




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)
文檔簡介
表H-101TAB.化學(xué)工業(yè)工程建設(shè)交工技術(shù)文件TECHNICALDOCUMENTSFORHANDOVEROFENGINEERINGCONSTRUCTIONINCHEMICALINDUSTRY項目:PROJECTS裝置:UNIT工號:SECTION建設(shè)單位:OWNER施工單位:CONTRACTOR第/卷第/冊VOL.NO.SECTNO.年月日DATE表H-102Tab.交工文件總目錄Generalcontentsofprojecthandoverdocuments項目:Project裝置:Unit工號:Section卷號VolNo.冊號SectNo.內(nèi)容Contents.表H-103Tab.交工文件目錄Contentsofprojecthandoverdocuments項目:Project裝置:Unit工號:Section序號SequenceNo.文件名稱Nameofdocument頁次Page備注Remarks表H-104Tab.開工報告Reportforstartofconstruction項目:Project裝置:Unit工號:Section合同號ContractNo.工程地點Jobsite計劃開工日期年月日PlanneddateforstartofconstructionDate造價Cost合同工期月/天TimelimitspecifiedbycontractMonths/Days工程內(nèi)容:Contentsofengineeringproject開工前已達到的條件:Conditionsattainedbeforestartofconstruction備注:Remarks經(jīng)雙方認定,實際開工日期:年月日ActualdateofstartofconstructionapprovedbybothsidesDate建設(shè)單位簽章:Ownersignature代表:年月日RepresentativeDate承包單位簽章:Contractorsignature代表:年月日RepresentativeDate.表H-105Tab.中間交接證書Certificateforintermediateacceptance項目:Project裝置:Unit工號:Section單項(位)工程名稱Nameofunitwork交接日期年月日DateofacceptanceDate工程內(nèi)容:Contentsofwork交接情況(符合設(shè)計的程度、主要缺陷及處理意見):Descriptionofacceptance(extentofconformitytodesign,maindefectsandsuggestionsfortreatment)工程質(zhì)量鑒定意見:Optionsforappraisalofengineeringquality建設(shè)單位簽章:Ownersignature代表:Representative年月日Date承包單位簽章:Contractorsignature代表:Representative年月日Date.表H-106Tab.聯(lián)動試車合格證書Certificateforqualificationofsystemsimulationtest-run項目:Project裝置:Unit工號:Section裝置、車間、工段或生產(chǎn)系統(tǒng)名稱Nameofinstallation,plantorproductionsystem試車日期自年月日至年月日Dateoftest-runfromDatetoDate試車情況:Descriptionoftest-run附件:Attachment建設(shè)單位簽章:Ownersignature代表:Representative年月日Date設(shè)計單位簽章:Designunitsignature代表:Representative年月日Date承包單位簽章:Contractorsignature代表:Representative年月日Date.表H-108Tab.工程備忘錄Memorandumforengineeringproject項目:Project裝置:Unit工號:Section事由:Maincontent編號:CodeNo.提出人:Submitter年月日Date會簽Co-signature建設(shè)單位代表:Ownerrepresentative年月日Date承包單位代表:Contractorrepresentative年月日Date施工單位代表:Subcontractorrepresentative年月日Date.表H-109Tab.技術(shù)聯(lián)系單Technicalliaisonsheet項目:Project裝置:Unit工號:Section提出人Submitter送達Submittedto聯(lián)系單號SheetNo,內(nèi)容:Contents年月日Date答復(fù):Answer簽章Signature年月日Date.表H-110Tab.隱蔽工程記錄Concealedworkrecords項目:Project裝置:Unit工號:Section隱蔽部位Concealedlocation施工圖號EngineeringDrawingNo.