




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
專用
人人文庫
NATIONALSTANDARD
OFTHEPEOPLESREPUBLICOFCHINA
CodeforConstructionofBuilding
FoundationEngineering
GB51004-2015
ChiefDevelopmentDepartment:ShanghaiUrbanRuralDevelopmentand
-
TransportationCommission
ApprovingDepartment:MinistryofHousingandUrbanRuralDevelopment
-
ofthePeoplesRepublicofChina
ImplementationDate:November1,2015專用
人人文庫
ChinaPlanningPress
Beijing2018
ChineseeditionfirstpublishedinthePeoplesRepublicofChinain2015
EnglisheditionfirstpublishedinthePeoplesRepublicofChinain2018
byChinaPlanningPress
rd
,,專用
3FloorCTowerGuohongBuilding
No.A11,Muxidi-Beili,XichengDistrict
Beijing,100038
PrintedinChinabyBeijingJingyintangGraphicPrintingCenter
?2015byMinistryofHousingandUrban-RuralDevelopmentof
thePeoplesRepublicofChina
Allrightsreserved.Nopartofthispublicationmaybereproducedortransmittedinanyformor
byanymeans人人文庫,graphic,electronic,ormechanical,includingphotocopying,recording,
oranyinformationstorageandretrievalsystems,withoutwrittenpermissionofthepublisher.
Thisbookissoldsubjecttotheconditionthatitshallnot,bywayoftradeorotherwise,belent,
resold,hiredoutorotherwisecirculatedwithoutthepublisherspriorconsentinanyformof
blindingorcoverotherthanthatinwhichthisispublishedandwithoutasimilarcondition
includingthisconditionbeingimposedonthesubsequentpurchaser.
ISBN978-7-5182-0997-2
AnnouncementoftheMinistryofHousingandUrban-Rural
DevelopmentofthePeoplesRepublicofChina
No.782
NoticeonPublishingtheNationalStandard
ConstructionofBuildingFoundationEngineering
Codefor
CodeforConstructionofBuildingFoundationEngineeringhasbeenapprovedasanationalstan-
dardwithaserialnumberofGB51004-2015andshallbeimplementedfromNovember1,2015.Arti-
cles5.5.8,5.11.4,6.1.3and6.9.8aremandatoryandmustbeenforcedstrictly.
AuthorizedbytheStandardRatingResearchInstituteoftheMinistryofHousingandUrbanRural
-
DevelopmentofthePeoplesRepublicofChina,thisstandardispublished專用byChinaPlanningPress.
inistryofHousingandUrbanRuralDevelopmentofthePeoplesRepublicofChina
M-
March8,2015
人人文庫
Foreword
AsrequiredbytheMinistryofHousingandUrbanRuralDevelopmentintheNoticeonPrinting
-
"DevelopmentandRevisionPlanforNationalEngineeringConstructionStandardsandCodesin2009"
(JianBiao〔2009〕No.88),thiscodeispreparedbythecodedraftinggroupviaconductingextensive
investigationandcarefullysummarizingpracticalexperienceswithreferencetorelevantinternational
standardsandforeignadvancedstandardsaswellasonthebasisofwidelysolicitingforopinions.
Thiscodeconsistsof10chaptersandthemaintechnicalcontentscovergeneralprovisions,terms,
basicrequirements,groundconstruction,foundationconstruction,shoringconstructionoffoundation
excavation,groundwatercontrol,constructionofearthwork,slopeconstructionaswellassafeandgreen
construction.
Inthiscode,theprovision(s)printedinboldtypeis(are)mandatoryone(s),andmustbeenforced
strictly.
MinistryofHousingandUrbanRuralDevelopmentisinchargeoftheadministrationofthiscode
-
andtheexplanationofthemandatoryprovisions;ShanghaiConstructionGroupCo.,Ltd.isinchargeof
theexplanationofspecifictechnicalcontents.Duringtheprocessof專用implementingthiscode,any
commentsorsuggestions,whenevernecessary,canbepassedorpostedtoShanghaiConstructionGroup
Co.,Ltd.(Address:No.666,EastBroadwayRoad,Shanghai;Postcode:200080)forreferenceinfuture
revisions.
