

下載本文檔
版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、Purge procedure, materials and operating temperatures吹膜設備沖料程序Materialin the die 模頭內的原料Purge Material 沖洗原料Typical operat ing temperatures oC典型操作溫度Z1Z2 Z3Z4LDPEShut dow n layer/ li ne withLDPE 以 LDPE 關閉層或生產 線180200195200HDPEUse 0.3 0.5 MI LDPE un tilLLDPE is completely out. No need to purge system if
2、HDPE isgoing to be run the next day 使用0.30.5MI 的 LDPE 直至 LLDPE完全清出,如第二天仍要運行,就不用沖 洗系統(tǒng)205220 210 205LLDPEUse 0.3 0.7 MI LDPE un tilLLDPE is completely out. 用0.30.7MI 的 LDPE,直至 LLDPE完全清出205220 210 205NYLON1. In crease temps 10 degrees Cbefore in troduc ing235250 255 260purge res in. Purge res in maybe
3、0.3 0.7 MI LDPE or ble ndsof LDPE and Tie at 50/50 ratio.For blend, about 50kg isrequired in itially the n con ti nuewith LDPE un til complete. Aftercomplet ing disco purgeprocess, add(PA 6227(PA 6,66232 237 243about 15 kg ble nd of Tie and LDPE to flush out any remai ning PA.Procedure for PA6,66 is
4、 similar except the temperature profiles arenormally lower. 在放入沖料原 料前升高溫度 10 度,沖洗原料 可以用是0.30.7MI 的 LDPE, 或 LDPE 和 TIE 各 50%比例 混合原料,對于混合原料,一開 始需要 50 公斤,然后繼續(xù)使用 LDPE 直至完全清出,完成”迪 斯科”中料程序后,加入 15 公 斤 Tie 和 LDPE 的混合料沖出 殘留的尼龍.對于共聚尼龍的 沖料程序類似,除了溫度通常 需低一點.2. Go to Shut dow n procedures 2.執(zhí)行關機程序 2EVOHUse 0.3 0.
5、7 MI LDPE; followsame procedure outlined forNylon.用 0.30.7MI 的 LDPE 與尼龍程 序相同195205210 210Tie MaterialUse 0.3 0.7 MI LDPE 用0.30.7MI 的 LDPEPETUse 0.3 0.7 MI LDPE 用0.30.7MI 的 LDPE250260260 260PPUse 0.3 0.7 MI LDPE, if PP200225220 210is the n ext material to be run after 0.3 0.7 MI LDPE, then use 1-1.5L
6、DPE as the transition material to purge out the 0.3 LD before PP isintroduced.用 0.30.7MI 的LDPE,如果 PP 是0.30.7MILDPE 之后要運行 的原料撚后用 11.5 的 LDPE 作為轉變(過渡原料,在導入PP 前沖止沖清洗 0.3LDMetalloce neS Use 0.3 0.7 MI LDPE 用 2050.30.7MI 的 LDPE220 210 205PVDCUse 2 MI LDPE 用 2MI 的 150 DPE155 155 155Note: The above operati
7、ng temperatures can be changed depending on process ing conditi ons, and grades of res ins and applicati ons.注意;以上操作溫度可以根據處理環(huán)境或再生料視應用等級進行調節(jié)Shut dow n procedures:關機程序1. Before in troduc ing the purge material in crease the temperatures 510oCfor PA, EVOH and PET res ins. This will lower the viscosity
8、of the polymersbeing purged to avoid wetted-surface freez ing whe n the cooler higher viscosityresin passes over the system. For Polyolefin resins, temperature change is notnecessary. 對于 PA EVOH 和 PET 原料在導入沖 洗原料前升高溫度 510 度,這將降低要沖洗的聚合物的粘性以避免當冷 卻的高粘性原料通過系統(tǒng)的表面凝固。對于聚烯烴原料,溫度不需要改 變。2. Run extruders (on ly