隱蔽前的檢查:Inspectionbeforeconcealed隱蔽方法:Concealedmethod簡圖說明:Illustrationwithsketch建設(shè)單位代表:Ownerrepresentative年月日Date承包單位代表:Contractorrepresentative年月日Date施工單位:Subcontractorrepresentative施工人:Operator檢查員:Inspector年月日Date表H-111Tab.基礎(chǔ)沉降測量記錄Foundationsettlementsurveyingrecords項目:Project裝置:Unit工號:Section位號LocationNo.名稱Name參考水準點Referencebenchmark標(biāo)高Elevation測量點位置Locationofsurveying安裝前Beforeerection安裝后Aftererection加負荷Loading負荷后Afterloading日期Date標(biāo)高Elevation日期Date標(biāo)高Elevation負荷量Load日期Date標(biāo)高Elevation日期Date標(biāo)高Elevation測量草圖:Surveyingsketch技術(shù)負責(zé)人Technicalpersonincharge測量人Surveyor.表H-112Tab.焊工登記表Welderregistrationtable項目:Project裝置:Unit工號:Section序號SequenceNo.姓名Name鋼印號Welder’sstampNo.合格證號CertificateNo.合格項目(代號)Qualifieditems(codeNo.)焊接檢查員Weldinspector制表人Tabulator管理人員登記表項目:裝置:工號:序號姓名發(fā)證機關(guān)合格證號有效期表H-113Tab.焊接記錄表Weldingrecords項目:Project裝置:Unit工號:Section管線號或設(shè)備位號PipelineNo.orequipmentNo.焊縫號WeldNo.焊工/鋼印號Welder/StampNo.預(yù)熱溫度Preheatingtemp.焊接日期Dateofwelding備注Remarks記錄人Recorder.表H-116Tab.滲透探傷報告Penetranttestreport項目:Project裝置:Unit工號:Section委托單位Truster試驗編號TestNo.執(zhí)行標(biāo)準Standardforexecution材質(zhì)Material規(guī)格Specification表面狀態(tài)Surfacecondition清洗液Cleaningliquid滲透液Penetratingliquid滲透時間Penetrationduration顯影液Developingagent靈敏度Sensitivity觀察Observation肉眼/放大鏡()倍Visual/()timesmagnifyingglass探傷部位Testlocation缺陷性質(zhì)Defectnature缺陷長度Defectlength缺陷位置Defectlocation缺陷處理Defecttreatment評定結(jié)果Resultofevaluation附注:Note蓋章Sealed審核人Examiner年月日Date報告人Reporter年月日Date證號CertificateNo.NDT證號CertificateNo.NDT.表H-117Tab.磁份探傷報告Magneticpowderinspectionreport項目:Project裝置:Unit工號:Section委托單位Truster試驗編號TestNo.執(zhí)行標(biāo)準Standardforexecution材質(zhì)Material規(guī)格Specification表面狀態(tài)Surfacecondition儀器型號Instrumenttype靈敏度試片Testpieceforsensitivity靈敏度評價Sensitivityevaluation磁粉類型Kindofmag-neticpowder粒度:目Size濃度Concentration媒介Medium磁化方式Modeofmagnetization電流:AElectriccurrent時間:sTime探傷部位Testlocation缺陷性質(zhì)Defectnature缺陷長度Defectlength缺陷位置Defectlocation缺陷處理Defecttreatment評定處理Evaluationresult附注:Remarks蓋章Sealed審核人Examiner年月日Date報告人Reporter年月日Date證號CertificateNo.NDT證號CertificateNo.NDT.表H-118Tab.熱處理報告Heat-treatmentreport項目:Project裝置:Unit工號:Section管線號/設(shè)備位號Pipeline/EquipmentlocationNo.規(guī)格Specification焊縫號WeldNo.材質(zhì)Material熱處理曲線Heat-treatmentcurve溫度(℃)時間(h)Times硬度試驗Hardnesstest部位Testlocation硬度值Hardnessvalue焊縫Weld熱影響區(qū)Heat-effectzone母材Basematerial說明:interpretation技術(shù)負責(zé)人Technicalpersonincharge操作人Operator(熱處理)(Heat-treatment)(硬度試驗)(Hardnesstest).