文檔簡(jiǎn)介
1、1和滑境干涉的倒勾者青加月蓼填平至 滑可以平K滑勤The undercut area where interfere with slide block need to be f川ed material to help the slide can move smoothly2加月蓼太多The thickening added too thick.3加月蓼聞稹太大The thickening area is too wide.4灌黑占位置移位Gate position is moved.5滑現(xiàn)拆的位置The split line of slide block or the area of slid
2、e.6此庭啟尖角,填充困頭隹This area is hard to be filled due to the sharp feature7此虞金同材太薄,弓金度不足而且不 容易冷郤The strength of this area is too weak and isn ' t easy to get cold due to the steel too thin8圄柱特徵要有一半閶/、可以拆在 滑現(xiàn)上,以免粘滑現(xiàn)造成拉白, 四.The semicircle of cylinder avoids designing on slide block lest it will be pull
3、ed apart or cause drag mark.9此慮做斜金肖在作S&畤簿r破壤到成 品The part will be damaged if we make lifter in this area.10道他面是裝配面,不能加月蓼This is critical surface where is not allow to add material.11此慮料位太厚,曾有縮水,建H 減小塑料厚度以改善This thick wall area might because sink mark, Please reduce some wall thickness to improve
4、it.12此慮做滑境的有結(jié)合M 碓百忍是含可以接受Please confirm whether it is acceptable to has Slide split line if we have slide in this area.13清碓此面是不是外覲面?Please confirm whether it is critical surface or not?14此蜓有倒勾,能否減料,使公母 ??科?,不做滑瑰和斜金肖Please confirm whether we can reduce material to the area where have undercut as indic
5、ated to have shut off on core and cavity side. No slide block and lifter to be made.15小快吟道的顧占,否JW曾影 簪交期Please confirm these questions asap.Otherwise the lead-time will be extended.16Gate做在此慮的 . 3打11彳爰 看/、到Gate的修剪部位The trim mark of the gate is not visual after open the top case if the gate position i
6、s designed like it17加大拔模角,以便脫模K利Wewould suggest to enlarging draft to help tool released.18如果GATE"®要做在你伸號(hào)指定 的位置的忘舌,那遢不如做在適 ffl,適檬的忘舌遺可以減小道他位 置的縮水If you insist that the gate position have to be as original design then we would further recommend to have it to the area where indicate as it ca
7、n avoid shrink problem in this area.19P.L面K在此霓,模具上曾有尖 角和刀口,封模具毒命有影簪There are sharp edges if set the parting line at here, It will reduce the tool life20M的此品的面是否懸外覲面? 表面做什麼慮理?是食蟲微:/拋 光?Can you tell mewhether the surface of this part is a visible/esthetic one? What will we do for its surface? Texture
8、or Polishing?21言青的崖品道他面可否加J(金十或1BM?品允if加扁IB金十嘀?Does this part need an ejector pin or an ejector bar? Can we add an ejector blade?22道由品的柱位元我伸號(hào)打算做司 筒。(或鰻金十)可以嘀?Can we add ejector sleeves or ejector pins in the boss of this part?23道他位置有倒勾不能脫模,我伸號(hào) 打算做滑瑰,在此面上曾有分模 獻(xiàn)你接受嘀?There's an undercut at this pos
9、ition and it needs a slider. It will also have a parting line on this side, is that OK?24我伸號(hào)打算在道他位置做斜1B或內(nèi) 滑好有的題嘀?We will make the lifter or inner slider in this position, will that be a problem?25你提供的2Dj£品H典3Dj£品H 不一a,言青曲以哪一畫n正碓?The 2D and 3D drawing you provided is not the same, can you t
10、ell me which one is correct?26你提供的3Dj£品圄有的地方?jīng)] 有脫模角,有的地方月蓼位太厚, 有的地方月蓼位元太薄,適些品 曲題我伸號(hào)可以自己修改嘀?修改 彳爰1r給父給你碓百忍。There is no draft angle in the 3D drawing, some materials are too thick, and some place are too thin. Can we modify this part by ourselves? We will send the drawing to you for you to check a
11、fter we modify it.27按你伸號(hào)提供的縮水率千分之五, 道他1模具的尺寸已做到了模具 圄向要求。According to the shrinkage one over two hundred, the mold has been done in the right dimension,28注塑出來的品不符合你伸號(hào)的The part falls short to your part drawing,品H。蕾碓百忍你相號(hào)的材料的縮水 率是否止碓?are you sure the shrinkage is right?29品的道(0位置太小,醇致模具 金嗣料太薄,能別加SE道他1位置
