![中建公路臨時用電施工方案_第1頁](http://file4.renrendoc.com/view12/M01/06/0F/wKhkGWdc8SGAb94kAAF5W9XFLCw065.jpg)
![中建公路臨時用電施工方案_第2頁](http://file4.renrendoc.com/view12/M01/06/0F/wKhkGWdc8SGAb94kAAF5W9XFLCw0652.jpg)
![中建公路臨時用電施工方案_第3頁](http://file4.renrendoc.com/view12/M01/06/0F/wKhkGWdc8SGAb94kAAF5W9XFLCw0653.jpg)
![中建公路臨時用電施工方案_第4頁](http://file4.renrendoc.com/view12/M01/06/0F/wKhkGWdc8SGAb94kAAF5W9XFLCw0654.jpg)
![中建公路臨時用電施工方案_第5頁](http://file4.renrendoc.com/view12/M01/06/0F/wKhkGWdc8SGAb94kAAF5W9XFLCw0655.jpg)
版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
高速公路齊河至濟南段改擴建工程
臨時用電施工組織設計
(格式最終版)
編制單位:
編制人:
日期:
I
目錄
第一章編制說明...........................................................................................................1
1.1編制依據(jù)...........................................................................................................1
1.2編制原則...........................................................................................................2
第二章工程概況...........................................................................................................3
2.1工程建設概況一覽表.......................................................................................3
2.2工程簡介...........................................................................................................3
2.3臨電設計...........................................................................................................4
2.4施工平面布置...................................................................................................4
2.5施工要求...........................................................................................................5
2.6施工地氣候特征和季節(jié)性天氣.......................................................................6
2.7風險辨識與分級...............................................................................................6
第三章施工臨安排.......................................................................................................7
3.1項目管理組織...................................................................................................7
項目管理組織機構.........................................................................................7
部門職責.........................................................................................................7
3.2項目管理目標...................................................................................................8
3.3各項資源供應方式...........................................................................................9
3.4施工流水段的劃分及施工工藝流程.............................................................10
3.4.1施工流水段的劃分...............................................................................10
3.4.2施工工藝流程.......................................................................................10
3.5工程施工重難點和難點分析及應對措施.....................................................11
