




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
《HighVoltageEquipmentTesting》SwitchCharacteristicTest主講人:何發(fā)武(副教授)OperatingWorksheet:OperatingWorksheet:TableofContents01Followme02Workshop03Training01FollowmeⅠ.MeaningandPurposeofCircuitBreakerMechanicalTestingMechanicaltestingofthecircuitbreakerprimarilyconsistsoftwoparts:mechanicaloperationtestingandmechanicalcharacteristictesting.Mechanicaloperationtestingreferstovariousoperationaltestsperformedonthecircuitbreakerunderno-loadconditions(i.e.Whenthereisnovoltageorcurrentinthemaincircuit).Itisatestthatverifiesthemechanicalperformanceandoperationalreliabilityofthecircuitbreaker.Mechanicalcharacteristictestingreferstotheactiontimeandmotionspeedofthecircuitbreakercontacts.Itmainlyincludesparametersandtestitemssuchastheopeningandclosingtime,openingandclosingspeed,synchronismofthemainandauxiliarycontactsduringopeningandclosing,operatingvoltageoftheopeningandclosingelectromagnets,bounce,travel,andopeningrange.Ⅱ.MechanicalCharacteristicTestingofHighVoltageSwitchesTheopeningandclosingspeed,time,anddegreeofasynchronismofthecircuitbreaker,aswellastheoperatingvoltageoftheopeningandclosingcoils,directlyaffecttheswitchingperformanceofthecircuitbreaker.Onlybyensuringappropriateopeningandclosingspeedscanthecircuitbreakerfullyexertitsabilitytointerruptcurrent,reducecontactwearcausedbypre-breakdownduringtheclosingprocess,andavoidcontactburnout,oilspraying,andevenexplosions.Ⅱ.MechanicalCharacteristicTestingofHighVoltageSwitchesIftheclosingspeedisreduced,whenashort-circuitfaultisclosed,thehinderingeffectoftheelectromotiveforcethatobstructsthecontactclosurewillcausecontactvibrationorkeepitinastagnantstate,especiallywhenautomaticreclosingfails,whichmayeasilyleadtoexplosions.Onthecontrary,iftheclosingspeedistoohigh,themovingmechanismwillbesubjectedtoexcessivemechanicalstress,causingdamagetoindividualcomponentsorshorteningtheservicelife.Atthesametime,duetostrongmechanicalimpactandvibration,thecontactbouncetimewillbeextended.Seriousasynchronyofthecircuitbreakeropeningandclosingwillcausepartial-phaseconnectionordisconnectionofthelineortransformer,whichmayresultinovervoltagethatendangersinsulation.Therefore,zincoxidesurgearrestersareinstalledattheendsoftransmissionlinestolimitovervoltage,asshowninFigure3-44.Ⅱ.MechanicalCharacteristicTestingofHighVoltageSwitchesFigure3-44
InstallationofzincoxidesurgearrestersattheendsoftransmissionlinestolimitovervoltageⅡ.MechanicalCharacteristicTestingofHighVoltageSwitchesSomeaspectsofthemechanicalcharacteristicsofthecircuitbreakerarerepresentedbythecharacteristicparametersofcontactactiontimeandmotionspeed.Inmechanicalcharacteristictesting,themostimportantparametersaregenerallytheopeningspeed,closingspeed,maximumopeningspeed,openingtime,closingtime,close-opentime,open-closetime,andsynchronismofopeningandclosing.Thecontactmotionspeedduringthecircuitbreakeropeningandclosingisanimportantcharacteristicparameterthataffectstheworkingperformanceofthecircuitbreaker,andthemostimportantparametersaretheopeningspeedandclosingspeed.Basedontheopeningandclosingtimeofthecircuitbreakerandthestrokeofthecontact,theaveragespeedofthecontactmotioncanbecalculated.Thespeedofthecircuitbreakervariesgreatlyduringtheentiremotionprocess,soitisnecessarytomeasuretheactualcontactmotionspeedofthecircuitbreaker.Ⅲ.DefinitionofPartialTimeParametersTable3-24
DefinitionofTimeParameters
Ⅲ.DefinitionofPartialTimeParametersⅢ.DefinitionofPartialTimeParametersⅣ.ThebasisstandardofthetestitemTable3-25
