc.
3Thenamesandserialnumbersshallbelistedforthemainapplicablestandards.
4Thecontentoftelecommunicationsystemshallcomplywiththefollowingrequirements:
1)Theadministrationtelephonesystemshalldescribethesystemscheme,telephonestation
capacityandfunctionconfiguration,modeofrelay,numberingplan,principleonselectionof
auxiliaryequipmentinthetelephonestation,telephonestationprocessrequirements,wiring
design,powersupply,lightningprotectionandgrounding,etc.;
2)Thedispatchtelephonesystemshalldescribethesystemscheme,telephonestationcapacity
andfunctionconfiguration,powersupply,lightningprotectionandgrounding,etc.;
3)Thestructuredcablingsystemshalldescribethesystemsolution,composition,function,cable
selectionandcabling,etc.;
4)Thewirelesstelecommunicationsystemshalldescribethesystemscheme,composition,
function,basestation,antenna,vehicle-locatingset,radiosetupprinciple,powersupply,
lightningprotectionandgrounding,etc
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 塑料零件的動態(tài)力學性能測試考核試卷
- 漁業(yè)資源保護與海洋資源長期規(guī)劃實施考核試卷
- 復混肥料在農作物適應性種植中的研究考核試卷
- 林產品消費市場趨勢研究考核試卷
- 視覺傳播設計與商業(yè)價值試題及答案
- 木材國際貿易中的匯率風險防范考核試卷
- 珠寶首飾行業(yè)品牌風險管理考核試卷
- 統型應急電源充電機BUSELECTRICALINSTALL
- 煙草機械裝備的能效對比分析與改進考核試卷
- 2025年高考英語二輪復習測試02 無提示詞的單句填空+語法填空(語篇)(測試)(原卷版)
- 愛美的小公雞(共22張)課件
- 碳酸丙烯酯法脫碳工藝工程設計
- 巧用繪本提升自閉癥兒童語言表達能力
- 計數型量具分析報告(Excel帶計算KAPPA公式)
- 麗聲北極星分級繪本第三級下 A Long Wait課件
- 瀝青路面工程施工監(jiān)理細則
- 譯林版六年級下冊英語期中試卷(江蘇南京江北新區(qū)2021年真卷含聽力答案)
- 事故車輛毛利率核算表
- 新規(guī)范四統表(范本)
- 不穩(wěn)定性心絞痛和非ST段抬高心肌梗死診斷與治療指南(全文)
- 大學生電子商務創(chuàng)業(yè)存在的問題及對策
評論
0/150
提交評論