u加筋土擋土墻施工方案_第1頁
u加筋土擋土墻施工方案_第2頁
u加筋土擋土墻施工方案_第3頁
u加筋土擋土墻施工方案_第4頁
u加筋土擋土墻施工方案_第5頁
已閱讀5頁,還剩4頁未讀, 繼續(xù)免費閱讀

下載本文檔

版權說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權,請進行舉報或認領

文檔簡介

1、Good is good, but better carries it.精益求精,善益求善。u加筋土擋土墻施工方案加筋土擋土墻施工方案加筋土擋土墻施工方案一、 工程部位及數(shù)量二、施工方案1、加筋土擋土墻施工工藝流程圖場地平整施工準備構件預制施工放樣筋帶加工填料準備筋帶鋪設基槽開挖基礎澆筑墻面板安裝填料鋪筑竣工驗收附屬工程夯實碾壓2、材料要求(1)、筋帶:筋帶采用強度高、受力后變形小、能與填料產(chǎn)生足夠的摩擦力的CAT鋼塑復合材料拉筋帶。筋帶寬30mm,厚2mm,伸長率1%。筋帶結點的水平間距0.5m,垂直間距0.5m,地基承載力大于350Kpa。(2)、面板:面板應具有足夠的強度,以保證拉筋端部

2、土體的穩(wěn)定;面板應具有足夠的剛度,以抵抗預期的沖擊和震動作用;面板應具有足夠的柔性,以適應加筋體再荷載作用下產(chǎn)生容許沉降所帶來的變形。面板采用鋼筋混凝土預制面板。(3)、填料:填料施工應易于填筑與壓實,與筋帶之間能產(chǎn)生足夠的摩擦力,對筋帶材料無腐蝕性,且水穩(wěn)性好。填料優(yōu)先選用有一定級配、透水性較好的砂類土、碎(礫)石類土,以保證筋帶與填料之間能發(fā)揮較大的摩擦力,確保結構穩(wěn)定。填料最大粒徑不得大于15cm。3、基礎工程基底平面尺寸大于基礎外緣30cm。在澆筑條形基礎前基底土質及地層情況須檢驗?;A澆筑時,按設計要求預留沉降縫。4、面板安裝 (1)、第一層面板安裝在清潔的面板基礎上,準確畫出面0板

3、外緣線。在確定的外緣線上定點,然后進行水平測量。安裝時用干硬性砂漿砌筑調平,砂漿厚度1cm左右,面板布置如下圖所示。同層相鄰面板水平誤差不大于10mm;軸線偏差每20延米不大于10mm。按要求的垂度掛線安裝,安裝縫宜小于10mm。安裝時應防止角隅碰壞。面板采用人工安裝就位。安裝時單塊面板傾斜度,一般可內(nèi)傾1/1001/200,作為填料壓實時面板外傾的預留度。AABBAABB(2)、以后各層面板的安裝沿面板縱向每5m間距設標樁,每層安裝時用垂球核對,每三層面板安裝完畢測量標高和軸線,其允許偏移量與第一層相同。為防止相鄰面板錯位,用夾木螺栓或斜撐固定。在曲線部位注意安裝順適。水平誤差用低強度砂漿找

4、平。水平及傾斜的誤差應逐層調整,不得將誤差累積后再進行總調整。安裝縫應均勻、平順、美觀。不得在未完成填土作業(yè)的面板上安裝上一層面板。嚴禁采用堅硬石子及鐵片支墊,以免造成應力集中損壞面板。5、筋帶鋪設筋帶與面板的連接,將筋帶從面板的預留孔中穿過,并綁扎以防止抽動,避免筋帶在孔上繞成死結。筋帶鋪設在壓實平整的填料上,不宜重疊,不得卷曲或折曲。筋帶不得與硬質棱角填料直接接觸。筋帶在鋪設時,用鋼筋將筋帶拉緊,再用少量填料壓住筋帶,使之固定并保持正確位置。6、填料的攤鋪、壓實面板后按1:1放坡回填砂礫,砂礫根據(jù)筋帶豎向間距進行分層攤鋪和壓實,砂礫外回填炮渣石。卸料時自卸汽車與面板距離不應小于1.5m,汽

