1、Good is good, but better carries it.精益求精,善益求善。c錨噴護(hù)壁施工方案目錄目錄一、工程概況2二、主要工程數(shù)量(未延伸10m)2三、施工方法21、土釘錨桿22、掛網(wǎng)33、噴射砼3四、環(huán)境保護(hù)及文明施工措施41、環(huán)境保護(hù)措施42、文明施工4五、安全生產(chǎn)措施51、噴射砼施工52、應(yīng)急避險(xiǎn)措施5六、施工現(xiàn)場(chǎng)臨時(shí)用電5附圖一、平面圖7附圖二、原方案溝槽斷面圖8附圖三、重新錨噴支護(hù)溝槽斷面圖9附圖四、土釘錨桿布置示意圖10一、工程概況本工程為頂管工作坑?xùn)|側(cè)明開(kāi)槽敷設(shè)管道工程,敷設(shè)管材采用D=2.6m鋼筋混凝土管,開(kāi)挖深度最深部位為10m,最淺部位為6.2m,敷設(shè)長(zhǎng)度
2、為28.4m(其中豎井中敷設(shè)管道5.6m)。因溝槽北側(cè)為居民樓房,原方案采用溝槽北側(cè)錨噴支護(hù),開(kāi)挖坡度為1:0.4;溝槽南側(cè)采用大開(kāi)挖方式,從頂端按1:1.25坡度開(kāi)挖至4米位置,留10米臺(tái)階,然后按1:1.25坡度放坡挖至基坑底?,F(xiàn)階段溝槽開(kāi)挖施工已完成過(guò)半,西側(cè)已挖深至6m,東側(cè)已挖深至4m。已挖完的溝槽北側(cè)邊坡錨噴支護(hù)已完成,但因土體穩(wěn)定性較差,且東側(cè)與支護(hù)結(jié)構(gòu)終點(diǎn)的土體出現(xiàn)塌方,造成北側(cè)邊坡錨噴支護(hù)結(jié)構(gòu)下沉,對(duì)錨噴支護(hù)結(jié)構(gòu)造成了破壞。原錨噴支護(hù)結(jié)構(gòu)無(wú)法滿(mǎn)足施工的需要經(jīng)現(xiàn)場(chǎng)勘查后決定將原護(hù)壁以北1m土方采用1:0.624坡度人工取土取出,并隨取土隨鑿除原護(hù)壁鋼筋混凝土。人工取土?xí)r每次取土
3、深度不大于0.7m,長(zhǎng)度不大于5.0m,嚴(yán)禁超挖,隨取土隨進(jìn)行錨噴支護(hù)。溝槽北側(cè)重新施作錨噴護(hù)壁,護(hù)壁采用25土釘錨桿+6網(wǎng)片+噴射C25混凝土結(jié)構(gòu)形式進(jìn)行支護(hù)。錨噴混凝土厚度為15cm,錨桿長(zhǎng)度為5.0m。 為保證錨噴結(jié)構(gòu)整體的穩(wěn)定性及樓房地基安全,樓房處10m長(zhǎng)錨噴護(hù)壁將設(shè)置地錨,將護(hù)壁連接筋與 2m長(zhǎng)42鋼管(壁厚3.25mm)地錨焊接連接。地錨需錨入原樓房地梁或混凝土地面內(nèi)。溝槽西側(cè)端頭靠近豎井位置處開(kāi)挖坡度同溝槽一致,隨開(kāi)挖對(duì)裸漏土壤部位進(jìn)行錨噴支護(hù)。因溝槽北側(cè)放坡系數(shù)為1:0.624,與我單位施工段所接溝槽處放坡系數(shù)需大于1:0.9,如若不能滿(mǎn)足,為保證施工安全建議護(hù)壁長(zhǎng)度延伸10
4、m。二、主要工程數(shù)量(未延伸10m)鑿除原護(hù)壁鋼筋混凝土 12m6 100mm100mm網(wǎng)片 1119kg15cm厚混凝土 252.1925.0m長(zhǎng)25錨桿 293根20連接筋(護(hù)壁部位) 1938kg 20連接筋(護(hù)壁與地錨之間連接筋) 21根2m長(zhǎng)42地錨 21根三、施工方法1、土釘錨桿土釘錨桿采用25鋼筋,用空壓機(jī)2025角度打入土體內(nèi),水平、豎直方向間距均為1米,梅花形布設(shè),水平錨桿之間使用20鋼筋焊接連接,焊接連接長(zhǎng)度為10d,錨桿插入長(zhǎng)度必須到位。2、掛網(wǎng)錨桿安裝完成后,在側(cè)壁滿(mǎn)鋪6100100鋼筋網(wǎng)片,網(wǎng)片搭接不小于一個(gè)網(wǎng)孔,網(wǎng)片同錨桿應(yīng)綁扎牢固,網(wǎng)片安裝完成后,噴射砼C25細(xì)石
5、砼,噴射砼中加入6%(占水泥用量)的速凝劑,縮短砼的初凝時(shí)間。3、噴射砼(1)噴射C25砼,拌和以機(jī)械干拌為主,人工干拌為輔,摻加速凝劑,摻量為水泥重量的6%,要隨拌隨用,砼拌好后,20分鐘內(nèi)必須噴射完成。(2)噴射機(jī)械的選擇應(yīng)根據(jù)工程的特點(diǎn)而定,本工程選用轉(zhuǎn)子式噴漿機(jī),并配備12米3的空氣壓縮機(jī)與之工作。(3)空壓機(jī)工作風(fēng)壓不小于0.4Mpa,水壓不小于0.5Mpa。(4)砼噴射作業(yè)應(yīng)先分段、分片、分層由低處向高處進(jìn)行,有較大凹連接時(shí)應(yīng)先填平,每層噴射砼厚度為5080mm,后一層噴射應(yīng)在前一層終凝后進(jìn)行。(5)噴射砼中的水泥優(yōu)先選普通硅酸鹽水泥,標(biāo)號(hào)不低于425#。(6)關(guān)鍵工序施工要點(diǎn):