12、 口H?This position is too small and will makethe steel material here too thin, can we widen it here?30斜IB典彳面的Boss空IW太小,斜1B在逋勤畤曾干涉到柱子,能移 勤造他1柱子的位置嘀?The angular lifter interferes with the boss during ejection. Please consider changing the position of the boss.31道(0筋骨位月蓼厚太薄,而且高度 偏高,注塑畤很H隹填充道他筋 位,可以增加造他筋
13、骨位的厚度 口The rib here is too thin and on the high side, so it will be difficult to fill here when we do the injection, can you increase the thickness of this rib?32你是想招此筋骨位的高度加高/ 減低嘀?假如加月蓼,我伸M各用放 重方式加深。W川 you increase/decrease the material on this rib? If add the material,We willmodify it with EDM pro
14、cess33減月蓼修改有雨槿做法,1、做鰻件;2、燎焊;因件的底部有逋 水,我伸號(hào)曾罩的做法是燎焊慮 理,你可以接受嘀?There are two option if decrease the material:1 .Make inserts;2 .Welding, because there is water in the bottom of the insert, is that OK?34道他檬板的筋骨位底部燎焦,是 因懸排氧/、良,我伸號(hào)可以在筋骨 位的中增加一 (0鰻件。This sample has been burned in the bottom because the ven
15、ting is not good, we can add an insert in the middle of the rib.35重做鰻件人余勺需要5-6天畤IWIt will take about 5 or 6 days to redo the insert36品的道他面我伸號(hào)已做了 01 慮理,如果需要加月隊(duì) 道他囿我 伸號(hào)需要重新外彝HIKi。可能需要 黑大的畤所以我伸號(hào)直接以銅 公放H的火花觸取代你要求的觸 路,你可以接受嘀?We have made the texture on this side, if we add material, it will take some day
16、s to remake the texture by out-resourcing, so we suggest using the texture by EDM instead, is that OK?37模具是用公制/英制的配件?Is this mold dimension measured in inches or meters?38需要借用件嘀?Does it need spare parts?39模具上牌上的刻字內(nèi)容是由你 伸號(hào)提供嘀?你伸號(hào)什麼畤候可以適 些刻字資料。W川 you provide the engraving content of the plate of this
17、mold to us? Whenwill you send it?40可否提供此模具生畤,注塑械Can you provide the type of injection的型虢及相資料。如:啤械大 小、呵林柱尺寸、IB棍孔尺寸等machine and other related information of this mold to us? Such as the boss dimension, the hole's dimension of the ejector pin and the size of the injection machine and so on.41道他的題我需
18、要同其他同事商S!1r再答彳復(fù)你。I need to discuss this problem with the other colleagues and then I will reply back to you.42我伸M各需Uj連成你的言十重,如有 昇常,曾及畤通知你。Wewill try our best to complete your plan, if there are any complications, we will notify you immediately.43道所品的法1330.12MMJE 度卷78.96MM,高度卷45MM月蓼厚 懸2MM重量懸70.63g,Th
19、e length of this part is 330.12MM, Width is 78.96MM, height is 45MM, thickness is 2MM, weight is 70.63g,44官式模注塑械型250 口虬月蓼料 is色懸黑色,品外表面 理,內(nèi)表回扁拋光.The injection machine is 250T,the material is black, the outside of the part has texture, inner side needs polishing,45和滑境干涉的倒勾者青加月蓼填平至 滑可以K利滑勤The undercut
20、area interferes with the slide block and needs to be filled with material to help the slider move smoothly.46此面是否后特殊要求,能否啟1S 金十痕Please confirm whether it is a critical surface or not and if we can have E.J. pin marks on it.47此虞Gate做潸伏市灌IB金十的 IS,背彳爰的外覲面曾有油料 痕,而且成品又是黑色的, 最明16If the design of the gate
21、has to be a sub.Gate, then the back surface of the part will have serious flow marks due to the black color.48P.L K在此慮不合理,模具加工 困!隹,P.L J8E和圄示的一檬This area is not suitable to have a Parting line because the tool will become more complicated; therefore, we recommend to have the Parting line as indicate