表H-119Tab.超聲波測厚報告Supersonicpachometerreport項目:Project裝置:Unit工號:Section委托單位Truster受檢件名稱Nameoftestpiece試驗編號TestNo.儀器型號Instrumentmodel執(zhí)行標(biāo)準Standardforexecution測點編號TestpointNo.設(shè)計厚度(mm)Designthickness實測厚度(mm)Testthickness測點編號TestpointNo.設(shè)計厚度(mm)Designthickness實測厚度(mm)testthickness測點示意圖:Sketchfortestpoints蓋章Sealed審核人Examiner年月日Date報告人Reporter年月日Date證號CertificateNo.NDT證號CertificateNo.NDT.表H-121Tab.金相檢驗報告Metallographicexaminationreport項目:Project裝置:Unit工號:Section委托單位Truster試驗編號TestNo.試驗標(biāo)準Standardforexamination試件名稱Nameofspecimen儀器型號Instrumentmodel評定標(biāo)準Standardforevaluation試驗?zāi)康腡estaim試驗前的技術(shù)條件Technicalcondition鑒定意見及結(jié)論Appraisalopinionand蓋章Sealed審核人Examiner年月日Date報告人Reporter年月日Date.表H-123Tab.化學(xué)分析試驗報告Testreportforchemicalanalysis項目:Project裝置:Unit工號:Section委托單位Truster試驗編號TestNo.試驗標(biāo)準Standardfortest取樣部位Samplinglocation材質(zhì)Material化學(xué)成份(%)ChemicalcompositionCSiMnSPCrNi附注:Remarks蓋章Sealed審核人Examiner年月日Date報告人Reporter試驗人Tester年月日Date.表H-126Tab.防腐層電火花檢測報告Electricsparktestreportofanti-corrosionlayer項目:Project裝置:Unit工號:Section委托單位Truster試驗編號TestNo.執(zhí)行標(biāo)準Standardforexecution檢件名稱Nameofspecimen防腐區(qū)段Anti-corrosionsection防腐等級Anti-corrosiongrade防腐厚度mmAnti-corrosionlayerthickness規(guī)范(設(shè)計)要求值:Requiredvalueofcode(design)kV/火花長度:Sparklength檢測結(jié)果Resultsoftest檢測部位Testlocation檢測值Testvalue檢測部位Testlocation檢測值Testvalue檢測部位Testlocation檢測值Testvalue檢測部位簡圖:Diagramoftestlocation蓋章Sealed審核人Examiner年月日Date報告人Reporter試驗人Tester年月日Date.表H-127Tab.絕熱施工工序質(zhì)量控制表Qualitycontroltableforconstructionproceduresofheat-insulation項目:Project裝置:Unit工號:Section機械位號/管道系統(tǒng)MachineequipmentNo./Pipelinesystem執(zhí)行標(biāo)準Standardforexecution檢查項目Inspectionitem等級Grade簽名/日期Signature/Date施工單位Subcontractor承包單位Contractor建設(shè)單位Owner機械、管道交接檢查Acceptanceofmachine&equipment&pipeline□C材料交接檢查Acceptanceofmaterial□C基層表面檢查Basecoursesurface□CR絕熱層檢查Heat-insulatinglayer□BR防潮層檢查Damp-proofcourse□CR保護層檢查Protectivecourse□BR機械位號或管線號基層表面Basecoursesurface絕熱層Insulationlayer防潮層Damp-proofcourse保護外殼Protectivecourse備注Remarks處理方法結(jié)果名稱厚度結(jié)果名稱厚度結(jié)果名稱厚度結(jié)果技術(shù)負責(zé)人Technicalpersonincharge質(zhì)量檢查員Inspector施工人Operator.表H-128Tab.項目:Project裝置:Unit工號:Section.表H-201Tab.