1、petroleum and natural gas regulatory boardnotificationnew delhi, the 11th november, 2009g.s.r. 808(e).-in exercise of the powers conferred by section 61 of the petroleum and natural gas regulatory act, 2006 (19 of 2006), the petroleum and natural gas regulatory board hereby makes the following regul
2、ations, namely:-1. short title and commencement. (1) these regulations may be called the petroleum and natural gas regulatory board (technical standards and specifications including safety standards for natural gas pipelines) regulations, 2009.(2) they shall come into force on the date of their publ
3、ication in the official gazette.2. definitions. (3) in these regulations, unless the context otherwise requires,(a) act means the petroleum and natural gas regulatory board act, 2006;(b) active regulator means a regulator in pressure regulating station (prs) that normally controls the outlet pressur
4、e; (c) active and monitor regulator system means an arrangement of two regulating devices in series, one (active) normally to control the outlet pressure and the other (monitor) to assume control in the event of failure of the active regulator; (d) asme b 31.8 means standard covering gas transmissio
5、n and distribution piping system referred to in annexure vi.(e) board means the petroleum and natural gas regulatory board established under sub-section (1) of section 3 of the act;(f) city gas distribution entity means an entity authorised by the board to lay, build, operate or expand the city or l
6、ocal natural gas distribution network; (g) compressor station means an installation on the pipeline having compressor units to boost gas pressure;(h) creep relief valve means a relief valve installed to relieve over pressure caused by creep in the system and having maximum 1 % flow capacity of such
7、a system; (i) intermediate pigging station means an installation having facility for receiving and launching of pigs for pigging operations;(j) onshore means areas other than offshore which shall form the scope of these standards. feeder lines from jetty or other storage points shall also form a par
8、t of the onshore pipelines. the offshore and onshore coverage as per this standard is depicted at annexure- i;(k) operating company or operator means an entity engaged in the operation of natural gas pipeline network with the authorization of the board;(l) owner means an entity that owns the natural
9、 gas pipeline network and has been authorized by the board;(m) natural gas pipeline means any pipeline including spur lines for transport of natural gas and includes all connected equipments and facilities, such as, compressors, storage facilities, metering units, etc. and gas pipelines for offshore
10、 and onshore coverage depicted at annexure i but excludes-(i) dedicated pipeline laid to transport natural gas to a specific customer to meet his requirement and not for resale;(ii) pipelines in a city or local natural gas distribution network which are regulated by the petroleum and natural gas reg
11、ulatory board (authorizing entities to lay, build, operate or expand city or local natural gas distribution networks) regulations, 2008;(n) positive isolation means the isolation with blind or spectacle blind in case of flanged joints or with welding the cap in case of welded joints; (o) right of us
12、er or right -of -way means the area or portion of land within which the pipeline operator or owner has acquired the right through the petroleum and minerals pipelines act,1962 or in accordance with the agreement with the land owner or agency having jurisdiction over the land to lay and operate the n
13、atural gas pipelines; (p) slam shut valve means a valve that is designed to close quickly in the event of an abnormal pressure (whether excess or low) being detected at a selected point in a gas pipeline system;(q) sub transmission pipeline means a high pressure pipeline connecting the main natural
14、gas pipeline to the city gate station but is owned by the cgd entity;(r) transmission system means one or more segments of pipeline usually interconnected to form a network that transports gas from a gathering system, the outlet of a gas processing plant or a storage field to a high, medium or low-p
15、ressure pipeline system, a large-volume customer or another storage field;(4) words and expressions used and not defined in these regulations, but defined in the act or in the rules or regulations made thereunder, shall have the meanings respectively assigned to them in the act or in the rules or re