22、d.49品粘母模的械曾很大,能否在 公模加倒勾,拉料1B金十或者公模 保留E.D.Mt, K模畤使成品留 在公模一There is possible sticking on cavity;therefore, please confirm whether it canmake undercuts, snatch pinsor leave coarse E.D.M. on the core to snatch the part on50此慮料厚段差很大,成品表面曾Please confirm whether it is acceptable to有力痕,是否接受have stress lines
23、 on the surface because the thickness is not equal.51言青注明何"外覲面,能否提供2D曬注意事Please advise where the critical surfaceis. Please also provide us a 2Ddrawing with critical dimensions.52缸色所示慮是有曲題的地方,M 特別注意Please note the red highlights because those areas have problems.53成品言十此蜓有的題,建S!如下 圄所示修改We would
24、suggest using the attached part design as the current design has problems.54此慮改號(hào)40球形的凹槽Wesuggest modifying it as a globe recess.55此慮大滑現(xiàn)上走小滑現(xiàn),小滑現(xiàn) 要先退,大滑現(xiàn)要做延i1The inside small slide block will recede first and the parent slide block have to postpone sliding.56滑要用液屋油缸抽芯以保 合模J嗔序The slide pins will use a
25、n oil cylinder to assure that the process is in proper order.57道他面有裝配,加料的言舌裝配畤 曾B住,如圄所示W(wǎng)e cannot add material to this surface because it will intervene between the two parts when it is assembled.Please see the sketch attached.58可降低斜金肖面,增加成品些if肉 厚來做建化To descend the surface of lifter in order to thick
26、en the part.59一半做斜金肖,一半做自然One half side will have the lifter and the other half will be solid/nature.60此慮雨他柱子重疊,有倒勾,不 能做自然,要做SLIDEThese two bosses are overlapping with undercut therefore it can not be made assolid. Wesuggest making it with a slide block.61此霓弓金迫IB出This area needs force ejection.62公模雨
27、段K模,道他地方先退Here will be a double ejection for forward and receding.63此慮做鰻件1r有,能否接受Please confirm whether it is acceptable that there will be a split line here.64此面公母模1度靠破,曾有段 差,可否接受Please confirm whether it is ok to have mismatch to the area where there is 1 degree of shut off in Core / Cavity side.6
28、5道低1尺寸能否加大Please confirm whether we can enlarge this dimension.66此慮加一他凹槽,月蓼片的彈出效It will affect the elastic of the film果曾更好一些,模彳爰看裝配的 效果再做修正better if we add a recess. See how it will affect the assembly parts, and then make your decision.67此庭啟倒勾,建剖面所小 部位CUTW可避免此慮的倒勾There is an undercut here, we sugge
29、st cutting out the indicated part as it highlighted to avoid an undercut.68成型接SUB GAT段修平The gate (sub gate) needs to be trimmed evenly after being moulded.69此慮倒勾先垂直IB出,之彳爰再手 勤取出This area of the undercut needs to be ejected vertically, then taken out manually.70B雨他面都有滑現(xiàn),GAT改在此 慮改/、到The gate is not su
30、itable in this area becuase there are two sliding blocks sealing off this area.71此慮加做一他1旋樽GATE射出畤 方便湖整成品的品HWewould suggest placing a runner shut-off insert to adjust the volume of part filling.72此倒勾在滑境上強(qiáng)迫脫模,倒勾 是否可以減小到0.6This undercut will be force ejected out, Please confirm whether it can be reduce
31、d to 0.6 mm.73此柱子瓢法脫模,清碓是否是 在樽圄畤位,能否提供客戶的 原始BM富data.This boss is not releasable. Please check the file again and if possible, pleas re-send us the original draft.74此柱子是心的,曾縮水This boss will shrink because it is a solid boss.75道他而是e'要咬花,咬花番虢是 什麼,最小的拔模角要多大Please confirm whether this surface needs t
32、o be textured or not. Please advise texture specs. Also, what's the min.draft.76道他面是否要打光,貼襟筵Please confirm whether this surface needs to be polished and stuck on a sticker.77缸色St示的襄他面拔模用太小, 出模日寸曾拉像,建百我加大拔模角The red highlighted area has a problem of a small draft angle. We suggest enlarging the dr
