版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)
文檔簡介
1、Page 1Supplier TrainingGP-5December, 2001 EditionPage 2Supplier TrainingPurpose:Train Supplier personnel on changes to GP-5/GQTSProcess:Explanation of GP-5 enhancements and screen shots of GQTS enhancementsProduct:Understanding of process and system enhancementsPage 3Supplier TrainingOverview of cha
2、nges made to the procedureOverview of PRR System Changes in GQTSDescription of GM SupplyPower GP-5 folderWhat does this GP-5 Training Include?Page 4Supplier TrainingChanges to GP-5Control and Rework CompanyA company approved by General Motors to perform controlled shipping level 2 inspections or oth
3、er work necessary to ensure product quality. This company performs directly under the responsibility of the supplier.Line AccumulationsLine accumulations are defined as unavoidable discrepancies or singlecases of commodities where only initial response is needed. These PRRs will be issued on a month
4、ly basis per part or part group.Definitions added to GP-5Page 5Supplier TrainingQuality Performance Reports Monthly 6 panel charts that graphically display the data contained in GQTS. Charts display the following:Major Disruptions (Spills, Downtime, Stockouts)PRRsDiscrepant PartsPPMSourcing MetricsS
5、upplier evaluation system that ranks each supplier manufacturing location in terms of overall quality in one of three categories: green, yellow or red. The ranking criteria are based on the historical commodityperformance. (Example Enhanced Metric Bid List)Changes to GP-5Definitions added to GP-5Pag
6、e 6Supplier TrainingChanges to GP-5Packaging PRRs (section 4.2.2)Packaging PRR s are now defined as packaging issues that cause part/specification nonconformity, or effect salability of the part. Examples: Damaged part or material that was inadequately secured in the container Container was inadequa
7、tely secured in the carrier vehicle and caused part/material damage Container design and/or fabrication was inadequate and caused part/material damage Container that has been damaged by improper handling and caused part/material damage Mixed pallets built incorrectly and caused part/material damage
8、Parts not packaged to specification for servicePage 7Supplier TrainingChanges to GP-5Line Accumulation PRRs (section 4.3) The Line accumulation PRR should be entered in the system only after the full impact and the monthly quantity is available to the issuer. When it is appropriate for the plant, th
9、e PRR may be issued with the first occurrence of the discrepant part. Regular adjustments of the volume will then be made during the month. For awareness purposes, the issuer should indicate the possibility of adjustments when issuing the PRR.Page 8Supplier TrainingChanges to GP-5Problem Location an
10、d Direct Run Indicator (section 4.3.2) Issuer must indicate on the PRR where the problem was found. (Phase drop down box) Issuer must indicate on the PRR if the issue affects Direct Run Rate. (Direct Run Rate check box)Page 9Supplier TrainingChanges to GP-5Quantity Checked (section 4.3.6.2) The “1%
11、or 30 pieces” requirement replaced by the following wording:“The quantity checked MUST be of a statistically significant size to represent the percentage defective within the batch.”Page 10Supplier TrainingChanges to GP-5Quantities for Label Issues (section 4.3.6.4) For parts shipped in bulk such as
12、 fasteners, labels, etc. (that are received in large quantities at manufacturing locations) mislabel problems will be counted using the following escalation process.First labeling offense (at a particular Duns location, in last 15 months) Issuer counts only one quantity discrepant against the suppli
13、er (Quantity nonconforming and estimated quantity nonconforming = 1) Second offense (at a particular Duns location, in last 15 months) Issuer counts only one quantity discrepant against the supplier (Quantity nonconforming and estimated quantity nonconforming = 1) The supplier will also be placed on
14、 Controlled Shipping Level 1.Third offense (at a particular Duns location, in last 15 months) Issuer counts all parts against the supplier. The supplier will also be placed on Controlled Shipping Level 2. Page 11Supplier TrainingChanges to GP-5Quantities for Label Issues (example - section 8.4)A PRR
