1、RCC as a New Construction Method(RCC 作為一種新的施工方法)8.1 General Construction Considerations 一( 般情況下施工過程需考慮的因素 )There are considerable differences between vertical, block-by-block construction( 垂直 塊 狀 澆 筑 ) of dams with conventional mass concrete and horizontal, lift-by-lift construction(水平通倉澆筑) of dams

2、with RCC. The construction plant for RCC is usually, less costly, and utilized at a higher capacity factor (利用率)than that required for conventional concrete gravity dams.But the fast pace of placement required to achieve the economies possible with RCC imposes a greater discipline 要( 求)on the planni

3、ng, scheduling(進(jìn)度), and coordination(協(xié) 調(diào)) in the field between designer(設(shè)計(jì)) and contractor(承包商).The RCC design approaches described in Chaps. 4, 5, and 6 diverge不( 同點(diǎn)在于 .) in some construction procedures. In all cases, however, the mixing( 拌合 ), transporting(運(yùn)輸 ), spreading(攤鋪 ), and compacting (碾壓)

4、of relatively large volumes of material are concentrated into a short time interval. In the United States, the time limit from mixing plant to final compaction is about 45 min. It is about twice that in Japan. In addition, the JapaneseR CD method requires that lifts be cured (養(yǎng)護(hù))for as long as 36 h

5、before placement (澆筑)of the next layer of RCC. In the United states and elsewhere, the goal has nearly always been to come as close as possible to continuous placement of RCC.8.1.1 SchedulingConstruction scheduling for RCC is less forgiving than for mass concrete大( 體積混凝土 ). Although some mix designs

6、 can have greater tolerances than conventional concrete, RCC is still a sensitive concrete and the critical path ( 關(guān)鍵路線 )for placing RCC is focused on completing one lift at a time. There are no alternate monolithic 整( 塊的、獨(dú)塊的)blocks to form or place while problems are being analyzed.To avoid costly

7、delays over disputes on specificatio(n規(guī)范) compliance(執(zhí)行), the authority to resolve engineering problems must be vested in a well trained field organization. Lines of communication between the project engineer(項(xiàng)目工程師) and contractor must be clearly established and used frequently. Clarity廉(潔), candor(

8、坦誠) , and cooperation are very important in achieving the speed of placement possible with RCC.Thorough field and classroom training of construction crew(s 施工隊(duì)伍) and inspectors (檢查員) in the handling and placement of RCC is essential. Lean, dry RCC mixes resemble damp(潮濕的) gravel(砂礫石) and are often p

9、laced by road-building or earth-dam crews using earthmoving equipment. However, all the desired characteristics of the product are those of concrete. Meeting the specifications requires educating workers to the specific requirements of RCC as a new construction material requiring specific constructi

10、on methods.Because so much depends on fast, efficient placement of the RCC, all related activities such as foundation cleanup, access, assembly of embedded components(預(yù)埋件), and stockpiling (貯存、堆存) of materials must be meticulously planned and scheduled well before construction starts. Construction o

11、f forms and assembly of embedded items should be planned and scheduled so that as much of the work as possible is done off the dam, or if necessary, from the top of a lift (升程) during shift (工作班) changes.Lift scheduling is often complicated by concerns over heat buildup. Because the production rate

12、of RCC can be very high, controls to limit thermal cracking(溫度裂縫) may restrict the season or time of day that placement is allowed as well as the rate of placement.At Upper Stillwater Dam, all of the RCC was placed during a five-month weather window each year from May to October and only during two

13、8-h shifts starting at 8 p.m. This was necessary in order to keep placement temperatures below the 50oF (10oC) specification limit. At Willow Creek and Galesville dams, placement was limited to no more than three and four lifts, respectively, each 24 h.Conversely, at Elk Creek and Stagcoach dams, th

14、e contractor was encouraged to place RCC as fast as possible. At peak placement, six 1-ft (0.3-m) lifts were placed in a day at 33Stagecoach. The 150-ft-high (46-m) dam required 44,500 y3d (34,000 m3) of RCC which was placed during 37 days in the summer of 1988. To keep placement temperatures low at

15、 Elk Creek, the specifications required that the most massive sections be constructed during the late winter and early spring.8.2 Aggregate Production and Plant Layout (砂石料生產(chǎn)和混凝土工廠布置 )Maintaining adequate supplies of acceptable aggregate is particularly important to RCC scheduling. More than half of

