版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)
文檔簡介
DCVDProcessIntroductionWhat’sDCVD?CVDcomponentCVDProcessapplicationCVDfilmindexComponentsofCVDsystemsWhat’sDCVD?DCVDmechanismDCVDprocessapplicationDCVDfilmcharacteristic&indexSACVDPECVDHDPCVD
DCVDProcessIntroductionWhat’sDCVD?DCVD
Theprocessofdepositingsolidfilmsusingvapororgasesasthesourcematerial.Thesesolidfilmsareusedforinsulationbetweensemiconductorlayers.DielectricAmaterialthatconductsnocurrentwhenavoltageisappliedtoacrossit.OxideandNitridesaredielectricmaterials.Chemical
Thereisachemicalreactionatthewafersurfaceasfilmisdeposited.Vapor
Thereactantareeithergasesorvapor.DepositionAsolidfilmisdepositedonthesurfaceofthewaferasaproductofthereactionbetweensourcegasesComponentsofCVDsystemCVDprocessdescriptionA).Gas/VaporphaseprecursorsintothereactorB).PrecursorsdiffuseacrosstheboundarylayerC).PrecursorsadsorbonthesubstrateD).AbsorbedprecursorsmigrateonthesubstrateE).ChemicalreactiononthesubstrateF).ByproductdesorptionsG).ByproductdiffuseacrosstheboundarylayerH).Byproductoutofreactor(A)(B)(C)(D,E)(F)(G)(H)BoundarylayerDCVDProcessSilaneprocess:
Oxide:SiH4+N2O plasma&heat
SiOx+N2+H2+H2O+othervolatilesSiH4+O2SiOx+H2+H2O+othervolatilesNitride:SiH4+N2+NH3
plasma&heat SiNxHy+othervolatilesSION
SiH4+N2O plasma&heat
SiOx
Ny+N2+H2+H2O+othervolatilesSilaneprocesschambercleanNF3+SiO2plasma&heatSiF4+N2+othervolatilesNF3+SiNplasma&heatSiF4+N2+othervolatilesplasma&heatDCVDProcessOzoneTEOSProcess:USGO3 heat O2+OO+Si(OC2H5)4
plasma&heatUSG+volatileorganicsPSGO+TEOS+TEPOheatPSG+volaticorganicsBPSGO+TEOS+TEPO+TEBplasma&heatBPSG+volatileorganicsTEOSchambercleanC2F6+NF3+SiO2
plasmaSiF4+CO+N2+othervolatileSurfaceAdsorption
SubstratesurfaceChemisorbedprecursorPhysisorbedprecursorBondingEnergySurfacedistanceChemisoptionStrongbondingenergyprecursor&surfaceVerylowsurfacemobility&badstepcoverageSiH4gasPhysisoptionWeakbondingenergyprecursor&surfaceHighsurfacemobility&goodstepcoverageTEOSgasDCVDApplicationin18LGShallowTrenchIsolation(STI)Anti-reflectedCoating(DARC)PremetalDielectric(ILD)IntermetalDielectric(IMD)PassivationDielectric(PASS)1.5k?SRO+6kASINMet1Met2Met3Met4Met5Met6Gox38?(El.)0.15m0.15m0.35mPoly2k?SiON400?ILD7.5k?COSiIMD19.0k?IMD29.0k?IMD39.0k?IMD49.0k?IMD510.5k?HDP10.0k?SiN+SRO7.5k?8.7k?4.8kA4.8k?4.8k?4.8k?4.8k?10k?HDPDielectricfilmcharacteristics
RefractiveIndex(R.I.)SpeedoflightinavacuumSpeedoflightinthefilmR.I.=Surfaceinterfaceθ2
θ1Vacuumn1Filmn2
n1sinθ1=n2sinθ2SiO2=1.46,Si3N4=2.01,Air~1(Referenceλ=633nm)R.I.SOG
SiO2SROSiONUVSiNSiNDARCPoly
1.381.461.501.751.92.02.0~2.53.8~4.0Oxygen/NitrogenrichSiliconrichDielectricfilmcharacteristics
PECVDrefractiveindextrendDielectricfilmcharacteristics
Depositedfilmthickness
Depositionrate=Depositedtime
Thicknessbeforewetetch-Thicknessafterwetetch
Wetetchrate=Wetetchtime
ThicknesschangeoftheCVDfilm
Wetetchrateratio=(WERR)Thicknesschangeofthethermaloxidefilm(A/min)Dielectricfilmcharacteristics
ThicknesschangeafterthermalcycleShrinkage=Standarddeviation(σ)(Non-)Uniformity=Meanvalue(
)Σ(XI-)2
σ=N-1Thicknessbeforethermalcycle
╳100%i=1~nX1+X1+…….+XNNDielectricfilmcharacteristics
StressBarewaferCompressivestress(-)Tensilestress(+)Afterdeposition△L=α
△TL
α
Coefficientsofthermalexpansion(in10-6C-1)
SiO2=0.5 Si=2.5Si3N4=2.8 W=4.5Al=23.2Dielectricfilmcharacteristics
StresscalculatedE
Stress=(-)1-vh2
6t1
Rafter1
RbeforeSubstrateYoung’smodulusSubstratethicknessSubstratepossion’sratioFilmthicknessWafercurvatureradius*1Mpa=106Pa=107dynes/cm2WhyUsingSABPTEOS?