5、車不得在未覆蓋填料的筋帶上行駛,并不得擾動下層筋帶。攤鋪采用人工配合機械的方式進行,攤鋪厚度均勻一致,表面平整,橫坡度不小于3%。每層厚度不得大于20cm。推土機距面板不小于1.5m。推土機運行方向與筋帶垂直,并不得在未覆蓋填料的筋帶上行駛或停車。距面板1.5m范圍內(nèi)采用人工攤鋪。填料填筑時,隨時檢查含水量是否滿足壓實要求,每層填料填筑完畢及時碾壓。填料應嚴格分層碾壓。碾壓時先輕后重,不得使用羊足碾。壓路機不得在未經(jīng)壓實的填料上急劇改變運行方向和急剎車。壓實作業(yè)先從筋帶中部開始,逐步碾壓至筋帶尾部,再碾壓靠近面板部位。碾壓前應進行壓實試驗,以確定最經(jīng)濟的碾壓遍數(shù)壓實機具距面板不應小于1.0m。

6、三、質量標準及保證措施1、基底實測項目表項次檢查項目規(guī)定值或允許偏差值檢查方法及頻度1軸線偏位(mm)30沿軸線量2點2基底標高(mm)±30用水準儀測3點3斷面尺寸(mm)大于基礎外緣30cm量2處2、面板基礎工程實測項目表項次檢查項目規(guī)定值或允許偏差值檢查方法及頻度1圬工強度(Mpa)在合格標準之內(nèi)按公路工程質量檢驗平定標準2端面尺寸(mm)不小于設計量測3處3基頂標高(mm)±20用水準儀測3點4軸線偏位(mm)25沿軸線量2處5基頂平整度(mm)10用2米直尺量測3處3、面板預制實測項目表項次檢查項目規(guī)定值或允許偏差值檢查方法及頻度1強度(N/mm)在合格標準內(nèi)按公

7、路工程質量檢驗平定標準2邊長(mm)±5或0.5%邊長各量一次3兩對角線差(mm)10或0.7%最大對角線長兩對角線各量一次4厚度(mm)+5,3量兩處5表面平整度(mm)4或0.3%長(寬)板長寬方向各靠量一次6插銷孔中心位置(mm)3每孔量一次7穿筋孔(片)無明顯偏位易穿筋目測8外觀蜂窩麻面1%目測、量測4、面板安裝實測項目表項次檢查項目規(guī)定值或允許偏差值檢查方法及頻度1每層面板頂高(mm)±10抽查4組板2軸線偏位(mm)±10掛線量3處3面板垂度+0,0.5%吊線量2處5、填料壓實度合格率表項次檢查項目規(guī)定值或允許偏差值檢查方法及頻度1距面板1m范圍以內(nèi)7

8、0%每層100延米取3點作工地試驗2距面板1m范圍以外97%每層500m2或每50延米取3點作工地試驗6、筋帶施工實測項目表項次檢查項目規(guī)定值或允許偏差值檢查方法及頻度1筋帶長度不小于設計值檢查5根2筋帶根數(shù)不少于設計值檢查5根3筋帶與面板接符合設計檢查5處4筋帶鋪設符合設計檢查5處5筋帶與筋帶接符合設計檢查5處6鋼件防銹處理符合規(guī)范要求檢查10處四、安全保證措施1、堅持“安全第一,預防為主”的方針,建立健全安全生產(chǎn)責任制,成立安全生產(chǎn)領導小組。2、各生產(chǎn)組配有專職安全員在工地巡查,發(fā)現(xiàn)有安全隱患之處及時更改。3、各用電設備配有漏電保護設施。4、夜間施工配備足夠的照明設施。五、文明施工1、現(xiàn)場