機泵安裝工序質(zhì)量控制表Qualitycontroltableformachineandpumpinstallingprocedure項目:Project裝置:Unit工號:Section位號LocationNo,名稱Name工作介質(zhì)Medium驅(qū)動機類型Typeofdriver傳動方式Transmissionmode執(zhí)行標(biāo)準Standardforexecution檢查項目Inspectionitem等級Grade簽字/日期Signature/Date施工單位Subcontractor承包單位Contractor建設(shè)單位Owner機器及附件接收AcceptanceofmachineaccessoriesC基礎(chǔ)復(fù)查CheckoffoundationC機泵安裝InstallationofmachineandpumpCR灌漿前檢查InspectionbeforegroutingA拆洗及回裝Disassembling,cleaningandreassemblingC(CR)聯(lián)軸節(jié)對中CenteringofcouplersB傳動裝置檢查TransmissiongearC潤滑油系統(tǒng)檢查、注油LubricationsysteminspectionandoilingC冷卻、密封系統(tǒng)檢查CoolingandsealingsystemC試運轉(zhuǎn)TestrunAR找正偏差A(yù)lignmentdeviation對中偏差Centeringdeviation位置Location允差Tolerance0-18090-270配管前Beforepipeassembling配管后Afterpipeassembling水平Horizontal位置Location允差Tolerancea1a2a3a4a1a2a3a4中心center徑向Radial標(biāo)高Elevation軸向Axialaθaθa4a3a1a2Testtemp介質(zhì):Medium持續(xù)時間:Timeduration從驅(qū)動機方向讀數(shù):Readingindirectionofdriver百分表固定端:Fixedendofdialindicator聯(lián)軸節(jié)間距:mmSpacingofcouplersa=tg=機器軸承溫度:℃Machinebearingtemp.前:Front后:Rear驅(qū)動機軸承溫度:℃Driverbearingtemp.前:Front后:Rear壓力:MPaPressure進:In出:Out電流溫升:℃Motortemp.rise電流(啟動/運轉(zhuǎn)):ACurrent(starting/running)備注:Remarks.表H-202Tab.機組安裝工序質(zhì)量控制表Qualitycontroltableformachineandpumpinstallingprocedure項目:Project裝置:Unit工號:Section位號LocationNo.名稱Name執(zhí)行標(biāo)準Standardforexecution驅(qū)動機Driver主機Hostmachine種類Type型號Model種類Type型號Model功率Power轉(zhuǎn)速Rottingspeed介質(zhì)Medium檢查項目Inspectionitem等級Grade簽字/日期Signature/Date施工單位Subcontractor承包單位Contractor建設(shè)單位Owner機組及附件接收AcceptanceofmachineaccessoriesC基礎(chǔ)復(fù)查CheckoffoundationC機組安裝InstallationofmachineandpumpAR灌漿前檢查InspectionbeforegroutingAR聯(lián)軸節(jié)對中CenteringofcouplerAR機組安裝完整性確認IntegrityofmachinesetinstallationB機組拆檢組裝情況Disassembling,inspectingandassemblingofmachinesetCR油系統(tǒng)沖洗FlushingofoilsystemA油系統(tǒng)整定SettingofoilsystemB冷卻系統(tǒng)CoolingsystemC冷凝真空系統(tǒng)CondensingvacuumsystemB控制和保護系統(tǒng)ControlandprotectionsystemB盤車裝置系統(tǒng)IdlerotatingdeviceC試運轉(zhuǎn)TestrunAR加注油情況Oilingcondition部位Location油標(biāo)號Markofoil合格證號CertificateNo.注油數(shù)量Oilingquantity簽名/日期Signature/Date備注:Remarks.表H-203Tab.機組安裝找正記錄Alignmentrecordforinstallationofmachineset項目:Project裝置:Unit工號:Section位號LocationNo名稱Name執(zhí)行標(biāo)準Standardforexecution項目Item允許偏差(mm)Tolerance實際偏差(mm)Actualdeviation標(biāo)高Elevation中心線Centerline縱向Longitudinal橫向Transverse水平測量(mm/m)Leveling12345678910縱向Longitudinal允許值A(chǔ)llowablevalue實測值Measuredvalue橫向Transverse允許值A(chǔ)llowablevalue實測值Measuredvalue附圖:Attacheddiagram承包單位代表Contractorrepresentative施工單位Subcontractor施工人Operator建設(shè)單位代表Ownerrepresentative檢查員Inspector.