:
ChiefDevelopmentOrganizations
ShanghaiConstructionGroupCo.,Ltd.
ShanghaiFoundationEngineeringGroupCo.,Ltd.
:
ParticipatingDevelopmentOrganizations
ChinaAcademyofBuildingResearch
ShanghaiConstructionNo.1(Group)Co.,Ltd.
ShanghaiConstructionNo.4(Group)Co.,Ltd.
ShanghaiMechanizedConstructionGroupCo.,Ltd.
GuangdongFoundationEngineeringGroupCo.,Ltd.
ShanghaiXianDaiArchitecturalDesign(Group)Co.,Ltd.
人人文庫ShanghaiGeotechnicalInvestigationsandDesignInstituteCo.,Ltd.
TongjiUniversity
YunnanConstructionEngineeringGroupCorporation
ShaanxiConstructionEngineeringGroupCorporation
LiaoningConstructionEngineeringGroupCo.,Ltd.
XinjiangBeixinRoadandBridgeConstructionCo.,Ltd.
XinjiangBingTuanConstructionEngineering(Group)Co.,Ltd.
ChiefDrafters:
FanQingguoLiYaoliangYuanFenGeZhaoyuanGaoWensheng
ZhongXianqiZhuYiminQiuXihongZhuJunGaoChengyong
·1·
GuGuorongYeGuanbaoZhuJianmingWangWeidongLiuHongming
GanYonghuiXuAnjunXueYongwuLiuJiawengZhuJianguo
WangLixiangJiangXialingLiangZhirongXuFengLiuShannan
LiangFayunLiCunliangShaoMengxinTengXinLuoXin
GuYangHuangQiuliangZhangGangChengHuiPingYuzhu
WangZhiminChenHengWangJianjiangZhangZhijianFanJiming
HuaYanChenGangXiongBaohengXingLiChenRongkai
HanZhengping
ChiefExaminers:
YeKemingZhangYanZhongDongboZhengXiangbinGuQianyan
WuHouxinXuGuominRenShuhuaGeWenzhi
專用
人人文庫
·2·
Contents
1GeneralProvisions………………(1)
2Terms……………(2)
3BasicRequirements………………(5)
4GroundConstruction……………(6)
4.1GeneralRequirements……………(6)
4.2CohesiveFillandLimesoilFill……………………(6)
-
4.3SandandGravelFills……………(7)
4.4FlyashFill………………………(7)
4.5DynamicConsolidation……………(8)
4.6Grouting………………………(10)
4.7Preloading………………………(11)
4.8Vibroflotation……………………(13)
4.9HighPressureJetGrouting………………………(14)
4.10SoilcementMixedPile…………專用(14)
-
4.11SoillimeCompactedColumns……………………(16)
-
4.12CementFlyashGravelPiles………………………(16)
4.13TampingSoilcementPiles………………………(18)
-
4.14StoneColumns…………………(18)
4.15FoundationonCollapsibleLoess…………………(20)
4.16FoundationonFrozenSoil………………………(22)
4.17FoundationonExpansiveSoil……………………(22)
5FoundationConstruction…………(23)
5.1GeneralRequirements……………(23)
5.2NonreinforcedSpreadFoundation…………………(23)
-
5.3ReinforcedConcreteSpreadFoundation……………(24)
5.4RaftandBoxFoundation…………(25)
5.5PrecastReinforcedConcretePile…………………(26)
5.6CastinsituSlurrydrilledPile……………………(30)
--人人文庫-
5.7ContinuousFlightAugerCastinsituPileswithPressureConcreting……(36)
--
5.8TubesinkingCastinsituPile……………………(37)
---
5.9CastinsituPilewithDryMethod…………………(38)
--
5.10SteelPile………………………(39)
5.11JackedPilebyAnchorReaction……………………(42)
5.12FoundationonRockanchorSystem………………(44)
-
5.13SunkWellandCaisson…………(45)
6ShoringConstructionforFoundationExcavation………………(47)
6.1GeneralRequirements……………(47)
·1·
6.2ContiguousCastinsituPileWall…………………(47)
--
6.3SheetPileWall…………………(48)
6.4SecantPileWall…………………(50)
6.5SoilcementMixingWallwithSteelInclusions………(51)
-
6.6DiaphragmWall…………………(52)