第四章施工進度計劃.................................................................................................12
第五章施工準備與資源配置計劃.............................................................................14
5.1施工準備計劃.................................................................................................14
5.1.1技術準備...............................................................................................14
5.1.2現(xiàn)場準備...............................................................................................15
5.2資源配置計劃.................................................................................................15
第六章施工臨時用電總體方案.................................................................................17
II
6.1用電總體設計.................................................................................................17
6.2主要供、耗電設備及用電量計算.................................................................17
6.3配電箱設置.....................................................................................................27
6.4導線截面計算.................................................................................................28
6.4.1按導線的允許電流選擇導線截面.......................................................29
6.4.2按導線電壓降選擇導線截面...............................................................34
6.4.3按導線機械強度選擇截面...................................................................36
6.5線路安裝.........................................................................................................37
6.5.1架空電纜安裝.......................................................................................37
6.5.2埋地電纜安裝.......................................................................................37
6.5.3施工臨時用電的安裝...........................................................................38
6.6安全用電措施.................................................................................................41
6.6.1接地保護...............................................................................................41
6.6.2保護接零...............................................................................................43
6.6.3配電開關箱...........................................................................................43
6.6.4設置漏電保護器...................................................................................46
6.6.5安全電壓...............................................................................................47
6.6.6施工現(xiàn)場的電纜線路...........................................................................47
6.6.7室內電纜的敷設及照明裝置...............................................................48
6.6.8電工及用電人員...................................................................................49
6.6.9電氣設備的使用與維護.......................................................................49
6.6.10外電防護安全保證.............................................................................50