表H-204Tab.大型機械灌漿前檢查記錄Inspectionrecordbeforegroutingoflargemachinery項目:Project裝置:Unit工號:Section位號LocationNo.名稱Name執(zhí)行標(biāo)準Standardforexecution隱蔽前檢查:Inspectionbeforeconcealing1.墊鐵:布置□接觸面□焊接□ShimsLayoutContactfaceWelding2.地腳螺栓□3.螺栓孔用基礎(chǔ)表面清洗□AnchoringBoltholeandfoundationsurfacecleanliness4.墊鐵規(guī)格:平墊鐵斜墊鐵SpecificationFlatshimsTaperedshims附圖:AttacheddiagramNo.h×nLNo.h×nLNo.h×nL施工人:Operator上項工程經(jīng)檢查符合設(shè)計(規(guī)范)要求,可以隱蔽。Theaboveworkconformingtotherequirementofdesign(code)maybeconcealed年月日Date建設(shè)單位代表Ownerrepresentative承包單位代表Contractorrepresentative檢查員Inspector.表H-205Tab.機器拆檢及組裝間隙測量記錄Clearancemeasurementrecordfordisassembling,inspectingandassemblingofmachine項目:Project裝置:Unit工號:Section位號LocationNo.名稱Name執(zhí)行標(biāo)準Standardforexecution間隙測量部位Clearancemeasuredlocation規(guī)定值(mm)Specifiedvalue拆前間隙(mm)Clearancebeforedisassembling組裝后間隙(mm)Clearanceafterassembling日期Date注:間隙測量部位另附圖(如果需要)。Note:Clearancemeasuredlocationhasdiagramattached(ifnecessary)。檢查員Inspector施工人Operator.表H-206Tab.電機空氣間隙測量記錄Airgapmeasurementrecordformotor項目:Project裝置:Unit工號:Section位號LocationNo.名稱Name執(zhí)行標(biāo)準Standardforexecution按定子上標(biāo)定的一點盤車檢查空氣間隙單位:(mm)InspectionofairgapatspecifiedpointonthestatorbyidlerotatingUnit部位Location12345678910111213141516171819實測值Measuredvalue按定子上標(biāo)定的一點盤車檢查空氣間隙單位:(mm)InspectionofairgapatspecifiedpointonthestatorbyidlerotatingUnit:部位Location12345678910實測值Measuredvalue承包單位Contractorrepresentative檢查員Inspector施工人Operator.表H-208Tab.____透平試運轉(zhuǎn)報告Test-runreportfor____turbine項目:Project裝置:Unit工號:Section位號LocationNo.機組名稱Nameofmachineset功率Power介質(zhì)名稱Nameofmedium介質(zhì)壓力PressureofmediumMPa介質(zhì)溫度Temp.ofmedium℃額定轉(zhuǎn)速Ratedrotationalspeedr/min試車類型Typeoftest-run試車日期Dateoftest-run執(zhí)行標(biāo)準Standardforexecution危急保安器試驗Testofemergencyprotectiondevice手動Manual自動Automatic時間Time轉(zhuǎn)速Speed(r/min)介質(zhì)Medium潤滑油Lubricant軸承溫度Bearingtemp.(℃)軸振動(mm)Shaftvibration軸位移(mm)shaftdisplacement備注Remarks流量Flowrate溫度Temp.(℃)壓力Pressure(MPa)溫度Temp.(℃)壓力Pressure(MPa)進In出Out進In出Out進In出Out進In出Out前Front后Rear試運轉(zhuǎn)結(jié)果Resultoftest-run承包單位代表Contractorrepresentative施工單位Subcontractor施工人Operator建設(shè)單位代表Ownerrepresentative檢查員Inspector.表H-210Tab.大型軸流風(fēng)機安裝工序質(zhì)量控制表Qualitycontroltableforinstallingproceduresoflargeaxialflowblower項目:Project裝置:Unit工號:Section位號LocationNo.