6、在噴射砼施工中,噴射工藝為關(guān)鍵工序,有關(guān)操作人員,需執(zhí)行以下職責(zé),確保噴射砼質(zhì)量。 1)噴射手注意事項(xiàng):A、砼表面出現(xiàn)流淌、滑移、拉裂時(shí),表明水灰比太大,立即調(diào)整。B、噴射砼出現(xiàn)干斑,作業(yè)中粉塵大,回彈多表明水灰比太小,應(yīng)立即調(diào)整。C、砼表面調(diào)整,呈水亮光澤,粉塵和回彈量均較少,表明水灰比適當(dāng),可繼續(xù)噴射。 2)噴射手職責(zé):A、用壓縮空氣將待噴面吹凈,吹掉待噴面上的雜質(zhì)和松散的塵埃。B、保證噴射速度適當(dāng),以利砼密實(shí)。C、調(diào)整水量,使砼稠度適當(dāng),以便良好壓實(shí)砼,降低回彈量。D、使噴嘴與受?chē)娒姹3诌m當(dāng)距離,噴射角度盡可能為900以使獲得最大的壓力實(shí)力和最小的回彈量。E、正確掌握回彈順序,不使角隅處
7、及鋼筋背面出現(xiàn)蜂窩或砂囊。F、當(dāng)開(kāi)始或停止噴射時(shí),給噴射機(jī)司機(jī)明確信號(hào),當(dāng)料流不能從噴嘴均勻噴出時(shí),及時(shí)通知噴射司機(jī)停止作業(yè)。G、及時(shí)清除受?chē)娒嫔仙澳壹半s物,以便重新噴射。H、噴射結(jié)束后,認(rèn)真清洗噴嘴。 3)操作噴射機(jī)并指導(dǎo)拌料人員的工作:A、根據(jù)噴射手的要求,調(diào)整工作風(fēng)壓和給料裝置,使拌和料以期望的輸送率和速度從噴嘴噴出。B、拒絕使用存放時(shí)間超過(guò)規(guī)定要求的干拌和料。C、了解噴射機(jī)的機(jī)構(gòu)及性能,并能預(yù)測(cè)機(jī)器運(yùn)轉(zhuǎn)中會(huì)發(fā)生的困難和以最少的停工時(shí)間進(jìn)行必要的修理。D、辨認(rèn)管路堵塞,并采取有效措施及時(shí)排除。F、終止噴射作業(yè)后,要吹凈噴射機(jī)及管路內(nèi)的積料。 4)配料、拌和工的職責(zé):A、確保按規(guī)定的配合比
8、進(jìn)行配料,徹底拌和混合料,并將拌和料連續(xù)不斷地運(yùn)往噴射機(jī)處。B、負(fù)責(zé)集料、水泥、速凝劑的儲(chǔ)存并使集料含水率控制在規(guī)定的范圍內(nèi)。C、保護(hù)攪拌設(shè)備的良好工作狀態(tài)。四、環(huán)境保護(hù)及文明施工措施1、環(huán)境保護(hù)措施(1)盡量避免使用高噪聲設(shè)備,如:鉆孔使用反循環(huán)鉆機(jī)。使用空氣壓縮機(jī)鑿除砼時(shí)避免午夜居民休息時(shí)間,清倉(cāng)時(shí)采用“汽水混合器”防止塵土飛揚(yáng)。(2)現(xiàn)場(chǎng)設(shè)置垃圾箱并派人管理,嚴(yán)禁隨地大小便,并制定相應(yīng)的管理措施。(3)在比較干燥浮土多的地段,要灑水降塵。(4)施工現(xiàn)場(chǎng)使用和存放油料,不得有跑、冒、滴、漏現(xiàn)象、避免污染水體和環(huán)境。(5)施工現(xiàn)場(chǎng)細(xì)顆粒散體材料裝卸運(yùn)輸時(shí),采用遮蓋等有效措施,避免遺灑飛揚(yáng)。(
9、6)注意保護(hù)好施工現(xiàn)場(chǎng)周?chē)臉?shù)木和市政公共設(shè)施。(7)爭(zhēng)取居民區(qū)與施工單位密切配合,盡量為居民的出行提供方便。2、文明施工(1)施工現(xiàn)場(chǎng)應(yīng)整潔有序,各類(lèi)材料應(yīng)分類(lèi)碼放整齊,各班組每天收工前應(yīng)做到活完料凈腳下清。(2)土方外運(yùn)過(guò)程中,要設(shè)專(zhuān)人在大門(mén)口進(jìn)行車(chē)上土方拍實(shí),地上鋪草簾,杜絕泥濘、遺灑現(xiàn)象發(fā)生。(3)做好宣傳工作,對(duì)施工人員進(jìn)行文明施工教育,做到便民、利民、不擾民。(4)維護(hù)好施工周?chē)慕煌ㄖ刃?,使道路暢通。?)防止空氣污染,盡量減少施工粉塵。(6)空壓機(jī)搭設(shè)棚子,并安裝消音器,盡量避免施工噪音。五、安全生產(chǎn)措施1、噴射砼施工(1)、噴射作業(yè)前,應(yīng)由人仔細(xì)檢查管理,接頭噴射機(jī)等設(shè)備和機(jī)
