1、 An outline of: Lean Thinking Banish Waste and Create Wealth in Your Corporation By James P. Womack and Daniel T. Jones New York, NY: Free Press, Simon & Schuster, Inc., 1996, Second Edition, 2003 Preface to the 2003 Edition. Forecasts are always wrong. That is why lean thinkers strive to reduce

2、 order-to-delivery time. During the 2002 meltdown, this 1996 book went back on the Business Week bestseller list. We have added what we have learned since 1996 in this edition. Lean Thinking is more relevant today. Lean ideas are the single most powerful tool available for creating value and elimina

3、ting waste in any organization. Part I: Lean Principles Taiichi Ohno (1912 1990), a Toyota executive, identified seven types of waste found in any process: Transportation. Unnecessary transport of parts under production. Inventory. Stacks of parts waiting to be completed or finished products waiting

4、 to be shipped. Motion. Unnecessary movement of people working on products. Waiting. Unnecessary waiting by people to begin the next step. Over-Processing the product with extra steps. Over-Production of products not needed. Defects in the product. We have added an eighth waste: goods and services t

5、hat do not meet the customers needs. Other authors have added: underutilization of people Lean Thinking is the antidote to waste. There are (5) Lean Principles: Specify Value. Value can be defined only by the ultimate customer. Value is distorted by pre-existing organizations, especially engineers a

6、nd experts. They add complexity of no interest to the customer. Identify the Value Stream. The Value Stream is all the actions needed to bring a product to the customer. If the melter, forger, machiner, and assembler never talk, duplicate steps will exist. Flow. Make the value-creating steps flow. E

7、liminate departments that execute a single-task process on large batches. Pull. Let the customer pull the product from you. Sell, one. Make one. Pursue Perfection. There is no end to the process of reducing time, space, cost and mistakes. Lean is doing more with less. Use the least amount of effort,

8、 energy, equipment, time, facility space, materials, and capital while giving customers exactly what they want. The Prize We Can Grasp Now. Converting a batch-and-queue system to continuous flow, with pull, will: Double labor productivity Cut throughput time by 90% Reduce inventory by 90% Cut errors

9、 by 50% Cut injuries1: Value A House or a Hassle-Free Experience? Doyle Wilson Homebuilder found that customers “valued” a hassle-free design process and on-time delivery. All his processes were then re-aligned to meet this goal. Define Value in Terms of the Whole Product. As the product flows, each

10、 firm defines value differently. Think of air travel. Each firm agent, airline, taxi, currency exchange, customs, immigration defines their own priorities, duplicates efforts, and works in disharmony with the whole process. The customer is not satisfied. 2: The Value Stream The View from the Aisle.

11、A value stream “map” identifies every action to design, order, and make a specific product. Each step is then sorted into three categories: (1) those that add value, (2) those that add no value but are currently necessary, and (3) those that add no value and can be eliminated. After the third catego

12、ry has been eliminated, the second category should be addressed through flow, pull, and perfection techniques. The Value Stream for a Carton of Cola. The British grocery chain Tesco retails products with thousands of value streams. In the canned cola value stream, three hours of value-added activity

13、 take 319 days to perform. 3: Flow The World of Batch-and-Queue. Five-sixths of home-building is waiting for the next set of specialists or rework. Flow principles typically cut half the effort and the time required. The Techniques of Flow. The 1st step is to maintain focus on the product. The 2nd s

14、tep is to ignore job boundaries and departments IOT remove impediments to continuous flow of the specific product. The 3rd step is to rethink work practices to eliminate backflow, scrap, and stoppages IOT make the product continuously. Takt time synchronizes the rate of production to the rate of sal

15、es. (48) bikes per day sold divided by (8) hours of production = (6) bikes and hour, or (1) bike every ten minutes. Flow requires all workers and machines to be capable at all times. This requires cross-training. Flow requires workers to know the status of production at all times. This requires visu

16、al controls. All activities can flow. Concentrate on the value stream for a specific product, eliminate organizational barriers, and relocate and right-size tools. 4: Pull Pull means that no one upstream should produce anything until the customer downstream asks for it. “Dont make anything until it