Sub-atmosphericdopeTEB/TEPOwithTEOS/O3Goodgap-fillingcapabilityandPlanilization
forILDLayerTrapNa+LowerReflowTemperatureNonePatternSensitivityThroughputSACVD(Sub-AtmosphericCVD)HardwareintroductionINTERLAYERDIELECTRIC(ILDScheme)PE-SION400ADEPSABP-TEOSDepositionBPSGFLOW PETEOSdepositionOxCMPforILDN-WellP-WellP+P+N+N+2K?SABPSG10.5K?PETEOS400?SINOPECVD
SiH4+N2OplasmaSiOx(Hy)+othervolatiles(400C)SiH4+N2+NH3plasmaSiNx(Hy)+othervolatiles(400C)SiH4+N2O+NH3+N2
plasmaSiOxNy(Hz)+othervolatiles(400C)SiH4+N2O+He
plasmaSiOxNy(Hz)+othervolatiles(400C)WhyneedPECVD?LowtemperatureformetallizationprocessHighdepositionrateforWPHR.I.Adjustable(DARC,SRO)PECVD(PlasmaenhancedCVD)
PECVD(PlasmaenhancedCVD)
ACDielectricARC
DARC:DielectricAnti-ReflectiveCoating
Eliminatetheunwantedreflectionsbyphaseshiftcancellation
ofunwantedwavelengthPECVDOxynitride(SiH4+N2O+He→SiON)PECVDApplication(0.18Logic)
1.5k?SRO+6kASINMet1Met2Met3Met4Met5Met6Gox38?(El.)0.15m0.15m0.35mPoly2k?COSi4HDP10.0k?SiN+SRO7.5k?6.8k?5.1k?5.1k?5.1k?5.1k?5.1k?10k?HDP
PESiONEtchstoplayerN-WellP-WellP+P+N+N+2k?SABPSG10.5k?PETEOS
ILDPETEOS10.5KMet1N-WellP-WellP+P+N+N+6.5k?HDP11KAPEFSG
IMDPEFSG11KPass.PESRO1.5K/PESIN6KPolyDARCMetalDARCContact/ViaDARCWhyUsingHDP?
WhatistheHDP-CVD?=>HighDensityPlasma(HDP)isatypeofadvancedchemicalvapordeposition(CVD)technologyinwhichthedensityoftheinconventionalplasma-enhanced(PE)CVDtechnology.plasma(~1011-1012n/cm3)ishigherthanthatused
WhyweneedHDP-CVD?
=>HDP-CVDisconsideredaleadingtechnologyforthemostadvancedgap-fillingrequirementsin<0.35μmdesignrules.HDPCVD(HighDensityPlasmaCVD)
StepcoveragebacSidewallstepcoverage=b/aBottomwallstepcoverage=c/aAspectratio=h/sl:line,s:space
ArrivingangleStepcoveragetopressure&surfacemobilityrelativeoverhanghlsGapfill
TrapperprofileOverhangprofileNormalprofileVoidCM81SABPSGvoidissueHDP-CVDConcept
Silaneoxidedepositingandargonionetchingbackatthesametime.Whendepositionandsputterrateareproperlyadjusted,theHDPchamberandprocessiscapableoffillingnarrowgapsfromthebottomupwithoxideofhighqualityandspatialuniformity.Gap-fillingcapabilitydependentonratioofdepositiontosputteringD/S=(netdepositionrate+blanketsputteringrate)/
(blanketsputteringrate)Deposition=>DryEtching=>Deposition=>ContinuousProcessHDP-CVDConcept
HDP-CVDConcept
IMDHDPgap-fillvsD/SHDP-CVDConcept
HDP-CVDConcept
HDP-CVDConcept
Howtocontrolwafertemperatureduringprocess?ESC(ElectrostaticChuck)
1)Largeionbombardmentcomponentgeneratesmuchheatonwafer.2)BacksideHecoolingi
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2024年物業(yè)管理改善協(xié)議3篇
- 小班音樂教案錦集10篇
- 雙十一營銷活動方案大全10篇
- 醫(yī)院護士演講稿(合集15篇)
- 軍訓(xùn)心得高一范文5篇
- 邀請活動的邀請函八篇
- 感恩中學(xué)生演講稿三篇
- 會計的實習報告三篇
- 乒乓球比賽的作文400字合集7篇
- 保護水資源倡議書15篇
- DB32T 4353-2022 房屋建筑和市政基礎(chǔ)設(shè)施工程檔案資料管理規(guī)程
- 航空小鎮(zhèn)主題樂園項目規(guī)劃設(shè)計方案
- 保潔冬季防滑防凍工作措施
- 少兒美術(shù)課件-《我的情緒小怪獸》
- 拆除工程原始記錄
- 重視圍透析期慢性腎臟病患者的管理課件
- 預(yù)應(yīng)力鋼絞線張拉伸長量計算程序單端(自動版)
- 企業(yè)內(nèi)部審計情況報表
- 基坑監(jiān)測課件ppt版(共155頁)
- 露天臺階爆破設(shè)計
- 中式婚禮PPT幻燈片課件
評論
0/150
提交評論