6.7防雷措施.........................................................................................................50
6.7.1辦公、生活區(qū)防雷措施.......................................................................51
6.7.2鋼筋加工廠防雷措施...........................................................................51
6.7.3電氣設備防雷措施...............................................................................51
第七章驗收要求.........................................................................................................52
7.1驗收標準.........................................................................................................52
7.2驗收程序.........................................................................................................52
7.3驗收內容.........................................................................................................52
III
7.4驗收人員.........................................................................................................53
第八章各項管理計劃及保證措施.............................................................................55
8.1綠色施工管理計劃及保證措施.....................................................................55
8.2進度管理計劃及保證措施.............................................................................64
8.3質量管理計劃及保證措施.............................................................................65
8.4特殊氣候條件下施工管理計劃及保證措施.................................................73
8.5安全管理計劃及保證措施.............................................................................74
8.6成品保護計劃及保證措施.............................................................................83
第九章施工用電專項應急預案.................................................................................87
9.1應急救援組織機構及職責.............................................................................87
9.1.1應急組織機構.......................................................................................87
9.1.2項目指揮機構及職責...........................................................................87
9.2事故風險分析.................................................................................................88
9.3應急救援程序.................................................................................................90
9.4應急處置措施.................................................................................................91
9.5應急物資儲備.................................................................................................93
9.6應急響應、響應結束、演練.........................................................................94
9.6.1接警與通知...........................................................................................94
9.6.2現(xiàn)場保護...............................................................................................94
9.6.3警報與緊急公告...................................................................................94
9.6.4事態(tài)監(jiān)測...............................................................................................95