9、 for the layers with the difficult-to-purge resins such asPA, EVOH and PET at the highest rate possible for about 10 minutes limitedonly by pressure and bubble in stability. Con ti nue the process with discopurging. e.g. Ext at 80 rpm s for two minutes then 30 rpmminutes. Repeat steps until all trac
10、es of previous materials are gone . Purg ingcan beg in later for the other layers that are n ormally not difficult to purge.當壓力和氣泡不穩(wěn)定時,以高速運行擠出機(只對于難以沖洗的 原料層如;尼龍、EVOH PET)大約 10 分鐘,然后繼續(xù)以迪斯科沖料程序 進行,如;擠出機以 80rpm,運轉用 2 分鐘,然后擠出機以 30rpm,運轉 用 2 分鐘,反復多次交換進行,直至以前的原料完全被沖出。隨后開始對 一般不容易沖洗的其它層進行沖洗s for two3. When
11、no more trace of the previous material is visible, decrease the extruder and dietemperatures in in creme nts of 20 to 25oC for 15 to 20minutes untiltemps reach 120oC. Reduce output as pressure builds toavoid failure of rupture discs and stoppage of extruders due to motor over loads. When itis no Ion
12、 ger possible to maintain a bubble, rotatethe screws slowly untilthe temperatures are at the suggested values.This procedure must be followed to get the dies below 200oC before shutting power off tothe system.當看不出以前原料的痕跡時,在1520 分鐘之內降低擠出機和模頭的溫度,每次2025 度,直到溫度達到 120 度,隨著壓力的升高,降低了產量,以避免破裂轉盤故障和由于馬達超負荷而導致
13、擠出機停 機,當不能再維持氣泡狀態(tài)時,緩慢旋轉螺桿直至溫度達到建議值。關閉系統(tǒng)之 前,必需按照此步驟使將模頭溫度降至200 度以下。4. When procedures 1-3 are completed, stop the extruders and decrease temperaturesto 90oC. Shut the power off whe n the extruders are at 90oC.(If the planned shut down is with power on but for more than 12 hours, leave systemtemperature at 60oC. The die temperature can be higher tha n 100oC at this pointbecause of its mass and the fact thatthere is no cooling. 完成 13 步驟后,停止擠出機,降低溫度至90 度,當擠出機溫度達到 90 度時
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 財務分析題庫及答案
- 2025中介服務合同
- 智能制造生產線設備采購合同
- 貴州國企招聘2025貴陽供銷集團有限公司所屬企業(yè)第一批招聘21人筆試參考題庫附帶答案詳解
- 浙江國企招聘2025年紹興市新昌縣國有企業(yè)公開招聘工作人員66人筆試參考題庫附帶答案詳解
- 青少年班試題及答案
- 2025遼寧撫順市龍晟保安服務有限責任公司招聘20人筆試參考題庫附帶答案詳解
- 2025福建南平綠發(fā)集團有限公司招聘28人筆試參考題庫附帶答案詳解
- 2025春季福建省港口集團有限責任公司校園招聘219人筆試參考題庫附帶答案詳解
- 無人機物流引領低空經濟新趨勢
- 水利工程竣工報告
- 2024年秋新冀教版英語三年級上冊 unit 3 lesson 3 教學課件
- 工業(yè)園區(qū)保潔合同
- 2024年網絡安全知識競賽考試題庫500題(含答案)
- 廣州醫(yī)學院攻讀臨床醫(yī)學專業(yè)學位研究生培養(yǎng)方案
- 經導管主動脈瓣置換術(TAVR)患者的麻醉管理
- 2024-2030年中國預付卡和禮品卡行業(yè)市場發(fā)展趨勢與前景展望戰(zhàn)略分析報告
- 【鄉(xiāng)村空心化的風險探究文獻綜述3000字】
- 煙草公司正式員工勞動合同
- 國能遼寧北票 200MW 風力發(fā)電項目地質災害危險性評估報告
- 《中電聯(lián)團體標準-220kV變電站并聯(lián)直流電源系統(tǒng)技術規(guī)范》
評論
0/150
提交評論