XXX水電站增效擴(kuò)容改造工程概算_第1頁(yè)
XXX水電站增效擴(kuò)容改造工程概算_第2頁(yè)
已閱讀5頁(yè),還剩56頁(yè)未讀 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說(shuō)明:本文檔由用戶(hù)提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

A243004369XXXXXX增效擴(kuò)容改造工程概算(送審稿)XXX市水利水電勘測(cè)設(shè)計(jì)院二○一二年六月審 定:審 查:校 核:編

XXX市XXX水力發(fā)電站增效擴(kuò)容改造工程PAGE21XXXPAGE21XXX市水利水電勘測(cè)設(shè)計(jì)院目 錄1. 一、概算正件 52.··································································································································1、編制說(shuō)明 53.··································································································································1.1 工程概況 54.··································································································································1。2 主要工程指標(biāo) 55.··································································································································1.3 編制原則和依據(jù) 66.··································································································································1.3。1定額依據(jù) 67.··································································································································1。3。2編制方式及費(fèi)用標(biāo)準(zhǔn) 68.··································································································································1。4其他說(shuō)明 69.··································································································································1.4。1基礎(chǔ)單價(jià) 610.·································································································································1。4.2取費(fèi) 811.·································································································································1。5其他費(fèi)用 1012.·································································································································1.5.1設(shè)備及安裝工程 1013.·································································································································1.5。2獨(dú)立費(fèi)用 1014.·································································································································1。5.3預(yù)備費(fèi)及其他 1115.·································································································································1。6資金籌措方案 1116.·································································································································1。7主要工程指標(biāo)表 1117.·································································································································1。8工程概算總表 1218.·································································································································2。工程部分概算表 1419.·································································································································2。1概算表 1420.·································································································································(總概算表 1421.·································································································································(建筑工程概算表 1522.·································································································································(機(jī)電設(shè)備及安裝工程概算表 1623.·································································································································(金屬結(jié)構(gòu)設(shè)備及安裝工程概算表 1724.·································································································································(施工臨時(shí)工程概算表 1725.·································································································································(獨(dú)立費(fèi)用概算表 1826.·································································································································2.2概算附表 1927.·································································································································(建筑工程單價(jià)匯總表(附表一) 1928.·································································································································(安裝工程單價(jià)匯總表(附表二) 2129.·································································································································(主要材料預(yù)算價(jià)格匯總表(附表三) 2030.·································································································································(次要材料價(jià)格匯總表(附表四) 2131.·································································································································(施工機(jī)械臺(tái)時(shí)費(fèi)匯總表(附表五) 2332.·································································································································(主要工程量匯總表 2533.·································································································································(主要材料量匯總表 2634 二、概算附件 2735.·································································································································1、主要材料預(yù)算價(jià)格計(jì)算表 2736.·································································································································2、施工用電價(jià)格計(jì)算表 2837.·································································································································3、施工用水價(jià)格計(jì)算表 2838.·································································································································4、施工用風(fēng)價(jià)格計(jì)算表 2839.·································································································································5、混凝土和砂漿材料單價(jià)計(jì)算表(附件六) 2940.·································································································································6、施工機(jī)械臺(tái)時(shí)費(fèi)計(jì)算表 3041.·································································································································7、建筑工程單價(jià)表 3442.·································································································································8、安裝工程單價(jià)表 44一、概算正件1、編制說(shuō)明1。1 工程概況XXXXXXXXXXXX301986102×500kw+1×630KW.電保護(hù)失效,機(jī)組運(yùn)行效率低,出力下降過(guò)半,并危及發(fā)電安全。必需改造。XXX電站的增效、改造工程,主要任務(wù)是:更換33套自動(dòng)化控制設(shè)備,使原來(lái)的手動(dòng)操作改為自動(dòng)化操控,電站實(shí)現(xiàn)自動(dòng)化,做S水工建筑物和機(jī)房進(jìn)行改造。1.2 主要工程指標(biāo)本工程總投資:467.58靜態(tài)總投資:457。38其中:機(jī)電設(shè)備及安裝:257。98建筑工程:81.48

節(jié)能型.及對(duì)部分11金屬結(jié)構(gòu)及安裝:4.99境保護(hù)費(fèi):10.0時(shí)工程:12.5651。3 編制原則和依據(jù)1。3.1定額依據(jù)(1).水利部水總[2002]116。水利部水建管1999]523([2002]1161.3.2編制方式及費(fèi)用標(biāo)準(zhǔn)依據(jù)湖南省水利廳湘水建管[2008]16設(shè)計(jì)概(估)其他說(shuō)明基礎(chǔ)單價(jià)。人工工時(shí)預(yù)算單價(jià)工長(zhǎng) 高級(jí)工 中級(jí)工 7.22元/小時(shí)初級(jí)工 。施工用風(fēng)、水、電概算價(jià)施工用水:3.90/m3。砂石料概算價(jià)格45.60/m344.50/m3的市價(jià)進(jìn)入單價(jià),二次轉(zhuǎn)運(yùn)XXX2012格表提供的概算價(jià):粗砂:45.60/m3塊石:44.50/m3(4).主要材料概算價(jià)格水泥32。5杉原木板枋木炸藥4#TTm3m3水泥32。5杉原木板枋木炸藥4#TTm3m3T359。004,856.27992.101,507.40汽油T10.99柴油T9。19粗砂m3105.00碎石m345.60塊石m344。50電KWH0。855水m33.90風(fēng)m30.17(5).次要材料概算價(jià)格次要材料概XXX2012確定。(6).設(shè)備價(jià)格。2取費(fèi)(1)。其他直接費(fèi)3。0%,安裝工4。1%。(2)現(xiàn)場(chǎng)經(jīng)費(fèi)建筑工程以直接費(fèi)為計(jì)算基礎(chǔ),安裝工程以人工費(fèi)為計(jì)算基礎(chǔ),費(fèi)率見(jiàn)表1。4。2—1。表1.4。2-1 現(xiàn)場(chǎng)經(jīng)費(fèi)費(fèi)率表序號(hào)序號(hào)工程類(lèi)別計(jì)算基礎(chǔ)現(xiàn)場(chǎng)經(jīng)費(fèi)(%)(樞紐工程)1土方工程直接費(fèi)8。02石方工程直接費(fèi)8.03砌石工程直接費(fèi)7.04砼工程直接費(fèi)7.05模板工程直接費(fèi)7.06鋼筋制作安裝工程直接費(fèi)4.07其他工程直接費(fèi)6。58機(jī)電、金屬結(jié)構(gòu)、設(shè)備安裝工程人工費(fèi)40(3).間接費(fèi)建筑工程以直接工程費(fèi)為計(jì)算基礎(chǔ),安裝工程以人工費(fèi)為計(jì)算基礎(chǔ),費(fèi)1。4。1—2。序號(hào)工程類(lèi)別計(jì)算基礎(chǔ)現(xiàn)場(chǎng)經(jīng)費(fèi)(%)序號(hào)工程類(lèi)別計(jì)算基礎(chǔ)現(xiàn)場(chǎng)經(jīng)費(fèi)(%)(樞紐工程)1土方工程直接工程費(fèi)8。02石方工程直接工程費(fèi)8。03砌石工程直接工程費(fèi)7。04砼澆筑工程直接工程費(fèi)5。05模板工程直接工程費(fèi)5。56鋼筋制作安裝工程直接費(fèi)3。577其他工程直接工程費(fèi)6.58機(jī)電、金屬結(jié)構(gòu)、設(shè)備安工程人工費(fèi)457%計(jì)算.(5)3.22%計(jì)算。其他費(fèi)用1。5。1設(shè)備及安裝工程5%計(jì)算。1.5。2獨(dú)立費(fèi)用2.1—1。2%80%計(jì)算.??蒲锌睖y(cè)設(shè)計(jì)費(fèi)。6.5%計(jì)算。(3)1。0%計(jì)算.(4).其他。1。5。3預(yù)備費(fèi)及其他56.8%計(jì)算。資金籌措方案457.381000/千瓦申請(qǐng)國(guó)家補(bǔ)163250/40。75150103。6310。2467.58萬(wàn)元。主要工程指標(biāo)表表1.6—1 XXX電站綜合指標(biāo)匯總表序號(hào)一指標(biāo)名稱(chēng)投資指標(biāo)單位數(shù)值 備注總投資萬(wàn)元467。58靜態(tài)總投資萬(wàn)元457.38建設(shè)期融資利息萬(wàn)元10.2kW投資元/kW2868.6kW·h投資元/kW·h0.844二相關(guān)稅費(fèi)指標(biāo)銀行貸款利率%6.8綜合折舊率%3。65電站定員人數(shù)人7平均年工資萬(wàn)元/人2。5成本電價(jià)元/kW·h0.32增值稅教育附加及城市維護(hù)建設(shè)稅%%65+5=10所得稅率%25%三效益指標(biāo)投資回收期年4。75財(cái)務(wù)內(nèi)部收益率(差值)%29.23財(cái)務(wù)凈現(xiàn)值萬(wàn)元643。21借款償還期年1.41。8工程概算總表表1.7—1 XXX市XXX水力發(fā)電站概算總表 單位:萬(wàn)元編工程或費(fèi)用名稱(chēng)號(hào)