16、 the aggregate required for an entire construction season may need to be stockpiled well ahead of the start of construction in order to keep up with extraordinarily high demand during the placement season. This can also provide some easing(緩解)of cash flow (現(xiàn)金流) and scheduling requirements during the

17、 placement season. Large stockpiles also allow for more economical sizing of production facilities and for blending of material that may be out of specification. If precooling of aggregate is desired to keep placement temperatures low, stockpiling in the winter provides that opportunity.Continuous r

18、aw feed to stockpiles is necessary throughout the construction season to keep up with RCC production. At Upper Stillwater Dam, the largest in the United States, the contractor had to produce 9000 tons/day (8160 metric tons) of 3/4- and 2-in. (19- to 50-mm) aggregate from soft sandstone to keep up wi

19、th its RCC placement schedule of 7200 yd3/day (5500 m3/day) during the final construction season in 1987.The location, size, and shape of aggregate piles must be coordinated with the concrete plant location and method of feed. If conveyors ( 傳送帶、皮帶機(jī) )are not used, several large loaders may be requir

20、ed to feed the mixers on large RCC projects. To achieve RCC production of 900 yd3/h (690 m3/h), for instance, four 12-yd3 (9 m3) front-end loaders could be needed to allow for a reasonable interval between loadings. The haul distances (運(yùn)距), dumping procedure(s 卸料過程) , and turnarounds need to be plan

21、ned carefully to operate efficiently and safely.At Elk Creek Dam, the aggregate was produced from an andesite-basalt( 安山玄武巖 ) outcrop(露頭) about 3000 ft (910 m) upstream and to the right of the dam. Rock was hauled to the primary jaw crusher, located in the quarry(采石 場), using 85-ton 77-metric-ton en

22、d dump trucks (后卸式卡車) . Rock was crushed to 9-in (230-mm) maximum sizes. The aggregate was transported from the quarry down a 12 percent slope by a 56-in-wide, 2085-ft-long (1.4 x 635 m) conveyor belt rated at 1000 tons/h (907t/h) and stored in a surge pile using a radial stacker(棧式料倉 ). A series of

23、 cone crushers and screens then produced 3-in (75-mm), 1-in (38(mm), and 3/4-in (19-mm) aggregate sizes.3The aggregate was transferred from these stockpiles by three 7-yd (5.4 m3) front-end loaders into movable hoppers discharging onto five conveyors which fed the batch plant surge piles. From there

24、, the material was loaded from reclaim tunnels onto 36-in-wide (910-mm) conveyor belts and transported to the RCC and conventional concrete batch plant aggregate bins(貯料倉 ). The Elk Creek layout is shown in Fig. 8.3。Three concrete mixing plants about 300 ft (90 m) upstream of the dam were used to pr

25、oduce the bedding grout, conventonal concrete, and RCC for Elk Creek. Conveyors were used to move the mix from the plants to the dam and deposit it on either side of a regulating outlet structure.The concrete plant layout and location should be selected to minimize energy requirements whether the RC

26、C is transported to the dam by conveyor or haul vehicles. The intent should be to minimize haul distances, vertical lift, and exposure of the RCC to sun, wind, or rain. If trucks or other vehicles are used for hauling, the plant should be located on a raised, free-draining area. This avoids making m

27、ud and helps to prevent tracking of foreign material onto the dam.Fueling and field maintenance of equipment should not be done on the RCC surface because of the likelihood of contamination(污染 ) and consequent problems in establishing a secure bond between lifts at that point. Fuel spills were a pro

28、blem at Monksville Dam because the contractor was allowed to refuel on the dam. That potential problem was addressed at Elk Creek Dam by specifying that the contractor use a movable refueling pad (墊) on the surface of the dam to collect and contain fuel spillage. The contractor chose instead to refu

29、el equipment and perform maintenance off the surface of the dam.8.3 Mixing RCCIn most cases, the methods used for transporting, spreading, and compacting RCC will not affect production as much as the speed and efficiency of mixing. Thus, the mixing plant capacity should exceed the laydown capacity設(shè)(

30、 計(jì)容量 ).Achieving the desired product consistency and quality at continuous, high production rates requires good concrete plant design and rigorous maintenance. RCC mixes are relatively harsh and sticky, and the lean, dry material has no fluid properties. The design of misers, transfers, and hoppers