6.7GravityCementsoilWall…………(58)
-
6.8SoilNailingWall…………………(59)
6.9Strut……………(62)
6.10Rod(Strand)Anchors…………(63)
6.11FoundationPitSupportCombinedwithMainStructure………………(64)
7GroundwaterControl……………(67)
7.1GeneralRequirements……………(67)
7.2DrainageGalleries………………(68)
7.3Dewatering………………………(68)
7.4Cutoffs………………………(73)
-
7.5Recharge………………………(73)
8ConstructionofEarthwork………………………(74)
8.1GeneralRequirements……………(74)
8.2ExcavationofEarthwork…………專用(74)
8.3RockFoundationExcavation………………………(77)
8.4StackingandTransportationofEarthwork…………(77)
8.5Backfilling………………………(78)
9SlopeConstruction………………(80)
9.1GeneralRequirements……………(80)
9.2BoltshotcreteSupport……………(80)
-
9.3RetainingWall…………………(80)
9.4SlopeExcavation………………(82)
10SafeandGreenConstruction…………………(85)
ExplanationofWordinginThisCode………………(87)
ListofQuotedStandards……………(88)
人人文庫
·2·
1GeneralProvisions
Thiscodeispreparedwithaviewtosafetyapplicability,advancedtechnology,reasonable
1.0.1
economy,qualityassuranceandenvironmentalprotectionduringconstructionofbuildingfoundation
engineering.
Thiscodeisapplicabletoconstructionofbuildingfoundations.
1.0.2
Theconstructionofbuildingfoundationsshallensuresafetyandqualityandshalladjust
1.0.3
measurestolocalconditionsandsaveresources.
Theconstructionofbuildingfoundationsshallcomplywithnotonlythiscodebutalsothe
1.0.4
requirementsofrelevantcurrentnationalstandards.
專用
人人文庫
·1·
2Terms
Subsoil
2.0.1
Soilmassorrockmassthatsupportsthefoundation.
Foundation
2.0.2
Astructuralcomponentthattransfersexternalloadbornebyupperstructureanddeadweightof
upperstructuretosubsoil.
Compositefoundation
2.0.3
Subsoilwiththeloadsbornebyreinforcement(whichisformedbyreinforcingorreplacingpartial
soilmass)andsubsoilaroundtogether.
Pilefoundation
2.0.4
Foundationcomposedofpilethatisimbeddedintosubsoilandpilecapthatisconnectedwithpile
toptogether.
Dynamicconsolidation
2.0.5
Thesubsoiltreatmentmethodtotampsubsoilbyrepeatedlyliftingthehammertohighplaceand
makingitfallfreely,whichimpactsthesubsoilandgivesitvibrationenergy專用.
Dynamicreplacement
2.0.6
Thesubsoiltreatmentmethodtoformdensepierbyrepeatedlyliftingthehammertohighplace
andmakingitfallfreelytoformtampingpitonthegroundandthenrepeatedlytampingsandgravels,
-
steelslagsandothergranulesfilledinthetampingpitalternately.
Grouting
2.0.7
Thetreatmentmethodtocementloosesoilparticlesorcracksintoanintegralwholebyinjecting
solidifiablegroutintothevoidsofsoils/rockswiththehelpofthehydraulic,pneumaticorelectrochemical
principle.
Preloading
2.0.8
Thesubsoiltreatmentmethodtoacceleratesubsoilconsolidationbyfillpreloadingorvacuum
preloadingtothesubsoils.
Vibrofloatation
2.0.9
Thesubsoiltreatmentmethodtoformcompositefoundationcomposedofinsitusubsoilsandsand
-
orgravelcolumns,whichareformedbydensifyingeithertheinsitugranularsoilsorbackfilledgravels
人人文庫-
insoftsoilsundercombinedactionofhorizontalvibrationofvibroflotandhighwaterpressure.
