


版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、(規(guī)章制度)站場(chǎng)安全生產(chǎn)管理制度 4站場(chǎng)安全生產(chǎn)管理制度?第一章總則第一條為了貫徹“安全第一,預(yù)防為主”的方針,確保站場(chǎng) 安全、穩(wěn)定、有序運(yùn)行,根據(jù)國(guó)家相關(guān)法律、法規(guī)、規(guī)范標(biāo)準(zhǔn), 結(jié)合我公司實(shí)際情況,制訂本管理制度。第二條本制度適用于公司各站場(chǎng)日常生產(chǎn)運(yùn)行的管理。?第二章組織管理和交接班制度第三條公司站場(chǎng)管理部負(fù)責(zé)門站、魯能晉北鋁業(yè)調(diào)壓站、同 煤鍋爐房調(diào)壓站等大型調(diào)壓場(chǎng)站及其附屬設(shè)施、設(shè)備的運(yùn)行管 理,是站場(chǎng)管理的歸口部門。第四條站場(chǎng)管理部設(shè)經(jīng)理一名,全面負(fù)責(zé)站場(chǎng)部工作,副經(jīng) 理兩名,一名負(fù)責(zé)公司門站和同煤鍋爐房調(diào)壓站等 (省、市、區(qū)、縣)大型站場(chǎng)設(shè)施,另一名負(fù)責(zé)魯能晉北鋁業(yè)調(diào)壓站和其它 工業(yè)
2、用戶調(diào)壓設(shè)施,站場(chǎng)部經(jīng)理柯根據(jù)業(yè)務(wù)需要適時(shí)調(diào)整。第五條站場(chǎng)部運(yùn)行工實(shí)行四班三倒作業(yè)制。公司門站每班兩人,其中班長(zhǎng)一名,運(yùn)行工一名。魯能晉北鋁業(yè)調(diào)壓站每班三人, 其中班長(zhǎng)一名,運(yùn)行工兩名。同煤鍋爐房調(diào)壓站為無(wú)人值守站, 由分管門站的副經(jīng)理每日巡查一次; 新增場(chǎng)站將根據(jù)實(shí)際需要由 分管生產(chǎn)的副總經(jīng)理統(tǒng)一調(diào)配。第六條所有進(jìn)站人員必須遵守進(jìn)站安全管理規(guī)定1、本部門上班人員及公司安全檢查人員進(jìn)站須按規(guī)定著裝, 佩帶工作證。2、公司其他部門人員及外來(lái)人員須經(jīng)有關(guān)領(lǐng)導(dǎo)(站場(chǎng)部經(jīng)理、分管副總經(jīng)理)批準(zhǔn)后,辦理登記手續(xù);各種機(jī)動(dòng)車輛不得 進(jìn)站,若必須進(jìn)站按規(guī)定帶合格的防火帽,進(jìn)站后按指定位置停放。4、公司或上級(jí)
3、領(lǐng)導(dǎo)參觀視察時(shí), 應(yīng)由分管生產(chǎn)的副總經(jīng)理、 站場(chǎng)部經(jīng)理陪同,并按要求著裝、確保站場(chǎng)安全。5、未經(jīng)允許不得在車間照相、錄像。8站區(qū)內(nèi)嚴(yán)禁煙火,不得帶火種,不得穿鐵釘鞋進(jìn)站,各 種動(dòng)火作業(yè)方案需經(jīng)相關(guān)人員審批后方可作業(yè)。9、違反上述規(guī)定,值班人員有權(quán)盤查、制止。第七條門站所有工作人員必須遵守倒班及交接班管理制 度規(guī)定如下:1、接班人員上班前必須保證有充分的睡眠和良好的休息, 并不得飲酒,嚴(yán)禁酒后上崗。3、每班結(jié)束之前半小時(shí)以內(nèi)為交接班時(shí)間,接班人應(yīng)在此時(shí)間內(nèi)上崗接班,未進(jìn)行交接班或交接班未結(jié)束之前,交班人不得離崗。4、交接班工作的組織實(shí)施由上一班次和下一班次的班長(zhǎng)負(fù)5、交接班時(shí),必須做到"
4、;十交""五不接"十交:交運(yùn)行情況及記錄;交設(shè)備工作情況;交閥門啟閉情 況;交上級(jí)領(lǐng)導(dǎo)指令情況;交加臭液位情況;交流量計(jì)流量;交 帶氣設(shè)備接口檢漏情況;交維修工具及消防器材;交崗位衛(wèi)生和 存在的問(wèn)題。五不接:生產(chǎn)及記錄情況不清不接;閥門開關(guān)情況不清不接; 工具、用具、消防設(shè)施不全不接;崗位衛(wèi)生不好不接;無(wú)客觀原 因,該處理的問(wèn)題不處理不接。6、交接班時(shí)要責(zé)任明確,交接過(guò)程中查出的問(wèn)題由交班班 長(zhǎng)負(fù)責(zé),接班人簽字后出現(xiàn)的問(wèn)題由接班人負(fù)責(zé)。7、交接班記錄必須書寫工整,不得用鉛筆填寫,不得涂改, 并妥善保存,并由本部門存檔。第三章值守工作內(nèi)容及要求12版土木工程試驗(yàn)班人