9.6.5警戒與治安...........................................................................................95
9.6.6人群疏散與安置...................................................................................95
9.6.7救援路線...............................................................................................95
9.6.8公共關系...............................................................................................96
9.6.9應急救援人員的安全...........................................................................97
9.6.10應急響應、響應結束、演練.............................................................97
第十章疫情防控措施...............................................................................................105
10.1技術準備.....................................................................................................105
10.2物資準備.....................................................................................................105
IV
10.3人員準備.....................................................................................................105
10.4疫情防控工作小組.....................................................................................105
10.4.1項目部主要疫情防控人員配置.......................................................105
10.4.2施工現(xiàn)場疫情防控人員配置...........................................................107
10.4.3施工隊伍疫情防控人員配置...........................................................107
10.5建立疫情防控體系.....................................................................................107
10.6做好疫情防控準備工作.............................................................................108
10.7建立“1234”復工管理制度..........................................................................108
10.8日常防控工作.............................................................................................109
V
高速公路齊河至濟南段改擴建工程xx臨時用電施工組織設計
第一章編制說明
1.1編制依據(jù)
表1.1編制依據(jù)
序號類別文件名稱編號
1中華人民共和國安全生產(chǎn)法(2021年修訂版)/
【2014】國家主席令第
2中華人民共和國環(huán)境保護法
9號
3國家法律建設工程安全生產(chǎn)管理條例國務院令第393號
法規(guī)、行
4政文件建設工程質量管理條例國務院令第279號
【2013】國家主席令第
5中華人民共和國傳染病防治法
15號
6新型冠狀病毒肺炎診療方案(試行第九版)/
7《施工現(xiàn)場臨時用電安全技術規(guī)范》JGJ46-2005
8《低壓配電設計規(guī)范》GB50054-2011
9《建設工程施工現(xiàn)場供用電安全規(guī)范》GB50194-2014
10《通用用電設備配電設計規(guī)范》GB50055-2011
11《供配電系統(tǒng)設計規(guī)范》GB50052-2009
12《建筑物防雷設計規(guī)范》GB50057-2010
國家行業(yè)
13《建筑機械使用安全技術規(guī)程》JGJ33-2012
規(guī)范
14《系統(tǒng)接地的型式及安全技術要求》GB14050-2008
15《剩余電流動作保護裝置安裝和運行》GB/T13955-2017
16《建筑施工場界環(huán)境噪聲排放標準》GB12523-2011
17《大氣污染物綜合排放標準》GB16297-1996
18《建筑施工安全檢查標準》JGJ59-2011
19《污水綜合排放標準》GB8978-1996
xx高速公路齊河至濟南段改擴建工程一標
20設計文件/
段招投標文件
山東高速集團《高速公路施工標準化技術指
21現(xiàn)行版本
南》
中建八局《施工組織設計、施工方案編制模
22現(xiàn)行版本
企業(yè)文件板》
23《基礎設施工程質量通病防治手冊》現(xiàn)行版本
24《公司標準化圖集》現(xiàn)行版本
25其他《新型冠狀病毒感染的肺炎公眾防護指南》/
1
高速公路齊河至濟南段改擴建工程xx臨時用電施工組織設計
序號類別文件名稱編號
26《電氣工程師手冊》機械工業(yè)出版社/
《簡明施工計算手冊》(第四版)中國建筑
27/
工業(yè)出版社
1.2編制原則
1遵循“安全第一,預防為主,綜合治理”的施工安全方針原則。
2遵循相關國家標準、規(guī)范的原則,確保臨時用電工程安全運行。
3遵循臨時用電三項基本原則。采用TN-S接地、三級配電系統(tǒng)和兩級漏電