Postbasegroutingboredpiles
2.0.10--
Boredpilesthatgroutisinjectedunderhighpressurethroughgroutingpipeinpileshaftandpiletip
groutingsystemoncetheconcretehasgainedsufficientstrength.
Excavationengineering
2.0.11
Agenerictermforsuchengineeringsasenclosure,shoring,dewatering,waterproofandseepage
--
proofengineering,reinforcement,earthworkexcavationandbackfillingforbuildingunderground
structure.
Retainingandbracingsystemforfoundationexcavation
2.0.12
·2·
Structuralsystemcomposedofretainingwall,wales,bracings(anchors),supportcolumns
(columnpiles)andothercomponents.
Secantpiles
2.0.13
Rowpilewallformedbymutuallappingandcuttingofearlierconstructedboredpilesandlater
-
constructedboredpiles.
Soilcementmixingwallwithsteelinclusions
2.0.14-
Compositesoilretainingandwaterinterceptingstructureformedbyinsertingsteelintooverlapped
threeaxissoilcementmixingpiles.
--
Diaphragmwall
2.0.15
Undergroundwallformedbyputtingreinforcementcageandpouringconcreteorputtingprecast
reinforcedconcreteslabintoequipmentexcavatedtrench.
-
Cutterjoint
2.0.16
Jointofdiaphragmwallsformedbycuttingconcreteinprevioustrenchwithslotmillingmachine.
Jointpipe(box)
2.0.17
Temporarysteelpipe(box)adoptedtoformjointofdiaphragmwallbetweenunitpanels.
Soilcementgravityretainingwall
2.0.18-
Gravityshoringstructureformedthroughaseriesofoverlappedsoilcementmixingpiles.
-
Soilnailedwall
2.0.19-
Shoringstructurecomposedofsoilnailreinforcedsoilmassandprotective專用facing.
-
Topdownmethod
2.0.20-
Constructionmethodthatmakesconstructionofundergroundstructurefromtoptobottomand
foundationpitexcavationalternatelywithapartorallofmainundergroundstructureasshoring
structure.
Opencaisson
2.0.21
Undergroundstructureformedbymanufacturingcaissonunitonthegroundandsinkingitto
undergroundpredetermineddepththroughsoilremovalwithincaisson.
Pneumaticcaisson
2.0.22
Undergroundstructureformedbymanufacturingcaissonunitwithhorizontalsealingplateonthe
groundtoformpneumaticpressureworkroomundersealingplate,carryingoutexcavationthrough
addingairintoworkroomtobalancewaterandsoilpressure,andthensinkingittounderground
predetermineddepth.
Groundwatercontrol
2.0.23
Measuressuchaswaterdrainage,dewatering,watercutoffandrechargingadoptedinexcavation
人人文庫-
engineeringinordertoguaranteesmoothimplementationofexcavationandtoreducetheinfluenceof
constructiononsurroundingenvironment.
Watercutoffwall
2.0.24-
Verticalwatercutoffwallusedtocutoffordecreasegroundwaterfromflowingintoexcavation
-
throughsidewallandbottomoffoundationpitandtocontrolgroundwaterloweringoutsidefoundation
pit.
Nonreinforcedspreadfoundation
2.0.25-
Stripfoundationunderwallorisolatedfoundationundercolumncomposedofbrick,rubble,
concreteorrubbleconcrete,limesoil,trinitysoil(tabia)andothermaterialswithnoreinforcement.
·3·
Reinforcedconcretespreadfoundation
2.0.26
Castinplacereinforcedconcretefoundationsincludingisolatedfoundationundercolumnandstrip
--
foundationunderwall.
Raftandboxfoundation
2.0.27
Raftfoundationreferstoreinforcedconcretefoundationwithcontinuousflatslaborbeamslab.
--
Boxfoundationreferstomonolithicallycastedsinglefloorormultifloorsreinforcedconcretefoundation
--
composedofbottomslab,topslabandinternalandexternalverticalwalls.