Applicationandstandardofhighvoltagetesttestinginstruments02WorkshopⅠ.MechanicalCharacteristicsTestWiringThewiringisdividedintoinstrumentwiringandcontrollineconnection.Wheninstrumentwiring,pleaseconnecttheinstrumentprotectiveearth“?”tothesiteearthbeforeperformingotherwiringandoperations.Afterthetestiscompleted,turnofftheinstrumentpowersupply,removeotherwires,andfinallyremovethegroundingwire.Themachine’sdisconnectionlineisafour-coresheathedwirewithfourcolors:yellow,green,red,andblack,correspondingtoABCandcommonendsrespectively.TheconnectionmethodisshowninFigure3-45.Ⅰ.MechanicalCharacteristicsTestWiringFigure3-45
WiringdiagramofcircuitbreakermechanicalcharacteristicstestinstrumentⅠ.MechanicalCharacteristicsTestWiringWhenconnectingthecontrollines,thismachineprovidesa3-coresheathwireastheinternalpowersupplyoutputwire(redfortheclosingwire,greenfortheopeningwire,andblackforthecommonpowersupply),anda3-coresheathwireastheexternalactionvoltageacquisitionwire.Whentheopeningandclosingcontrolpowersupplyisprovidedinternallybytheinstrument,disconnectthecontrolpowersupplyinthecontrolboxofthetestedswitch(usuallybyremovingthefusethatconnectsthecontrolpowersupplyinthecontrolboxtothecontrolbus),butdonotcutoffthestoredenergypowersupplyoftheswitchmechanism.Then,followthewiringdiagramasfigure3-46.TheinternalpowersupplyoftheinstrumentcanonlyprovideDCcurrent,and“internaltriggering”shouldbeusedwhenusingtheinternalpowersupplyoftheinstrument.IfthefieldswitchhasanACoperatingmechanism,pleaseusethe“externaltriggering”mode.Ⅰ.MechanicalCharacteristicsTestWiringFigure3-46
ControllinewiringdiagramofcircuitbreakermechanicalcharacteristictestⅠ.MechanicalCharacteristicsTestWiringWhenusinganexternalfieldpowersupplyforopeningandclosingcontrol,the“internalpowersupply”isnotwired.Whenperformingasingle-closingtestontheswitch,connectthe“externaltrigger”twowirestogetherwiththetwoendsoftheclosingcoil;whenperformingasingle-openingtestontheswitch,connectthe“externaltrigger”twowirestogetherwiththetwoendsoftheopeningcoil.Whenusinganexternalpowersupplyforoperation,usethe“externaltriggering”mode.TheexternaltriggeringmethodissuitableforbothACandDCswitches.TheinstallationofthesensorisshowninFigure3-47.Ⅰ.MechanicalCharacteristicsTestWiringFigure3-47
SensorinstallationⅡ.OperationMethodofSwitchCharacteristicTestInstrumentTurnonthepower,andtheinstrumententersthemenuoperationinterface,asshowninFigure3-48.Figure3-48
Human-MachineinterfaceofswitchcharacteristictestⅡ.OperationMethodofSwitchCharacteristicTestInstrument(Ⅰ)TestSettingSetthesensortype:Thereareseveraloptionssuchaslinearresistance,rotaryresistance,accelerationsensor,andphotoelectricsensor.Setaccordingtothesensorused.Ifthereisnosensor,select“None”.1.SensorInstallationInstallasensorthree-phaselinkagemechanismandchoosethree-phaselinkage;installthreesensorsandchoosethree-phasesimultaneousmeasurement.Ⅱ.OperationMethodofSwitchCharacteristicTestInstrument2.SpeedTestingIfspeedtestingisnotrequired,thisitemcanbeturnedofftoshortenthetesttimeandreducethetestintensity.Thespeeddefinition:generallyobtainedbymeasuringthe“time-travelcharacteristiccurve”beforeclosingandafteropeningfor10