保護系統(tǒng)。
2
高速公路齊河至濟南段改擴建工程xx臨時用電施工組織設計
第二章工程概況
2.1工程建設概況一覽表
表2.1工程概況
xx高速公路齊河至濟南段改擴建工
工程名稱工程性質高速公路
程一標段
涉鐵項目全長共計6.96公里,包含位于濟南市槐蔭區(qū)和市
建設規(guī)模工程地址
橋梁段4.55公里,路基段2.41公里中區(qū)境內
本標段內所有路基工
程、路面工程、橋涵工
程、交叉工程、排水工
項目承包范
建設單位程、交通安全設施工
圍
程、預埋管線工程、綠
化等招標圖紙中標明的
全部施工內容。
臨建、樁基、下部結
主要分包工
設計單位構、上部結構、路基、
程
路面、轉體、頂推等
交工驗收的質量評定:
勘察單位合質量合格,竣工驗收的質量
同評定:優(yōu)良
監(jiān)理單位要工期1460天
總承包單求
國建筑第x工程局有限公司聯(lián)合體安全無安全責任事故發(fā)生
位
工程主要
支撐經(jīng)濟發(fā)展、推動社會進步、保障國家安全、服務可持續(xù)發(fā)展等重要作用,
功能或用
同時有助于實現(xiàn)濟南市城市總體發(fā)展戰(zhàn)略
途
2.2工程簡介
xx高速公路齊河至濟南段改擴建北起晏城樞紐互通,南至殷家林樞紐互通,
途經(jīng)德州市齊河縣、濟南市槐蔭區(qū)、市中區(qū)。
項目以中建八局名義與山東路橋聯(lián)合體承接,山東路橋承建黃河以北(含黃
河段,里程K393+224.908-K399+264),長度6.04km;我部承建黃河以南段(里
程K399+264-K415+160),長度15.9km。
項目為雙向六車道擴建雙向十二車道,改擴建后技術指標為雙向12車道高
速公路,設計行車速度采用120km/h,擴建加寬方式為分離加寬,標尾部由兩側
分離加寬漸變?yōu)閮蓚绕磳?,涉軍事區(qū)路段(K413+784.941~K415+160)采用西側
單側拼寬,三車道分離線路基寬度17m。
xx高速公路齊河至濟南段改擴建工程涉鐵項目全長共計6.96公里,包含橋
梁段4.55公里,路基段2.41公里,主要施工內容包含常規(guī)橋梁施工、連續(xù)梁轉
3
高速公路齊河至濟南段改擴建工程xx臨時用電施工組織設計
體、鋼箱梁頂推、鋼箱梁吊裝、路基單、雙側拼寬等施工。
施工時用電變壓器由就近接駁點接入,現(xiàn)場線路布設采用橋梁段貫通全線布
置。路基段用電量較少考慮自發(fā)電,不設變壓器。
2.3臨電設計
施工現(xiàn)場設置2個工區(qū)(一、二工區(qū))、2個鋼筋廠(1#、2#鋼筋廠),現(xiàn)場
施工時用電量高峰出現(xiàn)在樁基施工時間段,現(xiàn)場有兩個特殊結構施工作業(yè)區(qū)(轉
體、頂推施工作業(yè)區(qū)),綜合考慮現(xiàn)場施工情況,在轉體和頂推施工作業(yè)段各布
設1個630KVA變壓器,由于物資已調撥3臺630KVA變壓器,考慮合理利用,
剩余施工區(qū)域用電采用1臺630KVA和4臺400KVA變壓器。變壓器布置情況見
下表。
表2.3臨時用電布置情況
變壓器編號部位變壓器配置變壓器位置
京滬三四線鐵路以北
1#1臺630KVAZK402+710
(YK402+272.4-YK403+137.1)
京滬三四線鐵路以南至國際醫(yī)學互通
2#1臺630KVAYK403+720
(YK403+137.1-YK404+200)
國際醫(yī)學互通以南至一工區(qū)標尾
3#1臺400KVAYK404+615
(YK404+200-YK404+859)
馬莊區(qū)間高架橋
4#1臺400KVAYK411+640
(YK411+128.46-YK412+081.5)
京滬線公鐵立交橋(YK412+081.5-
5#1臺630KVAZK412+690
K413+060.344)
6#2#鋼筋廠1臺400KVAZK412+200
7#1#鋼筋廠1臺400KVAYK402+200
2.4施工平面布置
4
高速公路齊河至濟南段改擴建工程xx臨時用電施工組織設計
圖2.4-1一工區(qū)施工現(xiàn)場平面位置(1#、2#、3#、7#變壓器)
圖2.4-2二工區(qū)施工現(xiàn)場平面位置(4#、5#變壓器)
圖2.4-3二工區(qū)施工現(xiàn)場平面位置(6#變壓器)
2.5施工要求
5
高速公路齊河至濟南段改擴建工程xx臨時用電施工組織設計
施工質量達到方案要求的標準,不出現(xiàn)安全事故,計劃開工時間2022年7
月1日(先期開工點)、8月1日(后期開工點),預計結束時間2022年7月16
日(先期開工點)、8月11日(后期開工點)。
2.6施工地氣候特征和季節(jié)性天氣
施工處于溫帶半濕潤大陸性季風氣候區(qū)。四季分明,春季風多雨少,氣候較
干燥;夏季高溫多雨,雨量充沛集中,雨熱同期,常有大風暴雨、冰雹、雷擊、
上游山洪等災害性天氣,雨季一般在6~8月份;秋季最短,冬季最長,干冷少
雪,為半干旱氣候。
2.7風險辨識與分級
臨電施工時主要的風險源有情緒異常、冒險作業(yè)、過度緊張、辨識錯誤、指
揮失誤、違章指揮、操作失誤、違章作業(yè)、設備缺陷、防護缺陷、電傷害等。
臨電施工時主要的事故類別有物體打擊、車輛傷害、機械傷害、起重傷害、
觸電、高處墜落等。
事故風險按可能性和出現(xiàn)的后果分為四級:重大風險、較大風險、一般風險
和低風險。
臨電施工時將變壓器的接駁作業(yè)定位一般風險。其余變壓器安裝,電纜線敷
設定位低風險。
6
高速公路齊河至濟南段改擴建工程xx臨時用電施工組織設計
第三章施工臨安排
3.1項目管理組織
3.1.1項目管理組織機構
項目部為保障現(xiàn)場施工臨時用電,成立臨時用電管理機構,管理組織機構詳
見下圖:
項目經(jīng)理部
工
商程安物質測
務技全資量量
部術部部部部
部
一/二工區(qū)
臨時用電施工隊伍
圖3.1.1施工用電管理組織機構
3.1.2部門職責
表3.1.2-1部門職責
組織機構崗位人員名稱主要職責
項目經(jīng)理楊文良
商務經(jīng)理郭丹
宋光遠1)負責對施組的審核。
項目總工
李朋2)負責質量、安全、環(huán)保、工期、成本的總體管
項目經(jīng)理
理,對施工過程的全過程進行監(jiān)督。
部安全總監(jiān)李瑞
3)組織各部門對臨時用電安裝的過程檢查及階段
質量總監(jiān)殷健武驗收。
工程技術部長許利彤
物質部長孟凡偉
王俊達1)負責質量、安全、環(huán)保、工期、成本的管理,
生產(chǎn)經(jīng)理
一/二工薛春安對施工的全過程負責。
區(qū)2)負責組織其他部門對用電線路和設備做定期檢
專業(yè)工程師李亞東查。
7