31、must take these characteristics into consideration in order to avoid caking(結(jié)塊) and loss of capacity.The mixing method must produce a homogeneous mixture of the ingredients. This factor determines the mixing time and, to a large extent, the production rate. Tests should be done to determine retentio

32、n times(拌合時(shí)間) required for each mix. The variable-speed pugmill mixers (葉片式攪拌機(jī)) used during 1987 at Elk Creek Dam required 38s of3 3 3 mixing for 6-yd (4.5-m ) batches. At Willow Creek Dam, the retention time in the 9-yd3(6.8 m ) drum misers was 75 s.The trend in design is to use one RCC mix for the

33、 body of the dam. For large projects that require a variety of mixes, the plant chosen for the job must be able to change mix designs quickly and little or no mechanical or manual manipulation to plant components. On most projects, different plants are used to produce conventional concrete and RCC.F

34、or major projects the weights of all ingredients should be digitally recorded as a function of time, date, and mix design. Because of the sensitivity of RCC to excess water, the plant should be equipped with instrumentation to determine the fine aggregate moisture content. In Japan, automatic water-

35、batching systems are adjusted according to results of continuous monitoring of the moisture content of sand in the sand storage piles. This System has been used on most JapaneseR CD projects and has resulted in precise control of moistllre colltent. In the United States most contractors feel continu

36、ous visual inspection of the RCC placement or a Vebe test is a more reliable control of water content than moisture meters in the aggregate piles.Proper blending or ribboning of the aggregates and cementitious material on the charging belt as they are fed into the miser will help to speed mixing tim

37、e and avoid buildup of the sticky material. Achieving the proper timing and angle of introduction of water into batehed mixtures is also important. The proper sandwiching of material to achieve best results with RCC often is different from conventional mass concrete mixes. Each plant and mix combina

38、tion has its own quirks(特點(diǎn)) , so the exact method of ribboning mix constituents(要素) can only be determined by trial and error(反復(fù)試驗(yàn) ).High-speed batching and mixing can best be achieved with individual weigh systems for aggregate. Accumulative weigh systems make it more difficult to fine-tune the rib

39、boning of constituents on the belt.8.3.1 Mixing plants Various combinations of batch and continuous concrete plants using drum and pugmill mixers have been used to produce RCC. Continuous-mix plants can provide higher output capability than batch plants, and the most sophisticated continuous mixers

40、can produce the same degree of control as batch plants. Land use and labor requirements are generally less for continuous plants.Drum mixers have the advantage of using less energy than pugmills and provide good control of batch proportions. Pugmills are faster and are generally more portable than d

41、rum mixers. Pugmills have been used on all RCC dams in Japan. Pugmills need to be carefully designed to avoid maintenance problems and excessive wear on paddles and plates, particularly for mixes with large aggregates. In drum mixes, excessive buildup of the sticky material can occur, reducing capac

42、ity and mixing efficiency. Redesign of fins (鰭狀物) has helped to avoid this problem in some cases. Considerable cleanup of the drums on a daily basis is often required.For high-volume production, larger-than-average-capacity drum mixers may be necessary to cope with problems encountered when mixing n

43、o-slump RCC. Blending a zero-slump (塌落度 )mixture with a high proportion of fines often causes long mix and discharge times.33At Willow Creek, a four-bin Noble 600 plant with two 9-yd3(6.8-m3) Erie Strayer drums was used. The plant had been proven on an earlier highway job at 600 to 750 yd3(460 to 57

44、0m3) times were 30 s longer than for the fluid highway paving mix, and the drums had to be derated(降級為) to between 7 l/2 and 8 yd3 (5.7 and 6 m3) because the diameter of the discharge end was increased to speed dumping. On average, the plant produced 400 yd3/h (310 m3/h) of RCC and peaked during one

45、 shift at 438 yd3/h (335 m3/h).3Four 250-yd /h (190 m3/h) IHI-Hydam pugmills made by Ishikawajima ConstructionMachinery were used by the Japanesec ontractor for mixing batched RCC at Elk Creek Dam. The double-shaft(雙軸 ) pugmills were hydraulically driven and allowed for variable rotation speeds duri