17、is needed, then make it very quickly.” “Sell one, buy one.” “Ship one, make one.” The Bad Old Days of Production. The Toyota bumper replacement system suffered long lead times. The ability to get parts quickly from the next upstream producer enabled re-orders in small amounts. This is the secret to

18、reducing inventory. Cut lead times and inventories. Demand should instantly generate new supply. 5: Perfection The Incremental Path. Freudenberg-NOK, a gasket manufacturer, improved a single process six times in three years. “Why didnt they get is right the first time?” Because perfection is continu

19、ous. Continuous Radical and Incremental Improvement. If you are spending capital, you are doing it wrong. Once leaders understand the first four lean principles value specification, value stream identification, flow, andpull their perfection step starts with policy: a vision of the ideal process, an

20、d the step-wise goals and projects to get there. Transparency is everything. Everyone must know what you are attempting to achieve and what area is the first priority. The force behind this is the leader known as the change agent. Part II: From Thinking to Action: The Lean Leap 6: The Simple Case La

21、ntech manufacturers stretch wrap machines. “Process Villages” Sawing department, Machining department, Welding department, Painting department, and Sub-assembly department all generated long lead times. Batches of ten were manufactured to ship one. Inventory overwhelmed the factory. Order changes cr

22、eated havoc in the plant. “The more inventory you have, the less likely you will have the part you need.” The Lean Revolution. Ron Hicks leaned Lantech. He created four cells, one for each product. He defined standard work: on time, on spec, every time. Takt time was introduced: number of products n

23、eeded per day divided by number of hours (8/8 = 1 hour). He right-sized machines to fit inside work cells. He implemented quick changeover to make multiple different parts with little machine downtime. Result. Lantech cut 30% excess space, doubled product output, cut defects from 8 per product to 0.

24、8 per product, and cut lead time from sixteen weeks to fourteen hours. On-time shipping rose from 20 to 90%. 7: A Harder Case The Change Agent. Art Byrne was hired as CEO of Wiremold in 1991. “CEOs are timid to change the shop floor.” Byrne led lean training using a manual he wrote himself. He led t

25、ours of the plant to observe waste that his managers were now able to see. Improvements Must be Fast. Three days was Byrnes standard. Post a Scorecard for Each Product Team. Wiremold tracked: Productivity sales per employee, Service percent delivered on-time, Inventory turns, and Quality mistakes. T

26、each People How to See. Create a lean training function. Teach all employees the five principles of lean: Value, Value Stream, Flow, Pull, and Perfection. Teach all employees lean techniques: standard work, takt time, visual control, pull scheduling, and single-piece flow. Results. Wiremold freed 50

27、% factory floor space, eliminated a warehouse, and converted $11M of inventory into $24M in sales. Lead time fell from four weeks to two days. 8: The Acid Test Pratt & Whitney (P&W). In 1991, CEO Karl Krapek and cost-cutter Mark Coran leaned P&W. Jet Engines. Founded in 1860, P&W led

28、 the aircraft engine business by 1929. When they abandoned piston engines to gamble on jets in 1946, business soared. Production inefficiencies were overlooked. Overcapacity. Faced with competition in the 1980s, P&W rationalized plant layout and addressed development costs. They needed lower pro

29、duction costs and flexibility to react to customer needs. Why did P&W need so much space, tools, inventory and people to get so little done? Daily output of engines and spare parts could fit inside CEOs office. Failure to manage assets. P&W cut people, cut managers, and overhauled their enti

30、re production culture and processes. The Monument of all Monuments. A “monument” is a machine or process too big to be moved and whose scale requires operating in batch mode. Monuments are evil, generating huge amounts of waste. P&W had an $80M grinding system, representing obsolete thinking. Al

31、though speeding up grinding from 75 minutes to 3 minutes and eliminating multiple manual grinding jobs, in actuality grinding jobs took longer (due to eight-hour changeovers and batch scheduling), and required more people (22 computer technicians). P&W retired the $80M monument, returned to 75-m