15、 is written to a supplier for mislabeling a pallet of ten boxes of screws, each box containing 1,000 screws.If this is the suppliers first labeling offense:Quantity Checked:1000Quantity Nonconforming: 1Quantity Suspect:1000Est. Quantity Nonconforming: 1If this is the suppliers second labeling offens
16、e:Quantity Checked:1000Quantity Nonconforming: 1Quantity Suspect:1000Est. Quantity Nonconforming: 1If this is the suppliers third labeling offense:Quantity Checked:1000Quantity Nonconforming:1000Quantity Suspect:1000Est. Quantity Nonconforming:1000Page 12Supplier TrainingChanges to GP-5PRR Closure (
17、section 4.3.8) A PRR is considered closed after the customer has moved the PRR from an “Open or “Rejected” status to an Approved status. A new status field is being added to GQTS.Page 13Supplier TrainingChanges to GP-5Timeliness of Final Response (section 4.4.5) Suppliers will be measured on the tim
18、eliness of their final response. The following timestamps will be captured in the database only Implemented date Approved dateGM will use the timestamps to calculate the following metrics: Time to Implementation (Implementation date - Issue date) Time to Closure (Approved Date - Issue date)Page 14Su
19、pplier TrainingChanges to GP-5General Updates New Business Hold added to procedure (section 6.0) Issues that affect multiple plants counted as only one major disruptionPage 15Supplier TrainingPRR System Changes in GQTS This field indicates whether the PRR has an impact on the Direct Run Rate. An unc
20、hecked value indicates that the PRR does not impact the Direct Run Rate of the plant. A checked value indicates that the PRR impacts the Direct Run Rate of the plant. This field will default to unchecked.Page 16Supplier TrainingPRR System Changes in GQTSThis will automatically classify the PRR Recor
21、d as both “Problem Identified” and “Implemented”. Secondary Nonconformance is set as “Line Accumulation - Only Initial Response Required”Supplier has entered only the Initial response In Step 1: Initial Response, the Conforming Material Date field is set to the first day of the month following the c
22、urrent month. This field is set to this default value even if the supplier user had previously input a date to this field.In Step 3: Problem Identification and Action Plan, the following fields will be set (if the user entered a value for one of these fields, the user entered value will not be chang
23、ed):Root Cause drop list field to the value Other.Corrective Action Implementation Date field to current system date.Date Changes to FMEA will be Complete field to current system date.Date Changes to Process Control Plan will be Complete field to current system date.In Step 4: Implementation Process
24、, text “Not Required” will be placed in the Institutionalized text area.Line Accumulation PRRsPage 17Supplier TrainingPRR System Changes in GQTSSelect a category Phase box will no longer default to “ Production” Default will be “Select a Category” User must make a selection that represents where the problem was found.Page 18Supplier TrainingPRR System Changes in GQTSCustomer Response added as Step 5 on Supplier Response page. - Radio button added for Status - Default value is Open - Field can be updated at any time by a GM user ID with PRR upda
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 二零二五年開發(fā)商與購房者長租公寓買賣合同范本3篇
- 二零二五年度餐飲服務(wù)業(yè)勞動合同模板及食品安全3篇
- 二零二五版特種動物繁育與購銷一體化服務(wù)合同3篇
- 二零二五年教育機構(gòu)教學(xué)資源整合合同書3篇
- 二零二五年空壓機租賃與應(yīng)急響應(yīng)服務(wù)合同3篇
- 二零二五年教育培訓(xùn)機構(gòu)代理招生合同模板3篇
- 二零二五版未成年人撫養(yǎng)權(quán)變更合同3篇
- 二零二五年度財務(wù)風(fēng)險控制合同3篇
- 二零二五年度鋼材采購與智能制造合作合同3篇
- 二零二五版豪華游輪包船旅游運輸服務(wù)合同參考模板2篇
- 2024版?zhèn)€人私有房屋購買合同
- 2025年山東光明電力服務(wù)公司招聘筆試參考題庫含答案解析
- 《神經(jīng)發(fā)展障礙 兒童社交溝通障礙康復(fù)規(guī)范》
- 2025年中建六局二級子企業(yè)總經(jīng)理崗位公開招聘高頻重點提升(共500題)附帶答案詳解
- 2024年5月江蘇省事業(yè)單位招聘考試【綜合知識與能力素質(zhì)】真題及答案解析(管理類和其他類)
- 3-9年級信息技術(shù)(人教版、清華版)教科書資源下載
- 瑪氏銷售常用術(shù)語中英對照
- (完整)貓咪上門喂養(yǎng)服務(wù)協(xié)議書
- 上海牛津版三年級英語3B期末試卷及答案(共5頁)
- 行為疼痛量表BPS
- 小學(xué)生必背古詩詞80首(硬筆書法田字格)
評論
0/150
提交評論