傳動方式Modeoftransmission名稱Name執(zhí)行標(biāo)準Standardforexecution檢查項目等級簽名SignatureInspectionitemGrade施工單位Subcontractor承包單位Contractor建設(shè)單位Owner機器及附件接收AcceptanceofmachineandaccessoriesC基礎(chǔ)復(fù)查CheckoffoundationC機器安裝InstallationofmachineCR驅(qū)動機對中AlignmentofdriverC灌漿前檢查InspectionbeforegroutingA風(fēng)筒安裝InstallationofwindductC傳動裝置檢查TransmissiongearC翼片安裝FittingofbladeCR潤滑部位檢查、注油LubricationsysteminspectionandoilingC電機轉(zhuǎn)向檢查RotatingdirectionofmotorC試運轉(zhuǎn)Test-run持續(xù)時間Durationh電機軸承溫度Motorbearingtemp.℃風(fēng)機軸承溫度Blowerbearingtemp.℃AR電機定子溫升Motorstatortemp.rise℃結(jié)果Result找正偏差A(yù)lignmentdeviation翼片安裝Fittingofblade允差Tolerance0°-180°90°-180°垂直度(mm/m)Verticality翼片角度偏差Bladeangledeviation1234中心(mm)Center標(biāo)高(mm)Elevation翼片間隙(mm)Clearanceatbladetip最大Max.最小Min.附注:Note.表H-211Tab.立式攪拌器安裝工序質(zhì)量控制表Qualitycontroltableforinstallingproceduresofverticalagitator項目:Project裝置:Unit工號:Section位號LocationNo.名稱Name工作介質(zhì)Medium執(zhí)行標(biāo)準Standardforexecution檢查項目等級簽名SignatureInspectionitemGrade施工單位Subcontractor承包單位Contractor建設(shè)單位Owner機械及附件接收AcceptanceofmachineandaccessoriesC支架(支架法蘭)安裝InstallationofsupportC容器與攪拌器法蘭墊片安裝SettingflangegasketsofvesselandagitatorC找正AlignmentCR皮帶輪平行度確認ParallelismofbeltpulleyB齒輪箱內(nèi)部清潔度確認CleanlinessingearboxC注油(脂)Oiling(greasing)C冷卻、密封系統(tǒng)檢查CoolingandsealingsystemCR電機轉(zhuǎn)向確認RotatingdirectionofmotorC試運轉(zhuǎn)Test-runARaab找正記錄Alignmentrecordammbmm垂直度Verticalitymm/m備注:Remarks.表H-212Tab.空調(diào)系統(tǒng)安裝工序質(zhì)量控制表Qualitycontroltableforinstallingairconditionersystem項目:Project裝置:Unit工號:Section位號LocationNo.型號Model制造廠Manufacturer制冷量Refrigerationoutput制冷劑Refrigerant執(zhí)行標(biāo)準Standardforexecution檢查項目Inspectionitem等級Grade簽名Signature施工單位Subcontractor承包單位Contractor建設(shè)單位Owner機械及附件接收AcceptanceofmachineandaccessoriesC基礎(chǔ)及預(yù)留孔復(fù)查Checkoffoundation&providedholesC主機及附件安裝Installationofhostmachine&accessoriesC內(nèi)部清潔度確認InteriorcleanlinessB機器拆卸、清冼Disassembling&cleaningofmachineB氣密性試驗Air-tightnesstestB充填制冷劑FillingrefrigerantA制冷劑系統(tǒng)檢漏LeakagecheckofrefrigerantsystemA風(fēng)管及部件制作安裝Fabrication&erectionofventduct&partsC風(fēng)管內(nèi)部清理CleaningofventductinteriorC冷卻水管道安裝InstallationofcoolingwaterpipelineC試運轉(zhuǎn)Test-runAR附注:Note.表H-215Tab.容器、換熱器安裝工序質(zhì)量控制表Qualitycontroltableforinstallingproceduresofconveyingmachine項目:Project裝置:Unit工號:Section位號LocationNo.