32、inute production.9: Lean Thinking versus German Technik Porche. Chairman Wendelin Wiedeking introduced lean thinking to Porche. In 1994, the first-ever Porsche rolled off the line with nothing wrong with it. Engineers. Porche is led by engineers, intrigued with unique solutions that are difficult to

33、 manufacture. Workers are craftsmen. Unfortunately, much craftsmanship is waste. Tinkering with the product repairing and polishing raw materials, troubleshooting, re-assembling elements, repainting and re-fitting were thought to be necessary activities to produce a high-quality product. Crisis. 198

34、6 was the boom year. 1992 was the crash. Porche products were too expensive. Costs and throughput time had to be slashed. New quality focus: “Stop fixing mistakes that should never have been made.” Reduction in inventory: “Where is the factory? This is the warehouse!” Just-in-Time (JIT) Game. Porche

35、 asked all their suppliers to play a simulation to learn lean concepts. Lean concepts were critical across all firms contributing to the Porche value stream. The Remarkable Lean Transition at Porche. In five years, through 1997, Porch doubled its productivity, cut manufacturing space in half, cut le

36、ad time for a finished vehicle from six weeks to three days, cut supplier defects 90%, cut inventories 90%, and cut first-time-through errors by 55%. The German Tradition. The Germans need to stop prioritizing the engineers definition of value, “voice of the engineer,” over the customers definition

37、of value, “voice of the customer.” A German weakness is a fondness for monster machines that produce large batches: paint booths are an example. Variety and Refinement Cost. Volkswagen makes four exterior mirrors, nineteen parts each, in seventeen colors. Nissan has four-part mirrors in four colors.

38、 Excess variety often exceeds the ability of the customer to notice, and his willingness to pay. 10: Mighty Toyota; Tiny Showa Showa has been transformed by its relationship with Toyota. Showa, a radiator manufacturer, had “Process villages” for casting, cleaning, stamping, welding, painting and ass

39、embly. Each was run in batch mode with long intervals between tool changes. Mountains of parts were transported and stored between steps. The Initial Struggle. Taiichi Ohno, lean advisor, promised to reduce three months of inventory to three days, double labor productivity, and halve plant space for

40、 zero capital investment. This he did. The Final Element: Rethinking Order-Taking and Scheduling. Showa then leaned order-taking by scheduling backwards, working to takt time, to synchronize orders with production slots, exactly four days before shipment time. Orders with incorrect information were

41、never passed along. Toyota Today. Lesson: high-tech automation only works if the plant can run at 100 percent output and if the cost of indirect technical support and high-tech tools is less than the cost of direct labor saved.Part III: Lean Enterprise 11: A Channel for the Stream; a Valley for the

42、Channel The Lean Enterprise. No one watches the performance of the whole value stream. Identify all actions to bring a product to the customer, across all firms. There is no privacy. Each firms costs become transparent. 12: Dreaming About Perfection Long-Distance Travel. Each organization ignores th

43、e role of the other parties. The time, cost, and comfort of the total trip are key performance measures. What would travel times be without queues?Construction. 80% of home building is hurry-up and wait, then re-working the construction errors. The Prize We Can Grasp Right Now. Lean thinking can boo

44、st productivity while reducing errors, inventories, accidents, space requirements, production lead times, and costs in general. Lean thinking requires little capital.Part IV: Epilogue 13: A Steady Advance of Lean Thinking This chapter an updated review of Wiremold, Toyota, Porsche, Lantech, and Prat

45、t & Whitney. 14: Institutionalizing the Revolution An Enhanced Action Plan is the 2003 update to the 1996 plan from Chapter 11. Getting Started Months 1 6 Find a Change Agent with ability and authority. Get the Knowledge through an advisor. Start at the big picture before addressing small steps.

