北京雨季施工方案_第1頁
北京雨季施工方案_第2頁
北京雨季施工方案_第3頁
北京雨季施工方案_第4頁
北京雨季施工方案_第5頁
已閱讀5頁,還剩12頁未讀, 繼續(xù)免費閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領

文檔簡介

編號:XX市**少年宮工程 雨季施工方案編制人:審核人:批準人:編制單位:目錄編制依據(jù)··············································································································································1工程概況··············································································································································1整體概況·······································································································1施工條件·······································································································1施工總體安排······································································································································1施工準備·······································································································1機具、物資配置······························································································2組織機構(gòu)·······································································································3雨季主要施工方法······························································································································3回填土工程····································································································3塔吊基礎周圍排水···························································································4腳手架工程····································································································4砼工程·········································································································4鋼筋工程·······································································································5模板工程·······································································································5地下外墻防水工程···························································································5現(xiàn)場臨建·······································································································5現(xiàn)場臨時用電·································································································6預留洞口及后澆帶防雨·····················································································6機電施工·······································································································6技術質(zhì)量保證措施······························································································································7雨季施工材質(zhì)要求···························································································7防汛搶險工作必須及時、有效············································································7安全措施··············································································································································7應急預案··············································································································································8目的···········································································································8危險源分析····································································································8應急組織機構(gòu)及職責························································································8應急響應措施·································································································94.2.3土方回填,應安排在晴天,并且連續(xù)進行,盡快完成?;靥钸^程中,遇雨時,用塑料布覆蓋,防止雨水淋濕已夯實部分。雨后回填前認真作好填土含水率測試工作,含水率較大時將土鋪開晾曬,待含水率測試合格后方可回填。(最佳含水率通過標準擊實試驗測定,詳見《施工試驗方案》)2.4由于基坑較深,回填土需要一定時間,故回填前在回填面上每隔30米做一800×800×800mm(深)集水坑,兩側(cè)回填時留槎,并留出坡度,以便及時把雨水排出。塔吊基礎周圍排水三臺塔吊均座落于基坑內(nèi),為了回填基坑土方,四周砌筑保護墻,保護墻高出地面500mm,高出地面部分用防水砂漿抹面,頂部用蓬布覆蓋嚴實。在基坑內(nèi)一角用磚砌(表面抹灰)一800×800×800mm(深)的集水坑,用污水泵及時將基坑內(nèi)積水抽走,以保證塔吊基礎下部土層不受雨水的浸泡而降低承載力。塔吊基礎排水圖詳見附圖-02。腳手架工程4.4.1外腳手架座落于回填土上,故必須保證回填土的質(zhì)量,同時立桿下墊通長木方,并在木方下滿鋪碎石子,使重量均布于回填土上,在距腳手架外立桿外500mm處設一排水溝,及時將雨水排走,以免腳手架基礎被雨水浸泡造成地基沉陷。4.4.2現(xiàn)場專職安全員需在雨前檢查立桿墊木是否有效,回填土有無塌陷;雨后基礎有無沉陷,立桿有無下沉,腳手架有無變形,如有不正常之處,須迅速加以加固和修整。4.4.4上人馬道加上防滑條,做好防滑措施;馬道兩側(cè)加設300高擋腳板,同時加設不低于1.2米的安全護攔,立封密目安全護網(wǎng)。4.4.4大雨期間,不得進行腳手架的搭設和拆除;大雨、大風后應及時對腳手架進行檢查修理,有安全隱患的整改合格后方可投入使用。4.5腳手架防雷采用φ12圓鋼每三層每邊兩點與結(jié)構(gòu)防雷(或防雷帶)相焊接,且必須腳手架整體導電不間斷性(可在節(jié)點位置刮去鋼管漆來保證),腳手架搖測電阻不大于10。雨前認真檢查腳手架的防雷接地,對不符合處從速進行修補,避免遭受雷擊。4.5砼工程砼澆筑盡量避開雨天,如遇下雨,應采取如下措施:4.5.1墻、底板砼澆筑中遇到大雨時,,將已澆筑的砼振搗密實(留好接搓)后用塑料布覆蓋,并將塑料布綁扎牢固,防止被風吹走。4.5.2頂板砼澆筑遇大雨時,及時留置施工縫,邊澆筑邊振搗密實(用抹子抹平),同時用塑料布覆蓋,嚴禁砼內(nèi)的水泥漿流失,澆筑到位后立即停止?jié)仓?.5.3如遇小雨時及時振搗抹壓和覆蓋,保證水泥漿不流失。5.4本工程采用商品砼,為把好砼質(zhì)量關,定期派人去攪拌站檢查其砂、石堆料場,水泥倉庫,檢查砂、石的含泥量,水泥的防雨情況。嚴禁將含泥量超標的砂、石和失效的水泥用于本工程中。4.6鋼筋工程4.6.1現(xiàn)場鋼筋堆放應墊高,以防鋼筋泡水銹蝕。鋼筋原材堆放在磚砌地壟上;鋼筋半成品應堆放在墊高的木方上。4.6.2遇雨時,用塑料布或彩條布臨時加以遮蓋;雨后鋼筋視情況進行除銹處理,不得把銹蝕嚴重的鋼筋用于結(jié)構(gòu)上。6.3下雨天避免鋼筋焊接施工,以免影響施工質(zhì)量。4.7模板工程4.7.1大雨、大風后對模板架子等要及時檢查:扣件有無松動滑移、架子和模板有無變形、地基有無沉陷等現(xiàn)象。檢查完成后要及時修復,確定無安全隱患后方可繼續(xù)使用。4.7.2大雨、大風時,禁止進行大模板(框架柱定型鋼模)吊裝就位施工作業(yè)。已就位的大模板的對拉螺栓連接要牢固,模板支撐要穩(wěn)定。4.7.3大模板(框架柱定型鋼模)堆放場所要及時檢查,檢查架子的穩(wěn)定性,以防整體因雨淋地基下沉而失穩(wěn)傾倒及大鋼模的穩(wěn)定(自穩(wěn)角為60~80°),以防風大而傾倒。4.7.4制作模板的多層板和木方要堆放整齊,而且須用塑料布覆蓋防雨。7.5支立好的頂板?;驂δ#缬龃笥晡礉仓?,應進行遮蓋,防止因雨淋而造成脫模劑的失效。雨后要認真檢查其平整度、垂直度和脫模劑附著情況,合格后方可澆筑砼。4.8地下外墻防水工程4.8.1地下外墻防水層施工不得在雨天進行。4.8.2雨季施工地下外墻防水層,確?;鶎颖砻鎽3指稍铮什淮笥?%(檢測方法為:下午2:00,將1m2卷材平鋪在找平層上,靜置3~4小時,掀開檢查覆蓋部位,找平層未結(jié)露,卷材未見水?。?.3雨后施工防水時應將地下外墻防水基層認真清理干凈,檢查周圍的施工環(huán)境是否滿足要求,特別是邊坡的穩(wěn)定情況。4.9現(xiàn)場臨建4.9.1檢查辦公室、宿舍及料庫屋面有無漏雨現(xiàn)象,對漏雨的部位及時修理完好。4.9.2室外地面全面硬化,道路場地等排水坡向正確、排水溝暢通無阻,確保施工現(xiàn)場無積水。4.9.3檢查食堂、廁所等的排水溝,及時疏通污水管道。4.9.4大雨來臨前要清理糞坑,避免糞坑因大雨襲擊而溢出。4.9.5雨季來臨前,對現(xiàn)場的庫房等作好地面加高處理,對于受潮易損物品制定專項保護措施(架空或覆蓋保護)。