5、才培養(yǎng)方案201207101producti on capa city, i ncrease the inte n sity of中南大學(xué)“卓越工程師教育培養(yǎng)計(jì)劃”土木工程專業(yè)本科(3+1)培養(yǎng)方案(2012版)中南大學(xué)二一二年七月目錄第一部分中南大學(xué)土木工程專業(yè)(3+1)卓越計(jì)劃培養(yǎng)標(biāo)準(zhǔn) 錯(cuò)誤!未定義書簽。第二部分中南大學(xué)土木工程專業(yè)(3+1 )卓越計(jì)劃培養(yǎng)方案(6)第三部分中南大學(xué)土木工程專業(yè)(3+1)卓越計(jì)劃校企聯(lián)合 培養(yǎng)方案(26)第四部分中南大學(xué)土木工程專業(yè)(3+1)卓越計(jì)劃培養(yǎng)標(biāo)準(zhǔn) 實(shí)現(xiàn)矩陣(32)第一部分中南大學(xué)土木工程專業(yè)(3+1)卓越計(jì)劃培養(yǎng)標(biāo)準(zhǔn)面向土木工程技術(shù)和管理,培養(yǎng)具
6、有堅(jiān)實(shí)自然科學(xué)基礎(chǔ)、人文社會(huì)科學(xué)基礎(chǔ),扎實(shí)掌握土木工程學(xué)科基本理論、基本知識(shí)和 專業(yè)知識(shí),獲得土建類工程師基本實(shí)踐訓(xùn)練,具有較強(qiáng)的工程實(shí)踐能力、社會(huì)適應(yīng)能力、溝通與組織管理能力和國(guó)際視野的實(shí)用 型高素質(zhì)土木工程專業(yè)人才。本專業(yè)畢業(yè)的學(xué)生,可從事土木工程、道路與鐵道工程勘察、 設(shè)計(jì)、施工與養(yǎng)護(hù)維修工作,并可進(jìn)一步承擔(dān)設(shè)計(jì)、施工企業(yè)生 產(chǎn)技術(shù)和市場(chǎng)經(jīng)營(yíng)等管理工作。1. 知識(shí)擁有良好的人文與社會(huì)知識(shí)、學(xué)科基礎(chǔ)知識(shí)、專業(yè)基礎(chǔ)知識(shí)與專業(yè)知識(shí)。1.1人文社會(huì)知識(shí)掌握一定的經(jīng)濟(jì)、法律、管理、信息交流、社會(huì)學(xué)和環(huán)境等 人文與社會(huì)學(xué)的知識(shí),滿足社會(huì)交往和工程實(shí)踐的需要。1.2學(xué)科基礎(chǔ)知識(shí)(1)自然科學(xué):掌握土木
7、工程學(xué)科所需的自然科學(xué),包括 數(shù)學(xué)、物理、化學(xué)、一般試驗(yàn)技術(shù)等。(2)學(xué)科基礎(chǔ):掌握土木工程學(xué)科所需的工程基礎(chǔ)科學(xué),包括工程力學(xué)(如:理論力學(xué)、材料力學(xué)和流體力學(xué)等)、力學(xué)實(shí)驗(yàn)、電工學(xué)、工程制圖、工程測(cè)量和計(jì)算機(jī)技術(shù)等相關(guān)學(xué)科知識(shí)。1.3專業(yè)基礎(chǔ)知識(shí)掌握結(jié)構(gòu)力學(xué)、工程地質(zhì)、土木工程材料、土力學(xué)、混凝土 結(jié)構(gòu)設(shè)計(jì)原理、鋼結(jié)構(gòu)設(shè)計(jì)原理、工程軟件開發(fā)與應(yīng)用等基本理 論和原理。1.4專業(yè)知識(shí)掌握扎實(shí)的土木工程基本理論知識(shí)、工程技術(shù)、先進(jìn)的工程 計(jì)算方法、工程試驗(yàn)與檢測(cè)技術(shù),了解新材料、新工藝、新設(shè)備。videoc onfere n ce, Secretary of the prov in cial C
8、ommittee of Xia Baol ong stre ssed: this year i s the "five water treatment" "357" timetables "for three years to resolve outsta ndi ng issues, obviouslyw orked," vict ory of the year. The County's de partments at all level s must firmly establish the "g uanghu
9、i is g old a nd silv er" green devel opme nt concept, convi nee d that Castl e is not relaxed, always main tai ning strategic ability a nd str ong determ in atio n to improve t he envir onme nt, consiste ntly playi ng well "five water treatment of" winning t he war, ever-hig her level