名稱:Name規(guī)格Specification材質(zhì)Material工作介質(zhì)Medium壓力MPaPressure溫度Temperature執(zhí)行標(biāo)準Standardforexecution檢查項目Inspectionitem等級Grade簽名Signature施工單位Subcontractor承包單位Contractor建設(shè)單位Owner設(shè)備及附件接收檢查Acceptanceofequipment&accessoriesC基礎(chǔ)復(fù)位CheckoffoundationC找正AlignmentC灌漿前檢查InspectionbeforegroutingA內(nèi)件安裝InstallationofinternalsA嚴密性試驗Air-tightnesstestAR抽芯試壓CorewithdrawalandpressuretestAR附件安裝InstallationofaccessoriesC平臺、扶梯、護攔安裝Erectionofplatform,stair&guardrailC臥式設(shè)備滑動端檢查CheckofslidingendofhorizontalequipmentB附注:Note.表H-216Tab.分段塔組對工序質(zhì)量控制表Qualitycontroltableforassemblingsectionedcolumn項目:Project裝置:Unit工號:Section位號LocationNo.設(shè)備名稱:Nameofequipment規(guī)格Specification材質(zhì)Material設(shè)計壓力MPaDesignpressure設(shè)計溫度Designtemp.工作介質(zhì)Medium執(zhí)行標(biāo)準Standardforexecution檢查項目Inspectionitem等級Grade簽名Signature組對記錄Assemblingrecord施工單位Subcontractor承包單位Contractor建設(shè)單位Owner設(shè)備材料接收Acceptanceofequipment&materialC方位偏差Orientationdeviation焊接及焊工資格認定Weldingprocess&welder’squalificationB直線度偏差Straightnessdeviation組對檢查AssemblinginspectionCR長度偏差Lengthdeviation焊縫外觀VisualinspectionofweldB最大錯邊量Max.edgemismatch無損檢測Non-destructivetestingAR圓度偏差Roundnessdeviation焊縫熱處理Heat-treatmentofweldBR壓力試驗Pressuretest介質(zhì)MediumAR壓力(MPa):Pressure時間(Min)Duration附注:Note.表H-217Tab.塔類安裝工序質(zhì)量控制表Qualitycontroltableforcolumntypeequipment項目:Project裝置:Unit工號:Section位號LocationNo.名稱Name規(guī)格Specification材質(zhì)Material介質(zhì)Medium壓力Pressure溫度Temperature執(zhí)行標(biāo)準Standardforexecution檢查項目Inspectionitem等級Grade簽名Signature垂直偏差(mm)Vertical施工單位Subcontractor承包單位Contractor建設(shè)單位Owner設(shè)備及附件接收Acceptanceofequipment&accessoriesC0-180°:基礎(chǔ)復(fù)查CheckoffoundationC方位確認AffirmationoforientationC90-270°:找正AlignmentCR灌漿前檢查InspectionbeforegroutingA/AR塔盤安裝InstallationofcolumntrayAR附件安裝InstallationofaccessoriesC平臺、扶梯、護欄檢查Checkofplatform,stair&guardrailC裝填料PackingoffillersAR封閉前檢查InspectionbeforeenclosingA基礎(chǔ)沉降觀測ObservationoffoundationsettlementAR備注:Remarks.表H-218Tab.塔盤安裝記錄Recordforinstallingcolumntray項目:Project裝置:Unit工號:Section位號LocationNo.工作介質(zhì)Medium名稱Name設(shè)計壓力Designpressure規(guī)格Specification設(shè)計溫度Designtemp.材質(zhì)Material執(zhí)行標(biāo)準Standardforexecution塔盤編號TrayNo.塔盤支承圈水平度Levelnessoftraysupportingring(mm)隆液板至塔板間距Distancefromliquiddroppingboardtocolumntray(mm)塔盤水平度Levelnessofcolumntray(mm/m)溢流堰高偏差Spillwayheightdeviation(mm)溢流堰水平度Levelnessofspillway(mm/m)塔盤充水鼓泡試驗結(jié)果Resultofbubblingtestwithwaterfilling備注Remarks允許值A(chǔ)llo-wablevalue實測值Mea-suredvalue允許值A(chǔ)llo-wablevalue實測值Mea-suredvalue允許值A(chǔ)llo-wablevalue實測值Mea-suredvalue允許值A(chǔ)llo-wablevalue實測值Mea-suredvalue允許值A(chǔ)llo-wablevalue實測值Mea-suredvalue承包單位代表Contractorrepresentative施工單位Subcontractor施工人Operator建設(shè)單位代表Ownerrepresentative檢查員Inspector.