ms,andthenanalyzingthecorrespondingspeedvalueonthecurve.3.TravelTestingWhenusingalinearsensororphotoelectricsensorfortesting,thisitemcanbeenabledtomeasurethetraveldistance.Whenusingothersensorsornottestingthetraveldistance,thisitemissettoclose.Ⅱ.OperationMethodofSwitchCharacteristicTestInstrument4.LabeledtravelSettingWhenmeasuringspeedwitharotaryoraccelerationsensor,inputthetotaltravelvalueoftheswitch.Whentestingwithalinearorphotoelectricsensor,inputthelabeledtravelvalueofthesensor.5.Triggermode(1)Internalpowersupplytrigger:UsetheinternalDCpowersupplyoftheinstrumenttooperatetheswitchopeningandclosing.Ⅱ.OperationMethodofSwitchCharacteristicTestInstrument(2)Externalpowersupplytrigger:TheinternalDCpowersupplyoftheinstrumentdoesnotwork,andtheswitchactionisoperatedbytheon-sitepowersupply(ACorDC).Whentheinstrumentmakesaclosing(opening)operation,the“externaltrigger”wiringoftheinstrumentisdirectlyconnectedinparalleltotheclosing(opening)coil.Whentheswitchisoperated,theinstrumenttakesthevoltagesignalfromthecoilasthetimingstartingpoint.(3)Auxiliarycontacttrigger:Whenthereisnoelectricalsignalonthecoil,thetestcanbetriggeredbyusingtheauxiliarycontactmethod.(4)Sensortrigger:Manualswitchoperationwithoutelectricalcontrolmechanism,andnotimingstartingpoint.Themeasurementcanbestartedbyusingthesensoractionasthetimingstartingpoint.Ⅱ.OperationMethodofSwitchCharacteristicTestInstrument(5)Manualswitch:Measurementwithmanualswitch.Justconnectthebreakwireandperformtheclosingandopeningtests.Theinstrumentisinawaitingstate.Thenmanuallyopenandclosetheswitch.6.TestDurationReferstothedurationoftheoperatingvoltageoutputbytheinternalpowersupply.(1)200
ms:Generallyusedforsingleopeningandsingleclosingtestsofconventionalswitches,selectadurationof250
ms.(2)2,000
ms:Usedwhenperformingreclosingoperationsongeneralswitches.Itincludesclosing-opening,opening-closing,andopening-closing-opening.Ⅱ.OperationMethodofSwitchCharacteristicTestInstrument(3)20,000
ms:Generallyusedforcontactswitcheswithpre-actionbeforetheoperationofopeningorclosingblades,whichrequiresalongtimefortheoperationofopeningorclosingblades.7.SwitchTypes(1)MetalContact:Conventionalswitchwithmetalcontacts,setto“Closed”.(2)ClosingResistor:Forswitcheswithclosingresistors,iftheclosingresistanceneedstobetested,setitto“ClosingResistor”.Iftheclosingresistancedoesn’tneedtobetested,setitto“Closed”.(3)GraphiteContact:ForSiemensgraphitecontactswitches,itisnecessarytosettheswitchto“GraphiteContact”duringtesting.Ⅱ.OperationMethodofSwitchCharacteristicTestInstrument8.Pre-Closing/ClosingDurationSetthisoptionforswitchesthatrequirepre-closingorpre-opening.Generally,select“None”.Notes:Aftercompletingalltheoptions,movethecursortothe“Confirm”buttonatthebottomofthescreenandpresstheConfirmkeytofinalizeallthesettings.(Ⅱ)PowerSettingsSettheoutputvoltagevaluesforclosing,opening,andreclosingaccordingtotherequirementsoftheswitch.Aftersetting,press“Confirm”.Ⅱ.OperationMethodofSwitchCharacteristicTestInstrument(Ⅲ)StatusDetectionCheckifthesensorsareworkingproperlyandinstalledcorrectly.Also,verifyiftheswitchisinthecorrectclosedoropenposition.Ensurethatthewiringiscorrect.Deleteuser-definedspeeddefinitions.(Ⅳ)DataAnalysisFigure3-49showsthetestgraphsanddataforclosing,opening,andclosing-openingoperations.Ⅱ.OperationMethodofSwitchCharacteristicTestInstrumentFigure3-49