程費(fèi)

置費(fèi)

安裝

占一至合計(jì)五部分%工程合計(jì)

85。55 244.02 3210 95.71 457.3881.48 — - — 81.48 18。71—擋水工程二泄洪工程三引水工程

——51。31

-—51.31四發(fā)電廠工程30。17-229.0128.9730。17- 257。9859.22一發(fā)電設(shè)備及安裝工程204.232797232。20二輸變電設(shè)備及安裝工程24.781.0025。783.391.604.991.15第四部分施工臨時(shí)工程12.50 12.502。87一建設(shè)管理費(fèi)7865 78.6518.00 18。0018。06二三四五六生產(chǎn)預(yù)備費(fèi)其他— —25.98 25。98799 7.99— —2668 26.68一至五部分合計(jì)81。482324030.5791.15 435。60100根本預(yù)備費(fèi)5%建設(shè)期融資利息總投資4.0785。5585.551162244.02244.02153321032.104.56 21.789571 457.3810。2095.71 467。582。工程部分概算表2。1概算表33391.604.991。15第四部分施工臨時(shí)工程12.5012。502。872。1—1總概算表單位:萬(wàn)元編號(hào)工程或費(fèi)用名稱(chēng)程費(fèi)置費(fèi)安裝用合計(jì)五部分%工程合計(jì)8555244.0232.1095.71457。38一第一部分擋水工程建筑工程81.48———-81.48—18。71二泄洪工程--三引水工程51.3151.31四發(fā)電廠工程30.1730。17- 2290128.97— 257。9859。22一發(fā)電設(shè)備及安裝工程204.232797232。20二輸變電設(shè)備及安裝工程24.781.0025。78第五部分獨(dú)立費(fèi)用786578.6518.06一二三四五六建設(shè)及施工場(chǎng)地征用費(fèi)其他18.00-2598799—26.6818.00-98799-26。68一至五部分合計(jì)81.48232.4030.579115435.60100根本預(yù)備費(fèi)5%4.0711621.5345621。78建設(shè)期融資利息85.552440232109571457。3810.20總投資總投資85.552440232.109571467。58(2)建筑工程概算表2.2-1建筑工程概算表單位:萬(wàn)元編號(hào)第一部分建筑工程稱(chēng)單位數(shù)量單價(jià)合計(jì)81。48一擋水工程二泄洪工程三引水工程51。31(1)5#隧洞維修襯砌工程(80m)m80。0023.18①砼澆筑(墻0。2×2×1.2×80)m338.400。297611。43②砼澆筑(半圓拱0.65×3.1416×0.2×80)m332.670.29769.72③鋼筋t1.760。88281.55④鋼模板(直墻圓拱、安、拆)㎡355.360.00130。48(2)6#隧洞維修工程(55m)m55.0028。13①平洞石方開(kāi)挖(加寬1.5×0。3×2×55)m349。500。021。00②平洞石渣運(yùn)輸(開(kāi)挖+底板清渣)m367。700.00280。19③砼澆筑(墻0.3×2×1。5×55)m349。500。297614.73④砼澆筑(半圓拱)m336。300。297610.80⑤鋼筋t1。210.88281.07⑥鋼模板(直墻圓拱、安、拆)㎡253.000.00130。34四發(fā)電廠工程30。17廠房二期混凝土30。17①砼鑿除(機(jī)墩螺栓孔)m32.000。03790.08②二期砼澆筑m32.000.04390。09③機(jī)房裝修(26。8×16=428.8m2)套1.0030。0030.00(3)機(jī)電設(shè)備及安裝工程概算表2.3—1 機(jī)電設(shè)備及安裝工程概算表 單位:萬(wàn)元單 價(jià) 合 計(jì)號(hào)編 工程或費(fèi)用名稱(chēng) 單位 號(hào)

