



下載本文檔
版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、建筑裝飾工程施工合同Contract發(fā)包方(簡(jiǎn)稱甲方)PartyA:承包方(簡(jiǎn)稱乙方):上海巧點(diǎn)裝飾設(shè)計(jì)有限公司PartyB:i-pointdesign(InspirationPointDesign)依照,以及其他有關(guān)法律法例規(guī)定的原則,聯(lián)合本工程的詳細(xì)情況,甲、乙雙方在相同、自覺(jué)、磋商一致的基礎(chǔ)上達(dá)成以下協(xié)議,共同恪守Accordingto:“PRCContractLaw”,“LawontheProtectionofConsumerInterests”,“PRCPriceLaw”,SupervisionofContractTerms”,“ShanghaiConstructionMarketM
2、anagementRegulations”,aswellasother“Shanghlawsandregulationsrelevanttothespecificcircumstancesofthisproject,partiesAandBhaveherebyequallyandvoluntarilyenteredintothefollowingagreementexecutedonthebasisofmutualrespect.一、大體OVERVIEW甲方裝飾物業(yè)系合法物業(yè)PartyAistheowneroftheproperty.乙方為本市經(jīng)工商行政管理機(jī)關(guān)贊同登記,并可從事裝潢裝飾的公司
3、PartyBisapprovedandregisteredwiththecityindustrialandcommercialadministrativeorgansasanenterpriseengagedinrenovationanddecoration.裝飾施工地址Constructionsite:4.建筑構(gòu)造:建筑面積平方米,施工面積平方米。Constructionarea:totalarea(includingstairwellsandothercommonareas):m2,privatelivingarea:m2.裝飾施工內(nèi)容:住處裝飾,詳見(jiàn)附件一Structure:reside
4、ntial.承包方式:詳見(jiàn)附件一Contractorengagementmethod:Seeannex(quotation).7.總價(jià)款:.00元,大寫(xiě)(人民幣):元整。Totalprice:.00RMB;inwords:元整.Anychangesinthispricemustbeagreedbybothpartiesinwriting.8.工期:自年代日動(dòng)工,至乙方委派現(xiàn)場(chǎng)施工監(jiān)理為Period:Start:(year)(month)Totaldays(excludingnationalholidays):年代日前竣工,工時(shí)總計(jì)天,不含國(guó)家法定節(jié)假日先生,聯(lián)系方式:(day);Complet
5、ionbefore:(year)(month)(day);days.PartyBsonsiteconstructionsupervisorwillbe:,二、對(duì)于工程付款及結(jié)算的約定TERMSOFPAYMENT工程款的付款方式以下Thepaymentscheduleshallbeasfollows:付款時(shí)間款時(shí)間Amount(RMB)付TimingofPayments合同簽訂后60%Afterthecontractissigned.油漆工進(jìn)場(chǎng)前30%Whenhalfoftheprojectperiodtimehaselapsed.家具、燈具進(jìn)場(chǎng)前5%Furnitureoflampsandlan
6、terns,beforetheapproach查收合格后,五天內(nèi)5%UponAcceptanceofthecompletionoftheproject.增加工程項(xiàng)目100%Projectchanges.簽訂工程項(xiàng)目改正單100%Dateofsigningfortheprojectchange.空調(diào)工程項(xiàng)目100%Airconditioningproject家具工程項(xiàng)目100%Furnitureengineering三、對(duì)于資料供應(yīng)的約定AGREEMENTONTHESUPPLYOFMATERIALS乙方供應(yīng)的資料:乙方供應(yīng)的資料、設(shè)施,如不符合設(shè)計(jì)、施工要求,應(yīng)禁止使用。如已使用,對(duì)工程造成的損
7、失由乙方負(fù)責(zé)。如甲方要另增加資料由甲方供應(yīng),并應(yīng)符合以下規(guī)定:MaterialprovidedbyPartyB:AnymaterialsorequipmentsuppliedbyPartyBwhichdonotmeetthedesignandconstructionrequirementsareprohibited.AnyextramaterialsrequestedbyPartyAwhichwerenotintheoriginaldesignmustbepaidforbyPartyA.甲方供應(yīng)的資料:另擬補(bǔ)充附件甲方負(fù)責(zé)采買供應(yīng)的資料、設(shè)施,應(yīng)符合設(shè)計(jì)施工要求的合格產(chǎn)品,并應(yīng)準(zhǔn)時(shí)供應(yīng)到現(xiàn)場(chǎng)。
