1、中國海洋石油總公司OFFSHORE OIL ENGINEERING CO.,LTD.南堡 35-2 海洋開發(fā)工程NANBAO 35-2 OIL FIELD DEVELOPMENTHEAVY EQUIPMENTLIFTINGPROCEDURENB-CON-007勝利油田勝利石油化工建設(shè)有限責任公司SHENGLI OIL FIELD PETROCHEMICAL CONSTRUCTION CORPORATION南堡 35 2 工程管理部NANBAO 35-2 PMO OF SLPCCCA報批9遲艷芬張勁松崔新村Rew.DateDescriptionPagePreparedCheckedApprove
2、d版 次日 期說 明頁 數(shù)編 制審 核批 準TABLE OF CONTENTS目錄1.0Scope 范圍2.0CompilationReferenceand RelevantDocument參考資料及相關(guān)文件3.0Operating Sequence操作順序4.0Lifting Procedure吊裝程序5.0Final work phase最終工作階段1.0Scope1.1 Thisprocedureistoensurethatheavyliftingwork shallbeperformedsafelyandinhighqualityandalltheelementsthataffectt
3、heliftingworkareunder control.At thesame time,thisprocedure is for the equipment lifting greater than 50t.1.2 This procedure is applicable toZhao Dong Extension Development Project.2.0 Organization and ResponsibilitiesOrganization chartProduction managerConstructionTechnicalHSE departmentQA/QCRdepar
4、tmentsponsibiliiesdepartmentConstructiondepartment4.2.1 Construction departmentteamResponsible for performing the constructiontechnique of lifting and management.Coordinate lifting machines and tools.Receive /establish construction instructions and deliver to construction team4.2.2 Technical departm
5、entMake the technical schemes of lifting.Responsible for lifting calculationof safe character.Make the staff know about the technical requirementsHSE DepartmentSchedule and coordinate safety activitiesCheck 工程安全監(jiān)督和施工單位地相關(guān)安全人員負責監(jiān)督吊裝方案和公司各項相關(guān)安全管理制度地執(zhí)行情況.Responsible for investigation and disposalin cas
6、e of incidents.QA/QC DepartmentSupervise the conditions ofNDT inspection.3.0Lifting Procedure2.0Preparation Phase:2. 1 Construction team prepares for facilities of lifting according lifting projects.2.2supervisorof HSEDepartment andconstructionteam organizeallrelevantpersonnel to inspect as followin
7、g:All the lifting machines and tools have been checked and crane is in good condition.All the staff know about the technical requirementsThe specifications and lay-out of the lifting machines and tools are consistent withlifting technical measure and they are convenient to operateThesparetools/mater
8、ialshave been allready andallthe obstacleshave beenhandled, other relevant preparation work has been all readyLug must be performed NDT inspection before liftingCommander and workers have been familiar with their responsibility, and signal hasbeen unifiedHeavy equipment doesnot permit to be liftedin
9、 case of thunder, rain, fog and thewind that is more than 6 grades (including 6 grades).Establish guard-line and make irrelevant man from danger areas.2.3 After inspected, HSE supervisors of construction organize all relevant persons to fillin the table“ safe evaluate table before lifting” . Then in
10、forms the lifting commanderto perform.3.0Lifting Phase:the lifting commander declares the lifting command, after all condition is good including:Tow ropes are in place and long enough to ensure the safe space.Gesture and signal of command should be clear and explicit .if interphones are used, made t
11、he communication in good conditions.All driver must obey uniform commands during lifting4.0 Final work phase:Declares the lifting is finished and documents the table“ safe evaluate table beforelifting” .Liaison manner of liftingLiaison manner: InterphoneLiaison channel:7Attachment 1 “ safe evaluate table before lifting”陸上大型起重作業(yè)安全評估檢查表Time ( 時間 ):Content
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- GB/T 18282.1-2025醫(yī)療保健產(chǎn)品滅菌化學(xué)指示物第1部分:通則
- 商品采購合同協(xié)議書范本
- 19《剃頭大師》(教學(xué)設(shè)計)-2024-2025學(xué)年語文三年級下冊統(tǒng)編版
- 4 繁星 教學(xué)設(shè)計-2024-2025學(xué)年統(tǒng)編版語文四年級上冊
- 銷售行業(yè)勞動合同范本
- 度消防設(shè)備保養(yǎng)合同書
- 小企業(yè)勞動合同經(jīng)典合同示例
- 獨家經(jīng)銷合同正式簽署
- 度商業(yè)銀行外匯融資合同(模板五)
- 壓漿合同范本
- 2025年茂名市高三年級第一次綜合測試(一模)物理試卷(含答案)
- 2025年重癥醫(yī)學(xué)科(ICU)護理工作計劃
- 四川省名校2025屆高三第二次模擬考試英語試卷含解析
- 2024各科普通高中課程標準
- 《垂體瘤規(guī)范化診治》課件
- 早產(chǎn)臨床防治指南(2024版)解讀
- 艾草種植基地合同(2篇)
- GB/T 30661.10-2024輪椅車座椅第10部分:體位支撐裝置的阻燃性要求和試驗方法
- 《電子商務(wù)法律法規(guī)》電子商務(wù)專業(yè)全套教學(xué)課件
- 空調(diào)制冷管道施工協(xié)議
- 《產(chǎn)后出血預(yù)防與處理指南(2023)》解讀課件
評論
0/150
提交評論