33、aft to avoid casuing drag marks on the part.78此RIB太溥,曾填充/、足This rib can not be filled properly becauseit is too thin.79此RIB太厚,曾縮水This rib will have a shrink problem because it is too thick.80此慮倒勾出模困莫隹,建先不做 倒勾,成型彳爰再二次加工,但要 做治具,費(fèi)用要另外算There are problems with this current design, we recommenddoing this
34、undercut as an alternative but there will be additional costs.81柱子底部都要做火山口The base of all bosses require a crater to avoid shrinkage.82鰻件,P.L.面有充足排氧坑,P.L. 面要H碟形排氧槽,MgWMH 排到模外。Insert/PL should have adequate venting,PL should have around slot for venting.831B棍孔鰻件端面距離隹底板面0,5mm,攻 m20牙the surface of KO i
35、nsert shound below bottom plate 0.5mm,thread M20.84排氧槽距封月蓼位10-15mmVenting slot distance from the seal off position 10-15mm85底卸板均要啟隔熱板,dmeB格1/4厚Top/Bottom plate must have insulator plate,DME standard 1/4'H86此蜓有暹月蓼及方1B,所以瓢法在 此慮加水路This area has runner & square ejects then can not set up cooling
36、 system87迤月蓼黑占改成在方 屋 做潸水的形 式,方1B具醴位置需要模流分析 彳爰碓定。此槿迤月蓼方式削除敕困 曾啟殘繪(表面不平或圖或 低),而且品表面JR力大彳爰很 容易有除影。)Change to one sub-gate/ square gate(1.2x4mm) . After the mold flow analysis, xxx will advise where to set gate location. This gate may hard to remove the runner. It also may has shadow on the surface. Abo
37、ve will serious affect the texture & cosmetics88依照客戶崖品原有拔模角度II品 曾沾母模,所以我伸號(hào)建S!此慮分 模需要改在上面To prevent from part stick on cavity side, MGFadvise the PL change to this location89懸防止滑現(xiàn)黏母模,品此慮R 不能出在滑瑰上(t|考我伸號(hào)的 初步3d拆模)To prevent from scrape, the slide can not cover the radius(xxx has 3D file for referen
38、ce)90能否往箭方向移S& 1mmCan this stage move1 mmas the Pink arrow direction?DFM常用中英文對(duì)照1、這個(gè)紅色面在前模方向/后模方向/行位方向有倒扣。This red surface is undercut at cavity side / core side / slider side.2、這些紅色面在前模方向/后模方向/行位方向有倒扣。These red surfaces are undercut at cavity side / core side / slider side.3、產(chǎn)品的這個(gè)位置太小,導(dǎo)致模具在前模方向/
39、后模方向/行位方向有薄鋼位。This position is too small and it will bring the thin steel at cavity side / core side / slider side.4、這些紅色線是前后模/鑲件/行位/斜頂分型線。These red lines are the parting line of cavity and core / insert / slider / lifter.5、此產(chǎn)品使用推板/推塊頂出。Use the stripper plate / ejector block to eject this part.6、前模/后模斜行位。Inner angle slider at cavity / core side.7、為了簡(jiǎn)化模具結(jié)構(gòu)建議改變此處出模方向。Suggest to change the draft direction of this position to make the mold structure simply.8、最終的進(jìn)膠位置根據(jù)模流分析。Finally gate p
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025至2031年中國(guó)鋁合金梳狀加熱器行業(yè)投資前景及策略咨詢研究報(bào)告
- 2025至2031年中國(guó)海島絲行業(yè)投資前景及策略咨詢研究報(bào)告
- 2025年充電樁建設(shè)和維護(hù)合同
- 2025年公務(wù)車輛調(diào)度管理承包合同
- 2025年農(nóng)業(yè)金融借款合同模板
- 2025年住宅區(qū)消防系統(tǒng)裝修合同范本
- 2025年度旅游合同服務(wù)標(biāo)準(zhǔn)與糾紛解決合同
- 2025年度城市地下綜合管廊工程沙石材料運(yùn)輸合同
- 2025年度海洋工程商砼材料供應(yīng)與海洋環(huán)境保護(hù)合同
- 2025年度海上風(fēng)電場(chǎng)建設(shè)項(xiàng)目承包合同
- 高中物理選擇性必修2教材習(xí)題答案
- 我國(guó)糖尿病視網(wǎng)膜病變臨床診療指南2022解讀
- 鋰離子電池健康評(píng)估及剩余使用壽命預(yù)測(cè)方法研究
- c30混凝土路面施工方案
- 頸椎骨折的護(hù)理常規(guī)課件
- 電商運(yùn)營(yíng)銷售計(jì)劃Excel模版
- 2022-2023學(xué)年上海市楊浦區(qū)上海同濟(jì)大附屬存志學(xué)校七年級(jí)數(shù)學(xué)第二學(xué)期期中綜合測(cè)試模擬試題含解析
- 稿件修改說明(模板)
- GB/T 33107-2016工業(yè)用碳酸二甲酯
- GB/T 16604-2017滌綸工業(yè)長(zhǎng)絲
- 勞動(dòng)合同法經(jīng)典講義
評(píng)論
0/150
提交評(píng)論