16、gulations, as the case may be.3. application. (1) these regulations shall apply to all the entities authorised by the board to lay, build, operate or expand natural gas pipelines under the petroleum and natural gas regulatory board (authorizing entities to lay, build, operate or expand natural gas p
17、ipelines) regulations, 2008 and any other natural gas pipeline including dedicated pipelines notified by the board from time to time.(2) definitions of design, material and equipment, welding, fabrication, installation, testing, commissioning, operation and maintenance and corrosion control of natur
18、al gas pipeline network shall be in accordance with the requirements of asme b31.8 except in so far as such requirements are specifically cancelled, replaced or modified by the requirements specified in these regulations.4. scope. (1) requirements of these regulations shall apply to all existing and
19、 new natural gas pipelines including dedicated pipelines.(2) these regulations shall cover pipeline design, materials and equipment, welding, fabrication, installation, testing, commissioning, operation and maintenance and corrosion control of common carrier or contract carrier natural gas pipelines
20、 (transmission or sub transmission) including safety requirements for natural gas pipelines. the pipelines coverage shall be as per annexure i and includes dedicated pipelines for specific consumers.5. intent. these standards are intended to ensure uniform application of design principles and to gui
21、de in selection and application of materials and components, equipment and systems and uniform operation and maintenance of the natural gas pipeline system and shall primarily focus on safety aspects of the employees and public and facilities associated with natural gas pipelines. 6. the standard. t
22、echnical standards and specifications including safety standards (hereinafter referred to as standard) for natural gas pipelines are at schedule i which cover material and equipment (schedule 1a), welding (schedule 1b), piping system components and fabrication (schedule 1c), design, installation and
23、 testing (schedule 1d), operating and maintenance procedures (schedule 1e), corrosion control (schedule 1f), miscellaneous (schedule 1g) as read with annexure i to annexure vi.7. compliance to these regulations. (1) the board shall monitor the compliance to these regulations either directly or throu
24、gh an accredited third party as per separate regulations on third party conformity assessment.(2) if an entity has laid, built, constructed or expanded the natural gas pipeline network based on some other standard or is not meeting the requirements specified in these regulations, the entity shall ca
25、rry out a detailed technical audit of its infrastructure through a board authorized or approved third party agency. the entity thereafter shall submit the compliance report prepared by the third party along-with its time-bound mitigation plan and implementation schedule to the board for authorizatio
26、n within six months from the date of notification of these regulations.(3) the continuation of operation of existing natural gas pipeline network shall be allowed only if it meets the following requirements, namely:-(i) the natural gas pipeline system shall have been tested initially at the time of
27、commissioning in accordance with asme b 31.8. the entity should have proper records of the same. such test record shall have been valid for the current operation. alternatively, if such a record is not available, the entity should produce in service test record of the natural gas pipeline network ha
28、ving been tested as per asme b 31.8;(ii) the natural gas pipeline system has leak detection system in position compressor station, gas receiving and terminal station and is operative; (iii) there shall be protection of the system against third party damages:provided that-(a) the entity shall submit
29、self-certification in support of meeting the above requirements within a month of notification of these regulations;(b) certifications referred to in para (a) shall be done for natural gas pipeline in construction and commissioning, operation and maintenance. the self certification shall be submitte
30、d to the board with mitigation plan and implementation schedule;(c) the critical components of the system as identified by the board for such existing networks shall be complied with these regulations within a period specified at appendix i and the authorized entity shall maintain the integrity of t
