版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、Energy supply system assemblyIntegrated energy supply systemBefore the new cable set assembly is installed, the greased surfaces of the robot must be cleaned of old grease.Protective gloves must be worn!All accident prevention regulations must be observed when handling cable grease.Energy supply sys
2、tem assemblyIntegrated energy supply systemPull cable set carefully through the base frame aperture, then lay it down fully extended and straighten it.Energy supply system assemblyIntegrated energy supply systemAttach flexible tube with the tube clamp to the base frame. Arrange the cable bundle in a
3、 gentle curve between the junction boxes and the tube clamp.The cables must not be subjected to any tensile forces. Cable straps are not permitted in this area.Energy supply system assemblyIntegrated energy supply systemThe cables must be greased between (1) and (2). If necessary, regrease cables ap
4、prox. 100 to 200 mm into flexible tube.1Tube clamp 1Tube clamp 2212132Tube clamp 1Tube clamp 2 Tube clamp 3 213The flexible tube must lie correctly in the indentations of the clamp and must be able to turn easily.Energy supply system assemblyIntegrated energy supply systemClose tube clamps. The mark
5、ing must be flush with the end of the tube.Take hold of cable bundle and turn it in a tight curve down to the cable clip (1). Place cable clip (2) around the cable bundle emerging from flexible tube A 1 and fasten.Energy supply system assemblyIntegrated energy supply systemCable clip 1 Cable clip 2
6、2121Observe white mark!A1Push worm thread clip (3) as far as possible into the buffer and fasten. Run cables XP3-L to XP6 and XM3 to XM6 in a tight curve to cable clip (2). Fasten cables and secure them with cable straps. Run cables in parallel to cable clip (1) and fasten them.Energy supply system
7、assemblyIntegrated energy supply systemThe cables must not be trapped or pinched.132Cable clip 1 Cable clip 2 Cable clip 3 2132121Motor A 2Motor A 112Plug in cables XM1 and XP1 at the motor of axis 1 and the cables XM2 and XP2 at the motor of axis 2.Energy supply system assemblyIntegrated energy sup
8、ply systemEnergy supply system assemblyIntegrated energy supply systemBundle cables XM2 and XP2 leading from axis 2 motor with cable strap and push remaining lengths back into rotating column housing. Bundle cables XM1, XM2 and XP1, XP2 on the rotating column housing with cable straps. Bundle all th
9、irteen cables between the cable clip (4) and the aperture using cable straps so that individual cables do not slip back and rub against the base frame.41423Make four ground conductor connections.All ground conductor connecting elements, including the PE bolts and the corresponding tapped holes in th
10、e robot, must be free from grease and paint.Energy supply system assemblyIntegrated energy supply systemGround conductor, rotating column armGround conductor, arm - rotating column21Ground conductor, base frame - rotating columnGround conductor, rotating column - base frame432341Motor A 6Motor A 534
11、Motor A 3Motor A 412Plug in connectors for the motor cables XM3 to XM6 and control cables XP3-L to XP6 at the motors of axes 3 to 6. Align cables and secure them with cable straps.Energy supply system assemblyIntegrated energy supply systemEnergy supply system assemblyWhen the robot electrical installations (cable set) are completely installed in the robot, the following tests must be carried out: Continuity test of t
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年度高新技術企業(yè)流動資金借款合同4篇
- 二零二五年度金融數(shù)據(jù)安全保密合同2篇
- 2025年度臨時體育設施租賃及賽事組織服務協(xié)議4篇
- 2025版二零二五綠化工程生態(tài)景觀規(guī)劃分包合同范本4篇
- 二零二五年酒店消防設施安全評估與整改服務合同2篇
- 二零二五版太陽能光伏發(fā)電合同保修與后期維護服務3篇
- 二零二五年物流倉儲中心建筑工程施工及智能物流協(xié)議3篇
- 2025年度毛石石材加工廠質量管理體系合同4篇
- 二零二五年度防盜門行業(yè)標準制定與合作合同3篇
- 2025年度金融機構間回購協(xié)議合同范本4篇
- 2024-2025學年成都高新區(qū)七上數(shù)學期末考試試卷【含答案】
- 定額〔2025〕1號文-關于發(fā)布2018版電力建設工程概預算定額2024年度價格水平調整的通知
- 2025年浙江杭州市西湖區(qū)專職社區(qū)招聘85人歷年高頻重點提升(共500題)附帶答案詳解
- 《數(shù)學廣角-優(yōu)化》說課稿-2024-2025學年四年級上冊數(shù)學人教版
- “懂你”(原題+解題+范文+話題+技巧+閱讀類素材)-2025年中考語文一輪復習之寫作
- 2025年景觀照明項目可行性分析報告
- 2025年江蘇南京地鐵集團招聘筆試參考題庫含答案解析
- 2025年度愛讀書學長參與的讀書項目投資合同
- 電力系統(tǒng)分析答案(吳俊勇)(已修訂)
- 化學-河北省金太陽質檢聯(lián)盟2024-2025學年高三上學期12月第三次聯(lián)考試題和答案
- 期末復習試題(試題)-2024-2025學年四年級上冊數(shù)學 北師大版
評論
0/150
提交評論