46、 Seize a Crisis or create one. Focus on fixing an obvious problem. Small wins. Dont spend money. Map your current value streams. Managers need to see. Map also the flow of information going upstream to create a closed circuit. See Rother and Shook, Leaning to See, 1998. Analyze each step of the Curr

47、ent State. Does this step create value? Is this step capable, available, flexible? Is capacity sufficient? Excessive? Does the information flow from the customer smoothly? Every process has a box score: total lead time, value creating time, changeover time, uptime, rework, inventory, every part made

48、 every x minutes. If this step went away, what would happen? Envision the Future State. Draw it. Begin as soon as possible with an important, visible activity. Convert managers with hand-on activity. Demand Immediate Results. Everyone should see results which create psychological momentum. One week:

49、 less planning, more doing. Identify the waste and remove it. Communicate with your people by showing results at the scene of action. Creating an Organization to Channel Your Streams Months 6 24 Reorganize Your Firm by product and value streams. Put a Change Agent in charge of each product. Create a

50、 Lean Promotion Team. Deal with Excess People Early. Devise a Growth Strategy. Remove the Anchor Draggers. When Youve Fixed Something, Fix It Again. New: Convince Your Suppliers and Customers to Take the Steps Just Described. Install Business Systems to Encourage Lean Thinking Months 24 48 Create ne

51、w ways to keep score. Create new ways to reward people. Make everything transparent so everyone can see progress. Teach lean. Learn lean. Right-size Your Tools to insert directly into the value stream. Large and fast is more efficient but less effective. This wrong assumption is the cornerstone of b

52、atch-and-queue thinking. Pay a bonus. Tie bonus amount to the profitability of the firm. Completing the Transformation Months 48 60 Convert to bottom-up initiatives. Lean ideas are democratic and not top-down. Layers of management can be stripped away. New: Convert From Top-Down Leadership to Bottom

53、-Up Initiatives. Toyota gets brilliant results from average managers using brilliant procedures. Competitors get mediocre results from brilliant managers using mediocre procedures. Dont search for brilliant managers. Perfect your processes. Reviewers Comments In 1988 James Womack first described Toy

54、ota as a “l(fā)ean” corporation. Womack and co-writer Daniel Jones described the Toyota Production System (TPS) in The Machine That Changed the World. In 1990, the two toured companies in Europe, North American, and Japan presenting ideas on how to convert mass production practices to lean practices. Le

55、an Thinking, first published in 1996, is a survey of the lean movement. It clearly describes the waste found in mass production, explains the five principles of lean thinking, and then draws lessons from real companies who have successfully implemented lean ideas. Lean Thinking is not a technical ho

56、w-to text on production, but an enlightened overview of top-level lean ideas and applications. This updated edition includes lessons that the authors have collected between 1996 and 2003, especially the concept of a lean enterprise a collection of companies working lean together to produce a single

57、product with the least wasted effort and capital. The book is well-written, researched, and organized, and the authors make a strong case that lean is universal and will benefit any organization in any endeavor. Lean thinking and practices are the single most powerful tool for eliminating waste in a

58、ny organization. 中文翻譯 概述精益思想去除浪費(fèi),并在貴公司創(chuàng)造財(cái)富由詹姆斯P.沃麥克和丹尼爾T.瓊斯紐約編寫,紐約:自由出版社,西蒙與舒斯特公司,1996年。第二版,2003年。 2003年版序。預(yù)測(cè)永遠(yuǎn)是有錯(cuò)誤的。這就是精益思想家努力減少訂單到交貨的時(shí)間原因。在2002年的危機(jī)中,這個(gè)1996年出版的書出現(xiàn)在“商業(yè)周刊”暢銷書排行榜上。我們已經(jīng)在這個(gè)版本中添加了自1996年以來的所研究的內(nèi)容。精益思想更適合今天的世界。精益思想是用于創(chuàng)造價(jià)值和消除浪費(fèi)最有力的工具。第一部分:精益原則大野耐一(1912 - 1990),豐田執(zhí)行,在所有生產(chǎn)過程中發(fā)現(xiàn)并確定了七個(gè)的浪費(fèi)類型:運(yùn)輸。生

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論