9.6雨天時,要檢查生活區(qū)宿舍基礎周圍有無積水,積極采取增設排水溝等措施保證其排水通暢,確保宿舍地基不下沉。4.10現(xiàn)場臨時用電4.10.1供電線路,不能直埋的一定要架空,室外的配電箱、電焊機和機械設備搭設防雨棚。值班電工要經(jīng)常檢查現(xiàn)場電氣設備的接地,接零保護裝置是否靈敏有效。雨季使用的電氣設備應采用雙重保護措施──漏電保護和絕緣保護,及時檢查電線絕緣是否良好,接頭是否包好,禁止電線浸泡在水中。4.10.2在潮濕和易觸及帶電體場所的照明電源不得大于24V;在特別潮濕的場所或金屬容器內(nèi)工作的照明電源電壓不得大于12V;手持燈的電源線不得使用塑料線。4.10.3塔司班前必須檢查機身是否帶電,漏電裝置是否靈敏有效,各種操作機構(gòu)是否靈活、安全可靠;塔司每次下班后,須關好駕駛室門窗,切斷配電箱內(nèi)電源開關,關好箱門上好鎖。10.4遇大暴雨或五級以上強風等惡劣天氣,應停止起重。4.11預留洞口及后澆帶防雨4.11.1±0.00處沒有封閉的大于1000m的預留洞口,在洞口四周用磚砌墻,高出結(jié)構(gòu)面300mm,墻身四周抹水泥砂漿。用鋼管搭架高度為1.0米,并間隔300mm用紅、白油漆刷好(并且內(nèi)掛密目安全網(wǎng)),覆蓋鐵皮瓦防雨,防止雨水流入地下室。4.11.2±0.00樓層處小于1.0米的洞口用預制板封蓋,四周用水泥砂漿封堵,避免雨水從這些洞口留入地下室。11.3未澆筑混凝土的后澆帶,為避免泥漿和雜物等流入,并雨水銹蝕鋼筋,在兩側(cè)砌一皮灰砂磚,上面鋪木膠合板并覆蓋塑料布防雨。為防止竹膠板的移動,在板上固定一木方。4.12機電施工4.12.1設備預留孔洞做好防雨措施。如施工現(xiàn)場地下部分設備已安裝完畢,要采取措施防止設備受潮、被水浸泡。4.12.2現(xiàn)場中外露的管道或設備,應用塑料布或其它防雨材料蓋好。室外電纜中間頭、終端頭制作應選擇晴朗無風的天氣,油浸紙絕緣電纜制作前須搖測電纜絕緣及校驗潮氣,如發(fā)現(xiàn)電纜有潮氣浸入時,應逐段切除,直至沒有潮氣為止。4.12.3敷設于潮濕場所的電線管路、管口、管子連接處應作密封處理。5.技術質(zhì)量保證措施5.1雨季施工材質(zhì)要求雨季施工用材料必須有出廠質(zhì)量證明、說明書等資料,特殊材料必須具備北京市建委頒發(fā)的材料準用證。5.2防汛搶險工作必須及時、有效防汛值班人員在值班期間,嚴守紀律不得擅自離崗,發(fā)現(xiàn)汛情及時向總指揮匯報,以便盡快采取各種防范措施,及時調(diào)動搶險人員到位。出現(xiàn)訊情緊急情況時防汛人員必須堅守崗位,查清險情,同時向上級有關領導和防汛部門匯報情況。按現(xiàn)場搶險有關要求馬上組織搶險工作,力爭把災害降到最低限度。搶險過程中必須認真服從指揮人員的統(tǒng)一指揮,并統(tǒng)一調(diào)配搶險過程中所需使用的物資用品。6.安全措施6.1加強現(xiàn)場施工人員的勞保工作,大雨天氣不得露天作業(yè),小雨天氣穿雨衣、雨靴、雨鞋。電氣操作人員,必須穿絕緣鞋和戴絕緣手套6.2雨天,停止外腳手架的搭設與拆除等施工作業(yè)。6.3組織專人定期檢查基坑四周的護坡情況,并做好記錄,如有邊坡裂縫等可能出現(xiàn)塌方的現(xiàn)象,及時報告有關部門,以便及時采取有效措施。6.4雨天停止開挖基槽和基坑,對已開挖的須立即進行可靠的支撐防護,防止塌方。6.5塔機、腳手架按標準安裝避雷裝置,并確保完好、有效。6.6大雨來臨前,須清理外腳手架上的用具和其它物件;大雨后,應對塔基、道路和外腳手架等進行全面檢查,確認無沉陷和松動后方可使用。6.7電氣焊應嚴格按照有關標準規(guī)定進行操作,防止觸電事故發(fā)生,定期檢查機電設備的運行情況和檢修情況,確保機電設備的正常運行安全。6.8防汛搶險器材不得挪作它用。6.9雨季要定期進行塔吊垂直度觀測,并做好記錄;雨后要及時進行塔吊垂直度觀測,如偏差較大時,應停止使用,并及時通知相關單位和部門進行處理。7.應急預案7.1目的建立“集中領導、統(tǒng)一指揮、結(jié)構(gòu)完整、功能全面、反應靈敏、運轉(zhuǎn)高效”的應急反應體系,遵循團結(jié)協(xié)作和局部利益服從全局利益、下級服從上級的工作原則,統(tǒng)一指揮、分級負責。從切實保障人民生命財產(chǎn)安全,最大程度的減輕災害損失和成功舉辦2008奧運會的需要出發(fā),有效防御災害性洪水,規(guī)范防汛抗洪程序,根據(jù)《中華人民共和國防洪法》和《中華人民共和國防汛條例》規(guī)定,結(jié)合施工現(xiàn)場防汛工作的實際情況,制定本預案。7.2危險源分析雨季施工主要是基礎肥槽回填土及地上結(jié)構(gòu)施工,由于現(xiàn)場面積較大,現(xiàn)場料具堆放較多,現(xiàn)場排水系統(tǒng)距離市政管線較遠,雨量過大時,現(xiàn)場排水對基坑邊坡將造成較大威脅。7.3應急組織機構(gòu)及職責7.3.1公司防汛指揮機構(gòu)總指揮:副總指揮:、、成員:工程技術部、綜合辦公室、物資采購部指揮機構(gòu)職責:組織學習和貫徹國家及地方有關消防法律、法規(guī),督促制定執(zhí)行各種防汛規(guī)章制度。定期召開防汛工作會議,研究、布置、檢查防汛工作。組織防汛檢查。指導現(xiàn)場防汛工作,負責防汛事故的處理工作,對現(xiàn)場防汛工作做決策。7.3.2公司防汛指揮部辦公室設在工程技術部:主任:成員:、、、、聯(lián)系電話:汛期期間,公司設值班人員輪流值班。7.3.3項目經(jīng)理部組織機構(gòu)項目部成立應急救援指揮部,并設總指揮和副總指揮,下轄三個救援分隊。總指揮:副總指揮:應急救援一分隊負責人:應急救援二分隊負責人:應急救援三分隊負責人:職責總指揮:負責協(xié)調(diào)救援分隊及相關單位應急救援活動的關系;有權(quán)向業(yè)主應急指揮中心報告并發(fā)布疏散周圍作業(yè)人員的命令;宣布應急救援工作結(jié)束。副總指揮:全面協(xié)助總指揮的各項工作。其中包括現(xiàn)場救援指揮、救援人員調(diào)度、救援資源的有

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
  • 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論