




版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、corporate management used to be communication, now it is communication, and the future is still communication.(word文檔/a4打印/可編輯/頁眉可刪)一份船舶建造合同 yacht build agreementdated: 22nd december 20_betweenaaas yacht company limited, hong kong. (hereinafter referred to as “the builder”)andbbb cc, vietnam, (herei
2、nafter referred to as “the buyer”)whereas:1) the buyer wishes to acquire a aaas cape 65 trawler yacht (the yacht) designed by thanos condylis, and built to the buyers stated requirements and specification, and the builder has the capability, knowledge and skills to build and supply the same.2) the b
3、uilder has agreed to construct, equip, fit-out, test and deliver the yacht to the buyers stated requirements and specification, which the buyer has agreed to accept upon the terms and conditions here in after specified:now therefore the parties hereto have agreed and do hereby agree as follows:artic
4、le i - interpretation1) in this contract the following words and e_pressions shall have the meaning hereby ascribed to them, e_cept where the conte_t otherwise admits or requires:“banking days” shall mean days upon which hong kong clearing banks are customarily open for business.“the builders clarif
5、ications” shall mean the documents so entitled forming part of this contract and set out as anne_es hereto; (see also item (2) of this article.)“buyers representative(s)” shall mean such persons notified from time to time by the buyer as having authority to act for the buyer, the e_tent of such auth
6、ority being set out in the notice;“items of buyers supply” shall mean any item of equipment and stores for the yacht ordered by the buyer direct from the manufacturer or the supplier, for incorporation in the yacht by the builder;“items of builders supply” shall mean any item of equipment and stores
7、 for the yacht ordered by the builder direct from the manufacturer or the supplier, for incorporation in the yacht;“the certifying / survey body” shall mean the body responsible for the survey and certification of the yacht to the requirements of the buyer.“the contract” shall mean (a) this contract
8、, and (b) the attached anne_es and schedule more particularly described below.“the contract delivery date” shall mean no later than 30 june 20_;“the contract master programme” shall mean the programme for construction of the yacht, set out in anne_ d;“the contract price” shall mean the price stipula
9、ted in article v for the yacht, yard number 005;“the yacht” shall mean the yacht the subject of this contract and generally as described in article ii, with all the machinery, apparatus, outfit, materials, and equipment appurtenant thereto, but e_cluding the items of buyers supply.“the boatyard” sha
10、ll mean aaas yacht company, _inhui, china.“the design specifications” shall mean the specifications, designs, plans and drawings, set out in schedule a, prepared and signed by the buyer, identified as forming part of this contract, and including such revised or supplemental specifications, plans and
11、 drawings as may subsequently be agreed between the buyer and the builder provided that (i) in the case of any inconsistency between any article or paragraph of this contract and the design specifications, this contract shall prevail, (ii) in the case of any inconsistency between the design specific
12、ations and a plan or drawing, the design specification shall prevail, and (iii) in the case of any inconsistency between one plan or drawing and another plan or drawing, the later in date shall prevail;schedule a shall mean the agreed schedule of drawings“anne_ a” shall mean the list of materials, c
13、omponents and equipment defining a completed yacht;anne_ b shall mean the agreed weld quality procedures“anne_ c” shall mean the agreed shot blasting, fairing, painting and foaming specificationsanne_ d“ shall mean the agreed production schedule master program.“specified” shall mean stipulated in th
14、e specifications and anne_ a;“supplier” shall mean any person, firm or company, which has entered into a contract with the builder for the supply of materials, machinery, services or equipment (other than items of buyers supply) for the yacht;the inde_, article and paragraph headings, are inserted f
15、or convenience only and shall not affect the construction of this contract.words importing the singular shall include the plural and vice versa.2) list of builders clarifications, not covered in anne_ a document:“cradles for transport” the supply of a cradle for shipment is e_cluded from this contract.“dressing/stepp
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 減肥培訓班創(chuàng)業(yè)指南
- 我熟悉的街道講評課件
- 客戶關系管理課件
- 2025年高考語文作文終極押題04 人工智能能(押題理由+作文真題+審題立意+高分范文)(全國)
- 天津市寶坻區(qū)八年級地理上冊 第三章 第二節(jié) 土地資源教學設計 (新版)新人教版
- 電磁波 電磁波名詞解釋學習資料
- 網(wǎng)絡組織培訓總結
- 小學數(shù)學冀教版一年級上冊十 探索樂園教學設計及反思
- 租賃合同續(xù)簽申請
- 承包合同補充協(xié)議及實施細則
- 《蘭亭集序》《歸去來兮辭》對比閱讀課件(教材精研+情境任務)統(tǒng)編版高中語文選擇性必修下冊
- 農貿市場計量管理制度(3篇)
- 拼音bpmfdtnl課件教學課件最新
- 一級建造師《港口與航道工程管理與實務》課件專業(yè)工程技術
- 國家開放大學《社會心理學》形考任務1-4參考答案
- 《工程制圖》期末考試試卷附答案
- 重癥患者的容量管理課件
- 二年級下冊道德與法治 課件-9 小水滴的訴說 部編版 (共16張PPT)
- 生產設備點檢記錄表
- 轉化膜與著色技術
- DL∕T 1286-2021 火電廠煙氣脫硝催化劑檢測技術規(guī)范
評論
0/150
提交評論