




版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1.ProjectSummary22.Plasticmaterialinformation--33.
Analysispurpose&Processcondition44.Partinformation,Runnerandcoolingsystemdesign6~85.Analysisresult9~276.Conclusion&suggestion28MoldFlowReport2006-06-26MoldFlowReportcase1case2MoldNO:B10274Preparedby:Bill.BinCavitynumber:1*2Analysispurpose:
improvewarpage。AnalysisProject:Cool+Fill+Pack+WarpCase1isthe3Ddesign.Case2isrevisemolddesignandmodifiedtheprocesscondition.2006-06-26MaterialPropertyViscosityvsShearrateP-V-TABS
PolylacPA-737Manufacturer:ChiMeiCorporation1.MeltDensity:0.96055g/cu.cm8.MeltTemperatureMaximum240deg.C2.SolidDensity:
1.0494g/cu.cm9.MoldTemperatureMinimum40deg.C3.EjectionTemperature
90deg.C10.MoldTemperatureMaximum80deg.C4.RecommendedMold60deg.C11.MaximumShearRate500001/s5.RecommendedMeltTemperature220deg.C12.MaximumShearStress0.5Mpa6.Fillerunfilled13.Thermalconductivity0.19(k)w/m.c7.MeltTemperatureMinimum200deg.C14.MeasuredMFR3g/10min(5kg/200.C))2006-06-26ProcesssettingAnalysispurpose:improvewarpageAnalysisProject:Cooling+flow+WarpageProcesssettingcase1MoldTemperature:60/65℃MeltTemperature:220℃
FillTime:automaticCoolingtime:60SV/Pswitch-over:99%offilledvolumepack80%V/P10Scase280%X0.3+0X1.5+6X60%+12X100%S2006-06-26PartinfomatiomThicknessdistribution2006-06-26CoolingsystemdesignAllcaseisbase2dmolddesign.2006-06-26RunnersystemdesignCase1isbase2dmolddesign
,?12mm?10mm?8mm?2.8~8mm?10~2.8mmcase12006-06-26Runnersystemdesigncase2Samecase1Samecase1Samecase1case2isreviserrunnersystem(movegate)Movegate2006-06-26FillTimeThefilltimeresultshowsthepositionoftheflowfrontatregular,asthecavityfills.EachcolorcontourrepresentthepartsofthemoldWhichwerebeingfilledatsametime..Thefilltimeisabout5.6secondinthemodel.Noracetrackeffectoccur.Airtrapappearonthelastfilledarea.Dosetenoughventoverthere.case2case12006-06-26FillTimeThefilltimeresultshowsthepositionoftheflowfrontatregular,asthecavityfills.EachcolorcontourrepresentthepartsofthemoldWhichwerebeingfilledatsametime..Thefilltimeisabout5.6secondinthemodel.Noracetrackeffectoccur.Airtrapappearonthelastfilledarea.Dosetenoughventoverthere.case2case12006-06-26PressureatV/PswitchoverTheresultshowsthepressuredistributionthroughtheflowpathinsidethemoldattheSwitchoverpointfromvelocitytopressurecontrol.case1case22006-06-26AirTrapTheairtrapsareshowinpinknodecase1case22006-06-26AirTrapTheairtrapsareshowinpinknodecase1case22006-06-26WeldlineNoticethepositionsoftheweldlines,whichmayaffectthequalingofthepartappearancebutwhichmaybeaffectthepartstructuralfunctions..case1case22006-06-26波前溫度Themelttemperatureis220℃,thisthemperatureatflowfrontisallow.case1case22006-06-26Pressureatinjectionlocation:XYPlotTheresultshowsthepressureandclampforceatvarioustimesduringthefillingandpackingphasesoftheanalysis.case1case22006-06-26Clampforce:XYPlotTheresultshowsthepressureandclampforceatvarioustimesduringthefillingandpackingphasesoftheanalysis.case1case22006-06-26circuitcoolanttemperatureThecoolinganalysisscreenoutputcontainsthechangeincoolanttemperaturefromcoolant-intocoolant-outIftheincreaseisunacceptable(greaterthan2-3deg.c)case1case22006-06-26TimetofreezeTheresultshowsthethicknessofthefrozen.Ahighervaluerepresentsathickerfrozenlayer,whilelowvaluemeansathinnerpolymermelt(flow)layerCooingchannelneedtonearsprue,forreducecycletime.case2case12006-06-26TemperaturemoldThetemperaturemoldresultshowstheaveragetemperatureoftheplasticmoldinterfaceatthetopside,ofthemoldelementduringthecycletime.Theresultdisplaysinthemoldsurfacehasasmallrange..case2case12006-06-26VolumetricShrinkageatEjectionTheVolumetricshrinkageatejectionresultcanbeusedtodetectsinkmarksonthemodel.Volumetricshrinkageshouldbeuniformacrossthewholeparttoreducewarpage.Highshrinkagevaluescouldindicatesinkmarksorvoidsinsidet
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年兩人股份協(xié)議書(shū)模板
- 2025年技術(shù)轉(zhuǎn)讓合同模板版
- 六年級(jí)下冊(cè)數(shù)學(xué)教案- 3.2 正比例 正比例的意義|西師大版
- 五年級(jí)上冊(cè)數(shù)學(xué)教案-4.小數(shù)的大小比較 蘇教版
- 《野望》歷年中考古詩(shī)欣賞試題匯編(截至2022年)
- 2025年湖南省邵陽(yáng)市單招職業(yè)適應(yīng)性測(cè)試題庫(kù)審定版
- 2024年水輪機(jī)及輔機(jī)項(xiàng)目資金需求報(bào)告
- 2025年嘉興職業(yè)技術(shù)學(xué)院?jiǎn)握新殬I(yè)適應(yīng)性測(cè)試題庫(kù)新版
- 2025年河南省新鄉(xiāng)市單招職業(yè)傾向性測(cè)試題庫(kù)及答案1套
- 微專題21 圓錐曲線經(jīng)典難題之一類探索性問(wèn)題的通性通法研究 -2025年新高考數(shù)學(xué)二輪復(fù)習(xí)微專題提分突破140分方案
- 中國(guó)特色社會(huì)主義思想概論 課件 第四章 堅(jiān)持以人民為中心
- 湘少版3-6年級(jí)詞匯表帶音標(biāo)
- 采購(gòu)部組織結(jié)構(gòu)圖
- 土力學(xué)與地基基礎(chǔ)(課件)
- 股票入門(mén)-k線圖基礎(chǔ)知識(shí)
- 全國(guó)大全身份證前六位、區(qū)號(hào)、郵編-編碼
- 種植林業(yè)可行性研究報(bào)告
- 金和物業(yè)公司簡(jiǎn)介
- 廣東省五年一貫制考試英語(yǔ)真題
- 2023年中央廣播電視總臺(tái)校園招聘筆試參考題庫(kù)附帶答案詳解
- 項(xiàng)目部崗位廉潔風(fēng)險(xiǎn)情景教育案例
評(píng)論
0/150
提交評(píng)論