Testgraphsanddataforclosing,openingandclosing-openingoperationsⅢ.AnalysisandProcessingofTestDataforHigh-VoltageSwitchDynamicCharacteristicTestEquipment(1)Testresultsshouldbecomparedwiththevaluesgiveninthecircuitbreakermanualandmeetthemanufacturer’srequirements.(2)Ifthereareanytestdatathatdonotmeetthemanufacturer’srequirementsinthetestitems,firstcheckwhetherthewiring,parametersettings,instrumentconditions,etc.Meetthetestrequirements.(3)Possiblereasonsfortheunsatisfactoryopeningtimemayinclude:①Improperpositioningoftheopeningelectromagneticpolerodandopeningtripshaft.②Fatigueoftheopeningspring.③Insufficientopeningdistanceorovertravel.Ⅲ.AnalysisandProcessingofTestDataforHigh-VoltageSwitchDynamicCharacteristicTestEquipmentAcomprehensiveanalysisoftheabovereasonsshouldbeconducted,andadjustmentsshouldbemadetotheopeningelectromagneticpole,opening-closingsprings,andmechanismconnectingrodsaccordingtothemanufacturer’stechnicalrequirements.(4)Possiblereasonsfortheunsatisfactoryclosing-openingtimemayinclude:①Individualclosingoropeningtimenotmeetingthespecifiedrequirements.②Issueswiththeperformanceofthecircuitbreakeroperationmechanism’sreleaser.Acomprehensiveanalysisoftheabovereasonsshouldbeconducted,andadjustmentsshouldbemadetotheindividualclosingoropeningtimeortothereleaseraccordingtothemanufacturer’stechnicalrequirements.Ⅲ.AnalysisandProcessingofTestDataforHigh-VoltageSwitchDynamicCharacteristicTestEquipment(5)Possiblereasonsfornon-compliancewiththespecifiedrequirementsforasynchronyinclude:①Inconsistentopeningdistancesamongthethreephases.②Inconsistentoperationtimesofthephase-disconnectingmechanism’selectromagneticpoles.Acomprehensiveanalysisoftheabovereasonsshouldbeconducted,andadjustmentsshouldbemadetotheopeningelectromagneticpoles,opening-closingsprings,andmechanismconnectingrodsaccordingtothemanufacturer’stechnicalrequirements.Ⅳ.PrecautionsforMechanicalCharacteristicTesting(1)Whenusinganinsulatingpullrodtotestthebreakingpoint,multiplepeopleshouldsupportittopreventthepullrodfromtilting.(2)Beforeconnectinganddisconnectingthetestwires,theinstrumenthousingmustbegroundedtoreleasetheinducedvoltageonthebreakingpointwireandprotectthesafetyoftheinstrumentandpersonnel.(3)Thecontrolcircuitwireshouldbeconnectedtotheauxiliarycontactsideoftheopeningandclosingcoil,anditisstrictlyprohibitedtoconnectitdirectlytotheopeningandclosingcoiltoavoidburningoutthecoil.Ⅳ.PrecautionsforMechanicalCharacteristicTesting(4)Inactualoperation,thecircuitbreakerisonlyactivatedwhenthecontrolvoltageisattheratedvoltage.Therefore,themeasuredoperatingtimeofthecircuitbreakerisonlyaccuratewhentheappliedcontrolvoltageremainsattheratedvoltage.Generally,thehigherthevoltageappliedtotheopeningcircuit,theshortertheopeningtimeofthecircuitbreaker,andviceversa.Topreventtestingerrors,itisnecessarytoensurethatthevoltageappliedtotheopeningandclosingcoilistheratedoperatingvoltage.Ⅳ.PrecautionsforMechanicalCharacteristicTesting(5)When
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年度跨境電商平臺(tái)開發(fā)及運(yùn)營(yíng)服務(wù)合同
- 鋁塑復(fù)合管用帶材行業(yè)市場(chǎng)發(fā)展及發(fā)展趨勢(shì)與投資戰(zhàn)略研究報(bào)告
- 個(gè)人廠房轉(zhuǎn)讓合同范本
- 2025年水表檢測(cè)服務(wù)項(xiàng)目投資可行性研究分析報(bào)告
- 物流設(shè)備行業(yè)深度研究報(bào)告
- 2025年度電機(jī)電機(jī)線圈制造與采購合同模板
- 2025年中國甲醛氣體檢測(cè)儀器行業(yè)市場(chǎng)發(fā)展前景及發(fā)展趨勢(shì)與投資戰(zhàn)略研究報(bào)告
- 2025年度清潔能源發(fā)電項(xiàng)目出資擔(dān)保協(xié)議書
- 2025年度進(jìn)口車輛專業(yè)維修與售后服務(wù)合同
- 2021-2026年中國福建省公路建設(shè)市場(chǎng)供需現(xiàn)狀及投資戰(zhàn)略研究報(bào)告
- 論述小學(xué)數(shù)學(xué)教學(xué)中的五育融合
- 第3章 環(huán)境感知技術(shù)
- 【小學(xué)生心理健康教育】開學(xué)第一課課件ppt
- 全隱框玻璃幕墻施工方案
- 十八項(xiàng)醫(yī)療核心制度詳解培訓(xùn)課件
- 五年級(jí)上冊(cè)信息技術(shù)教學(xué)計(jì)劃華科版
- 機(jī)器人傳感器PPT完整全套教學(xué)課件
- 初一語文下冊(cè):閱讀理解知識(shí)點(diǎn)整理
- CSM工法雙輪銑水泥土攪拌墻專項(xiàng)施工方案
- 定點(diǎn)醫(yī)療機(jī)構(gòu)接入驗(yàn)收申請(qǐng)表
- 小羊詩歌大全1479首(小羊喝水?dāng)U句)
評(píng)論
0/150
提交評(píng)論