31、he existing natural gas pipeline system at all times; and (d) provisions of these regulations related to operation and maintenance procedures shall also be applicable to all such existing installations. 8. default and consequences. (1) there shall be a system for ensuring compliance to the provision
32、 of these regulations through conduct of technical and safety audits during the construction, commissioning and operation phase, as well as on an on-going basis as may be specified from time to time. (2) in the event of any default in sub regulation (1), the entity shall qualify as defaulting entity
33、 under the regulation 16(1) the of petroleum and natural gas regulatory board (authorizing entities to lay, build, operate or expand natural gas pipelines), regulations, 2008.(3) in case of any deviation or shortfall including any of the following defaults, the entity shall be given time limit for r
34、ectification of such deviation, shortfall, default and in case of non-compliance, the entity shall be liable for termination of operation or termination of authorization apart from any penal action under the provisions of the act, namely:-(a )if an entity fails to comply within the specified time li
35、mit of critical activities at appendix i. (b) the entity defaults three times under sub-regulation (1) of regulation 16 of the petroleum and natural gas regulatory board (authorizing entities to lay, build, operate or expand natural gas pipelines), regulations, 2008.(c) the entity is found operating
36、 the pipelines beyond the maximum allowable operating pressure (maop) conditions (either the original or de-rated pressure).(d) the entity is found operating the pipeline system without conducting the hydro test as mentioned in these regulations;(e) in the event of installations is found unsafe to b
37、e operated as per the third party periodic inspection assessment and compliance is not achieved within the notice period by the board.9. requirements under other statutes. it shall be necessary to comply with all statutory rules, regulations and acts in force as applicable and requisite approvals sh
38、all be obtained from the relevant competent authorities for the natural gas pipeline system. 10. miscellaneous. (1) if any dispute arises with regards to the interpretation of any of the provisions of these regulations, the decision of the board shall be final. (2) the board may at any time effect a
39、ppropriate modifications in these regulations.appendix-ilist of critical activities in natural gas pipelines*sr. no.critical infrastructure/ activity/ processestime period for implementationimplementation plan1test record for radiography, ultrasonic test or other applicable ndt methods (as carried o
40、ut before commissioning)6 monthscan be submitted in stages within 6 months2hydro-test (as carried out before commissioning)report6 monthscan be submitted in stages within 6 months3pipeline cathodic protection record 6 monthscan be submitted in stages within 6 months4pipeline as-built records 6 month
41、scan be submitted in stages within 6 months5intelligent pigging shall be carried out to detect metal loss for the pipelines of size nps of 12 inches and above and length of 10 km and above. 2 yearsif the pigging has not been done for more than 5 years for sour gas and 10 years for sweet gas pipeline
42、, then the intelligent pigging shall be carried out within two years, otherwise relevant records shall be submitted.6hse management system (including fire protection system)6 monthsto be implemented7height of the vent shall be minimum 3 meters above working level6 months increase height of vent8gas
43、detectors shall be installed at compressor station, gas receiving and delivery terminals 1yearinstall gas detectors for scada backed up system, elsewhere hand held gas detector shall be provided 9environmental friendly fire extinguishing flooding system for closed space. 2 yearsfor control room, swi
44、tch gear and battery room, etc. (co2 is acceptable only for unmanned station)10hazop shall be done for all the pipeline facilities1 yearhazop report to be submitted along with mitigation planschedule itechnical standards and specifications including safety standardsfornatural gas pipelinesschedule-1
45、a material and equipmentschedule-1bweldingschedule-1cpiping system components and fabrication detailsschedule-1ddesign, installation and testingschedule-1eoperating and maintenance proceduresschedule-1f corrosion controlschedule-1g miscellaneousschedule 1amaterials and equipmentmaterials and equipme