8、乙方發(fā)現(xiàn)甲方供應(yīng)的資料、設(shè)施有質(zhì)量問(wèn)題或規(guī)格差異,應(yīng)及時(shí)向甲方提出,甲方仍要求使用的,由此造成工程損失,責(zé)任由甲方肩負(fù)。甲方供應(yīng)的資料準(zhǔn)時(shí)到達(dá)現(xiàn)場(chǎng)后,由乙方負(fù)責(zé)保存MaterialprovidedbyPartyA:(seetheannex:“TableofMaterialstobeprovidedbytheOwnerIfPartyAacquiresmaterialsfortheproject,itshouldfirstcheckwithPartyBthatthematerialsmatchtothedesignrequirements,andoncethematerialsareintheca
9、reofPartyB,thenPartyBisresponsibleforthematerials.IfPartyArequiressomematerialswhichdonotfittothedesignthenitshallbetheresponsibilityofPartyAtopayanyadditionalcostsincurredbyPartyB.四、對(duì)于工程質(zhì)量及查收的約定”).FULFILMENTOFTHISAGREEMENT1.本工程應(yīng)符合和市建設(shè)行政主管部門(mén)制定的其他地方標(biāo)準(zhǔn)質(zhì)量評(píng)定查收標(biāo)準(zhǔn)Theexecutionofthisprojectmustbeconsistentw
10、iththe“ArchitecturalandEngineeringRules”ofthecityadministrativedepartmentsresponsibleforthedevelopmentofbuildingsandlocalstandardsandqualityevaluationacceptancecriteria.本工程由乙方進(jìn)行設(shè)計(jì),供應(yīng)施工圖紙一式兩份,雙方署名確認(rèn)PartyBmustprovideaduplicatecopyoftheconstructiondesignsanddrawings,andbothcopiesshouldbesignedbybothpar
11、ties.甲方供應(yīng)的資料、設(shè)施質(zhì)量不合格而影響工程質(zhì)量,其返工花銷由甲方肩負(fù),工期相應(yīng)順延IfmaterialsprovidedbyPartyAfortheconstructiondonotmeetthenecessaryrequirements,PartyAshallbearresponsibilityforanyresultingdelaysinthecompletionintheproject.4.由于乙方原因造成質(zhì)量事故,其返工花銷由乙方肩負(fù)IfthequalityofPartyBsworkresultsinanyaccidents,theliabilityforsuchacciden
12、tsshallbethe5.responsibilityofPartyB.后,方能進(jìn)行該項(xiàng)目的施工、因此影響工程竣工日期的,責(zé)任由甲方肩負(fù)。凡甲方私自與施工人員約定改正施工內(nèi)容、增加施工項(xiàng)目所惹起的所有結(jié)果,甲方自負(fù),給乙方造成損失的,甲方應(yīng)予賠償If,duringtheconstruction,PartyAwishestoproposeachangetothedesign,heshouldsigna“ChangeofProject”withPartyBandmustassumeresponsibilityforresultingdelaysorincreaseincosts.IfPartyA
13、secretlyattemptstochangetodesigndirectlywiththeconstructionpersonnelandthisactioncauseslosstoPartyB,thenPartyAmustcompensatePartyBforthisloss.工程查收:乙方負(fù)責(zé)理隱蔽工程和中間工程的檢查與查松手續(xù)。由乙方組織特地人員進(jìn)行查收。所有理隱蔽工程和中間工程的質(zhì)量由乙方負(fù)責(zé)Thestandardofwork.ItistheresponsibilityofPartyBtomakesurethatallconstructionworksarecarriedoutto
14、therequirementsofthedesignandtomakesurethatallinternalwallsandhiddenconstructionpartsaretotherequiredstandard.工程竣工:乙方竣工后即應(yīng)通知甲方查收,甲方應(yīng)在竣工當(dāng)日組織查收,并辦理查收移交鋒續(xù),雙方簽。假如甲方在規(guī)準(zhǔn)時(shí)間內(nèi)不可以組織查收,須及時(shí)通知乙方,另定查收日期。如經(jīng)過(guò)竣工查收,甲方應(yīng)認(rèn)同原竣工日期,并肩負(fù)因此造成的乙方的看守花銷和其他有關(guān)花銷Projectcompletion.PartyBmustnotifyPartyAwhentheprojectiscompleteandrea