10、s of compr ehe n sive well-of f society was built. (A) lay the sewag e uphill battle. Thi s year we will "river water quality improve d at the county level, up to five" this basi c obje ctive grasp of polluti on con trol that focus, wit h the focus on t hree thi n gs: a good job, "cle
11、ar rivers" reach ing the County create d. Or ga ni zati on "look back" special i n specti on, t he County garbage River, bla ck and odorous River is "Dragnet" investigati on, timely re ctification of problems found i nplace firmly to prev ent river polluti on re bound. In ac
12、cordance with t he "one-st op strategy", improvi ng the i nferior five water quality monitoring stati ons work this year to e nsure the Elimi nation of 1 pr ovincial control, five water qual ity secti on 3 m uni cipalitie s con trolle d deteri orati on, en sure t he creati on t his year of
13、 "clear rivers" standards. Second, pay spe cial attention to poll utio n-cutti ng con structi on of na no tubes. In tercept ing nano tubes are t he ba sis of poll uti on of water source engi n eeri ng, engi n eeri ng, matter of succe ss or fail ure of water man ageme nt. Ur ban sewage trea
14、tme nt, to i mprove "efflue nt from sewage treatme nt rate, r unning a ccuracy, com plia nce" requireme nt, spee d up the t own's support netw ork con str ucti on, i s focus ing on nano tubes home "last meters" que sti on. Domestic sewage treatme nt in r ural areas, t hisyear
15、 i s the final year of the thre e-year a ction, det erm in ati on t o fight and the mome n tum around, e ndi ng the battle on whi ch fully t o en sure the realizati on of all County 648 forme d villagecoverage. Also, be sure to atta ch importa nee to focus on rural domesti c wastewater treatment fac
16、ility operation and management, ensure that wastewater treatment facility up a nd r unning, rol e pla y, avoid t he "Sun" pr oblem. T hird, pay spe cial attenti on to t he River Lake pond desilting operation. Provinces now have focused on poll ution control of water go to "dig up mud&
17、quot;, as the deepeni ng water of this year's "play s". Next, to jump-start a n investigation line t ouches w ork, impleme ntation pla n accordi ng to the prioritie s and the pr ogramme of work, i n a ccor da nee wit h the "one rive r one policy" requires detailed clea ning,