10、具,是否耐損,接頭斷開(kāi)等不良現(xiàn)象,確保各種機(jī)具處于良好狀態(tài)時(shí)方可施作。(2)、進(jìn)行噴射作業(yè)時(shí),必須配戴防護(hù)用品,如膠手套、防塵口罩等。(3)、噴射面較高時(shí)配備輔助支架,防止在管路堵塞時(shí)因噴頭劇烈震動(dòng)和突然噴出而引起危害。當(dāng)轉(zhuǎn)移噴射地點(diǎn)時(shí)必須關(guān)閉噴射機(jī),噴頭前方不得站人。(4)、處理管路堵塞時(shí),噴頭前不準(zhǔn)站人,以防消除堵塞后突然噴出物料發(fā)生傷人事故。(5)、為避免供料、拌合、運(yùn)輸、噴射作業(yè)之間的干擾,應(yīng)有聯(lián)絡(luò)信號(hào),噴射作業(yè)應(yīng)由班組長(zhǎng)按規(guī)定信號(hào)、方法進(jìn)行指揮,防止因噴手和機(jī)械操作人員聯(lián)絡(luò)失誤造成事故。(6)、噴射砼后應(yīng)經(jīng)常注意觀察,發(fā)現(xiàn)有變形或裂縫,及時(shí)支護(hù)和加固,必要時(shí)將信號(hào)人員撤離到安全地帶。
11、2、應(yīng)急避險(xiǎn)措施(1)、將應(yīng)急材料、工具準(zhǔn)備到現(xiàn)場(chǎng),如泡沫磚、草袋子、小導(dǎo)管、鋼筋、方木、大板、圓木等,并不挪做它用。(2)、準(zhǔn)備好應(yīng)急的發(fā)電機(jī),保證在停電的情況下能夠正常作業(yè)。六、施工現(xiàn)場(chǎng)臨時(shí)用電1臨時(shí)用電系統(tǒng)必須按部頒標(biāo)準(zhǔn)采用三項(xiàng)五線制。2在采取接地或接零保護(hù)方式的同時(shí),必須設(shè)置兩級(jí)漏電保護(hù)裝置,實(shí)行分級(jí)保護(hù),形成完整的保護(hù)系統(tǒng),要求在用電設(shè)備首端設(shè)動(dòng)作電流不大于30mA,動(dòng)作時(shí)間不大于0.15的漏電保護(hù)器,潮濕環(huán)境應(yīng)用15mA,0.1S的漏電保護(hù)器。3臨時(shí)用電必須建立定期檢查制度,并將檢查檢驗(yàn)記錄存檔備檢。內(nèi)容有臨時(shí)用電工程驗(yàn)收表,接地電阻測(cè)試記錄,漏電檢驗(yàn)記錄,電工維修記錄,絕緣搖測(cè)記
12、錄等。4暫設(shè)臨時(shí)架空線必須采用絕緣導(dǎo)線,不得采用塑膠軟線,必須按規(guī)范架設(shè)整齊,不得成束架空敷設(shè),也不得沿地面明敷設(shè),施工機(jī)具、車(chē)輛、人員應(yīng)與用電線路保持一定安全距離,用電線路與火源、水源保持一定安全距離,實(shí)現(xiàn)配電系統(tǒng)的安全運(yùn)行。5手持電動(dòng)工具應(yīng)符合國(guó)家標(biāo)準(zhǔn)的有關(guān)規(guī)定,工具的電源線、插頭、插座應(yīng)完好,電源線不得任意接長(zhǎng)和調(diào)換,工具的外絕緣應(yīng)完好無(wú)損,維修和使用應(yīng)專(zhuān)人負(fù)責(zé)。6凡在一般場(chǎng)所采用220V電源照明的,必須按規(guī)定布線和裝設(shè)燈具,并在電源一側(cè)加裝漏電保護(hù)器,工作坑里、巷道內(nèi)必須按規(guī)定使用安全電壓照明器。7配電箱裝設(shè)要一機(jī)一閘,并標(biāo)明每塊閘或插座的用途,專(zhuān)機(jī)專(zhuān)用。所有電力機(jī)械和各種電器設(shè)備的金
13、屬外殼必須作可靠的接零或接地。電焊機(jī)一次線長(zhǎng)度應(yīng)小于5m,二次線長(zhǎng)度應(yīng)小于30m,兩側(cè)接線應(yīng)壓接牢固,并安裝防護(hù)罩,焊把線應(yīng)雙線到位,不得借用回路,電焊機(jī)設(shè)置地點(diǎn)應(yīng)防潮、防雨、防砸。11recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste
14、 someone to clean up, to avoid polluting the environment 3.2 night arrangements of noise emitted by construction equipment, mixer noise emitted by machinery and equipment next to foam for noise control to prevent noise pollution of the surrounding environment. 3.3 construction managers and construct