15、dyforinspectionbyPartyA.Afterinspectionbothpartiesmustsignan“EngineeringQualityAcceptance”document.IfPartyAisnotavailabletoinspecttheconstructionsiteonthecompletiondate,hemustnotifyPartyBofthesoonestavailabledate.WherePartyAisnotavailableonthecompletiondatetoretakecustodyofthelocation,hemustpayanyex
16、tracostsincurredbyPartyB.8.工程保修期一年。工程竣工查收后甲、乙雙方簽訂,憑保修單推行保修,保修期一年,從竣工查收簽章之日起算Oneyearwarranty.Aftercompletionoftheworkandsigningofthe“SingleWarranty”,thereshallbeaoneyearwarrantyontheconstruction.五、有關(guān)安全生產(chǎn)和防火的約定SAFEPRODUCTIONANDFIREREGULATIONS1.施工圖紙和施工說(shuō)明應(yīng)符合防火防事故的要求,主要包括電氣線路等管道暢達(dá)、合格。乙方在施工中應(yīng)采用必要的安全防范和消防措
17、施,保障作業(yè)人員及相鄰關(guān)系的安全,防范相鄰單位的管道擁堵、滲漏水、停電、物品破壞等事故發(fā)生Constructiondrawingsandconstructionmustbeinlinewithfirepreventionregulations,andaccidentpreventionrequirements.Thisincludeselectricalcircuitsandpipelines.PartyBshalltakemeasurestoensurethesafetyofworkersandneighborsattheconstructionssiteandmustpreventleak
18、ageofwater,interruptionsofpoweranddamagetoproperty.施工中凡波及改變房子構(gòu)造,拆、改承重墻,加大樓(地)面荷載,由甲方向物業(yè)管理部門(mén)提出申請(qǐng),經(jīng)所在地建設(shè)行政主管部門(mén)贊同后方能施工Anychangestothehousingstructureordemolitionoralterationtoloadbearingwallsorincreaseinfloorloadmustfirstbeapprovedbythebuildingpropertymanagementbeforeconstructionbegins.雙方款項(xiàng)來(lái)往均應(yīng)出具正規(guī)收據(jù)和發(fā)
19、票,以備檢驗(yàn)和結(jié)算Bothpartiesmustprovidemoneyexchangereceiptsandinvoices.六、其他事項(xiàng)OTHERMATTERS1.甲方工作PartyA甲方應(yīng)在動(dòng)工前確認(rèn)施工圖紙并騰出足夠的施工空間,以除掉影響施工的阻攔物。甲方向乙方供應(yīng)施工需用的水、電等必備條件,并說(shuō)明使用注意事項(xiàng)WhenPartyAconfirmsthepre-constructionandconstructiondrawings,hemustalsomakesurethereissufficientspaceavailableattheconstructionsiteforconstr
20、uctiontotakeplace.PartyAmustmakesurethatPartyBhaseverythingnecessaryonsiteforcompletionoftheconstruction,particularlyelectricityandwater.做好施工中因臨時(shí)使用公用部位操作影響鄰居關(guān)系等的協(xié)調(diào)工作PartyAmusttakecareofthepublicrelationsintheconstructionsiteareaneighbors.particularlywiththe2.乙方工作PartyB1.參加甲方召集的現(xiàn)場(chǎng)交底PartyBmustbeavaila
21、bletoattendmeetingsorganizedbyPartyA.2.乙方按要求組織施工,保質(zhì)、保量、如期達(dá)成施工任務(wù)PartyBmustfollowtheconstructionplans,andtheconstructionmustbedurable,andmustmeetthescheduledcompletiondate.七、違約責(zé)任LIABILITYFORBREACHOFCONTRACT由于甲方原因以致緩期動(dòng)工或中途歇工,工期順延IfPartyAcausesanydelaystothecompletionofthisproject,thenthescheduledcomple
22、tiondateshouldbeadjustedaccordingly.2.由于乙方原因逾期竣工的,每逾期一天,乙方向甲方支付工程造價(jià)0.1(大寫(xiě):千分之一)的違約金IfPartyBcausesanydelaytothecompletionofthisproject,thenPartyBmustpaytoPartyAafeeof0.1(inwords:1/1000)ofthetotaloverallprojectfeeforeachdaybeyondthescheduledcompletiondate.甲方未辦理有關(guān)手續(xù),強(qiáng)行要求乙方拆改原有建筑承重構(gòu)造及共用設(shè)施管線,由此發(fā)生的損失或事故(包