高速公路齊河至濟南段改擴建工程xx臨時用電施工組織設計
組織機構崗位人員名稱主要職責
(工程技術孔壘
部)付鵬
潘士勇
苗存清
齊士寧
王建
1)檢查核對用電設備數(shù)量。
商務部商務工程師陳洋洋
2)檢查設備工作情況。
1)對現(xiàn)場臨時用電工程質量負有第一技術責任。
盧興成
工程技術2)負責審核項目用電物資需用計劃。
技術工程師丁明浩
部3)負責對項目部管理人員和施工人員用電安全交
李崢
底。
1)負責現(xiàn)場臨時用電工程安全檢查與監(jiān)督工作,
監(jiān)督和指導分包單位,保證安全體系的有效運行。
楊天猛
安全部安全工程師2)負責員工的入場教育培訓、考核;負責安全防
楊開祥
護措施的落實、防護用品的檢查與整改。
3)現(xiàn)場消防設施的管理與檢查,消防培訓。
陳浩
質量部質量工程師1)負責現(xiàn)場臨時用電工程質量檢查與監(jiān)督工作。
王冬
1)具體負責現(xiàn)場臨時用電設備的購買。
物資部物資工程師王志文
2)隨時更新用電設備臺賬。
1)負責現(xiàn)場臨電施工構件測量放線及測量校核等
測量部測量部長張琦
工作。
電工組仇新華電工安裝、巡檢、維修、拆除,并建立工作記錄。
表-1專業(yè)分包單位管理人員及職責分工
序號管理職務姓名職責和權限
1)負責組織對安全法規(guī)和常識的宣傳教育;
2)嚴格執(zhí)行國家安全生產(chǎn)規(guī)章制度及有關法律法規(guī);
1分包負責人張全發(fā)
3)負責施工現(xiàn)場的臨時用電管理進行定期檢查、維修和
不定期的巡查,確保施工用電安全。
2土建隊長種東坡1)負責臨時用電土建/安裝部分施工管理;
2)堅持檢查制度,認真填寫各種記錄;
3安裝隊長劉傳海3)對現(xiàn)場施工作業(yè)人員進行安全技術交底;
4)及時糾正和處理施工中各項違章作業(yè)現(xiàn)象。
3.2項目管理目標
表3.2項目管理目標
項目管理目標名稱目標值
定于2022年7月16日施工完成(先期開工點);
工期
2022年8月11日施工完成(后期開工點);
質量目標臨電施工工程交工驗收的質量評定:合格;
8
高速公路齊河至濟南段改擴建工程xx臨時用電施工組織設計
項目管理目標名稱目標值
竣工驗收的質量評定:優(yōu)良。
安全文明目標施工現(xiàn)場布局合理,施工過程無安全責任事故。
現(xiàn)場施工無揚塵,建筑垃圾處理規(guī)范,項目實施中無較大及
綠色施工目標
以上環(huán)境事件發(fā)生。
科技目標/
3.3各項資源供應方式
表3.3-1勞務資源安排一覽
施工項目專業(yè)施工資質建設分包分包商
開始施工時間責任人
名稱隊名稱要求工期方式選擇方式
2022.7.1(先期開包工
濟南昌泰
臨時用電施工點)/16天及部
電力工程/公司選定郭丹
工2022.8.1(后期開/11天分材
有限公司
工點)料
表3.3-2工程用大宗物資供應安排一覽
物資名稱數(shù)量擬選供應商采購地點要求進場時間責任人
630KVA變壓器3臺調撥/已進場孟凡偉
400KVA變壓器4臺采購/隨施工進度孟凡偉
YJLV1185mm228824m采購/隨施工進度孟凡偉
YJLV3185mm2-+2
1500m采購/隨施工進度孟凡偉
95mm2
YJLV3150mm2-+2
100m采購/隨施工進度孟凡偉
70mm2
YJLV395mm2-+2
620m調撥/已進場孟凡偉
50mm2
YJLV370mm2-+2
50m調撥/已進場孟凡偉
35mm2
YJLV350mm2-+2
200m調撥/已進場孟凡偉
25mm2
YJLV325mm2-+2
1700m調撥加采購/隨施工進度孟凡偉
16mm2
YJLV316mm2-+2
30m調撥/已進場孟凡偉
10mm2
12m混凝土電線桿145根采購/隨施工進度孟凡偉
一級箱46個調撥加采購/隨施工進度孟凡偉
二級箱30個調撥加采購/隨施工進度孟凡偉
9
高速公路齊河至濟南段改擴建工程xx臨時用電施工組織設計
表3.3-3大型機械設備采購供應安排
機械設備提供方
擬選供應商要求進場時間計劃出場時間責任人
名稱式
隊伍自
平板車2022年6月30日2022年8月11日孟凡偉
濟南昌泰電力工備
25t汽車程有限公司隊伍自
2022年6月30日2022年8月11日孟凡偉
吊備
3.4施工流水段的劃分及施工工藝流程
3.4.1施工流水段的劃分
圖3.4.1施工流水段劃分
3.4.2施工工藝流程
10
高速公路齊河至濟南段改擴建工程xx臨時用電施工組織設計
定位放線
變壓器及附屬安裝
架空線埋地線
線桿組立開挖溝槽
線纜架設電纜敷設
電纜終端頭制作安裝
線路絕緣測試
通電試運行
系統(tǒng)驗收
圖3.4.2臨時用電施工工藝流程
3.5工程施工重難點和難點分析及應對措施
表3.5臨時用電施工重難點及解決對策
序號重點和難點具體分析預防及應對對策
征拆用地困與施工隊伍簽訂分段施工合同,先施工
1難,施工工業(yè)主征拆進度緩慢已征收用地工作面,待后續(xù)工作面征收
作面不連續(xù)完畢,再進行后續(xù)臨電施工。
由施工隊伍選擇具有相關臨電作業(yè)資格
疫情期間,人員進出場較
人員專業(yè)水證的熟練工人,提前進場并提供24小
2難,以普通代替專業(yè)工
平不足時核酸檢測報告、近30天通行情況
種,降低施工效率
等,由項目安全部進行驗收。
11
高速公路齊河至濟南段改擴建工程xx臨時用電施工組織設計
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 人力資源招聘居間合同格式
- 文創(chuàng)園區(qū)衛(wèi)生間翻新合同
- 牛棚承包合同
- 化工產(chǎn)品購銷合同
- 電商承包合同協(xié)議書
- 玩具銷售合同范例
- 喝啤酒大賽比賽規(guī)則
- 場地租賃合同協(xié)議書
- 統(tǒng)編版初中語文七年級上冊第九課《從百草園到三味書屋》聽評課記錄
- 企業(yè)戰(zhàn)略規(guī)劃知識管理系統(tǒng)作業(yè)指導書
- 2024新版《藥品管理法》培訓課件
- 浙江省杭州市2024年中考英語真題(含答案)
- 《陸上風電場工程設計概算編制規(guī)定及費用標準》(NB-T 31011-2019)
- 扁鋼理論重量表
- 中央企業(yè)商業(yè)秘密安全保護技術指引2015版
- 人教版初中英語八年級下冊 單詞默寫表 漢譯英
- 《靜脈治療護理技術操作規(guī)范》考核試題及答案(共140題)
- 人事測評理論與方法-課件
- 最新卷宗的整理、裝訂(全)課件
- 信訪事項受理、辦理、復查、復核、聽證程序課件
- 【北京】施工現(xiàn)場安全生產(chǎn)標準化管理圖集
評論
0/150
提交評論