46、ng the charging(進(jìn)料 ), mixing, and discharging processes .The coarse aggregate was crushed basalt sized from 3/4 to 3 in (19 to 75mm) maximum. Batching was computerized using Erie-Strayer controls. The maximum output of the four 6-yd3 (4.6-m3) mixers was 1014yd3/h (775 m3/h). That was achieved on Oct

47、ober 29, 1988.Two different batch-type mixing plants were used to produce RCC at Upper Stillwater. 33The first plant built at the site was a Noble 600 with two 8-yd (6-m ) tilting drum mixers. 33A second plant, a Noble 600 modified to accept two 4-yd (3 m ) Nikko high-intensity, spiral-flow pugmill

48、mixers, was added later. Each plant achieved peak production rates of 33about 420 yd /h (320 m /h) in 1986. Abrasive quartzite sandstone aggregate with a silica content of about 80 percent created extraordinary maintenance problems. Problems were greater with the Nikko bottom-discharge pugmill mixer

49、s, which suffered from high wear rates on the paddles and breakage of the liner plate襯s(砌板 ).For the drum mixers, rubberized plastic liners were installed and these worked well. The high-wear steel liner plates on the Nikko mixers had to be replaced five times during the 1986 season, however. That w

50、as due mainly to breakage caused by the shock of loading and mixing RCC. Initially, the contractor switched to milder steel liner plates. They broke at about the same rate as the high-wear plates but they cost less and were more readily available.For the 1987 season, a belt-drive system was installe

51、d on the Nikko mixers to allow a 10 percent reduction in paddle(攪拌) speed. Retention times were kept the same so that 2 wear was reduced some-what. In addition, a 3/8-in-thick (9.5-mm) layer of 11,000-lb/in (76MPa) epoxy-silica(環(huán)氧 -硅石) grout was troweled onto the backs of the liner plates before the

52、 sixth set of plates was bolted to the mixer wall. The grout is commonly used as a coating for nuclear reactor containments and has the beneficial characteristics of being durable but relatively soft. Placing it between the plates and the mixer wall solved the breakage problem.RCC production peaked

53、in 1987 during the first week in June at an average of 548 y3d/h (419 m3/h) during two production shifts per day. Production from both plants during the entire month averaged 515 yd3/h (394 m3/h) over 59 shifts. The RCC batching and3delivery system produced 266,000 yd (203,000 m3) in June 1987. The

54、dam was topped out (達(dá)到壩頂高程 )on August 8, 1987.Two ARAN ASR-200 continuous-mix pugmill plants were used successfully to produce 33183,000 yd3 (140,000 m3) of RCC placed over 17 weeks at Copperfield Dam in Australia. Crushed alluvial gravel with a maximum size of 2.5 in (63 mm) was used as aggregate.

55、Each plant produced a different mix, one with cement and fly ash for interior concrete and one with only cement for the exterior faces. Slow progress in jump-forming the 330-ft-long (100-m), central overflow spillway controlled RCC production rates on much of the dam. Hence, neither of the self-cont

56、ained, mobile mixing plants was used to capacity although both were needed in order to produce the different mixes simultaneously.3 3 3 3The average hourly output was 290 yd (220 m ) for the first plant and 234 yd (179 m ) for the other.A contractor-designed continuous-mix plant produced consistent,

57、 high-quality RCC atMonksville Dam. Mixer proficiency test results are shown in Fig. 8.4. The plant consisted33of three 8-yd (6-m ) feed bins with adjustable-speed belts straddling a 36-in-wide (914-mm) main feed belt; a 75-ton (68-t) cement silo( 筒倉 ) with aerators and one vane feeder(螺旋進(jìn)料器) ; a Da

58、vis pugmill with a capacity of 500 yd3/h(382 m3/h); a stacker belt; and an 18-yd3 (14 m3) two-stage surge bin.The plant could be operated manually or by a computer programmed to initiate the production sequence starting at the surge hopper(涌浪式加料斗 ). Sensing devices included a feed-belt scale(帶稱) ; t

59、ilt gages on each feed bin; an electronic water flow meter; and a revolution counter (旋轉(zhuǎn)式稱量臺) for metering cement through the ital display was available for real-time measurement of aggregate feed. For aggregate, cement, and water, the system provided cumulative data every 5 min.8.4 Transporting RCCTransport of RCC can be by scraper(鏟土機(jī) ) conveyor, bottom-and rear-dump trucks, large front-end loaders or a combination of these. Continuous, high-speed co

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論