1、 Low voltage panels1、Participants in FAT12. Location13、Date14、Item standard15、Purpose16、Inspection Contents16.1 Documents16.2. Equipment Inspection Items36.2.1 Visual inspection36.2.2. Routine Inspection Items56.2.3 Problem List67. FAT Record78. Attachments81、Participants in FATl Supervisor:l Genera
2、l contractor:l Manufacturer:.2. Location 3、Date 4、Item standardl Related product standards and specificationsl Factory Acceptance Test Outline5、PurposeFactory Acceptance Test can operate safely and dimensions of the equipment meet the requirements in the contract and related standards.6、Inspection C
3、ontents 6.1 Documents No.NameContentsQualified or Not(,X)Remarks1Qualification certificateQuality, environment, occupational health, and other management systemQualification of manufacturers2Factory inspection report Performance and function test reports of main parts3Main component1.Product quality
4、 certificate and related certificate documents 2.Product Certificate from supplier and incoming inspection report 3.Purchasing acceptance record and parts in-out records Inspector : Date: 6.2. Equipment Inspection Items 6.2.1 Visual inspection No.Test itemsInspection standardResultsQualified orNot(、
5、X)Remarks1Nameplate and markWhether the installation is reliable, label content is correct.2SprayThe panel color should be RAL7032,and the spraying element should be no flow marks, loss, and damage.3Mechanical operation components, interlocking, lock action reliabilityHuman subjects components, oper
6、ation is flexible and reliable4Wire and cable arrangementLayout is correct5Element selection and installationThe choice for element type should be correct, the element installation position should be correct, and element should be in order.6Parts of fixed connection reliabilityWhether or not the con
7、nection good contacts7The correctness of electrical circuitElectricity for five times, each time 1 s, instrument is normal, switch action is reliable8The reliability of the mechanism operationThe installation within the device switch electrical and all components of the manual operation for 5 times,
8、 whether the agency action is reliable, normal9Cabinet sizeRequirements for Height × width ×depth should be 2200mm × 800mm ×1000mmInspector: Date:6.2.2. Routine Inspection ItemsNO.Inspection itemsInspection standardResultsQualified orNot(、X)Remarks1Test the effectiveness of the p
9、rotective circuitInstrument door-to-ground 100mCradle-to-ground 100mMain switch base ground 100mBus clip bracket to ground 100mBreaker switch base ground 100m2Dielectric properties testBetween live parts and insulated operating handle3.75KV/1SBetween live parts and exposed conductive parts2.5 KV/1SB
10、etween each pole and connected to the exposed conductive parts of other poles 2.5 KV/1SBetween the main and auxiliary circuits not directly connected with the main circuit2 KV/1S3Insulation resistancerelative insulation resistance should be voltage1K/V1K/V 4ClearanceBetween the main circuit bare con
11、ductors of different polarity 5.5 mmBetween the main circuit of bare conductors with the housing 5.5mmCreepage distanceBetween the main circuit bare conductors of different polarity 10 mmBetween the main circuit of bare conductors with the housing 10 mmInspector: Date:6.2.3 Problem List NO.Descripti
12、onModification RecordRecorded by: Date: 7. FAT Record FAT Record of Low Voltage panels for Mombasa-Nairobi Standard Gauge Railway ProjectDate: Location:NO.Function CategoryTest ltem and StandardsTest resultConclusion1Visual inspectionRefer to section 6.2.1Refer to section 6.2.1PassFailure2Routine In
13、spection ItemsRefer to section 6.2.2Refer to section 6.2.2PassFailure3Problem ListRefer to section 6.2.3Refer to section 6.2.3PassFailureConclusion:ManufacturerSign:General contractorSign:SupervisorSign:SupervisorSign:8. Attachments Attachment 1:Technical SpecificationAttachment 2:Product certification certificateAttachment 3:Signature List of Factor Acceptance Test MembersAttac
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 小學知識考試題及答案
- 內(nèi)蒙古自治區(qū)巴彥淖爾市2024-2025學年高中畢業(yè)班第二次質量檢查歷史試題含解析
- 天津濱海汽車工程職業(yè)學院《高等微生物學》2023-2024學年第二學期期末試卷
- 工業(yè)互聯(lián)網(wǎng)平臺2025年異構數(shù)據(jù)庫融合技術在工業(yè)互聯(lián)網(wǎng)平臺創(chuàng)新中的應用
- 家具設計中的社會功能與環(huán)境適應性研究探討及案例分析試題及答案
- 家具行業(yè)的消費者行為分析考題試題及答案
- 武漢航海職業(yè)技術學院《場地環(huán)境風險評價與修復》2023-2024學年第二學期期末試卷
- 教師教育教學反思的有效方法與策略試題及答案
- 家具設計中的空間美學考題及答案
- 未來出行領域技術展望試題及答案
- 2024中國國新基金管理有限公司相關崗位招聘7人筆試參考題庫附帶答案詳解
- 2025屆浙江省杭州市高三下學期二模物理試題(原卷版+解析版)
- 登高車安全培訓
- 成人重癥患者顱內(nèi)壓增高防控護理專家共識(2024版)解讀課件
- 在線監(jiān)測運維管理體系
- 英語課件 外研版(2019)選擇性必修四 Unit6 Developing ideas
- 2025年數(shù)獨考試試題及答案
- 化工工藝學知到智慧樹章節(jié)測試課后答案2024年秋廣州大學
- 產(chǎn)后抑郁癥的原因及護理文獻匯報
- 湖北省武漢市華中師大一附中2025屆高考數(shù)學全真模擬密押卷含解析
- 2024年司法考試完整真題及答案
評論
0/150
提交評論