46、ntsall materials and equipments forming a permanent part of any piping system constructed according to this standard shall comply with the design requirements and be suitable for the intended fabrication or construction methods. for sour gas service requirements as per schedule 1g shall be complied
47、with. materials for use in cold climatesmaterials to be used in facilities exposed to low ambient or low operating temperatures shall have adequate impact properties to prevent brittle fracture at such low temperatures.material specificationsin addition to standards and specification covered in asme
48、 b31.8, standards and specifications listed in annexure ii shall also be acceptable for manufacturing of various piping components forming part of the natural gas pipelines and associated facilities. steel pipeas per line pipe specification api 5l, shall be seamless, electric arc welded (eaw) or lon
49、gitudinal / helical submerged arc welded (lsaw/hsaw) conforming to (psl 2). electric welded pipes manufactures to api specification 5l shall also meet additional requirements specified under annexure iii of this standardcarbon equivalentmaximum limits on carbon equivalent for line pipes shall be as
50、follows: for pipes having carbon content 0.12%ce(iiw) = c + mn + cr+mo+v + ni+cu 6 5 15 ce (iiw) value shall be 0.43%. for pipes having carbon content 0.12%ce(pcm) =c + si + mn + cu + ni + cr + mo + v + 5b30 20 20 60 20 15 10 ce (pcm) value shall be 0.25%.mill hydro testline pipes should be hydrosta
51、tically tested in pipe mill using test pressure that produces a hoop stress equal to 95% of smys irrespective of material grade. for new pipeline, the test pressure period 15 sec. notch toughness for steel pipes of size nps 2 and above, notch toughness shall be specified.ductile iron pipeuse of duct
52、ile iron pipes is not permitted for natural gas pipelines.equipment specificationsequipment used in natural gas pipelines manufactured to standards listed in annexure ii of this standard shall also be acceptable.schedule 1bwelding preparation for weldingbutt weldsnotches or laminations on pipe ends
53、are not permitted and must be removed by cutting the pipe as a cylinder and re-beveling of pipe end or by grinding prior to welding.re-beveled ends shall be re-examined by ultrasonic or magnetic particle methods if cut section is more than previously examined length.seal weldsas far as practical sea
54、l welding of threaded joints should be avoided.qualification of procedures and weldersrequirements for piping systems operating at hoop stresses of 20% or more of the specified minimum yield strength welding procedures and welders for welding of gas pipelines shall be qualified as per api 1104 and s
55、hall include toughness testing requirements as applicable for the material to be welded. welding procedures and welders, for station piping shall be qualified as per asme boiler and pressure vessel (bpv) code section ix or api 1104. inspection of weldsinspection and tests for quality control of weld
56、s on piping system intended to operate at hoops stress levels of 20% or more of the specified minimum yield strength all non destructive testing (ndt) including radiographic examination shall be performed in accordance with the requirements of api 1104 except that no root crack shall be permitted. r
57、egardless of operating hoop stress as well as location class all carbon steel butt welds in natural gas pipelines shall be subjected to 100% radiographic examination and / or ultrasonic testing, the weld joints in vent and drain piping open to atmospheric pressure need not be radiographed/ ultrasonically tested. such welds however shall be visually examined and r
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 智慧課堂省級(jí)課題申報(bào)書
- 數(shù)字孿生課題申報(bào)書
- 課題立項(xiàng)申報(bào)書幼兒園
- 孔子學(xué)堂課題申報(bào)書
- 兵團(tuán)課題申報(bào)書
- 經(jīng)濟(jì)類課題申報(bào)書范例
- 城市更新課題申報(bào)書范本
- 醫(yī)院消防勞務(wù)合同范本
- 課題申報(bào)書是啥
- 教育科研方法課題申報(bào)書
- 高中英語丨高考核心高頻詞匯
- 《營養(yǎng)均衡膳食指南》課件
- 《數(shù)智化技術(shù)應(yīng)用與創(chuàng)新》課件 第1章 走進(jìn)數(shù)智化時(shí)代
- 《智能家居系統(tǒng)》課件
- 基礎(chǔ)模塊下冊(cè)《中國人民站起來了》2
- 繼電保護(hù)業(yè)務(wù)技能實(shí)操題庫
- 員工請(qǐng)假管理制度-員工請(qǐng)假管理制度范文
- 畢業(yè)設(shè)計(jì)(論文)鋼包用耐火材料的設(shè)計(jì)及優(yōu)化
- 關(guān)于材料認(rèn)質(zhì)認(rèn)價(jià)的申請(qǐng)(材料價(jià)格調(diào)差報(bào)告)
- 第2章 土中應(yīng)力
- (完整版)冠詞練習(xí)題及答案解析
評(píng)論
0/150
提交評(píng)論