安裝 小費(fèi)計(jì)229.0128.97費(fèi)計(jì)229.0128.9798一發(fā)電設(shè)備及安裝工程2042327.97201①水輪機(jī)設(shè)備及安裝沖擊式水輪機(jī)設(shè)備自重5t 臺(tái)3。018。8036189.8856.40102.11226410.826722②自動(dòng)調(diào)速器(廠家安裝)臺(tái)3。06。0018。000.001800③剎車(chē)裝置臺(tái)3.01。2003。600。003。60④閘閥(0。5t個(gè)1.01.000.361。000.361。36⑤閘閥(0。5t)個(gè)3。01.800365.401。086.48⑥水位傳感器YGY-Y臺(tái)1.01.201.200。001.20⑦采購(gòu)保管費(fèi)%0.0585。604.280.004.282發(fā)電機(jī)設(shè)備及安裝1143515.71130。06(1)發(fā)電機(jī)自重5tSFW500/6臺(tái)2。012。0038624。007。723172(2)發(fā)電機(jī)自重5tSFW630/6臺(tái)1.014。603.8614.603.8618.46(3)自動(dòng)化控制屏(與SFW500/6配套)套2.09。6019。200.0019.20(4)自動(dòng)化控制屏(與SFW630/6配套)套1。09。809.800。009。80(5)無(wú)功補(bǔ)償屏臺(tái)3。01。805.400.005。40(6)并網(wǎng)高壓屏(3塊)及計(jì)量裝置套1.015。0015。000.0015.00(7)NH—VV3×185+2×95100m0。85。970304。780。245.02(8)NH-VV3×240+2×120100m0.357.730302。710.112.82(9)母線安裝LMY80×10單相45m10m/單相1350。030140.411.892。30(10)母線安裝LMY120×10單相45m10m/單相13.50。050.140。681。892.57(11)母線支架(角鋼)個(gè)40.00。0080。320。000。32(12)(廠家安裝)套1.05.0005.000.005。00(13)水位測(cè)量監(jiān)視裝置(廠家安裝)套1.02。0002.000。002。00(14)后臺(tái)監(jiān)控及遠(yuǎn)程控制套1。05.0005.000。005.00(15)采保運(yùn)雜費(fèi)6%%005108905.450。005。45二輸變電電設(shè)備及安裝工程24。781。002578①S11—800臺(tái)1。010.800.3410.800。3411.14②S11-1250臺(tái)1。012。8006612.800.6613.46③采保運(yùn)雜費(fèi)6%%0.0523。601.180。001。18金屬結(jié)構(gòu)設(shè)備及安裝工程概算表2。4—1 金屬結(jié)構(gòu)及安裝工程概算表 單位:萬(wàn)元單單價(jià)合計(jì)編號(hào)單位數(shù)量費(fèi)設(shè)備費(fèi)安裝費(fèi)小計(jì)第三部分金屬結(jié)構(gòu)及安裝工程3.391.604.99伸縮節(jié)(0。5t個(gè)4.00。800.403.201。604.80采保運(yùn)雜費(fèi)6%%0.063。200。190.000。19施工臨時(shí)工程概算表編號(hào)工程或費(fèi)用名稱(chēng)單位數(shù)量單價(jià)合計(jì)編號(hào)工程或費(fèi)用名稱(chēng)單位數(shù)量單價(jià)合計(jì)第四部分臨時(shí)工程12.501臨時(shí)交通(已建便道)條2。000。501。002臨時(shí)住房㎡100。000.0252.503臨時(shí)動(dòng)力線KM2.501。503。754臨時(shí)倉(cāng)庫(kù)(2處)㎡200.000。0255.005其他臨時(shí)工程2%12.250。256678—(6)獨(dú)立費(fèi)用概算表編號(hào)單位數(shù)量單價(jià)第五部分編號(hào)單位數(shù)量單價(jià)第五部分建設(shè)管理費(fèi)其他費(fèi)用合計(jì)(元)78。65一1建設(shè)單位人員常常費(fèi)18.0010。002工程管理常常費(fèi)8.0056二生產(chǎn)預(yù)備費(fèi)0。00三 科研勘測(cè)設(shè)計(jì)費(fèi)1工程勘測(cè)設(shè)計(jì)費(fèi)25.9825。98四工程建設(shè)監(jiān)理費(fèi)7.99五建設(shè)及施工場(chǎng)地征用費(fèi)六其他26.681工程質(zhì)量監(jiān)督費(fèi)8.502工程安全監(jiān)督費(fèi)6。503工程保險(xiǎn)費(fèi)1.684環(huán)境保護(hù)費(fèi)10.002。2概算附表(1)建筑工程單價(jià)匯總表(附表一)序號(hào)名稱(chēng)序號(hào)名稱(chēng)單 位單 價(jià)人工費(fèi)材料費(fèi)其機(jī)械使用費(fèi)嵌套費(fèi)費(fèi)現(xiàn)場(chǎng)經(jīng)費(fèi)1平洞石方開(kāi)挖1001平洞石方開(kāi)挖100m320220.444476。816428.882563。821802。50458.16122172平洞石渣運(yùn)輸100m31442.38543。3761。66484.3632.6887。153人工入倉(cāng)澆筑100m32976084711027.7127576962236。439648。211514684039.144100m343881.237589.601704397451。653552。47859。13229105鋼筋制作與安裝t8032.87809.443541。46318.92140.09373。596鋼筋制作與安裝6隧洞t8828。08809.443541。46318。92140.09373。59用7攪拌機(jī)拌制混凝土1003448.611847.4851.07706。1178.14208。378膠輪車(chē)運(yùn)混凝土1002128.261349.8890.99166.5648.22128。599鋼模板(安拆、直墻圓拱形隧洞1008999.733060。782311.22986。39190.75508.6710襯砌)直墻圓拱形隧洞鋼模板制作1001341。73176。831035.65107.5411砼鑿除100m337878.8721589531635。665383。81858.272288.72安裝工程單價(jià)匯總表(附表二)其材料費(fèi)機(jī)械使用費(fèi)嵌套費(fèi)5KM30207319423.77。68其材料費(fèi)機(jī)械使用費(fèi)嵌套費(fèi)5KM30207319423.77。68。54699.986225。16。63。3032。681892。61528.65309。06電纜安裝電力電纜1kv618.126母線安裝100m/781000kvA4000kvA其他直接費(fèi)現(xiàn)場(chǎng)經(jīng)費(fèi)間861。735069.77570873.986009.41676164.601114.37125465.801930.70217761。723769。51424序號(hào)名稱(chēng)單位單價(jià)人工費(fèi)1沖擊式水輪機(jī)臺(tái)36063.4912674.432橫軸水輪發(fā)電機(jī)臺(tái)38612.4415023.533其他進(jìn)水閥安裝T7231.062785。924電纜安裝控制電纜K7614002.233939。10470.4814002.233939。10470.48367.451575.64177單相69臺(tái)3407.261276。12469.27176。1578。78510。4557t6584.642717。64553.12237。31143.831087。0612222PAGE30XXXPAGE30XXX市水利水電勘測(cè)設(shè)計(jì)院主要材料預(yù)算價(jià)格匯總表(附表三)其中序號(hào)名稱(chēng)單位其中序號(hào)名稱(chēng)單位預(yù)算價(jià)格原價(jià)運(yùn)雜費(fèi)采保費(fèi)1水泥32。5T359.002鋼筋(平均)T4,856。273杉原木m3992.104板枋木m31,507。405炸藥4#T25,520。006汽油T10.997柴油T9。198粗砂m3105。009碎石m345.6010塊石m344.5011電KWH0。85512水m33。9013風(fēng)m30.1714-15—16-17—(4)次要材料價(jià)格匯總表(附表四)附表四 次要材料概算價(jià)格匯總表

單位:元其中序號(hào) 名稱(chēng) 單位

概算價(jià)格

原價(jià) 運(yùn)雜費(fèi) 采保費(fèi)1鋸材m31,507.402合金鉆頭個(gè)50.003合金片kg250。004空心鋼、鋼管kg5.905鍍鋅扁鋼kg6。006母線金具kg8.507氧氣m33.508乙炔氣m34。509氬氣m39.0010電雷管個(gè)2.0011導(dǎo)電線m1。5012石油瀝青30#kg5。2413電焊條kg7。5014鋁焊條kg28。0015焊錫kg32。0016預(yù)埋鐵件kg5。11417鐵釘kg6。5018 組合鋼模板 kg5。4319型鋼kg4。67020卡扣件kg5.3921預(yù)制砼柱m3300.0022鐵件、墊鐵kg5。2023石油瀝青油氈350#㎡3.2224鐵絲kg6.8025編織袋個(gè)0。5026鋼板kg4。7027油漆kg11.9028銅材kg50。0029透明油kg17.0030變壓器油kg17.0031紅磚塊0。29032 酒精500g瓶 7.50033 聚酰胺樹(shù)脂651#kg 21。0034 300*300張 4.50續(xù)前表附表四 次要材料概算價(jià)格匯總表