15、ion personnel, special operations personnel listing jobs, site operators, leaders, managers, operators, wearing a helmet is divided into red, blue and yellow species. 3.4 site construction and companys comprehensive evaluation, check scores published examination results issued on a regular basis. 4,
16、 construction site environmental protection measures in order to protect and improve the living environment and the ecological environment, prevent construction and operation of pollution and nuisance, safeguard the health of residents and workers near the construction area, promoting the developmen
17、t of Socialist construction, environmental protection must be the construction site. 4.1 daily by the Deputy Project Manager, construction, safety officer for the afternoon the second comprehensive self test, where a violation of the provisions of the environment protection in construction site must
18、 be promptly identified and corrective action, made by construction workers on the day of the construction of the log on post records. 4.2 monthly by the Department of projects to be checked, according to the environmental protection in construction site inspection, evaluation criteria for inspectio
19、n score, fill in the score sheet as the basis for site evaluation of safe production and civilized. During the inspection, do not meet the environmental requirements of the three (people, time, and measures) modification, implementation and review review the duties specified. 4.3 4.3.1 pollution pre
20、vention measures in construction site clean up rubbish, used motor vehicle shipments, no free air dispersion caused by dust. Construction of refuse to be cleaned up to a designated location, no feel free to pile up, cleaned up and when adequate water to reduce dust. 4.3.2 earthmoving construction si
21、te entrances and set the car wash, and arrange for someone to clean up tire, not wheel dirt into other roads, affecting the city clean. 4.3.3 construction road construction site before construction ready plans and setting, make full use of red line layout, arrangement of temporary construction road,