Bermedexcavation
2.0.28
Anexcavationmethodtoleavesoilaroundinpit,excavatesoilinmiddlepartoffoundationpitfirst
toformpotshapedsoilmassandformundergroundstructureandsupportinmiddlepartoffoundation
-
pitandthenexcavatesoilaroundfoundationpitout.
Islandexcavation
2.0.29
Anexcavationmethodwithshoringstructuretoexcavatesoilaroundfoundationpitfirsttoform
islandshapedsoilmassandthenexcavatesoilinmiddlepartoffoundationpit.
-
Anchors
2.0.30
Atensionmemberformedbydrillingholeinsoils(rocks),insertingreinforcementbarorsteel
strands,groutingcementmortarwithinanchoragesectioninstablesoils(rocks)andconnectinganother
endwithstructuralelements.
Compositesoilnailingwall專用
2.0.31
Shoringstructurecomposedofsoilmixingcolumns(piles),soilnailsandshotcretefacing.
人人文庫
·4·
3BasicRequirements
Thequalityinspectionrequirementsformaterialsandproductsusedintheconstructionof
3.0.1
buildingsubsoils,foundations,foundationpitsandslopeengineeringsshallcomplywithcurrentnational
standardsandthedesignrequirements.
Beforeconstructionofbuildingsubsoils,foundations,foundationpitsandslopeengineerings,the
3.0.2
followingdatashallbeprovided:
Geotechnicalinvestigationreport;
1
Designdocumentsrequiredforconstructionofbuildingsubsoils,foundations,foundationpits
2
andslopeengineerings;
Dataaboutbuildings(structures),undergroundpipelinesandobstacleswithintheinfluence
3
scopeofproposedengineeringconstruction;
Constructionorganizationdesignandspecialconstructionandmonitoringschemes.
4
Theaxiscontrolpointsandelevationbenchmarksforconstructionofbuildingsubsoils,
3.0.3
foundations,foundationpitsandslopeengineeringsshallbeprotectedproperlyafterrecheckingand
shallberesurveyedregularlythereafter.專用
-
Beforeconstructionoffoundationpitengineering,thepreparationworkshallbedonewelland
3.0.4
suchconditionsassitehydrogeologicalconditions,adjacentundergroundpipelines,nearbybuildings
(structures)andundergroundobstructionsshallbeinvestigated.Correspondingmeasuresshallbetaken
toprotectadjacentundergroundpipelines,facilitiesandbuildings(structures).
Duringconstructionofbuildingsubsoils,foundations,foundationpitsandslopeengineerings,the
3.0.5
influenceofgroundwater,surfacewaterandspringtideshallbecontrolled.
Antifreezinganddrainagemeasuresshallbetakenforconstructionofbuildingfoundation
3.0.6-
engineeringinwinterorrainyseason.
Itisstrictlyforbiddentostacksoilswithintheinfluencerangeoffoundationpits(trenches)and
3.0.7
buildings(structures).
Excavationoffoundationpit(trench)shallmeetthefollowingrequirements:
3.0.8
Theconstructionloadforfoundationpit(trench)aroundperipheryandatslopingplatformshall
1
becontrolledinaccordancewiththedesignrequirements;
Duringexcavationoffoundationpit(trench),thestagedexcavationdepthsandtemporaryside
2人人文庫
slopeshallbedeterminedthroughanalysisaccordingtosoilconditions;
Excavationconstructionconditionsoffoundationpit(trench)shallmeetthedesignrequirements.
3
Wheredangersoccurduringconstruction,theemergencymeasuresshallbeimmediatelytaken
3.0.9
tocontrolthedangercase.
Whereculturalrelicsandhistoricsitesareencounteredduringconstruction,theconstruction
3.0.10
shallbestoppedimmediatelyandsuchcaseshallbereportedtotherelatedauthorities.
Duringconstructionofbuildingsubsoils,foundations,foundationpitsandslopeengineerings,
3.0.11
theconstructionrecordsshallbemadewell.
·5·
4GroundConstruction
4.1GeneralRequirements
Theplanpositionsandelevationsoffoundationshallbesurveyedandrecheckedbefore
4.1.1
construction.