9、材料分規(guī)格、地點按要求碼放整齊,杜絕亂堆亂放現(xiàn)象。2、制定成品、半成品保護措施,以增強成品保護意識。3、施工場地每作業(yè)班,工序完成后做到料盡場地清潔。4、夜間施工避免使用高噪聲設備,以防止擾民。5、按規(guī)范設計要求施工,文明生產(chǎn),嚴禁偷工減料,提高每個員工的道德品質。工區(qū)長:尹正祥六、施工組織機構技術員趙占義 質檢員洪巖試驗員張玲玲安全員燕春磊庫管員張永勝作業(yè)隊長工長魏紹來勞動力需求表1日期工種5月51015202531管理人員555555技工206060404040壯工40100100606060電工111111修理工111111司機101010101010合計7717717711711711

10、7機械需求表2機械名稱規(guī)格型號額定功率數(shù)量使用部位挖掘機日立200153KW3基槽開挖、裝車自卸汽車東風10噸4土方運輸攪拌機JZ3505.5KW4攪拌砂漿小翻斗車時風1噸5運輸砂漿推土機14011攤鋪土方振動碾YZ2222噸1碾壓夯實機1噸2夯實邊部材料需求表3序號材料名稱規(guī)格型號單位數(shù)量備注1A面板99×49×25cm塊2B面板49×49×25cm塊3鋼筋10噸4鋼筋8噸5鋼筋6噸6水泥P.O32.5噸7中砂方94. the persons listed in the temporary electrical permit to work shoul

11、d be consistent with field personnel, when personnel changes should go through the signing procedures and related matters of the transition. 5. in the temporary electrical permit to work is not completed within the stipulated time of electricity operations, ground-breaking of the applicant to apply

12、for temporary power operating license. 6. in the event of relevant meetings, breaks, night work and other special reasons, job ticket must be issued after approval, the request corresponds to staff and other officers will be in place. 7. work permits management should establish the ticket file (inve

13、ntory), the ticket is kept for 3 years. High operation management system in the course of work, aimed at reducing high falls, objects to combat such incidents occur, ensure employee safety, regulations are formulated. II, scope of application apply to the company activities and project work scope of

14、 construction, but also into our external contractors and personnel. Three, responsibilities, company management is working at height safety management departments. D, contents, and request 1, referred to in this system fall at height refers to the height of 2 m above the base level (2 m) fall possi

15、ble jobs. Working at height is divided into four levels: working at height at an altitude of 2-5 meters, called the high level operations; Height working height of more than 5 meters to 15 meters, as second class at height; Height working height of more than 15 metres to 30 metres, known as the thre

16、e levels of working at height; Working at height safety management regulations height working height is more than 30 meters, called super high job; Due to work reasons, the company only relates to one, working at height, there is no grade, super high assignment. Once the work above there are three l

17、evels of the construction project, in accordance with the provisions of the relevant procedures. 2, where there is one, working at height, of the communication construction safety rules must be strictly adhered to. 3, and all personnel involved in the construction of working at height must be traine

18、d and the climbing permits, without training and aerial work permit-free personnel for aerial work is strictly prohibited. 4, and all had high blood pressure, heart disease, anemia, epilepsy is not suitable for working at height and other personnel shall not engage in working at height. 5, high oper

19、ating personnel must fasten your seat belt, helmet, clothing to flexible, banned the wearing of hard bottom and nails easy slip-on shoes for working at height. 6, seat belts must be hung on the fixed objects, hanging low, must be higher than the waist, prohibited the use of any substitute in place o

20、f seat belts. 7, in adjacent areas, with release of toxic, harmful gases and dust outside the allowed concentrations of chimney and equipment is prohibited for working at height. In the allowed range, should also take effective protective measures. In the more than six-level wind and lightning, heav

21、y rain, fog and other adverse weather conditions affect safety during construction,of backbone backbone role; to full strengthening members youth work, full play youth employees in company development in the of force role; to improve independent Commission against corruption work level, strengthenin

22、g on enterprise business key link of effectiveness monitored. , And maintain stability. To further strengthen publicity and education, improve the overall legal system. We must strengthen safety management, establish and improve the education, supervision, and evaluation as one of the traffic safety management mechanism. To conscientiously sum up the Olympic security controls, promoting integrated management to a higher level, higher standards, a higher level of developm

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
  • 4. 未經(jīng)權益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
  • 6. 下載文件中如有侵權或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論