單位:元序號(hào) 名稱(chēng) 單位

概算價(jià)格

其中原價(jià) 運(yùn)雜費(fèi) 采保費(fèi)35 10m2

m 6。703637鍍鋅螺栓m10-12*75m10—16套套4。004.5038丁腈橡膠管Φ13Φ17m7。8039dt—10個(gè)11。0040≦120m2個(gè)6.0041封簽kg10.0042塑料軟管kg8.0043塑料脹管Φ6—8個(gè)0。0344電纜卡子個(gè)0.7045電纜吊掛套4。504620*40m卷7.0047610#kg21.0048石棉布㎡11。0049探傷材料張15.0050鋼軌(工字鋼)kg4.70施工機(jī)械臺(tái)時(shí)費(fèi)匯總表(附表五)附表五 施工機(jī)械臺(tái)時(shí)費(fèi)匯總表其他

單位:元序號(hào) 名稱(chēng)及規(guī)格— 土石方機(jī)械

臺(tái)時(shí)費(fèi)

折舊費(fèi)

備費(fèi)

安拆費(fèi)

人工費(fèi)

動(dòng)力燃料其他費(fèi)1121裝巖機(jī)風(fēng)動(dòng)0。26m3148。043。615。420.2717。33121.41109633.210.541.8930.781097風(fēng)鉆氣腿式45。720。822。4642。441098風(fēng)鎬14.830。481。6812。67二砼機(jī)械—20020。4m326.403。295。341。079。397.312047振搗器1。1kw2.220.321.220.682080風(fēng)(砂)水槍6m3/min37。220。240.4236.56三運(yùn)輸機(jī)械—3004載重汽車(chē)5t55。387.7710.869.3927。363005載重汽車(chē)8t-3074膠輪車(chē)0.900.260。643103電瓶機(jī)車(chē)5t23。235。144。119。394.593124V1m30。860.680.18-四起重機(jī)械-4024門(mén)座式起重機(jī)MQ540/304030塔式起重機(jī)10t112.0541。3716.893.1019。4931.204044橋式起重機(jī)雙梁起重量5t28。968。443。260.399。397.484085汽車(chē)起重機(jī)5t66.8712.9212。4219.4922.044087汽車(chē)起重機(jī)8t82.7720.9014.6619。4927。724088汽車(chē)起重機(jī)10t89.7425。0817.4519。4927.72409016t123.2437.6226.1719.4939。964143卷?yè)P(yáng)機(jī)5t20.292。971。160.059.396。72—五砂石料加工機(jī)械—六鉆孔灌漿機(jī)械-七工程船舶-八動(dòng)力機(jī)械-8011空壓機(jī)9m3/min57。143。404。910.859.3938.59—九其他機(jī)械-9063軸流通風(fēng)機(jī)14kw20.862。453.770。585。059。019126電焊機(jī)25kvA13.050。330.300.0912。339143鋼筋彎曲機(jī)Φ6—4016.710。531。450。249。395。109146鋼筋切斷機(jī)20kw27。181.181.710。289.3914。629147鋼筋調(diào)直機(jī)4—14kw20.241。602。690。449.396.129148型鋼剪斷機(jī)13kw32。858.654.891。339.398。599150型材彎曲機(jī)20.611。182.940.479。396.639170一般車(chē)床Φ400-60027.035.884.910.059。396.809180搖臂鉆床Φ35—5020。584。452。710。039。394。009181Φ130。430.669.391.709202圓盤(pán)鋸24.990.401.170.0517.336.049204雙面刨床19.301。011.100。159.397.659198B65015.852。262。090。159.391。969214氬弧焊機(jī)≦500A29。165.063。671。019.3910。039219壓力濾油機(jī)15029.571.040.340。19.3918.709198B65015.852.262.090。159.391。96主要工程量匯總表合計(jì)49.500。00合計(jì)49.500。00158。822.97608。36324.00序號(hào)項(xiàng)目石方洞挖(m3)土石方(m3)混凝土(m3)鋼筋制安(噸)模板(m2)砂漿抹面(㎡)1引水工程49。50156.822.97608.36324.002發(fā)電廠工程2.00合計(jì)42。40合計(jì)42。403。1790.50136.635,708.00附表七主要材料量匯總表序號(hào)項(xiàng)目水泥(t)(t)砂(m3)人工(工時(shí))1引水工程41。763。17 89。42134。913,152。442發(fā)電廠工程0.641.081.722,555.56二、概算附件1、主要材料預(yù)算價(jià)格計(jì)算表編號(hào)編號(hào)其中名稱(chēng)及規(guī)格單位概算價(jià)XXX2012.02二次運(yùn)運(yùn)雜費(fèi)采保費(fèi)采納地點(diǎn)期預(yù)算價(jià)輸費(fèi)1杉原木m3992。10992。102板枋材m31,507.401,507。4034#t25,520.0024,000。0080.001,440。0045汽油柴油tt10,990.009,190.0010,990。009,190。00通用6電度0。850。8557水m30。523.908風(fēng)m30.17132.5t1,079.00359.00720。002鋼筋(平均)t5,576。274,856。27720.003粗砂m3825.00105。00720.005#、6#隧洞4碎石m3765。6045。60720.005塊石m3764。5044。50720.001水泥t359。00359。002鋼筋(平均)t4,856。274,856.273粗砂m3105.00105.00廠房及通用4碎石m345.6045。605塊石m344.5044。502、施工用電價(jià)格計(jì)算表依據(jù)XXX2012,0。855/kwh.3、施工用水價(jià)格計(jì)算表依據(jù)XXX20123.90/t。4、施工用風(fēng)價(jià)格計(jì)算表施工用風(fēng)價(jià)格計(jì)算書(shū)2YV-6/812m3/min.計(jì)算公式計(jì)算依據(jù)1)能量利用系數(shù) 0。85供風(fēng)損耗率 12%單位循環(huán)水費(fèi) 0。005元/m34)供風(fēng)設(shè)施維修攤銷(xiāo)費(fèi)0.002/m3風(fēng)價(jià)計(jì)算 臺(tái)時(shí)總費(fèi)用=42.56元/臺(tái)時(shí)×2臺(tái)=85。12元。85=612m30。17元/m35、混凝土和砂漿材料單價(jià)計(jì)算表(附件六)預(yù)算量砼、水泥編 級(jí) 水泥(kg)0。28預(yù)算量砼、水泥編 級(jí) 水泥(kg)0。28元碎石(m3)45。6水(m3)0.52砂漿 強(qiáng)度 粗砂(m3)50元/m3 單價(jià)(元)采納地點(diǎn)號(hào) 配 /kg 元/m3 /m3標(biāo)號(hào)等級(jí)重量金額重量金額重量金額重量金額1M7532。5261。0073。081。1155。500。000.1570.08128.662C1532.52266.2074.540。5728。500.8639.220。1650。09142.353C2032。52317。9089。010.5427。000.8639。220.1650。09155.324C2532.52341。0095。480。5226。000.8639。220。1650。09160。79混凝預(yù)算量水泥編混凝預(yù)算量水泥編土砂級(jí)強(qiáng)度水泥(kg)(m3)碎石(m3)水(m3)(元)采納地點(diǎn)號(hào)號(hào)漿標(biāo)等級(jí)配重量增補(bǔ)金重量增補(bǔ)金重量增補(bǔ)金重量增補(bǔ)金額額額額8M7532。5261。00208.541。11860250.000。1570.531069.32910C15C2032.532.522266。20317.90212。69254.000.570.5444175418500。860.8661920619.200。1650.1650.560.561274。201292。265#、6#洞11C2532。52341.00272.460。52403000.86619200.1650.561295.2216M7532。5261.0020.621.1161.050.1570.5382.201718C15C2032。532.522266。20317。9021。