22、 grass-roots energising, pavement paving the way Coke button, fine aggregate, and water at all times, reduce road dust. 4.3.4 construction when the protection of urban public facilities have been built, reasonable arrangements within the lot of construction organization, construction on the normal l
23、ife of the residents and to minimize the impact of leisure. 4.3.5 easy cloud of fine materialof backbone backbone role; to full strengthening members youth work, full play youth employees in company development in the of force role; to improve independent Commission against corruption work level, st
24、rengthening on enterprise business key link of effectiveness monitored. , And maintain stability. To further strengthen publicity and education, improve the overall legal system. We must strengthen safety management, establish and improve the education, supervision, and evaluation as one of the traffic safety management mechanism. To conscientiously sum up the Olympic security controls, promoting integrated management to a higher level, higher standards, a highe
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 天津仁愛(ài)學(xué)院《計(jì)算機(jī)系統(tǒng)的局限性》2023-2024學(xué)年第二學(xué)期期末試卷
- 排球正面上手發(fā)球 教學(xué)設(shè)計(jì)-2023-2024學(xué)年高一上學(xué)期體育與健康人教版必修第一冊(cè)
- 阜陽(yáng)職業(yè)技術(shù)學(xué)院《石油工程軟件》2023-2024學(xué)年第二學(xué)期期末試卷
- 億以?xún)?nèi)數(shù)的大小比較(教學(xué)設(shè)計(jì))-2024-2025學(xué)年四年級(jí)上冊(cè)數(shù)學(xué)人教版
- 西安電力高等專(zhuān)科學(xué)校《養(yǎng)羊?qū)W》2023-2024學(xué)年第二學(xué)期期末試卷
- 寧夏財(cái)經(jīng)職業(yè)技術(shù)學(xué)院《文化史》2023-2024學(xué)年第二學(xué)期期末試卷
- 泰州2024年江蘇泰興市婦幼保健院招聘高層次人才2人(第2批)筆試歷年參考題庫(kù)附帶答案詳解
- 漯河醫(yī)學(xué)高等專(zhuān)科學(xué)校《鋼結(jié)構(gòu)設(shè)計(jì)與施工》2023-2024學(xué)年第二學(xué)期期末試卷
- 鶴壁職業(yè)技術(shù)學(xué)院《建筑實(shí)訓(xùn)》2023-2024學(xué)年第二學(xué)期期末試卷
- 伊犁師范大學(xué)《融媒體監(jiān)測(cè)技術(shù)》2023-2024學(xué)年第二學(xué)期期末試卷
- 2024年3月30日事業(yè)單位聯(lián)考D類(lèi)《職業(yè)能力傾向測(cè)驗(yàn)》試題
- 通信施工安全培訓(xùn)
- 智慧生活:AI與智能家居-揭秘未來(lái)智能化生活趨勢(shì)
- 大單元教學(xué)設(shè)計(jì)基本步驟
- 消渴癥護(hù)理查房
- 《鋼鐵是怎樣煉成的》讀書(shū)分享課件
- 二手中型、重型載貨車(chē)鑒定評(píng)估技術(shù)規(guī)范
- DB11T 2120-2023 古建筑安全防范技術(shù)規(guī)范
- 工業(yè)自動(dòng)化控制系統(tǒng)設(shè)計(jì)與實(shí)施規(guī)范
- 2023年銀行安全保衛(wèi)考試真題模擬匯編(共392題)
- DB34T 4627-2023 人民防空工程防護(hù)質(zhì)量檢測(cè)技術(shù)規(guī)程
評(píng)論
0/150
提交評(píng)論