23、括罰款)由甲方負(fù)責(zé)并肩負(fù)責(zé)任IfPartyAinstructsPartyBtomakeanyalterationstoaloadbearingwallandPartyAhasnotsoughtandreceivedpermissionfromthebuildingpropertymanagement,PartyAshallberesponsibleforanyresultingcostsandshallindemnifyPartyBforanyadditionalexpensesincurred.乙方私自拆改原有建筑承重構(gòu)造或共用設(shè)施管線,由此發(fā)生的損失或事故(包括罰款),由乙方負(fù)責(zé)并肩負(fù)責(zé)任
24、IfPartyBmakesanyunauthorizedchangestoloadbearingwallsorbuildingpipelinesandsuchchangesresultindamagesorloss,itshallbetheresponsibilityofPartyBtopayforsuchloss.5.工程未辦理查收、結(jié)算手續(xù),甲方提早使用或私自動(dòng)用工程成品由此造成無(wú)法查收和損失的責(zé)并肩負(fù)責(zé)任,由甲方負(fù)PartyAshallberesponsibleforanyextracostsincurredduetohisuseofthepropertybeforethefinalco
25、mpletionmeetingandsigningofthe“EngineeringQualityAcceptancedocument”.八、糾葛辦理方式DISPUTES因工程質(zhì)量雙方發(fā)生爭(zhēng)議時(shí),憑本合同文本向有關(guān)行業(yè)協(xié)會(huì)申請(qǐng)調(diào)停,也可向所在區(qū)、縣建設(shè)行政主管部門(mén)或花銷者協(xié)會(huì)投訴Ifthereisadisputebetweentheparties,thiscontractshouldbesubmittedtotherelevanttradeassociationformediationandalsotothehostdistrictandcountybuildingdepartmentsinc
26、hargeofadministrativecomplaints,ortoconsumerassociations.2.當(dāng)事人不愿經(jīng)過(guò)磋商、調(diào)停解決、或磋商、調(diào)停不可以時(shí),可以依照本合同約定向仲裁-人民法院提起訴訟-上海仲裁委員會(huì)申請(qǐng)if,afternegotiation,mediationand/orconsultation,thepartieshavefailedtoreachanagreement,thenthedisputeshouldbe:submittedtothe-ShanghaiArbitrationCommission-filedasalawsuit.九、合同改正和消除AMENDMENTANDTERMINATION1.合同經(jīng)雙方署名見(jiàn)效后,雙方必定嚴(yán)格恪守。任何一方要求改正合同內(nèi)容或消除合約,由雙方磋商解決,經(jīng)雙方署名確認(rèn)后見(jiàn)效Afterthiscontractissigneditmustbestrictlyadheredto.Afterthecontractissigned,neitherpartycanleavethecontractwithoutagreementoftheotherparty.2.本合同簽訂后,工程不得轉(zhuǎn)包Afterthiscontractissigned,theprojectsha
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年中考語(yǔ)文一輪復(fù)習(xí):小說(shuō)中的環(huán)境描寫(xiě)知識(shí)點(diǎn)及訓(xùn)練
- 2025年中考語(yǔ)文一輪復(fù)習(xí):古詩(shī)詞閱讀重點(diǎn)考點(diǎn)解讀 講義
- 廣東省廣州市藝術(shù)中學(xué)2024-2025學(xué)年高一上學(xué)期期末考試數(shù)學(xué)試卷(解析版)
- 屏蔽機(jī)房施工方案模板
- 基礎(chǔ)分部工程施工方案
- 室外大棚導(dǎo)線施工方案
- 2025年葡語(yǔ)語(yǔ)音考試題及答案
- 6個(gè)月寶寶早教兒歌
- 低分子量聚丙烯酸對(duì)卡波姆樹(shù)脂的影響
- 4年級(jí)下冊(cè)人教版要寫(xiě)的字第三課
- GB/T 3683.1-2006橡膠軟管及軟管組合件鋼絲編織增強(qiáng)液壓型規(guī)范第1部分:油基流體適用
- 探究反應(yīng)后溶液中的溶質(zhì)
- 景觀照明燈具技術(shù)規(guī)格標(biāo)準(zhǔn)附詳圖參考
- 《簡(jiǎn)·愛(ài)》外國(guó)小說(shuō)閱讀,初中語(yǔ)文下冊(cè)名著閱讀精講課件(部編版)
- 滬教版高一英語(yǔ)上冊(cè)(牛津版)全冊(cè)課件【完整版】
- 疾控中心考試試題
- 2023門(mén)球競(jìng)賽規(guī)則電子版圖文并茂
- DB13T 2801-2018 水利工程質(zhì)量監(jiān)督規(guī)程
- Q∕SY 05262-2019 機(jī)械清管器技術(shù)條件
- 耳鼻咽喉頭頸外科學(xué)耳鼻咽喉應(yīng)用解剖
- 科學(xué)研究方法與學(xué)術(shù)論文寫(xiě)作
評(píng)論
0/150
提交評(píng)論