0325.110.570。5431。3529.700.860.1650.1650。560。5652。9455。37廠房19C2532.52341。0026.940。5228.600.860.1650。5656。106、施工機(jī)械臺(tái)時(shí)費(fèi)計(jì)算表施工機(jī)械臺(tái)時(shí)費(fèi)計(jì)算表1121148.043.615.420。27138.72。4017.330.26m31096風(fēng)鉆手持式33.210.541。8930。781097風(fēng)鉆氣腿式45。720。822。4642。441098風(fēng)鎬14。830。481.6812.67-—二砼機(jī)械—20020.4m326.403。295。341.0716.701。309.398。602047振搗器插入式2.220.321.220.680。81.1kw2080(砂水槍6m3/min37。220。240。4236。56-—三運(yùn)輸機(jī)械——3004載重汽車(chē)5t55.387.7710。8636。751。309。397.2027.363004載重汽車(chē)8t80。3316.7217。5046.111.309.398。0036723074膠輪車(chē)0.900。260。64—3124V行斗車(chē)1m30。860.680.18—3012自卸汽車(chē)5t58.2510。735。3742.151。309.399.103276-—第一類(lèi)費(fèi)用第二類(lèi)費(fèi)用第一類(lèi)費(fèi)用第二類(lèi)費(fèi)用序號(hào)名稱(chēng)及規(guī)格臺(tái)時(shí)費(fèi)修理及柴油:3.60安拆380/kg折舊費(fèi) 替換設(shè)小計(jì)/工時(shí)/kg費(fèi)備費(fèi)數(shù)量金額數(shù)量金額數(shù)量金額數(shù)量一土石方機(jī)械裝巖機(jī)風(fēng)動(dòng)第一類(lèi)費(fèi)用第二類(lèi)費(fèi)用第一類(lèi)費(fèi)用第二類(lèi)費(fèi)用序號(hào)名稱(chēng)及規(guī)格臺(tái)時(shí)費(fèi)修理及人工費(fèi):7.22/安拆3.80/kg折舊費(fèi)替換設(shè)小計(jì)工時(shí)費(fèi)備費(fèi)數(shù)量金額數(shù)量金額數(shù)量金額四起重機(jī)械--五砂石料加工機(jī)械-—六鉆孔灌漿機(jī)械-門(mén)座式起重機(jī)4024 129.64MQ540/3067。9326。4435.273。9017。334030 塔式起重機(jī)10t 112。0541。3716。893。1050.692。7019.49橋式起重機(jī)雙梁起重量40445t28。968。443。260。3916.871.39。39——4085汽車(chē)起重機(jī)5t66.8712。9212.4241.532.7019。495。8022。044087汽車(chē)起重機(jī)8t82。7720.9014。6647.212.7019.497.7027。724088汽車(chē)起重機(jī)10t89。7425。0817。4547.212。7019.497。7027.724090汽車(chē)起重機(jī)16t123。2437。6226.1759。452.719.49-11。139.964143卷?yè)P(yáng)機(jī)單筒慢速5t20.292。971。160.0516.111.309.39——七工程船舶———八動(dòng)力機(jī)械-—8011空壓機(jī)9m3/min57。143.404.910。8547。98 1.30 9.3932第一類(lèi)費(fèi)用第二類(lèi)費(fèi)用修理及第一類(lèi)費(fèi)用第二類(lèi)費(fèi)用修理及序號(hào)名稱(chēng)及規(guī)格臺(tái)時(shí)費(fèi)安拆柴油:3.60元/kg 電:折舊費(fèi)替換設(shè)小計(jì)/工時(shí)備費(fèi)費(fèi)數(shù)量金額數(shù)量金額數(shù)量金額數(shù)九其他機(jī)械--9063軸流通風(fēng)機(jī)14kw20.862。453.770。5814.060。705。05109126電焊機(jī)溝通25kvA13。050.330。300。0912。33149143鋼筋彎曲機(jī)Φ6—4016。710.531.450.2414。491。309。396.9146鋼筋切斷機(jī)20kw27。181。181。710.2824。011.309.39179147鋼筋調(diào)直機(jī)4—14kw20.241.602.690。4415.511.309。397.9148型鋼剪斷機(jī)13kw32.858。654.891.3317.981.309。39109150型材彎曲機(jī)20.611。182。940。4716。021.309.397.9170一般車(chē)床Φ400—27。035.884.910.0516.191。39.398。6009180搖臂鉆床Φ35-5020.584。452.710。0313.391.39.394。9181立式鉆床Φ1312.180。430。6611。091.39.39——2。9202圓盤(pán)鋸24。990.401.170.0523。372。4017。33-—7.9204雙面刨床19。301.011.100.1517.041.309。39-—9。9198油頭刨床B650#REF!2.262。090.15#REF!1。39。39—-2。9214氬弧焊機(jī)≦500A29。165.063。671.0119。421.39。39— —119219壓力濾油機(jī)15029。571.040。340。128.091。39。39- -233PAGE54XXXPAGE54XXX市水利水電勘測(cè)設(shè)計(jì)院7、建筑工程單價(jià)表建筑工程單價(jià)表平洞石渣運(yùn)輸施工方式:斗車(chē)1.0m3施工方式:斗車(chē)1.0m3運(yùn)輸,運(yùn)距200m,增運(yùn)100m編號(hào)一1名稱(chēng)直接費(fèi)單位元元數(shù)量單價(jià)(元)合計(jì)(元)2,361。302,127.30(1)人工費(fèi)工長(zhǎng)元工時(shí)85.509.87543。37—(2)材料費(fèi)元9。3018。5057。709.327。225。6086.68133。57323.12120。41零星材料費(fèi)6%2,006.89120。41-(3)26m30。臺(tái)時(shí)7.83120。41148。04-1,463。521,159.155t臺(tái)時(shí)7.2123。23167.49(4)斗車(chē)1.0m3臺(tái)時(shí)109.593%0。861,420。8994.25--—2其他直接費(fèi)2,127.303%—63.823二三四間接費(fèi)材料調(diào)差2,127。302,361.302,550。208%8%7%170.18188。90178.51—五稅金2,728。713。22%—-87.86合計(jì)2,816。57建筑工程單價(jià)表人工入倉(cāng)澆筑定額編號(hào):40047單位:100m3施工方式:開(kāi)挖斷面≦5m230cmC20編號(hào) 名稱(chēng)單位 數(shù)量 單價(jià)(元)合計(jì)(元)— 直接工程費(fèi)元56,043.131 直接費(fèi)元50,489.31(1)人工費(fèi)元 1,624。4011,027.71工長(zhǎng)工時(shí) 48。70 9.87480。67高級(jí)工工時(shí) 81。20 9.32756。78中級(jí)工工時(shí) 877。20 7。226,333.38初級(jí)工工時(shí) 617。30 5。603,456。88(2)材料費(fèi)元27,576.96混凝土m3 173。00 155.3226,870。36水m3 146.00 3。90569.40—-—其他材料費(fèi)0。5% 27,43976137。20(3)機(jī)械使用費(fèi)2,236.43振動(dòng)器1。1kw臺(tái)時(shí) 78。91 2.22175。18風(fēng)水槍臺(tái)時(shí) 53.63 37.221,996。11——-—其他機(jī)械費(fèi)3% 2,171.2965.14(4)嵌套項(xiàng)9,648.21砼拌制m3 173。00 34.495,966。77砼運(yùn)輸m3 173.00 21。283,681.442 其他直接費(fèi)50,489。31 3%1,514.683 現(xiàn)場(chǎng)經(jīng)費(fèi)50,489.31 8%4,039。14二 間接費(fèi)56,043.13 8%4,483.45三 企業(yè)利潤(rùn)60,526。58 7%4,236.86四 材料調(diào)差223,560.98m3173。001,292。26223,560。98-五 稅金