Thepondedwatershallbetimelydrainedduringgroundconstructionandtheconstructionshall
4.1.2
notbeundersubmergingconditions.
Wherethefoundationbaseelevationsaredifferent,theconstructionshouldproceedintheorder
4.1.3
offromdeeptoshallow.
Protectivemeasuresshallbetakentoreducedisturbanceofthesoilsbelowfoundationbase
4.1.4
duringconstruction;the200mm-300mmthicksoillayerabovefoundationbaseshallbeexcavated
manually.
Theinfluenceofexcavation,filling,vibrationandsoildisplacementonslopestabilityand
4.1.5
surroundingenvironmentshallbeanalyzedduringgroundconstruction.
Duringinspectionoffoundationsubsoils,ifgeologicalconditionsarefoundinconsistentwith
4.1.6
thoseintheinvestigationreport,anadditionalinvestigationshallbeconducted專用.
Uponcompletionofgroundconstruction,thefoundationsubgradeshallbeprotectedandthe
4.1.7
foundationconstructionshallproceedshortly.
4.2CohesiveFillandLime-soilFill
Thesoilmaterialsofcohesivefillandlimesoilfillshallmeetthefollowingrequirements:
4.2.1-
Forcohesivefill,clayorsiltyclaycanbeused,ofwhichtheorganiccontentshallnotbegreater
1
than5%andwhichshallbesieved;frozensoilorexpansivesoilshallnotbeincluded;topsoil,mudand
muddysoilandunengineeredfillshallbestrictlyforbidden.
Forlimesoilfill,clayorsiltyclaycanbeused,ofwhichtheorganiccontentshallnotbegreater
2-
than5%andwhichshallbesievedwiththeparticlesizenotgreaterthan15mm;freshlyslakedlime,
withtheparticlesizenotgreaterthan5mmandnotincludingunslakedlimeparticles,shouldbeused;the
mixproportionoflimesoilbyvolumeshouldbe2∶8or3∶7,andthelimesoilshallbemixeduniformly.
Forcohesivefillandlimesoilfill,thewatercontentduringconstructionshouldbecontrolled
4.2.2-
withintherangeof人人文庫±2%optimumwatercontent,whichcanbedeterminedeitherthroughcompaction
testoracc
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 二零二五年度供暖供氣設(shè)施施工安全協(xié)議
- 二零二五年度鋼材現(xiàn)貨交易居間服務(wù)協(xié)議
- 2025年度電子商務(wù)合伙拆伙協(xié)議終止協(xié)議
- 2025年度離職解除勞動合同模板:傳媒廣告行業(yè)員工離職流程
- 會計(jì)財(cái)務(wù)審計(jì)作業(yè)指導(dǎo)書
- 公司股權(quán)購買協(xié)議詳細(xì)版
- 金融服務(wù)個(gè)人風(fēng)險(xiǎn)免責(zé)聲明
- 《數(shù)學(xué)思維訓(xùn)練課程:數(shù)形結(jié)合學(xué)習(xí)指導(dǎo)》
- 肉類銷售代理合同
- 關(guān)于項(xiàng)目進(jìn)度管理的解決方案
- 主持課課件教學(xué)課件
- 第四節(jié)-全電路歐姆定律
- 中學(xué)生的儀容儀表規(guī)范主題班會課件
- GB/T 44672-2024體外診斷醫(yī)療器械建立校準(zhǔn)品和人體樣品賦值計(jì)量溯源性的國際一致化方案的要求
- Unit 2 Bridging Cultures Reading for writing 課件-高中英語(2019)選擇性必修第二冊
- 2024年全國統(tǒng)一高考數(shù)學(xué)試卷(新高考Ⅰ)含答案
- 2024年河南省高考對口升學(xué)語文試卷及參考答案
- 司索工安全技術(shù)交底
- 解析:2023年廣西壯族自治區(qū)中考數(shù)學(xué)真題(原卷版)
- 爬模施工應(yīng)急處置措施
- 2024年越南高純碳化硅粉末行業(yè)現(xiàn)狀及前景分析2024-2030
評論
0/150
提交評論