18、dredgi ng pla n, pla nni ng ahea d of time clea ning out mud "way out", accordi ng to local conditions to do sl udge, promote scie ntific resource utilizati on of silt a nd mud. (B) the heavy regulati on of heav ily pol luting i n dustries. Poll ut ion of water must grab the source, wastew
19、 ater is primarily the source of backwar d production ca pacit y, increase the inten sity of(1) 熟練掌握道路與鐵路線路勘察設(shè)計(jì)、路面與軌道、路 基及支擋、橋梁、隧道、地下空間和房屋建筑等結(jié)構(gòu)設(shè)計(jì)的一般 原理和方法。(2) 熟悉工程材料種類、性能,熟悉道路與鐵路、路基及 支擋、路面和軌道、橋梁與隧道工程、房屋建筑工程的一般施工 方法、施工機(jī)械和施工工藝。(3)初步掌握道路與鐵路、路基及支擋、路面和軌道、橋 梁與隧道工程、地下空間和房屋建筑等工程結(jié)構(gòu)先進(jìn)的測(cè)試技 術(shù)、數(shù)據(jù)處理技術(shù)與計(jì)算分析方法。(4)在
20、道路與鐵路、路基及支擋、路面和軌道、橋梁與隧 道工程、地下空間和房屋建筑的規(guī)劃、設(shè)計(jì)、施工、管理等方面 具有堅(jiān)實(shí)和寬廣的基礎(chǔ)理論和專業(yè)知識(shí)。(5)熟悉現(xiàn)代計(jì)算機(jī)和信息技術(shù)在土木工程中的應(yīng)用。2. 能力擁有解決實(shí)際工程問(wèn)題的能力、較強(qiáng)的創(chuàng)新意識(shí)與創(chuàng)新能 力、良好的社會(huì)交往能力、較強(qiáng)的國(guó)際競(jìng)爭(zhēng)能力以及管理能力。2.1工程實(shí)踐能力具備分析解決土木工程實(shí)際問(wèn)題的能力,能從事土木工程設(shè) 計(jì)、施工、養(yǎng)護(hù)維修等工作。(1)參與一項(xiàng)及以上土木工程的設(shè)計(jì)、施工和養(yǎng)護(hù)維修實(shí) 際工作。(2)工程設(shè)計(jì)中,能理解工程應(yīng)用要求,掌握外業(yè)勘察方法,嚴(yán)格貫徹專業(yè)設(shè)計(jì)規(guī)范和專業(yè)設(shè)計(jì)流程,選用合適設(shè)計(jì)參數(shù),應(yīng)用合理、科學(xué)的計(jì)算模型和設(shè)計(jì)方法、軟件完成一般工程結(jié)構(gòu) 物的設(shè)計(jì)和復(fù)核工作。參與工程設(shè)計(jì)文件(設(shè)計(jì)投標(biāo)書,工程可 行性研究報(bào)告、初步設(shè)計(jì)或施工圖設(shè)計(jì)等)的編纂,并能進(jìn)行設(shè)計(jì)方案說(shuō)明與詳細(xì)方案比選。(3) 工程施工中,能充分理解工程設(shè)計(jì)意圖,考慮工程質(zhì) 量、投資、進(jìn)度、環(huán)境和安全以及工程條件,選擇所需的技術(shù)、 工藝和方法,參與編制施工組織設(shè)計(jì)。熟悉施工規(guī)范
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 三農(nóng)村合作社合作模式優(yōu)化方案
- 防撞護(hù)欄安裝施工方案
- 轉(zhuǎn)換層模板施工方案
- 不銹鋼雨棚施工方案
- 綦江酒店鋁單板施工方案
- 龍泉塑石假山制作施工方案
- 路面瀝青工程施工方案
- 臨床急性化膿性扁桃體炎和傳染性單核細(xì)胞增多癥鑒別診斷、相同點(diǎn)及區(qū)別
- 杭州扣盤式腳手架施工方案
- 桐梓科學(xué)開展松樹育苗和病蟲害防治工作的實(shí)踐及成果分析
- 企業(yè)對(duì)外負(fù)面輿情應(yīng)急預(yù)案
- 2004用工合同范本
- 燃?xì)獾缆分袎嚎⒐べY料全
- 2025年黑龍江農(nóng)業(yè)工程職業(yè)學(xué)院?jiǎn)握新殬I(yè)適應(yīng)性測(cè)試題庫(kù)完整版
- 2025年湖南環(huán)境生物職業(yè)技術(shù)學(xué)院?jiǎn)握新殬I(yè)技能測(cè)試題庫(kù)匯編
- 高三歷史臨界生輔導(dǎo)計(jì)劃及措施
- 2025年廣西南寧市公安局警務(wù)輔助崗位招聘2364人歷年高頻重點(diǎn)模擬試卷提升(共500題附帶答案詳解)
- 2024年中國(guó)農(nóng)業(yè)大學(xué)招聘筆試真題
- 課件:以《哪吒2》為鏡借哪吒精神燃開學(xué)斗志
- 2025年貴安發(fā)展集團(tuán)有限公司招聘筆試參考題庫(kù)含答案解析
- 2024預(yù)防流感課件完整版
評(píng)論
0/150
提交評(píng)論