42

3。22%

9,284。05合計(jì)定額編號(hào):40098建筑工程單價(jià)表其他混凝土297,608。47單位:100m3房二期編號(hào) 名稱(chēng)C25單位數(shù)量 單價(jià)(元)合計(jì)(元)— 直接工程費(fèi)1 直接費(fèi)元元31,787。8428,637。69(1)人工費(fèi)元1,080.607,589。60工長(zhǎng)(2) 材料費(fèi)元32.40 9.87108。10 9。32615.90 7。22324。20 5。60319.791,007.494,446。801,815。5217,043.97水m3m3103。00 160.79102.00 3.9016,561.37397。80-—-其他材料費(fèi)(3)機(jī)械使用費(fèi)振動(dòng)器1.1kw臺(tái)時(shí)0.5% 16,959。1742。45 2.2284。80451.6594。24風(fēng)水槍臺(tái)時(shí)8。40 37。22312.65-其他機(jī)械費(fèi)11% 406.89(4)嵌套項(xiàng)砼拌制m3103.00 34。493,552。473,552.472 其他直接費(fèi)28,637.69 3%-859.133 現(xiàn)場(chǎng)經(jīng)費(fèi)二 間接費(fèi)三 企業(yè)利潤(rùn)四 材料調(diào)差28,637.69 8%31,787.84 8%34,330.87 7%2,291。022,543。032,403.165,778。30混凝土五 稅金m3103。00 56。1042,512.33 3.22%5,778.30-1,368。90合計(jì)合計(jì)43,881。23建筑工程單價(jià)表鋼筋制作與安裝定額編號(hào):40123 單位:1t施工方式:回直、除銹、切斷、彎制、焊接、綁扎及加工場(chǎng)至施工場(chǎng)地運(yùn)輸。編號(hào)一1名稱(chēng)直接費(fèi)單位元元數(shù)量單價(jià)(元)合計(jì)(元)5,183。504,669.82(1)人工費(fèi)元106.00809.44工長(zhǎng)工時(shí)10.609。87104.62高級(jí)工工時(shí)29.709.32276.80(2)材料費(fèi)元37.1028。607。225.60267。86160.163,541。46鋼筋鐵絲其他材料費(fèi)tkgkg1.074。007。361。0%3,200.006。807。503,506.403,424.0027。2055.20--35.06(3)機(jī)械使用費(fèi)鋼筋調(diào)直機(jī)14kw臺(tái)時(shí)0。6320。24318。9212。75風(fēng)砂槍臺(tái)時(shí)1.5837.2258.81鋼筋切斷機(jī)20kw臺(tái)時(shí)0.4227.1811。42鋼筋彎曲機(jī)Φ6—40 型5t臺(tái)時(shí)0.47型5t臺(tái)時(shí)0.4755。3826.032其他直接費(fèi)10t臺(tái)時(shí)0。112%4,669.82112。05312.673%12.336。25—140。093現(xiàn)場(chǎng)經(jīng)費(fèi)4,669.828%373.59二間接費(fèi)5,183.508%414。68三四汽油kg5,598.183。387%7.19391。871,792.2324。30鋼筋t1.071,652。271,767。93五稅金7,782。283.22%250。59

10.500.42

16。7113。0585。53

18.38137.0335。92合計(jì)合計(jì)8,032。87建筑工程單價(jià)表鋼筋制作與安裝定額編號(hào):40123改 單位:1t施工方式:回直、除銹、切斷、彎制、焊接、綁扎及加工場(chǎng)至施工場(chǎng)地運(yùn)輸.6#隧洞用編號(hào)一1名稱(chēng)直接費(fèi)單位元元數(shù)量單價(jià)(元)合計(jì)(元)5,183。504,669。82(1)人工費(fèi)元106.00809.44工長(zhǎng)工時(shí)10。609.87104.62高級(jí)工工時(shí)29.709.32276。80中級(jí)工工時(shí)37。107.22267。86(2)初級(jí)工材料費(fèi)工時(shí)元28.605.60160。163,541.46鋼筋t1。073,200.003,424.00鐵絲其他材料費(fèi)kgkg4.007。361.0%6。807。503,506.4027。2055。20—35.06(3)機(jī)械使用費(fèi)318。92鋼筋調(diào)直機(jī)14kw臺(tái)時(shí)0。6320.2412.75風(fēng)砂槍鋼筋切斷機(jī)20kw臺(tái)時(shí)臺(tái)時(shí)1。580.4237.2227。1858。8111。42鋼筋彎曲機(jī)Φ 6-40型5t臺(tái)時(shí)0.47型5t臺(tái)時(shí)0.4755.3826。0310t臺(tái)時(shí)0。112%112.05312。6712.336。25—2其他直接費(fèi)4,669.823%140。093現(xiàn)場(chǎng)經(jīng)費(fèi)4,669。828%373。59二間接費(fèi)5,183。508%414.68三四企業(yè)利潤(rùn)汽油kg5,598。183.387%7.19391。872,562。6324。30鋼筋鋼筋(二次運(yùn)輸)tt1。071。071,652。27720。001,767。93770.40五稅金8,552。683.22%275.40

1.100.42

16。7113。0585。53

18。38137。0335。92合計(jì)合計(jì)8,828.08建筑工程單價(jià)表攪拌機(jī)拌制混凝土定額編號(hào):40171 單位:100m3編號(hào) 名稱(chēng) 單位— 直接工程費(fèi) 元直接費(fèi) 元人工費(fèi) 元工長(zhǎng) 高級(jí)工 工時(shí)中級(jí)工 工時(shí)初級(jí)工 工時(shí)材料費(fèi) 零星材料費(fèi) 其他材料費(fèi)機(jī)械使用費(fèi)攪拌機(jī)0。4 臺(tái)時(shí)膠輪車(chē) 臺(tái)時(shí)其他機(jī)械費(fèi)其他直接費(fèi)現(xiàn)場(chǎng)經(jīng)費(fèi)二 間接費(fèi)三 企業(yè)利潤(rùn)四 材料調(diào)差五 稅金合計(jì)