表H-219Tab.設(shè)備填充記錄Packingrecordofequipment項目:Project裝置:Unit工號:Section位號LocationNo.名稱Name填充部位Packinglocation填充物Packing規(guī)格/型號Specification/model材質(zhì)Material數(shù)量Quantity填充方法Packingmethod備注:Remarks承包單位代表Contractorrepresentative施工單位Subcontractor施工人Operator建設(shè)單位代表Ownerrepresentative檢查員Inspector.表H-220Tab.火炬、排氣筒安裝工序質(zhì)量控制表Qualitycontroltableforerectionofflareandexhaustshaft項目:Project裝置:Unit工號:Section位號LocationNo.名稱Name規(guī)格Specification材質(zhì)Material設(shè)計溫度℃Designtemp.執(zhí)行標(biāo)準Standardforexecution檢查項目Inspectionitem等級Grade簽名/日期Signature/Date施工單位Subcontractor承包單位Contractor建設(shè)單位Owner材料接收AcceptanceofmaterialC焊接工藝及焊工資格認定WeldingprocessandweldersqualificationB*基礎(chǔ)復(fù)查CheckoffoundC鋼架幾何尺寸檢查InspectionofdimensionsofsteelframeCR焊接前檢查InspectionbeforeweldingC焊縫外觀檢查VisualinspectionofweldC焊縫無損檢測Non-destructivetestingofweldBR鋼架焊接檢查WeldsofsteelframeC火炬頭檢查InspectionofflareheadA安裝Erection吊裝前檢查InspectionbeforehoistingC標(biāo)高中心線方位確認Affirmationofelevation¢er-lineorientationC垂直度檢查InspectionofverticalityCR灌漿前檢查InspectionbeforegroutingA垂直偏差(mm)Verticaldeviation0°~180°90°~270°附注:Note.表H-221Tab.大型儲罐組裝工序質(zhì)量控制表Qualitycontroltableforassemblinglargestoragetank項目:Project裝置:Unit工號:Section位號LocationNo.名稱Name規(guī)格Specification材質(zhì)Material工作介質(zhì)Medium設(shè)計壓力MPaDesignpressure設(shè)計溫度℃Designtemp.執(zhí)行標(biāo)準Standardforexecution檢查項目Inspectionitem等級Grade簽名/日期Signature/date施工單位Subcontractor承包單位Contractor建設(shè)單位Owner材料接收AcceptanceofmaterialC焊接工藝及焊工資格認定Weldingprocessandwelder’squalificationB基礎(chǔ)復(fù)查CheckoffoundationC幾何尺寸檢查GeometricdimensionsCR開孔方位檢查Opening
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 回款協(xié)議合同范本
- 團體旅游合同合同范本
- 名企給排水、通風(fēng)工程交底指引(材料驗收+檢查要點)
- 土地代理合同范本
- 商業(yè)合伙合作合同范例
- 農(nóng)戶訂單合同范例
- 園藝綠植合同范本
- 個人與駕駛員合同范例
- 業(yè)主車輛出租合同范例
- 醫(yī)療器材購買合同范本
- MOOC 中國傳統(tǒng)藝術(shù)-篆刻、書法、水墨畫體驗與欣賞-哈爾濱工業(yè)大學(xué) 中國大學(xué)慕課答案
- 人教版pep小學(xué)四年級英語下冊全冊完整
- 閩教版2023版3-6年級全8冊英語單詞表
- 金屬的電化學(xué)腐蝕與防護 完整版課件
- 保密風(fēng)險評估報告
- DB63-T 2033-2022 青海省農(nóng)房建筑節(jié)能建設(shè)標(biāo)準
- 《橋梁工程計算書》word版
- 中華人民共和國特種設(shè)備安全法(節(jié)選)
- 籃球比賽計分表
- 施工現(xiàn)場安全隱患檢查(附標(biāo)準規(guī)范)
- 吞咽障礙及吞咽功能的評定
評論
0/150
提交評論