




版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、Supplier Performance Development ProcessTask 15 PPAP.Task DescriptionProduction Part Approval Process (PPAP)Production parts are manufactured at the production site using production tooling, gaging, equipment, operators, etcParts from production run are analyzedTest results and records from APQP are
2、 submitted with Part Submission WarrantPPAP.PurposeFor the supplier to demonstrateall design records and specification requirements are properly understoodthe process has the capability to produce product that meets requirements.SomethingChanged Application AIAG PPAP manual defines when PPAP submiss
3、ion is required New partCorrection to discrepancy in previous submissionDesign or process changeChange in source of subcontracted materials or servicestransfer or rearrangement of tooling & equipment.MethodologyBuyer enters PPAP submission date on purchase orderApprover determines submission levelde
4、fault level 3default level 4 for raw materialSupplier submits PPAPPPAPALL.xls electronic submission recommendedApprover evaluates PPAP packageLevel 5 at supplier site Approver determine part submission status Notify supplier and manufacturing of status.DFMEAControl PlanEarly Production Containment P
5、lan (Pre-Launch Control Plan)Process capability studiesGage Measurement System AnalysisLab Accreditation & scopeRestricted & Reportable Materials formInterim Worksheet, if requiredSupplier Data ReceivedWarrantAppearance Approval Report (AAR), as requiredSample PartsPrint/Design RecordEngineering Cha
6、nge DocumentsCheck fixtures/aidsProcess Flow DiagramPFMEA.PPAP Review ChecklistDelphi checklist to assist with evaluation of PPAP packageAction plan created with use of checklist.Flow ChartLinkage of Product Characteristics from DFMEA to Operational StepsOperation numbers consistent with PFMEA, Cont
7、rol Plan, Operator InstructionsEnsure identification of inspection and reworkUse A-6 Process Flow Chart checklist in APQP manual to evaluate.PFMEALinkage with DFMEA, Process Flow, Control Plan, Operator Instructions, etcDegree to which high RPNs are addressed with preventive strategiesAction Plans a
8、ssigned, implemented, effectiveness assessed and RPN recalculatedUse A-7 Process FMEA checklist in APQP manualRPN = 504.DFMEAAssess feasibility, risk, design intent issuesConfirm manufacturing process capability consideredFocus on Critical CharacteristicsLessons Learned incorporatedUse A-1 Design FM
9、EA checklist in APQP manual to evaluate.Control PlanEnsure Control Plan is aligned to, and correlates with, DFMEA, Process Flow, PFMEAControl Methods appropriate to variation type(s)Incorporates Lessons Learned, Statistical DataUse A-8 Control Plan checklist in APQP manual to evaluate.Pre-Launch Con
10、trol PlanEarly Production Containment requirementsAdditional controls included for proper duration or quantityPFMEA and statistical data used to determine what additional controls necessaryshort term capabilitylong term capability on similar process.Process Capability Studies.MSA StudiesMeasurement
11、uncertainty determinedGage R&R, Bias, Stability, and LinearityGage R & R acceptance guidelines30% unacceptable, measuring system needs improvementVerify study performed correctly.Part Submission StatusFull Production ApprovalInterim ApprovalAuthorize shipment to Delphi without Full Production Approv
12、alCorrective Action Plan is requiredRejectedCorrected submission required before production quantities may be shipped.Interim Part ClassA parts from production tooling and meet specs, not all PPAP requirements have been metB parts from production tooling and require rework to meet specsC parts not f
13、rom production tooling, parts meet specsD parts do not meet specsE parts do not meet specs and vehicles with class E parts require retrofit to make them saleable.SummaryAIAG PPAP manual defines requirementsAPQP Product and Process ValidationSupplier submits PPAP to proper levelPPAP package evaluated and status determinedSupplier and Delphi manufacturing sit
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 信息系統(tǒng)項(xiàng)目管理師考試中的臨場(chǎng)發(fā)揮問(wèn)題分析試題及答案
- 2025年貴州電子信息職業(yè)技術(shù)學(xué)院高職單招職業(yè)技能測(cè)試近5年??及鎱⒖碱}庫(kù)含答案解析
- 2025年鄉(xiāng)村全科考試全科發(fā)展試題及答案
- 了解各類食物的GI值及其影響試題及答案
- 信息系統(tǒng)項(xiàng)目管理師考試流程控制試題及答案
- 2025年育嬰師考試重要考綱分析試題及答案
- 2025年蘇州幼兒師范高等??茖W(xué)校高職單招語(yǔ)文2019-2024歷年真題考點(diǎn)試卷含答案解析
- 2025年健康管理師考試健康評(píng)估方法試題及答案
- 鄉(xiāng)村全科醫(yī)師考試問(wèn)題設(shè)計(jì)試題及答案
- 二年級(jí)語(yǔ)文上冊(cè) 課文5 口語(yǔ)交際:看圖講故事教學(xué)設(shè)計(jì) 新人教版
- 2024年山西華陽(yáng)新材料科技集團(tuán)有限公司招聘筆試真題
- 2025年03月雙鴨山市“市委書記進(jìn)校園”引才活動(dòng)黑龍江能源職業(yè)學(xué)院13人筆試歷年典型考題(歷年真題考點(diǎn))解題思路附帶答案詳解
- 2025年湖南興湘投資控股集團(tuán)有限公司春季校園招聘28人筆試參考題庫(kù)附帶答案詳解
- 比例的應(yīng)用(教學(xué)設(shè)計(jì))-2024-2025學(xué)年六年級(jí)下冊(cè)數(shù)學(xué)北師大版
- 農(nóng)業(yè)機(jī)械設(shè)備使用與操作指南
- 2025年03月春季甘肅臨夏州引進(jìn)高層次人才和急需緊缺專業(yè)技術(shù)人才344人筆試歷年參考題庫(kù)考點(diǎn)剖析附解題思路及答案詳解
- 2025年03月州省氣象部門第二批公開招聘應(yīng)屆高校畢業(yè)生34人(第6號(hào))筆試歷年參考題庫(kù)考點(diǎn)剖析附解題思路及答案詳解
- 圖書管理員的崗位技能要求與試題及答案
- 自體輸血管理制度與技術(shù)規(guī)范
- 2025年浙江省初中學(xué)校TZ8共同體中考數(shù)學(xué)一模試卷
評(píng)論
0/150
提交評(píng)論