數(shù)量293。40126.20167。202%18.9087.152,604.662,891.173,341。03

單價(jià)(元)9.879.327.225。602,553.5951。0733.210。903%8%8%7%3.22%

合計(jì)(元)2,891.172,604。661,847.48——911.16936。3251.0751.07—-—-—706。11627.6778.44——-78.14208.37231。29218.57——-107.583,448。61建筑工程單價(jià)表膠輪車(chē)運(yùn)混凝土定額編號(hào):40182 單位:100m3施工方式:洞內(nèi)運(yùn)輸,運(yùn)距200m,人工、膠輪車(chē)定額乘以1。5系數(shù)編號(hào)一1(1)名稱(chēng)直接費(fèi)人工費(fèi)單位元元元數(shù)量241。05單價(jià)(元)合計(jì)(元)1,784.241,607.431,349。88工長(zhǎng)初級(jí)工工時(shí)241.059。879。327.225。60—--1,349.88(2)材料費(fèi)零星材料費(fèi)元%6%1,516。4490。9990.99——--(3)90.99—166.56膠輪車(chē)臺(tái)時(shí)185.070.90166.56———2其他機(jī)械費(fèi)其他直接費(fèi)1,607.43166.563%—-—-48.223現(xiàn)場(chǎng)經(jīng)費(fèi)1,607.438%128.59二三四五間接費(fèi)稅金1,784.241,926。982,061。878%7%3。22%142。74134。89——-66。39合計(jì)2,128.26建筑工程單價(jià)表鋼模板(安拆)定額編號(hào):50036 單位:100m2施工方式:直墻圓拱形隧洞混凝土襯砌,模板及鋼架安裝、拆除、除塵、刷脫模劑,維修倒倉(cāng),斷面≦35m2編號(hào)名稱(chēng)單位數(shù)量單價(jià)(元)合計(jì)(元)一1(1)直接費(fèi)人工費(fèi)元元元402。407,057.816,358。393,060。78工長(zhǎng)工時(shí)19.609。87193.45高級(jí)工工時(shí)55。009.32512。60中級(jí)工工時(shí)320.407.222,313。29(2)模板工時(shí)元m27.40100。005.6013。4241。442,311.221,342.00鐵件kg152.005.20790.40電焊條m3kg0.401。80300.007。50120。0013。50-(3)2.0%2,265.9045.32986。39汽車(chē)起重機(jī)5t臺(tái)時(shí)13。5066.87902。75電焊機(jī)25kva臺(tái)時(shí)2。8113。0536。67--其他機(jī)械費(fèi)5%939.42——46.97——-2其他直接費(fèi)6,358。393%190.753現(xiàn)場(chǎng)經(jīng)費(fèi)6,358.398%508.67二間接費(fèi)7,057.818%564.62三四企業(yè)利潤(rùn)汽油kg7,622.4378。307%7。19533.57562。98562。98五稅金8,718。983。22%-280.75合計(jì)8,999.73建筑工程單價(jià)表直墻圓拱形隧洞鋼模板制作定額編號(hào):50093 單位:100m2施工方式:直墻圓拱形隧洞混凝土襯砌,木模板及鋼架制作、鐵件制作、模板運(yùn)輸,斷面≦35m2一1(1)(2)(3)23二三四

名稱(chēng)直接費(fèi)單位數(shù)量單價(jià)(元)合計(jì)(元)元元元單位數(shù)量單價(jià)(元)合計(jì)(元)元元元23.301,320.021,320.02176.83工時(shí)1。509.8714.81工時(shí)4.909.3245。67工時(shí)13。407.2296.75工時(shí)元m33.500。505.6015.0719。601,035。657。54kg74.005.43401。89kg76。004.67354。92kg26。005。39140.19kg19。005.2098。80kg1。607。5012.002。0%1,015.3420.31臺(tái)時(shí)0.6024.99107。5414.99臺(tái)時(shí)0.6019。3011。58臺(tái)時(shí)0.3432。8511.17臺(tái)時(shí)0。5120。6110。51臺(tái)時(shí)0。0427.181.09臺(tái)時(shí)0.0916。711。50臺(tái)時(shí)0.4255.3823.26臺(tái)時(shí)2.175%13.05102。4228.325。12-—kg3.027.19-——21。7121.71-1,341。73-1,341。73型鋼鐵件圓盤(pán)鋸雙面刨床型鋼剪斷機(jī)13kw型材彎曲機(jī)鋼筋切斷機(jī)20kw鋼筋彎曲機(jī)Φ6-40載重汽車(chē)5t電焊機(jī) 其他機(jī)械費(fèi)現(xiàn)場(chǎng)經(jīng)費(fèi)間接費(fèi)汽油五 稅金合計(jì)建筑工程單價(jià)表混凝土鑿除定額編號(hào):YB4004 單位:100m3施工方式:風(fēng)鉆鉆孔,人工鑿除,人工清理堆放混凝土渣編號(hào)一1名稱(chēng)直接費(fèi)單位元元數(shù)量單價(jià)(元)合計(jì)(元)31,755。9928,609.00(1)人工費(fèi)元3,797.4021,589。53工長(zhǎng)工時(shí)75。909。87749.13高級(jí)工工時(shí)9.32-(2)合金鉆頭元個(gè)3,721。5023。817.225。6050。00-20,840.401,635。661,190。50水電焊條kgm3kg43.6124。761。805.903。907.50257.2196。5613.50-其他材料費(fèi)5。0%1,557.7777。89(3)機(jī)械使用費(fèi)5,383。81風(fēng)鎬138.8934。7233。2114。834,612.54514。90-——其他機(jī)械費(fèi)5%5,127。44--256.37—--2其他直接費(fèi)28,609。003%858.273二三四間接費(fèi)28,609.0031,755。9934,296。478%8%7%2,288.722,540。482,400.75—-五稅金36,697.223。22%—1,181。65合計(jì)37,878。878、安裝工程單價(jià)表安裝工程單價(jià)表沖擊式水輪機(jī)定額編號(hào):01067施工方式:設(shè)備自重5t編號(hào) 名稱(chēng)單位數(shù)量單價(jià)(元)單位:臺(tái)合計(jì)(元)— 直接工程費(fèi)1 直接費(fèi)(1)人工費(fèi)元元元1,661。0026,949.2921,017.7912,674.43工長(zhǎng)工時(shí)83。009。87819。21高級(jí)工工時(shí)399.009。323,718。68中級(jí)工工時(shí)947.007.226,837.34初級(jí)工(2) 鋼板元㎏232。00122。005。606.111,299.205,310.68745。42型鋼㎏224。005.2811,182。94銅材㎏5。0060。00300.00電焊條㎏46.007。50345.00氧氣m367.0010.00670。00乙炔氣m330.0010.00300。00汽油㎏27。0010。99296。73透明油㎏5。0017.9589。75油漆㎏17.003.5059.50木材m30。101。510。15電kwH470.000.85399.50其他材料費(fèi)(3)機(jī)械使用費(fèi)橋式起重機(jī)臺(tái)時(shí)21%29。004,388。9928.96921。693,032.68839。84電焊機(jī)25kvA臺(tái)時(shí)41。0013。05535.05車(chē)床Φ400—600臺(tái)時(shí)21.0027。03567.63刨床B650臺(tái)時(shí)17。0019。85337。45搖臂鉆床Φ50臺(tái)時(shí)11.0020.58226。38其他機(jī)械費(fèi)21%2,506。35526。332 其他直接費(fèi)21,017。794.1%861。733 現(xiàn)場(chǎng)經(jīng)費(fèi)二 間接費(fèi)12,674.4312,674。4340%45%5,069。775,703.49三 企業(yè)利潤(rùn)四 材料調(diào)差五 稅金32,652。7834,938.477%3。22%2,285.69——1,125。02合計(jì)36,063。49定額編號(hào):02028安裝工程單價(jià)表橫軸水輪發(fā)電機(jī)單位:臺(tái)施工方式:設(shè)備自重5t編號(hào) 名稱(chēng)單位數(shù)量單價(jià)(元)合計(jì)(元)— 直接工程費(fèi)元28,200。071 直接費(fèi)元21,316.68(1)人工費(fèi)元1,909.0015,023。53工長(zhǎng)工時(shí)101.009。87996。87高級(jí)工工時(shí)606。009。325,647.92中級(jí)工工時(shí)1,017.007。227,342。74初級(jí)工工時(shí)185。005。601,036。00(2)材料費(fèi)元4,400.54鋼板㎏133.004。70624.83型鋼㎏235.004。6701,097。45鋼管㎏10.005.9059。00銅材㎏2.0050.00100。00電焊條㎏21。007.50157。50氧氣m336。003.50126。00乙炔氣m315。004.5067.50汽油㎏39.0010.99428。61油漆㎏29。0011。90345。10電kwH540。000.85459.00其他材料費(fèi)27%3,464。99935.55(3) 機(jī)械使用費(fèi)1,892。61橋式起重機(jī)臺(tái)時(shí)19.0028。96550.24電焊機(jī)25kvA臺(tái)時(shí)21.0013.05274.05車(chē)床Φ400—600臺(tái)時(shí)6.0027。03162。18刨床B650臺(tái)時(shí)6.0019.85119。10搖臂鉆床Φ50臺(tái)時(shí)6。0020.58123.48空氣壓縮機(jī)9m3/min臺(tái)時(shí)3。0057。14171。42載重汽車(chē)5t臺(tái)時(shí)1.0055.3855.38其他機(jī)械費(fèi)30%1,455。85436.76-2 其他直接費(fèi)21,316。684。1%873。983 現(xiàn)場(chǎng)經(jīng)費(fèi)15,023。5340%6,009。41二 間接費(fèi)15,023.5345%6,760.59三 企業(yè)利潤(rùn)34,960.667%2,447.25四 材料調(diào)差五 稅金37,407。913。22%1,204.53合計(jì)38,612。44定額編號(hào):04012安裝工程單價(jià)表其他進(jìn)水閥安裝單位:t施工方式:平板閘閥編號(hào) 名稱(chēng)單位數(shù)量單價(jià)(元)合計(jì)(元)— 直接工程費(fèi)元5,293。521 直接費(fèi)元4,014.55(1) 人工費(fèi)元369。002,785.92工長(zhǎng)工時(shí)18。009.87177。66高級(jí)工工時(shí)80。009.32745.60中級(jí)工工時(shí)213.007。221,537。86初級(jí)工工時(shí)58.005.60324.80(2)材料費(fèi)元699。98鋼板㎏21。004。7098.66型鋼㎏40。004。670186。80電焊條㎏8。007.5060。00氧氣m34。003。5014.00乙炔氣m32。004.509.00汽油㎏4。003.8015.20油漆㎏3。0011。9035.70電kwH150.000.85127。50—其他材料費(fèi)28%546.86153.12(3)機(jī)械使用費(fèi)528.65橋式起重機(jī)臺(tái)時(shí)3。0028。9686.88電焊機(jī)25kvA臺(tái)時(shí)7.0013。0591.35車(chē)床Φ400—600臺(tái)時(shí)2.0027。0354。06刨床B650臺(tái)時(shí)2.0019。8539。70搖臂鉆床Φ50臺(tái)時(shí)4.0020。5882.32汽車(chē)起重機(jī)16t臺(tái)時(shí)0。20123.2424。65載重汽車(chē)5t臺(tái)時(shí)0。5055.3827.69—-其他機(jī)械費(fèi)30%406。65122.002 其他直接費(fèi)4,014.554。1%164。603 現(xiàn)場(chǎng)經(jīng)費(fèi)2,785。9240%1,114。37二 間接費(fèi)2,785.9245%1,253.66三 企業(yè)利潤(rùn)6,547.187%458.30四 材料調(diào)差—-—五 稅金7,005.483。22%225.58合計(jì)7,231.06定額編號(hào):06011安裝工程單價(jià)表電纜安裝單位:KM施工方式:控制電纜編號(hào) 名稱(chēng)單位數(shù)量單價(jià)(元)合計(jì)(元)— 直接工程費(fèi)元13,757。481 直接費(fèi)元11,360。98(1) 人工費(fèi)元620。004,826.76工長(zhǎng)工時(shí)38。009.87375。06高級(jí)工工時(shí)186.009.321,733。52中級(jí)工工時(shí)309。007。222,230.98初級(jí)工工時(shí)87.005。60487.20(2) 材料費(fèi)裸銅線10M2元M44。006。706,225.16294.80鍍鋅螺栓m10-12*75套719。004。002,876.00封簽㎏11.0010.00110.00焊錫㎏9.007.5067.50塑料軟管㎏14。008.00112。00塑料脹管Φ6—8個(gè)384.000.0311。52dt-10個(gè)49.0011.00539.00電纜卡子個(gè)385。000.70269。50電纜吊掛套66.004。50297。00—-———其他材料費(fèi)36%4,577。321,647。84(3)機(jī)械使用費(fèi)309。06汽車(chē)起重機(jī)5t臺(tái)時(shí)2.0066。87133.74電焊機(jī)25kvA臺(tái)時(shí)1.0013。0513.05載重汽車(chē)5t臺(tái)時(shí)2。0055。38110。76其他機(jī)械費(fèi)20%257。5551.512 其他直接費(fèi)11,360984.1%465。803 現(xiàn)場(chǎng)經(jīng)費(fèi)4,8267640%1,930.70二 間接費(fèi)4,826.7645%2,172。04三 企業(yè)利潤(rùn)15,929.527%1,115.07四 材料調(diào)差——-五 稅金17,044.593。22%548。84合計(jì)17,593.43安裝工程單價(jià)表電纜安裝定額編號(hào):06012施工方式:1kV以下電力電纜編號(hào) 名稱(chēng)單位數(shù)量單價(jià)(元)單位:KM合計(jì)(元)— 直接工程費(fèi)1 直接費(fèi)(1) 人工費(fèi)元元元1,211。0023,109。7518,578。529,423。77工長(zhǎng)工時(shí)73。009。87720.51高級(jí)工工時(shí)363。009.323,383.16中級(jí)工工時(shí)605.007。224,368.10初級(jí)工(2)材料費(fèi)10M2元M170。0078。005。606.70952。008,536.63522.60鍍鋅螺拴m10-12*75套578.004.0002,312。00封鉛㎏24。0010。00240。00丁腈橡膠管Φ13Φ17M78。007.80608。40塑料脹管Φ6—8個(gè)38。000。031。1420*40M卷21。007。00147。00環(huán)氧樹(shù)脂610#㎏19。0021.00399.

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論